You are on page 1of 1

A B C

6.00M

1.00M 2.50M 3.50M 1.00M

100 MM THK SLAB


WITH 12 MM Ø
TEMPERATURE
BARS @ 150 mm
RB-1 C1 RB-1 C1 RB-1 C1 RB-1 O.C BOTH WAYS
4

3.00M

RB-2

S-2 S-3 S-2


S-2

100 MM THK 2 WAY SLAB


ON FILL WITH 12 MM Ø
3

RB-1 RB-1 RB-1 MAIN BARS AND 12 MM


C1 C1 C1 ØTEMPERATURE BARS
1.20M

S-2 @ 150 mm O.C BOTH


WAYS

RB-1
4.00M

RB-2

S-2
STAIR WELL

RB-2
11.00M

2.80M

S-3
2

RB-1 RB-1 RB-1 RB-1


C1 C1 C1
4.00M

RB-2

S-2 S-2 S-2


RB-2

RB-2

S-2 S-2

C1 C1 C1
1

RB-1 RB-1 RB-1 RB-1

NOTE:

RB = REINF. CONCRETE BEAM


S-1, S-2 = REINF. CONCRETE SLAB

CIVIL ENGINEER: SHEET CONTENT: OWNER: SHEET NO.


PIMENTEL,JIMMY JR. G. SECOND ENGR. PALACPAC
PROJECT LOCATION:
BAGUIO CITY
FLOOR FRAMING PLAN PROJECT TITLE: S-2
JGPJR CORP. SCALE: 1:100 2-STOREY RESIDENCE