DCS System
System Manual
(Version 1.2)
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Sep., 2014
Content
1. System introduction.......................................................................................................4
1.1. Hardware................................................................................................................4
1.1.1. Cane preparation house..................................................................................4
1.1.2. Dewatering control room.................................................................................4
1.1.3. Clarification and evaporation control room.....................................................4
1.1.4. Boiling control room.........................................................................................4
1.1.5. Recycling water pump control room................................................................4
1.1.6. Central control room........................................................................................5
1.2. HMI.........................................................................................................................5
1.2.1. Cane preparation.............................................................................................5
1.2.2. Extraction.........................................................................................................5
1.2.3. Dewatering......................................................................................................6
1.2.4. Air compression and steam cooling................................................................6
1.2.5. Clarification......................................................................................................7
1.2.6. Filtering............................................................................................................7
1.2.7. Evaporation.....................................................................................................8
1.2.8. Milk of lime house and chemical cleaning.....................................................9
1.2.9. A Sugar (No.1).................................................................................................9
1.2.10. A Sugar(No.2)................................................................................................10
1.2.11. A sugar (No.3)...............................................................................................10
1.2.12. water system..................................................................................................11
1.2.13. B seed pan.....................................................................................................11
1.2.14. B CVP............................................................................................................12
1.2.15. A B C Molasses.............................................................................................12
1.2.16. C seed pan....................................................................................................13
1.2.17. C sugar boiling..............................................................................................13
1.2.18. C magma crystallization................................................................................14
1.2.19. Sugar handling, drying and bagging.............................................................14
1.2.20. Recycling water pump...................................................................................15
2. System operation.........................................................................................................16
2.1. System start and shut down.................................................................................16
2.1.1. System start..................................................................................................16
2.1.2. System power off...........................................................................................19
2.2. Log on and athorizaition.......................................................................................22
2.3. Graphic System operation....................................................................................23
2.3.1. Introduction....................................................................................................23
2.3.2. Appearance of the cursor during process operation.....................................24
2.3.3. Overview area...............................................................................................25
2.3.4. Work area......................................................................................................26
2.3.5. Button area....................................................................................................26
2.3.6. Operation introduction about motor, Valve and other control unit................29
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
2.4. Alarm....................................................................................................................39
2.4.1. Alarm classification........................................................................................39
2.5. Archive and reports..............................................................................................40
2.5.1. Archive and print of process values..............................................................40
2.5.2. Archive and print for Operation records (Logs).............................................44
2.5.3. Archive and print for alarm message............................................................45
3. Troubleshooting...........................................................................................................45
3.1. No feeback on hierarchy area and system function button area.........................45
3.2. Licence error.........................................................................................................46
3.3. System restart while WinCC running....................................................................46
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
1. System introduction
1.1. Hardware
The hardware components of the DCS system includes UPS system, I/O control cabinets,
power distribution cabinets, servers, operation panels. These hardware are located in six
control rooms, cane preparation control room, dewatering control room, clarification and
evaporation control room, boiling control room, recycling water control room and central
control room.
Server SVR1,SVR2
Engineering station ENG1;
Operation station OP2901、OP2902、OP2903、OP2904
UPS and battery sets
Printer
1.2. HMI
Figure 1
1.2.2. Extraction
Control points of the diffuser(F1401)include running status of the diffuser, level control,
temperature control etc.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 2
1.2.3. Dewatering
The control points of the section include the running status of mill No.1 、 mill
No.2,lubration system and oil pump.
Figure 3
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 4
1.2.5. Clarification
The control points of the section include the level, temperature, pressure, flow , PH of the
equipments .the following is the HMI of this section.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 5
1.2.6. Filtering
The control points of the section include the running status , level, temperature about the
equipments of No filter cloth vacuum filter machine No.1 , No.2 and No.3, juice pump
No.1, No.2 and No.3,mud conveyor ect. The following is the HMI of this section.
Figure 6
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
1.2.7. Evaporation
The control points of this section include the temperature, level, pressure of evaporator
No.1 ,No.2,No.3, No.4,No.5 and No.6, the running status of steam condensate pump,
syrup balancing tank, and the temperature, level of other equipments of this section. The
following is the HMI of this section.
Figure 7
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 8
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 9
1.2.10. A Sugar(No.2)
The control points of this section include the level, brix, temperature, pressure, vacuum of
A sugar No.2. The following is the HMI of this section.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 10
1.2.11. A sugar (No.3)
The control points of this section include the level, brix, temperature, pressure, vacuum of
A sugar No.3. The following is the HMI of this section.
Figure 11
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 12
1.2.13. B seed pan
The control points of this section include the level, brix, temperature, pressure, vacuum of
B seed pan. The following is the HMI of this section.
Figure 13
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
1.2.14. B CVP
The control points of B CVP include the brix, state of input valves of the equipments. The
following is the HMI of this section.
Figure 14
1.2.15. A B C Molasses
The control points of ABC Molasses include the level ,temperature and the status of the
valves in raw sugar molasses and B&C molasses section. The following is the ABC
molasses HMI in this section.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 15
1.2.16. C seed pan
The control points of this section include the level, brix, temperature, pressure, vacuum of
C seed pan. The following is the HMI of this section.
Figure 16
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 17
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 18
1.2.19. Sugar handling, drying and bagging
The control points of the section include the running status of the equipments,
temperature, brix, level in this section. the following is the HMI of this section.
Figure 19
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 20
2. System operation
2.1. System start and shut down
2.1.1. System start
(1) Main distribution cabinet power on
Step 1:Main distribution cabinet power on(PWS20)
Switch on Q1 first,then switch on air-switch Q2, Q3, F1, F2, F3, F4, F5, F991, F992,
F993 in sequence.
Switch on Q1 first.
UPS power on
Switch on air switch Q4, F2, F3, F4, F5, F6, F991, F992, F993 in sequence.
Note, in addition to the malfunction of UPS, please switch off Q1 first, and switch on air-switch
Q2,F1,Q3,Q4,F2,F3,F4,F5,F6, F991,F992,F993, then the power supplied is not by UPS but bypass
circuit.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
The following step can be done accordingly after DCS main distribution cabinet powered
on.
Switch on air-switch F1, F2, F101, F102, F103, F104, F991, F992,F993 in sequence.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Switch on Q1 first, then switch on the air-switch F1, F2, F6, F7, F8, F9, F10, F11, F12,
F13, F14, F17, F18, F200, F201, F202, F203, F204, F205, F991, F992, F993 in
sequence
Step 2, I/O cabinet (RIO15A01) power on
Switch on air-switch F1, F2, F101, F102, F103, F104, F991, F992, F993 in sequence.
Switch on Q1 first, then switch on air-switch F1, F2, F11, F12, F13, F14, F15, F16,
F17, F18, F25, F200, F20, F202, F991, F992, F993 in sequence.
Switch on air-switch F1, F2, F3, F4, F5, F6, F101, F102, F103, F104, F991, F992,
F993 in sequence.
Switch on air-switch F1, F2, F3, F4, F101, F102, F103, F104, F105, F106, F107,
F991, F992, F993 in sequence.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Switch on Q1 first, then switch on air-switch F1, F2, F5, F6, F7, F8, F9, F10, F12, F13,
F17, F18, F200, F201, F202, F203, F204, F205, F206, F207, F208, F209, F210,
F211, F212, F213, F214, F215, F216, F217, F218, F219, F220, F221, F222,
F223,F224, F225, F226, F227, F228, F229, F230, F231, F232, F991, F992, F993 in
sequence.
Switch on air-switch F1, F2, F3, F4, F101, F102, F103, F104, F991, F992, F993 in
sequence.
Switch on air-switch F1, F2, F3, F4, F101, F102, F991, F992,F993 in sequence.
Switch on Q1 first,then switch on air-switch F1, F2, F101, F102, F103, F104, F991,
F992, F993 in sequence.
Note: There is no power distribution cabinet and operation station in this control room.
Press ' Deactivate' to exit the project in the pop-up box 'exit runtime' after single click
the icon (close process mode) of operation station (OP13A).
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Switch off the air-switch F1, F2, F101, F102, F103, F104, F991, F992, F993 in
sequence.
Step 3, Power distribution cabinet (PWS13A) power off
Switch off the air-switch F1, F3, F991, F992, F993 in sequence.
Switch off Q1.
Figure 21
Press ' Deactivate' to exit the project in the pop-up box 'exit runtime' after single click
the icon (close process mode) of operation station (OP1501,OP1502).
Shut down the computer (OP1501,OP1502) .
Switch off the air-switch F1, F2, F101, F102, F103, F104, F991, F992, F993 in
sequence.
Switch off the air-switch F1, F2, F101, F102, F991, F992,F993 in sequence.
Switch off the air-switch F1, F2, F6, F7 ,F8, F9, F10, F11, F12, F13, F14, F17, F18,
F200, F201, F202, F203, F204, F205, F991, F992, F993 in sequence.
Switch off Q1.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Switch off the air-switch F1, F2, F101, F102, F103, F104, F991, F992,F993 in
sequence.
Switch off Q1.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Switch off the air-switch F1, F2, F11, F12, F13, F14, F15, F16, F17, F18, F25,
F200,F201,F202,F99,F992,F993 in sequence.
Switch off Q1.
Switch off the air-switch Q2, Q3, F1, F2, F3, F4, F5, F991, F992, F993 in sequence.
Switch off Q1.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 22
It's easy to realize the fucntion of user access management, different users can be
authorized to different system application. There are two level role authorization in this
DCS system.
Administrator /Admin;
Operator
/OP13A、OP1501、OP1502、OP2101、OP2102、OP2401、OP2402、OP2901、OP29
02、OP2903、OP2904;
Authorization allocation:
Administrator:full privileges of monitoring, process control ,advanced process control for
all section.
Operator:Monitoring, process control for designated section
After single click icon of ,One can switch the role as the tips of the system login pop-
pu dialog box. The following is the login dialog box.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 23
Note:
Login name of operation station OP13A is ' OP13A ',the privilege of this user
is only designated for section of cane preparation section.
Login name of operation station OP1501 is ' OP1501 ' , the privilege of this
user is only designated for section of extraction, dewatering and air-pressure.
Login name of operation station OP1502 is ' OP1502 ' , the privilege of this
user is only designated for section of extraction and dewatering.
Login name of operation station OP2101 is ' OP2101 ' , the privilege of this
user is only designated for section of clarification, filtering, evaporation and milk
of lime.
Login name of operation station OP2102 is ' OP2102 ' , the privilege of this
user is only designated for section of clarification, filtering, evaporation and milk
of lim.
Login name of operation station of OP2401 is ' OP2401 ',the privilege of this
user is only designated for section of A sugar boiling No.1, A sugar boiling No.
2, A sugar boiling No. 3, B seed boiling, B CVP, C seed boiling, C CVP, ABC
molasses, sugar handling, drying and bagging, and recycling water.
Login name of operation station OP2402 is ' OP2402 ',the privilege of this
section is only designated for section of A sugar boiling No.1, A sugar boiling
No. 2, A sugar boiling No. 3, B seed boiling, B CVP, C seed boiling, C CVP,
ABC molasses, sugar handling, drying and bagging, and recycling water.
The privilege of OP2901 、 OP2902 、 OP2903 、 OP2904 is not control but
monitoring of all sections.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
The size of the user interface and the sizes of the three areas within it are specified by the
configuration. The overview area and button area are always displayed. The working area
displays message lists and individual process pictures that may have faceplates and
operator control windows superimposed for process control or dialog boxes superimposed
for system operator inputs. The button area consists of two sets of buttons. The operator
can switch from one set to the other. An additional button set is provided for operator
control of the message system.
Figure 24
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
2.3.3.Overview area
(1) Purpose of the overview area
The overview area provides the operator with a constant overview of the status of the
entire plant. The overview area is used for monitoring and fast detection of problems in
the various areas of the plant. The overview area is displayed in various layouts according
to the configuration. The operator can define an OS-specific layout in the OS project
editor. The illustrations in this description are based on the "SIMATIC standard 1024*768"
(standard resolutions up to 2560*1600 maybe selected).
Each plant area is represented by an area selection button in the overview area. If the
operator click on an area selection button, the corresponding process picture of the
highest picture hierarchy level is displayed in the working area. The message with the
highest priority is displayed in the overview area. If two messages have the same priority,
the latest one is displayed.
plant area made between the following message states in the group
display: A = Alarm violation of the alarm limit (white on
red) W = Warning violation of the warning limit (black on
yellow) S = Process control fault (yellow on black) O =
Operator prompt (white on purple) X = On
Open Picture Opens the process window of the Picture Tree Navigator
Tree Navigator in the working area. The Picture Tree Navigator helps System
the operator to quickly select secondary process pictures function
in a plant area and to display them in the working area of
the user interface.
Screen printout/ Starts a printout of the screen content. The currently System
hardcopy displayed process control screen content is written to a function
temporary file and immediately output to a connected
printer.
Status of The status of the redundant server pair and the non-
assigned servers redundant server assigned to the OS client are displayed System
on the OS clients in the right section function
of the area overview.
Button sets 1
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Button sets 2
● Grayed out: The operator buttons in the button set are not active and cannot be used.
For example, the operator does not have the required authorization or process pictures
are missing.
● Colored: The operator buttons in the button set are active and can be used.
Switching between the button sets
The operator can switch between the two sets of buttons with the following operator
buttons:
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Assignment
Required
Icon Function Description/functionality to function
permission
area
Change to Switches from button set 2 back to button set System
None
button set 1 1. function
Opens a dialog box in the working area in
Change System
which the operator can select the required None
language function
language for the user interface.
The "Lock messages" function is used to lock
Lock the triggering of messages for all single control Authorization System
messages units in the process picture affected by group for area function
displays directly in the automation system.
The "Unlock messages" function is used to re-
release the triggering of messages for all
Unlock Authorization System
single control units in the process picture
messages for area function
affected by group displays directly in the
automation system.
Acknowledges the active signal of a signaling
device, such as a horn. However, the alarm
Acknowledge System
that triggered the horn is not acknowledged None
horn function
with this function. This function is identical to
the function in button set 1.
Acknowledges all the visible messages
Acknowledge displayed in a process picture in the work Process System
message area. The same function is available in button control function
set 2.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Open the motor/ pump faceplate after single click the icon of , the pop-up
command box will be opened after single click of the button on the right of textbox 'stop',
then the operators can close the face plate after the operation of confirmation about start
or stop motor or pump.
Let take start motor 13MIC_K1102 as a example.
Note:
Please make sure the motor state is in accordance with the command before
face plate close.
If the motor display is flashing, the operator should check whether there is error
at motor or not.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Open the motor/ pump face plate after single click the icon , the pop-up manual box
will be opened after single click the button on the right of textbox ' manual/ auto'. then the
operators can close the face plate after the operation of confirmation about manual auto
switch.
let's take the motor of cylinder screen as an example. The operator can switch the motor
from manual to auto according to the following steps.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Grey with tag blue E Auto run (exterior), No operation can be done
Open the variable speed face plate after single click icon , the operator can close the
face plate after the operation of speed value sets in the pop-up box after click the white
button on the right of text box 'set point'.
Let's take the following motor speed set points as an example.
The operator also can set the speed via the button on the left of command box , the
quantity can be '-2.5%', '-0.5%', '+0.5%', '+2.5%'.
Notes:
The speed of motor will speed up gradually, Please make sure the state of motor
is in accordance with the set point before face plate close.
If the motor display is flashing, the operator should check in local, there must be
motor error.
Figure 27 Figure 28
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
State display:
Green Open
Grey Close
Red malfunction
Grey stop
Open on/off valve operation face plate after single click the icon , then enter the
pop-up command box after click the button on the right of text box ' close', the operator
can open or close the valve.
Let's take the valve open as an example.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 29
Notes:
Please make sure the valve state is in accordance with the command before face
plate close.
If the valve display is flashing, the operator should check valve, there must be
error in local .
2)Adjustable valve
Display state:
Green Open
Grey Close
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Keep light green Valve close, the position is in accordance with the
set point
Open the adjustable valve operation faceplate after single click the icon , then
enter the pop-up command box after single click the button on the right of text box '
manipulated var.'. The operator can input the set points of the adjustable valve.
The operator also can set the position via the button on the left of command box , the
quantity can be '-2.5%', '-0.5%', '+0.5%', '+2.5%'.
Notes:
The adjustable Valve will open gradually, Please make sure the display valve is
in accordance with the set point before face plate close.
If the valve display is flashing, the operator should check in local, there must be
valve error.
Figure 30
Open the adjustable valve operation face plate after single click the icon , then
enter the pop-up command box after single click the button on the right of text box 'close'.
The operator can open or close the valve.
let's take the hot water outlet valve in imbibition water tank as a example. the details can
refer to the figure 31
Figure 31
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Green Open
Grey Close
Red Error
Open the electric butterfly valve operation face plate after single click of icon ,then
enter the pop-up command box after single click the button on the right of text box 'close'.
The operator can open or close the electric butterfly valve.
Let take the electric butterfly valve 23HIC01 as an example.
Figure 32
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
2.4. Alarm
2.4.1.Alarm classification
There are three types of alarm information in this project: alarm, warning, error, the
display is yellow, red and black. The operator can deal with the alarm(yellow) and warning
(red) according to the relative principle , as for the error(black), the operator should inform
the maintenance personnel or system engineers.
yellow alarm: The operator should check whether some parameters reach the
limits or not.
Red warning, The operator should deal with the warning information.
Black error, The operator should inform the maintenance personnel or system
engineers to deal with the error.
2.5. Archive and reports
The archive system consists: process values, operation records(logs) , warning
messages.
Open the HMI of archive for process values after single click of icon , there are
process values in the table of WinCC Online Table Control, The operator can increase of
decrease the form, change the time column or do some other changes.
The operator can print the process values via single click the icon on the left top of
WinCC Online Table Control.
Figure 32
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 34
The operator can edit the process value after single click the icon when the state of
WinCC Online Table Control is stop.
The operator can explore the statistic information via the WinCC Trend Ruler Control
after single click the icon on the let top of WinCC Online Table Control, and the
operator also can configure the properties in the property dialog after single click the
button on the right top of WinCC Trend Ruler Control.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
The operator can print the statistic report via single click the button in WinCC Trend
Ruler Control.
The operator can export the statistic report to local disk after single click the button in
WinCC Trend Ruler Control, and also can choose the storage fold after single click the
button .
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 36
Figure 37
Back to monitor screen after single click the button on the right bottom of Wincc
online table control.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Button Function
Back for main monitor screen
Operation record list will be shown after single click of button , the following is the HMI
of operation record list.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
Figure 38
The operator can print the operation record list after single click the button on the right
top of the screen.
3. Troubleshooting
3.1. No feeback on hierarchy area and system function button
area
Treatment1: Exit from graphical operation system and restart the graphical operation
system.
Details as follows:
press 'windows' button on the keyboard, right click the 'WINCC running
system' after press the 'display or hide icon' in the right bottom of task bar,
then choose ' exit from graphical operation system' .
Right click the 'WINCC running system' after press the 'display or hide icon'
in the right bottom of task bar, then choose ' run graphical operation system'.
Details as follows:
Press 'windows' button on the keyboard, right click the 'WINCC running
system' after press the 'display or hide icon' in the right bottom of task bar,
then choose 'Deactivate running system' .
Right click the 'WINCC running system' after press the 'display or hide icon'
in the right bottom of task bar, then choose ' activate running system'
Press 'windows' button on the keyboard, click 'safely remove hardware and
eject media' after press 'display and hide icon' button on the left bottom of task
bar, then click 'usb mass storage device'and eject usb mass storage device.
Unplug the usb license key hard lock.
Reinsert the license key hard lock into the usb slot
If the problem still can't be solved, please refer to treatment No.2
treatment 2, license key damage, please contact Siemens for after sales service
Details as follows:
Double click the icon in screen and start 'automation license manager', click
'cancel' if 'SIMATICA Logon service' dialogue shown.
Press E disk in 'my computer', right click 'check' after select all software
licenses, if the result is 'defective' , that means the licenses damaged.
Contact local SIEMENS for after sales service.
北京海莱德自动化工程有限公司
Beijing High Light Automation Engineering Ltd
Beijing High Light Automation Engineering Co. Ltd.
北京海莱德自动化工程有限公司
After system reboot, click the 'start' on the left bottom of the screen, press
'computer' first, then press 'network' and 'network and sharing center', press
'change adapter setting', if there is forbidden network card, right click the
button and click 'enable'.
Double click the icon and restart 'SIMATIC WinCC Explorer'