- Form Khor.3
- Copy or picture dedicating the owner of building or the possessor of building
- Consent letter from the owner of building (in case the possessor is the applicant)
- Certificate or license for changing of building usage in total of …… set (only in case the
applicant had already received the certificate or the license for changing of building usage)
- Copy of registered certificate, objectives and authorized person of the applicant which is
issued no later than six months
- Letter dedicating manager or representative who is operator of juristic person
- Area Plan, diagram and specification in total of …… set, each ……. pages
- One set of calculation in total……..pages (only in case the changing of building usage leads
to more load on building floor than being early permitted)
- Consent letter and confirming of designer and building calculator in total ……. set
including the copy or picture of license of who has License for Professional Engineer Practice
in total ……. set (in case the building having sort, size is under the Professional Engineer
Practice)
- Other documents (if any)
Fee: 20 THB
Inspection Fee: Not exceeding 4 THB/ Square meter of area plan
- Form Khor.6
- Copy or picture dedicating the owner of building or the possessor of building
- Consent letter from the owner of building (in case the possessor is the applicant)
- Copy of registered certificate, objectives and the authorized person of the applicant which is
issued no later than six months
- Letter dedicating manager or representative who is operator of juristic person
- Copy or picture of construction license, renovation license or relocation license of building,
as the case may be.
- Confirmation letter of supervisor dedicating control of …………………. of building is in
compliance with permission.
- Other documents (if any)
Fee: 20 THB
For hotel business license (in case of juristic person) at Service Center, Department of
Provincial Administration, Ministry of Interior
- Copy of company affidavit (not late than 6 months until the filling date)
- Copy of identification card (authorized person of company)
- Power of attorney attached with stamp duty and identification card of the authorized person
(in case of giving other person to act on behalf of)
- Plan, diagram together with the lists of plan and diagram of hotel building which engineer
and architect who is given authorization to sign for acknowledgement
- Copy of certificate of ownership or documents showing land use right
- Copy of construction license (Aor.1) (in case the hotel is under the Building Control Act
B.E. 2522) (in case request for renovation or changing of building usage)
- Location of hotel
- Picture of building (in case of renovation or changing building usage)
- Report of Environmental Impact Assessment (EIA) as approved by specialist committee
This fee is calculated at the rate of 80 THB per room per annum of the existing room of the
hotel
EIA is required for hotel having more than 80 rooms or usage area more than 4,000 square
meters or higher than 23 meters pursuant to the ministerial regulation issued by Ministry of
Natural Resources and Environment
Report of EIA shall be provided by who is approved from relevant committee in making the
report of EIA (“Consultant”) and the Consultant lists are available in the website of Bureau.
The service fee for engaging Consultant to make report of EIA is depended on the negotiation
between both parties.
The documents in which the Consultant shall submit to the Bureau as follows;