Indent Drwgs Drwgs Sent Approval Released to

Customer EE DE Eng No. SB-No. Description REMARKS/Status Tentative Delivery date


Received Comitment for Approval Received Production

MV Switchboards
21x3-Way+33x4-Way RMUs +
Design indent on 19-12; CLs on 19-12
11x200kVA+120x630kVA+ 03-01-08
M/s SKB Engg. & Constructions - DHA Phase VI FMF KR/HM A0860 3000975429 NR NR NR 4/28/2009 03x630kVA Transferred to Gakkhar; CLs on 28-
03x100kVA PMTs w/o Energy Meters as 17-04-09
04; Color awaited.; SB-D details
per WAPDA specs.
01x Outg. & 01xInc. Sample Panel of Drawings released 16/02; Wiring to be
Switchboard MR / FB A1019 IFO 1213 2/16/2009 NA
Simoprime (as per WAPDA Design) released!!
01x3-Way+07x4-Way RMUs + End Feb/
Northern Engineering Company Ltd. (Fazaia Housing Colony) FMF RJ A1073 3001677271 8/7/2009 8/12/2009 8/12/2009 2/15/2010 CL rel on 12-08. App. awaited.
02x100kVA+10x200kVA PMTs March
HESCO FMF RJ A1089 3001791877 20xI/C+60xO/G WAPDA Grid Panels 10/29/2009 10/30/2009 NR NR 11/11/2009 Components List on 23-10. Feb/March
13-11-2009 31-12-2009 24-12-2009
BU INF / Benazir Bhutto International Airport, Isb KC HM/VS A1097 3001795981 MV Switchgear Components List on 24-12.
18-12-2009 [SLD/FV/CL] [SLD/FV/CL]

Components List on 20-11. Schemarics


18-11-2009 24-12-2009
20-11-2009 pending. 250VDC @ KESC Grid.+Revised
Al-Abbas Sugar Mills Ltd. KC VS A1099 3001818213 MV Switchgear + RCP 18-12-2009 11/20/2009 [KESC March
[SLD/FV/CL] Indent
04-03-2010 Outgoings]
Remote Control Panel
13-11-2009 Components List on 20-11. CT Ratio
Ideal Rice Mills, Faisalabad SHA HM A1100 3001817512 01xWIP + 01xOwner's Panel [P44:96] 11/19/2009 11/25/2009
[WIP] awaited..Owner's panel under approval.
11kV Switchgear-8BD4
Components List on 16-12. P.O No. awaited for
FESCO (ADB) FMF RJ A1110 3001868968 27xI/C+148xO/G+07xBC as per WAPDA 12/24/2009 12/16/2009 12/16/2009
rating plate. LT Doors on hold.
Specs.

(50 + 100) 200kVA PMTs Alt-I; With & w/o Components List on 18-12. Rev. Components
IESCO FMF RJ A1112 3001883745 12/18/2009 NR NR NR 12/18/2009
Metering List with MG MCCBs on 24-12.

11kV Switchgear-8BD4
PESCO (ADB) FMF RJ A1115 3001869969 11xI/C+81xO/G+11xBC as per WAPDA 12/22/2009 12/29/2009 1/15/2010 1/26/2010 Components List on 15-01. LT Doors on hold. April/May
Specs.
06x11kV Capacitor O/G Panels - as per
IESCO FMF RJ A1116 3001859474 12/22/2009 12/24/2009 1/13/2010 1/13/2010 Components List on 13-01.
WAPDA Specs.
AJK KC RJ A1117 3001865562 03x11kV O/G Panel - 8BD4 12/23/2009 12/30/2009 1/5/2010 1/29/2010 1/6/2010 Components List on 06-01. Feb
11kV Switchgear-8BD4
MEPCO (ADB) FMF RJ A1120 3001877288 08xI/C+48xO/G+03xBC as per WAPDA 1/12/2010 1/15/2010 2/28/2010 Components List on 15-01. LT Doors on hold. April
Specs.

07x4-Way RMUs + 01x630kVA+


DHA Lahore Rahbar Sector (BU-INF) FMF HM A1121 3001931685 15x400kVA+02x200kVA + 02x100kVA as 12/23/2009 12/30/2009 2/23/2010 12/30/2009 Components List on 31-12. P.O. No. required.
per WAPDA specs.
3.3kV Switchgear [02xIncoming + 20-01-2009 Components List on 21-01. SB-D details.
BU T&D Se( BHP Billiton Pvt Ltd) SM FK A1125 3001879115 1/6/2010 1/12/2010 1/20/2010
02xOutgoing Panels] - SA2 [SLD/FV/CL] Imported PTs with Pri-fuses.
22-01-2009
Vogue Towers SHA HM A1127 3001903425 11kV Switchgear-8BD4 01xI/C+02xO/G 1/12/2010 1/15/2010 1/19/2010 2/22/2010 Components List on 22-01. CT ratios on 01-02. Jan
23-02-2010
22-01-2009
BU CI / Yanbu Cement, KSA SM VS A1128 3001888607 400A Motorised LBS 1/15/2010 1/20/2010 1/20/2010 2/3/2010 Components List on 21-01. SB-D details
[SLD/FV/CL]
Components List on 11-03, LT Doors on hold.
Fauji Fertilizer Co. Ltd. KC RJ A1131 3002011777 11kV Switchgear-8BD4 01xI/C+02xO/G 3/9/2010 3/10/2010 3/11/2010 3/11/2010
Confirmation awaited from SB-Isb.
70xVCB Trolley (800A) + 700xBusbar
Perfect Elektro Mek Pakistan (Pvt.) Ltd. SHA VS A1133 3001911557 Support Insulators + 210xSurge 2/1/2010 NR NR 2/1/2010 2/2/2010 Components List on 02-02.
Suppressors
Habib Rafique Pvt. Ltd. / Emaar Project FMF HM A1134 3001905101 02x100kVA + 01x200kVA PMT 2/1/2010 2/2/2010 2/2/2010 3/22/2010 3/26/2010 Components List on 03-02.
Grand Electric Company SHA NQ A1136 3001915150 01xWIP+01xWCP 2/16/2010 2/22/2010 NR NR 2/19/2010 Components List on 19-02.
19-02-2010 25-02-2010
Indus Motors Co. Ltd. SHA VS A1138 3001937359 11kV Switchgear-SA2 01xI/C+01xO/G 3/10/2010 3/12/2010 Components List on 03-10.
05-03-2010 11-03-2010
Components List on 04-03. Color shade
i-Solutions FMF RJ A1140 3001975349 01x4-WAY RMU as per WAPDA Specs 3/4/2010 3/5/2010 3/4/2010 3/4/2010
confirmation required.
Amer Cotton Mills SHA FK A1141 3001951623 01xWCP 3/4/2010 3/5/2010 NR NR 3/4/2010 Components List on 04-03.
Habib Rafique Pvt. Ltd. - DHA Phase II, Islamabad FMF NQ A1142 3001909640 19x200kVA PMTs + 04x4-WAY RMUs 3/9/2010 3/11/2010 NR NR 3/11/2010 Components List on 11-03.

K.E.S.C. KR A1143 08xO/G VCB Trolleys - KESC Grid 15kV Components List on …

NPI Construction & Engineering, Hyderabad Dev. Project SHA NQ A1144 3001969966 01xWIP 3/17/2010 3/18/2010 3/17/2010 4/5/2010 3/17/2010 Components List on 18-03.
MEPCO (WAPDA Town Multan) FMF RJ A1145 WAPDA I/C+O/G+Coupler+PMT Alt III 3/26/2010 4/2/2010 4/2/2010 4/6/2010 Components List on 02-04.
MEPCO (Qasim Bagh) FMF RJ A1146 WAPDA I/C+O/G+Coupler+PMT Alt III 3/26/2010 4/2/2010 4/2/2010 4/6/2010 Components List on 02-04.
BU CIP / SGM Sugar Mills SM NQ A1147 3001979514 Spares 3/31/2010 4/2/2010 NR NR 3/31/2010 Components List on 31-03.
US Embassy Islamabad SHA NQ A1148 3001961906 Supply of HRC Fuses 4/5/2010 NR NR 4/9/2010 Components List on 12-04.
BU OLM / Fauji Fertilizer Bin Qasim Ltd. KC VS A1149 3001984168 Spares 13.8kV, 60Hz 4/5/2010 4/6/2010 NR NR 4/9/2010 Components List on 09-04.
NESPAK SHA FK A1150 3001995389 01xVCB Trolley- WIP 4/8/2010 4/9/2010 NR NR 4/9/2010 Components List on 12-04.
12-04-2010
Crescent Bahuman (Sewing and cutting unit) SHA FK A1151 3002018249 04xVCB Panels - 8BD4 4/9/2010 4/14/2010 4/14/2010 Components List on 12-04. App. awaited.
[SLD/FV/CL]
3.3kV Switchgear [01x3150A Bus
Ghotki Sugar Mills Pvt. Ltd. - 10MW Export Project Plan SHA FK A1152 3002018413 Coupler/Riser+ 01xOutgoing Panel] - 4/26/2010 4/30/2010 Components List on …
Simoprime World

3.3kV Switchgear [02x1250A Outgoing


12-04-2010 Components List on 30-04. Schematics
Ghotki Sugar Mills Pvt. Ltd. - BMR2 Project SHA FK A1153 3002018418 Panel WAPDA Design + 02x630A I/O LBS 4/26/2010 4/30/2010
[SLD/FV/CL] pending.
Panels + 02x800A Outgoing Panels 8BD4]

PARCO KC NQ A1154 3002029591 Spare CTs/PTs 4/28/2010 NR NR NR 4/29/2010 Components List on 29-04.
Nawab Brothers FMF RJ A1155 01x3-Way RMU as per KESC Specs. 4/29/2010 4/30/2010 4/30/2010 Components List on 30-04.

LV Switchboards
20-11-07
Habib Rafique Pvt. Ltd. / 239xService Boxes as per WAPDA Specs.
FMF RAB A5864 3000923287 15-08-08 NR 15.09.09 NR 14.09.09 22/09/08 9/25/2008 Revised indent
Sector J - DHA Phase II, Islamabad + 07xStreet Lighting Control Panels
09.09.09

32x19 Inch Group Housing,19xModem


Plate, 16xMtg. Br. Left, 16xMtg. Br.
BU TS / Pakistan Railways MR A5911 3001101070 21.04.08 NR NR NR 21.04.08 Drawings received alongwith indent
Right,64xConnector Cover, 5xRelay Group
housing

15.09.08 17..09.08
BU TS / Restoration of Signalling System Project MR MR A6008 3001285555 63xLocal Case Panels+Dismantling job NR NR NR Manufacturing as per sample- Revised indent
21.05.09 21.05.09

LT Switchgear+PFIP+DBs+BTDs
"LTMPB of s/s 2
DBL-SS of S/s 2
PFIP (525 kVAR) of s/s 2
LTMPB-1, LTMPB-2 of s/s 3
BU IS / MTC-Shahpur Dam SM MTS A6070 3001537866 14.04.09 28.04.09 30.04.09 13.08.09(SS3)19.08.09(SS3) Only SS3 approved,SS2,6 on hold
DBL-SS of s/s 3
PFIP (525 kVAR) of s/s 3
LTM PB of s/s 6
PFIP (350 kVA) of s/s 6
BTD 1600 amp for 1000 kVA Trafo"

17.07.09
23.07.09
27.07.09
15.10.09(DB 17.11.09(LT)
28.07.09
s) 19.11.09(MC
1xLT, 3xPFIP, 02x Bus coupler ACB 30.07.09
BU IS / PTET Telecom Tower SM RA/RAB A6101 3001619500 10.07.09 13.08.09 06.11.09(MC C) 20.10.09- Jan
panels, MCC,BTDs, 189 DBs 03.08.09
C) 16.11.09(DB
06.08.09
12.11.09(LT) s)
11.08.09
12.08.09
13.08.09

BU TR / FESCO RA RA A6103 3001655727 05No. FCP + 05 No. ACP (31.5/40MVA) 16.07.09 21.07.09 20.07.09 19.08.09 19.08.09
BU TR / LESCO RA RA A6104 3001655762 05No. FCP + 05 No. ACP (31.5/40MVA) 16.07.09 22.07.09 20.07.09 19.08.09 19.08.09
BU TR / WAPDA RA RA A6109 3001682532 01No. 10/13MVA ACP 8/5/2009 10.08.09 06.08.09 NR 10.08.09

China State Construction Engg. Co. / Software Technology Park KC MTS A6110 3001845772 03x Main LTs - 8PU.011 18.12.09 24.12.09 05.01.10 03.02.10 04.02.10 Revised indent on18.12.09 Feb/March

962xService boxes as per specs DDS Drg submitted as per Mr. Suleman's email End Feb/
Northern Engineering Company Ltd. (Fazaia Housing Colony) FMF KAK A6111 3001677271 06.08.09 21.08.09 21.08.09 24.08.09
89:2008 dt:21.08 March

Approval rec with comments. Price settlement


BU IS / KCI Chashma KC RAB A6118 3001722165 Distribution Boards 9/3/2009 11.09.09 14.09.09 12.10.09 31.12.09 Feb
& go-ahead from BU SB/BU IS in end Dec

Drgs revised as per BU IS email dt:25.02.10


BU IS / KCI Chashma KC RAB A6119 3001722177 MCC Panel 9/3/2009 30.09.09 30.09.09 29.10.09 11.02.10 March
Approval awaited.

Modification Work in LT Switchgear for


Fatima Fertilizer (Pvt. ) Ltd. SMY SK A6120 3001735492 9/16/2009 NR NR NR
Synchronisation Scheme
Counter Meter, Clipsal 3-Pin socket & Fan Filter
BU EA (NOR- 5- NTDC) SM FB A6121 3001762366 45xSwing Rack Cabinet for PLC 9/18/2009 NR NR NR 9/20/2009 detail / sample required for mounting
arrangement
220kV R&C Panels -
R3,R4,CP10 drawings not received along
BU HSS / Bahria Town Rawalpindi - Phase VIII SM OE A6127 3001726112 02xR1+02xR2+01xR3+01xR4+01xR5+01xR 10/12/2009 NR NR NR
indent
6+01xR7+01xCP10
BU-TR (IESCO) RA RA A6132 3001775350 03xFCP+03xACP (20/26MVA) 10/16/2009 10/20/2009 10/19/2009
Revised indent:09.02, revised drawings by
M. Talib Enterprises SM SK A6135 3001793793 01xLT+08xDBs 30-10-2009 09.02.10 06.11.09 05.11.09 12.02.10 17.02.10
02.02.10; approval awaited
Sunder Industrial Estate SM MTS A6138 3001810725 03xSLCPs 11/12/2009 11/16/2009 17.11.09 20.11.09 24.11.09 Jan

24.03.10(DB
27.11.09(DBS 30.12.09(DBs)0 LT schematics approval awaited. IP65 go-
BU INF / Benazir Bhutto International Airport, Isb KC SK/RAB A6139 3001795981 LV Switchgear+DBs 11/13/2009 22.03.10 s)25.03.10(L
) 07.12.09(LT) 5.01.09(LT) ahead awaited from Sales
T)

220kV R&C Panels - 02xC1+01xC2+


BU-HSS (Bahria Town Phase VIII) SM OE A6140 3001810453 11/18/2009 NR NR NR 1/6/2010 All Drawings released except cutout Details
01xCP50+01xCP11+01xRP2+03xMK
Fatima Fertilizer (Pvt. ) Ltd. SMY SMY A6142 3001753414 MV/LV Operational Spares 11/20/2009 NR NR NR 24.11.09

Mobility RA (Signalling System)/ Pakistan Railways, Lahore SHA MR A6143 3001815821 Repainting of Housings 11/20/2009

BU TR / BAHRIA TOWN RA RA A6147 3001841519 01No. 20/26MVA ACP 12/4/2009 07.12.09 07.12.09 NR 07.12.09
BU TR / WAPDA RA RA A6148 3001841546 07No. 31.5/40MVA FCP+ACP 04.12.09 08.12.09 08.12.09 1/12/2010 1/13/2010
21.12.09 31.12.09
BU CI / Tetra Pack SM MTS/HM A6153 3001863092 01xMCC - 8PU.003 design 31.12.09 29.03.10 03.03.10
23.02.10 26.02.10 Revised Indent
Fatima Fertilizer (Pvt. ) Ltd. SMY SMY A6154 3001753414 LV Spares 14.12.09 NR NR NR 16.12.09

Pak Arab Fertilizers (Pvt.) Ltd. SM RAB A6155 3001857152 LT Switchgear in Sivacon 8PT design
18.12.09 30.12.09 30.12.09 02.02.10 25.02.10
Scope finalized during meeting dt:01.04.10,
Mobility RA (Signalling System)/ Pakistan Railways, Lahore SHA SK A6157 3001865619 05xLT Switchgears 22.12.09 01.01.10 05.01.10 drgs to be submitted by 16.04.10, revised
indent awaited.

15.01.10(Starte
02 No.ACB Panels+01 No. Starter panel+ Approval received with synch relay
BU T&D Se( BHP Billiton Pvt Ltd) SM SMY A6158 3001876971
Loose Components 31.12.09 15.01.10 r panel) 03.02.10 08.02.10 Mar/April
18.01.10(ACB) changed.

KAK/R
BU-TR (GEPCO) RA A6159 3001875460 02xFCP+02xACP (20/26MVA) 31.12.09 06.01.10 06.01.10 NR
A 12.01.10
Fatima Fertilizer (Pvt. ) Ltd. SMY MTS A6161 3001876908 Modiification work in UREA NPK SWGR 15.01.10
06.01.10 28.01.10 NA 28.01.10
Loose ACB with accessories+
Fatima Fertilizer (Pvt. ) Ltd. SMY MTS A6162 3001878493 15.01.10
Loose Current Module 06.01.10 20.01.10 NR 20.01.10
Indent returned to Ms. Samreen - No drawings
BU EA / IESCO (ADB) SM OE A6163 3001859474 06xCP50+06xRP4
08.01.10 NR NR NR attached
BU TR / WAPDA RA RA A6164 3001881475 16x31.5/40MVA FCP+ACP 08.01.10 15.01.10 12.01.10 NR 12.01.10
22.01.10(1st
phase)
BU CI / Yanbu Cement, KSA SM RAB A6166 3001883806 Main LT,MCCs in SIVACON 8PT
05.02.10(2nd
1/12/2010 phase) 22.01.10(phase 1)

10.03.10(1)0
12.02.10(1)13.0 06.04.10(2)0
6.03.10(2)15.
2.10(2)15.02.10 1.03.10(3)01
03.10(3)05.0
Descon Bhikki VS SK A6167 3001882069 LV Switchgear 1/13/2010 05.02.10 (3)12.02.10(4)2 .03.10(4)29.
3.10(4)02.02.
9.01.10(5)25.01 01.10(5)22.1
10(5)10.02.1
.10(6-8) .10(6-8)
0(6-8)

BU T&D Se( BHP Billiton Pvt Ltd) SM SMY A6168 3001878975 MCC+ACB Trolley+Remote Signalling DB 29.01.10 Approval received with changes Mar/April
06.01.10 02.02.10 23.02.10 05.03.10
Clarifications/documents received from
BU T&D Se( BHP Billiton Pvt Ltd) SM SMY A6169 3001879005 LV MCC 23.02.10 Mar/April
06.01.10 19.02.10 15.03.10 17.03.10 customer dt:18.02.10
BU TR (QESCO) RA RA A6171 3001883721 09No. 20/26MVA FCP+ACP 1/18/2010 25.01.10 22.01.10 NR 22.01.10
Clarifications/documents received from
BU INF (Isb) / KCI Chashma KC SHR A6173 3001897830 MCC in SIVACON 8PT design 1/25/2010 26.02.09 15.02.10 10.03.10 15.03.10
customer dt:18.02.10
BU TR (WAPDA) RA RA A6174 3001903204 05x31.5/40MVA FCP+ACP 1/26/2010 03.02.10 28.01.10 NR 28.01.10
BU EA / HESCO (ADB) SM OE A6175 3001907066 04xCP50+04xRP4 1/27/2010 NR NR NR Drawings received along indent
BU EA / FESCO (ADB) SM OE A6176 3001907010 07xCP50+07xRP4+08xCP30+08xRP3 1/27/2010 NR NR NR Drawings received along indent
BU EA / QESCO (ADB) SM OE A6177 3001907093 06xCP50+06xRP4+04xCP30+04xRP3 1/27/2010 NR NR NR Drawings received along indent
BU-TR (WAPDA) RA RA A6180 3001907779 01No. 31.5/40MVA FCP+ACP 1/29/2010 2/2/2010 01.02.10 NR 01.02.10
Habib Rafique Pvt. Ltd. / Emaar Project FMF KAK A6181 3001905101 07xLT Service Box+01xStreet LP 2/1/2010 08.02.10 08.02.10 22.03.10 01.04.10
BU INF / DHA Lahore (Rahbar Sector - Phase 1) FMF KAK A6182 3001931685 14xSLCP 2/1/2010 09.02.10 04.03.10 04.03.10 04.03.10 Approval rec. via email with comments
BU EA / Liberty Power Plant PLC Project (Wartsila) SM FB A6186 3001954620 04xSwing Rack Cabinets for PLC 3/3/2010 NR NR NR 3/5/2010
Panel housings of CP20 & CP30 shall be used
01xCP20+01xCP30 (Modification Job) 10-03-2010 10-
BU HSS / IESCO G13 project SM MA A6187 3001961834 NR NR NR from IESCO I-16 & complete panel of RP03 also
03xCP50+01xRP03+03xRP04 03-2010
from I-16 order
National Management Foundation / LUMS KC KAK A6190 3001955107 02xDBs+MCBs 3/5/2010 16.03.10 11.03.10 15.03.10 17.03.10
Drawings not released due to some changes
BU-EA (Ludewala) SM FB A6191 3001958320 08xSwing Rack Cabinets for PLC 3/8/2010 NR NR NR 3/10/2010 expected from EA after inspection of running
Ludewala order
Pakistan Petroleum Ltd. KC RAB A6192 3001957917 01xDB - IP65 8/3/2010 12/3/2010 12.03.10 17.03.10 17.03.10
Habib Rafique Pvt. Ltd. - DHA Phase II, Islamabad FMF KAK A6193 3001909640 158xLT Service Boxes 08.03.10 15.03.10 22.03.10
Fatima Fertilizer (Pvt. ) Ltd. SMY AQ A6194 3001815929 Spare Power Supply 18.03.10 19.03.10 19.03.10 NA 19.03.10
SMB Project KC AQ A6195 3001976144 DBs 3/18/2010 25.03.10 25.03.10
Allied Engineering KC HM A6196 3001977589 01x3200A Load Take Off Panel 3/19/2010 24.03.10 26.03.10
Engro Chemicals SHA KAK A6197 3001971810 Spares 22.03.10 22.03.10 22.03.10 NA 22.03.10
BHP Billiton RA RA A6198 3000185087 Fan Control Panel-2x3.5MVA Trafo 3/25/2010 31.03.10 31.03.10
MEPCO (WAPDA Town Multan) FMF KAK A6199 3002011854 WAPDA AC/DC+PMT Alt III 3/26/2010 02.04.10 02.04.10
MEPCO (Qasim Bagh) FMF KAK A6200 3002011863 WAPDA AC/DC+PMT Alt III 3/26/2010 02.04.10 02.04.10
Engro Chemicals SHA AQ A6201 3001987383 Spares 3/29/2010 31.03.10 31.03.10 NA 31.03.10
SGM Sugar Mills SM SK A6202 3001979514 Spares 31.03.10 01.04.10 01.04.10 NA 01.04.10
FFBL KC AQ A6203 3001983381 Spares 4/6/2010 4/9/2010
LV Switchgear (Phase Reversal Panel) +
Kiran Hospital SHA HM A6204 3001999874 4/6/2010 4/21/2010
U/V Release for MCCB
WAPDA (NTDC) RA RA A6205 3002000070 04xFCP/ACP 4/7/2010 14.04.10
WAPDA Town and Qasim Bagh RA RA A6206 3002000117 04xFCP/ACP 4/7/2010 13.04.10
02xSivacon 8PT Panels+
BU A&D / SP&EW KC RAB A6207 3001999960 4/7/2010 23.04.10
Loose modules
Glaxo Smithkline (BU-OLM) SHA SK A6208 3001999031 Spare Capacitors 4/7/2010 09.04.10 09.04.10
Institute of Bankers (BU-T&D Services) SHA KAK A6209 3002000013 Spares 4/7/2010 09.04.10 09.04.10
15-04-2010
Crescent Bahuman Ltd. SHA HM A6210 300201849 LV Switchgear 23-04-2010

220kV R&C Panels-02xR1+02xR2+01xR5+


BU-HSS (Ludewala) SM MA A6211 3001998740 4/12/2010 NR NR NR Only component list / Assembly drawing released
01xR6+01xC2+02xEM+03xLCC

Iqbal Engineering House (P&G Dry Laundry Plant) KC HM A6212 30020143305 09xMCCs 4/19/2010 4/28/2010
KCI Chashma SHA SHA A6213 3002015581 Spares 4/20/2010 NR NR NR
Missing Panels Order - SB No & PO No. issue
BU-TR RA RA A6214 - 1xFCP (40MVA) + 2xACP (40MVA) 4/20/2010
to be resolved
Sep

(Estimated -
Actual Hours

Difference
Running FY

Actual)
from
Current FY
Execution remarks

Running Inspection planned


0 0 Running MV Qtr Year
434.4 -115.7
19x630KVA PMT in Jan`10. Running MV 19.11.09 15 Nos. 4-WAY PMT/RMU Aug
30.11.09 06Nos. 630kVA
204.9 145.1 Running MV
28 72 Running MV
21 29 Running MV
Drawings under approval. 41 259 Running MV 15.06.10
174 76
RCP Panel inspection awaited & Alce
CT's delivery awaited. Running MV 3rd week of April

Input awaited at SB-Lhr 25 2 Running MV


25 55
Running MV

14 86
Running MV

16 64
Running MV

218.3 -103.3 Running MV


Inspection awaited. 6 11 Running MV 26.02.10
15 65
Running MV

20 60
Running MV

0 50 Running MV
0 25 Running MV
0 100 Running MV
Drawings approval awaited. 0 27 Running MV
0 0
Running MV

0 0 Running MV
0 0 Running MV
0 0 Running MV
0 0 Running MV
180.5 -80.5 Running MV 22.11.09
Running MV
80 0 Running MV Aug
14 -14 Running MV
0 0 Running MV
0 0 Running MV
313.8 -32.3 Running MV
0 0 Running MV
0 0 Running MV
80 0 Running MV Aug
0 0 Running MV

Running MV

Running MV

Running MV
Running MV
Running MV
Running MV
0 0 Running LV
23 17
Running LV

7 23
Running LV Aug

35 -35 Running LV
342.9 157.1

Deatil of s/s 6 released on 07.10.09,


approval of s/s2 & 3 are awaited. Running LV
Partially S/S6 & DBs.

713.7 -13.7

Running LV

20 10 Running LV
25 5 Running LV
29 1 Running LV
Inspection awaited. 104 146 Running LV 25.03.10
6 14 Running LV
24 1
Under testing Running LV

Structure ready, copper assembly to be 80 120


completed by 05th May, Control plug and
socket delivery awaited. OCR by 15th Running LV
May.

35 15 Running LV
33.6 26.4
Running LV
100 50
Running LV

20 30 Running LV
Approval Pending 41 -1 Running LV
10 10 Running LV
103.5 246.5
Drawings submitted to NESPAK. Running LV

Ordering in Process 0 150 Running LV


0 40 Running LV
45 Supplied 0 10 Running LV
7 13 Running LV
5 35 Running LV
37 113 Running LV
0 10 Running LV
54.5 95.5 Running LV
Under Approval

Checklist awaited. 0 50 Running LV

0 40 Running LV

0 40 Running LV
0 50 Running LV
0 50 Running LV
0 50 Running LV
0 40 Running LV
0 500
Running LV

0 100 Running LV

0 100 Running LV
0 100 Running LV
0 40 Running LV
All components are available. 0 250 Running LV
0 20 Running LV
0 50 Running LV
0 50 Running LV
0 50 Running LV
0 0 Running LV
0 0 Running LV
0 0 Running LV
Running LV

Running LV

Running LV
Running LV

Running LV
Running LV
Running LV
Running LV
Running LV
Running LV
Running LV
Running LV
Running LV
Running LV
Running LV
Details from OLM awaited. Running LV

Running LV
3649.15 Running LV
Running LV

Drawings under approval Running LV

Running LV
Running LV

Running LV

Running LV

Drawings submission awaited. Running LV


Running LV

Running LV

Running LV
Running LV
Running LV
Running LV
Running LV