You are on page 1of 1

TOP TECHNICAL

MATERIAL SUBMITTAL

Date: 1 March, 2019

Revised/ Updated CCTV Material


Submittal as per MOI ODC2 Approval
REF: ISS-RAD_PRS-CCTV-BOSH

REV01

TOP TECHNICAL
SHOP DRAWING

Date: 1 March, 2019

Revised/ Updated Shop Drawing


Design as per MOI ODC2 Approval
REF: ISS-RAD_PRS-SHOP-DRAWING

REV01

You might also like