WORK PROCEDURE

BY NANDED CITY SUGGESTED


STEP CONTROL POINT STEP CONTROL POINT
Exposed reinforced bars of Piles Provide the Cap at the end of reinforced
bars Avoiding the
injury to
working
person.

Provide the PVC Pipe upto cutoff level For easy


removal of
concrete in
pile head
chipping
Lifting of Reinforcement crane by
Piling Rig Lifting of Reinforcement Cage by
cranes
Make the groove of 20 mm deep at the
level of cut off of pile before cutting the
pile
Sides of excavated area Slope of 45 º to excavation area edge To avoid the
( area excavated for the pile head land subside
chipping )
Person standing into the pile for head USE CUP Lock scaffold system instead
chipping of pile because H- frame used is of H-Frame as height of working
not providing the required height for platform can be adjusted ( Min.
working plarform adjustable height = 500 mm )
To break the pile head , Concrete breaker Use of Hydraulic concrete splitter for Controlled
used breaking of pile head splitting
Improper bending of helical ring Helical ring after the pile head breaking Avoid the
should be properly bent inside the pile to injury to
avoid the injury to person. person.
Improper stacking of steel bars Steel bars should be stacked on wooden
platform of minimum 200 mm above the
ground level.