LISTA DE ITEMS DE CADECO

MAQUINARIA Y EQUIPO DE CONSTRUCCION

VALDA CASTRO VLADIMIR

0.7118 0.1494 0.05 0.15 0.1 0.0309

A B C D E F G

MANO CARGAS GASTOS


IMP PRECIO
Nro ITEM ACTIVIDAD UNIDAD MATERIAL DE SOCIALES IVA MAQ HERR GENERALES UTILIDAD
UNITARIO
OBRA
C.S. G.G. I.T.

VU-001 ACERA DE CEMENTO Y EMPEDRADO M2 58.87 110.60 78.73 28.29 0.00 10.88 43.11 33.05 11.23 374.76

OG-001 ACERO DE REFUERZO KG 7.19 3.50 2.49 0.89 0.00 0.34 2.16 1.66 0.56 18.79

OF-003 ALERO M2 93.51 77.00 54.81 19.69 0.00 9.09 38.12 29.22 9.93 331.37
APLICACIÓN DE TERMOPLASTICO
VU-002 M2 149.70 28.20 20.07 7.21 27.00 2.77 35.24 27.02 9.18 306.39
E=2MM
AV-004 AREA VERDE CON RAY - GRASS M2 37.85 34.50 24.56 8.82 0.00 3.39 16.37 12.55 4.27 142.31
BACHEO CON PROVISION DE CEMENTO
VU-003 M2 83.98 8.21 5.84 2.10 13.65 0.81 17.19 13.18 4.48 149.44
ASFALTICO ESPESOR=5CM
BAJANTE PLUVIAL CUADRADA 4'' DE
OF-001 ML 33.10 37.00 26.34 9.46 0.00 4.37 16.54 12.68 4.31 143.80
CALAMINA PLANA No28 SEC. (10*15CM)
OF-002 BAJANTE SANITARIA DE PVC 4'' ML 51.36 22.20 15.80 5.68 0.00 2.62 14.65 11.23 3.82 127.36

OG-037 BARANDA DE HORMIGÓN ARMADO ML 216.33 234.10 166.63 59.87 8.40 23.03 106.25 81.46 27.69 923.76

OF-041 BARNIZ SOBRE MANPOSTERIA M2 16.54 22.20 15.80 5.68 0.00 2.18 9.36 7.18 2.44 81.38

OF-040 BARNIZADO DE SOCALOS DE MADERA ML 0.90 11.10 7.90 2.84 0.00 1.09 3.57 2.74 0.93 31.07
BERMAS TRATAMIENTO SUPERFICIAL
CC-011 M2 10.83 0.90 0.64 0.23 3.85 0.09 2.48 1.90 0.65 21.57
SIMPLE
OG-038 BOTAGUAS DE HORMIGÓN ARMADO ML 74.42 34.70 24.70 8.87 0.00 3.41 21.92 16.80 5.71 190.53
OG-039 BOTAGUAS DE LADRILLO GAMBOTE ML 22.43 38.50 27.40 9.85 0.00 3.79 15.30 11.73 3.99 132.99

IS-001 CAMARA DE HoCo 40X40 cm h=45 cm PZA 218.89 350.00 249.13 89.51 0.00 34.43 141.29 108.33 36.82 1228.40

IS-002 CAMARA DE HoCo 60X60 cm h=100cm PZA 850.47 455.00 323.87 116.36 0.00 44.76 268.57 205.90 69.99 2334.92
CAMARA DE INSPECCION (60X60 cm) DE
IS-003 PZA 237.97 269.50 191.83 68.92 0.00 26.51 119.21 91.39 31.06 1036.39
LADRILLO GAMBOTE
IS-004 CAMARA DE REGISTRO PZA 235.33 350.00 249.13 89.51 0.00 34.43 143.76 110.22 37.46 1249.84
CANAL DE HORMIGÓN ARMADO 25*25
OG-040 ML 49.25 139.00 98.94 35.55 0.00 13.67 50.46 38.69 13.15 438.71
E=5 CM
OF-004 CANALETA DE CALAMINA No28 0.50 MT ML 33.77 55.50 39.50 14.19 0.00 6.55 22.43 17.19 5.84 194.97
CARPETA ASFALTICA CONVENCIONAL
CC-012 M3 1762.98 15.09 10.74 3.86 117.94 1.48 286.81 219.89 74.74 2493.53
(SIN TRANSPORTE)
CIMIENTO DE HORMIGON CICLOPEO H-
OG-007 M3 274.20 185.00 131.68 47.31 12.00 18.20 100.26 76.87 26.13 871.65
160 60% PIEDRA DESPL.
CIMIENTO DE HORMIGON CICLOPEO H-
OG-008 M3 338.35 185.00 131.68 47.31 12.00 18.20 109.88 84.24 28.63 955.29
180 60% PIEDRA DESPL.
CINTA DE SEÑALIZACION AMARILLA
OP-008 ML 4.00 0.70 0.50 0.18 0.00 0.07 0.82 0.63 0.21 7.11
A=40 MM E=50U
OG-032 COLCHONETA DE 4*2*0.30 M M3 420.77 164.50 117.09 42.07 0.00 16.18 114.09 87.47 29.73 991.90

OG-034 COLUMNA DE LADRILLO 25*25 CM ML 49.62 31.45 22.39 8.04 0.00 3.09 17.19 13.18 4.48 149.44
COLUMNA DE LADRILLO GAMBOTE DE
OG-035 ML 111.01 51.80 36.87 13.25 0.00 5.10 32.70 25.07 8.52 284.32
40*40 CM
COLUMNA DE MAMPOSTERÍA DE
OG-033 M3 470.64 666.00 474.06 170.32 0.00 65.52 276.98 212.35 72.18 2408.05
PIEDRA CORTADA
CONFORMACION DE TERRAPLEN (SIN
CC-003 M3 0.00 4.41 3.14 1.13 29.27 0.43 5.76 4.41 1.50 50.05
MATERIAL)
OG-073 CONTRAPISO DE CEMENTO S/LOSA M2 20.91 55.50 39.50 14.19 0.00 5.46 20.33 15.59 5.30 176.78

OG-062 CONTRAPISO DE CEMENTO SOBRE LOSA M2 20.31 52.50 37.37 13.43 0.00 5.17 19.32 14.81 5.03 167.94
CORDON DE HORMIGON SIMPLE PARA
VU-004 M2 17.46 14.00 9.97 3.58 14.80 1.38 9.18 7.04 2.39 79.80
JARDINERA (15*20*50 CM)
CORDON PARA ACERA DE HORMIGON
VU-005 M2 56.99 35.00 24.91 8.95 0.00 3.44 19.39 14.87 5.05 168.60
SIMPLE 20*40 CM
OG-059 CORDON PARA ACERA DE HORMIGON ML 607.26 259.00 184.36 66.24 6.00 25.48 172.25 132.06 44.89 1497.54
CUBIERTA DE CALAMINA GALVANIZADA
OG-063 M2 89.96 85.10 60.57 21.76 0.00 8.37 39.86 30.56 10.39 346.57
No 28
CUBIERTA DE CALAMINA GALVANIZADA
OG-064 M2 76.75 92.10 65.56 23.55 0.00 9.06 40.05 30.71 10.44 348.22
No 33
CUBIERTA DE CALAMINA PLASTICA 300
OG-066 M2 124.01 106.50 75.81 27.24 0.00 10.48 51.61 39.57 13.45 448.67
GR
CUBIERTA DE POLICARBONATO E=6MM
OG-065 M2 229.50 61.95 44.10 15.84 0.00 6.09 53.62 41.11 13.97 466.18
COSTANERA 100*50*15*3 MM
CUBIERTA DE TEJA CERAMICA TIPO
OG-067 M2 148.60 114.80 81.71 29.36 0.00 11.29 57.86 44.36 15.08 503.06
COLONIAL
CUBIERTA DE TEJA CERAMICA TIPO
OG-068 M2 159.62 119.00 84.70 30.43 0.00 11.71 60.82 46.63 15.85 528.76
ESPAÑOLA
OG-069 CUMBRERA DE CALAMINA PLANA No 28 ML 50.03 30.80 21.92 7.88 0.00 3.03 17.05 13.07 4.44 148.22

OG-070 CUMBRERA DE CERAMICA ML 24.44 15.40 10.96 3.94 0.00 1.52 8.44 6.47 2.20 73.37
DEFENSA METALICA FLEXIBLE TIPO FLEX
CC-014 PZA 556.80 35.00 24.91 8.95 0.00 3.44 94.37 72.35 24.59 820.41
BEAM
DE-002 DEMOLICION DE HORMIGON ARMADO M3 0.00 196.00 139.51 50.13 0.00 19.28 60.74 46.57 15.83 528.06

DE-003 DEMOLICION DE HORMIGON CICLOPEO M3 0.00 39.05 27.80 9.99 150.00 3.84 34.60 26.53 9.02 300.83

DE-001 DEMOLICION DE HORMIGON SIMPLE M3 0.00 168.00 119.58 42.96 0.00 16.53 52.06 39.91 13.57 452.61

DE-005 DEMOLICION DE MURO DE ADOBE M3 0.00 56.00 39.86 14.32 0.00 5.51 17.35 13.30 4.52 150.86

DE-006 DEMOLICION DE MURO DE LADRILLO M2 0.00 25.20 17.94 6.45 0.00 2.48 7.81 5.99 2.04 67.91
DEMOLICION DE MURO DE
DE-004 M3 0.00 98.00 69.76 25.06 0.00 9.64 30.37 23.28 7.91 264.02
MAMPOSTERIA
OG-041 DINTEL DE HORMIGÓN ARMADO ML 105.13 154.00 109.62 39.38 0.00 15.15 63.49 48.68 16.55 552.00

OG-042 DINTEL DE LADRILLO ARMADO ML 25.51 28.70 20.43 7.34 0.00 2.82 12.72 9.75 3.31 110.58

OG-043 DINTEL DE MADERA ML 43.05 18.55 13.20 4.74 0.00 1.82 12.20 9.36 3.18 106.10

OG-044 ELEVACIÓN DE CAMARAS DOSIF: 1:3:4 M3 381.73 185.00 131.68 47.31 0.00 18.20 114.59 87.85 29.86 996.22

OG-074 EMBOQUILLADO DE CEMENTO BLANCO M2 8.75 17.50 12.46 4.48 0.00 1.72 6.74 5.17 1.76 58.58
EMBOQUILLADO DENTRO DE GALERIAS
OH-004 M2 124.39 42.00 29.90 10.74 0.00 4.13 31.67 24.28 8.25 275.36
CON ADITIVO ADHESIVO
OF-013 EMNLUCIDO FINO DE CEMENTO M2 34.48 99.50 70.82 25.45 0.00 9.79 36.01 27.61 9.38 313.04

OG-036 EMPEDRADO M2 49.62 31.45 22.39 8.04 0.00 3.09 17.19 13.18 4.48 149.44

OF-016 ENLADRILLADO M2 51.91 35.00 24.91 8.95 0.00 3.44 18.63 14.28 4.86 161.98
ENLUCIDO DE MORTERO
OF-014 M2 5.71 20.35 14.49 5.21 0.00 2.00 7.16 5.49 1.87 62.28
IMPERMEABILIZANTE
MT-012 ENTIBADO Y APUNTALADO M2 61.00 35.00 24.91 8.95 0.00 3.44 20.00 15.33 5.21 173.84

OG-031 ESCOLLERADO M3 31.25 73.50 52.32 18.80 0.00 7.23 27.47 21.06 7.16 238.79

MT-007 EXCAVACION CON AGOTAMIENTO M3 0.00 73.50 52.32 18.80 11.25 7.23 24.47 18.76 6.38 212.71

MT-001 EXCAVACION CON RETROEXCAVADORA M3 0.00 2.59 1.84 0.66 15.40 0.25 3.11 2.39 0.81 27.05

CC-002 EXCAVACION EN ROCA M3 30.70 5.30 3.77 1.36 55.31 0.52 14.54 11.15 3.79 126.44
EXCAVACION MANUAL DE DE ZANJAS(0-
MT-008 M3 0.00 56.00 39.86 14.32 0.00 5.51 17.35 13.30 4.52 150.86
2M)SUELO SEMI DURO
EXCAVACION MANUAL(0.-2M)SUELO
MT-003 M3 0.00 35.00 24.91 8.95 0.00 3.44 10.85 8.32 2.83 94.30
SEMI DURO
EXCAVACION MANUAL(0-2M)SUELO
MT-002 M3 0.00 28.00 19.93 7.16 0.00 2.75 8.68 6.65 2.26 75.43
BLANDO
EXCAVACION MANUAL(2-4M)SUELO
MT-004 M3 37.50 70.00 49.83 17.90 0.00 6.89 27.32 20.94 7.12 237.50
SEMI DURO
CC-001 EXCAVACION NO CLASIFICADA M3 0.00 1.81 1.29 0.46 18.09 0.18 3.27 2.51 0.85 28.46

OG-045 GRADAS DE CEMENTO M2 147.95 105.00 74.74 26.85 0.00 10.33 54.73 41.96 14.26 475.82
HORMIGÓN CICLÓPEO 50% PIEDRA
OG-027 M3 274.70 222.00 158.02 56.77 12.00 21.84 111.80 85.71 29.13 971.97
DESPLAZADORA (1:2:4)
CC-013 HORMIGON PARA PAVIMENTO RIGIDO M3 574.81 378.00 269.06 96.67 33.40 37.19 208.37 159.75 54.30 1811.55

OG-002 HORMIGON POBRE M3 376.26 227.00 161.58 58.05 6.00 22.33 127.68 97.89 33.27 1110.06
HORMIGÓN SIMPLE COLUMNA EN
OG-053 M3 1195.27 1010.00 718.92 258.30 27.15 99.36 496.35 380.54 129.34 4315.23
ALTURA H-21
OG-047 HORMIGÓN SIMPLE COLUMNA H-21 M3 1195.27 720.00 512.50 184.14 17.10 70.83 404.98 310.48 105.53 3520.83
HORMIGON SIMPLE DE LOSA DE
OG-004 M3 610.11 415.00 295.40 106.13 33.60 40.83 225.16 172.62 58.67 1957.52
CIMENTACION H-21
HORMIGÓN SIMPLE LOSA ALIVIANADA
OG-051 CON VIGUETA PRETENSADA + ALIG. H21 M2 163.80 52.00 37.01 13.30 1.48 5.12 40.91 31.36 10.66 355.64
E=20CM
HORMIGON SIMPLE LOSA ALIVIANADA
OG-071 EN UNA DIRECCION (PLATAFORMA) H21 M2 137.62 66.80 47.55 17.08 1.48 6.57 41.57 31.87 10.83 361.37
E=20 CM
HORMIGON SIMPLE LOSA ALIVIANADA
OG-072 EN UNA DIRECCION (PLATAFORMA) H21 M2 155.26 69.35 49.36 17.74 1.48 6.82 45.00 34.50 11.73 391.24
E=25 CM
HORMIGON SIMPLE LOSA LLENA EN
OG-055 M3 1047.26 795.00 565.88 203.32 25.15 78.21 407.22 312.20 106.12 3540.36
ALTURA H-21
HORMIGON SIMPLE MURO DE
OG-056 M3 974.94 755.00 537.41 193.09 15.11 74.28 382.47 293.23 99.67 3325.20
CONTENCION
HORMIGÓN SIMPLE PARA
OG-049 M3 1025.01 583.00 414.98 149.10 15.10 57.35 336.68 258.12 87.74 2927.08
ENCADENADO
OG-050 HORMIGÓN SIMPLE PARA ESCALERA M3 1120.27 790.00 562.32 202.04 15.10 77.72 415.12 318.26 108.18 3609.01

OG-052 HORMIGÓN SIMPLE PARA LOSA LLENA M3 1032.27 569.00 405.01 145.52 15.10 55.98 333.43 255.63 86.89 2898.83
HORMIGON SIMPLE PARA
OG-006 M3 898.76 421.00 299.67 107.67 1.48 41.42 265.50 203.55 69.19 2308.24
SOBRECIMIENTOS H-21
HORMIGON SIMPLE PARA VIGA DE
OG-005 M3 846.06 678.00 482.60 173.39 15.95 66.70 339.41 260.21 88.45 2950.77
FUNDACION H-21
HORMIGON SIMPLE PARA VIGA EN
OG-054 M3 983.87 899.00 639.91 229.91 43.65 88.44 432.72 331.75 112.76 3762.01
ALTURA H-21
OG-048 HORMIGÓN SIMPLE PARA VIGA H-21 M3 983.87 797.00 567.30 203.83 33.60 78.41 399.60 306.36 104.13 3474.10

OG-003 HORMIGON SIMPLE ZAPATAS H-21 M3 735.56 631.00 449.15 161.37 33.60 62.08 310.91 238.37 81.02 2703.06
IMPERMEABILIZACION CON CARTON
OG-011 M2 129.50 37.00 26.34 9.46 0.00 3.64 30.89 23.68 8.05 268.56
ASFALTICO
IMPERMEABILIZACION CON LAMINA
OG-013 M2 69.81 12.25 8.72 3.13 0.00 1.21 14.27 10.94 3.72 124.05
ASFALTICA
IMPERMEABILIZACION CON MEMBRANA
OG-012 M2 91.74 103.60 73.74 26.49 0.00 10.19 45.86 35.16 11.95 398.73
DE ALUMINIO 3,5 MM
IMPERMEABILIZACION DE
OG-010 M2 22.81 18.50 13.17 4.73 0.00 1.82 9.15 7.02 2.39 79.59
SOBRECIMIENTOS
IMPERMEABILIZACION MURO DE
OG-014 M2 59.59 27.30 19.43 6.98 0.00 2.69 17.40 13.34 4.53 151.26
CONTENCION CON POLIETILENO
CC-009 IMPRIMACION BITUMINOSA M2 9.81 0.18 0.13 0.05 0.64 0.02 1.62 1.25 0.42 14.12
INST. ELÉCTRICA DE PUNTOS DE
IE-001 PTO 112.03 107.50 76.52 27.49 0.00 10.58 50.12 38.42 13.06 435.72
LUMINARIA
INST. ELÉCTRICA DE PUNTOS DE TOMA
IE-002 PTO 125.46 94.60 67.34 24.19 0.00 9.31 48.14 36.90 12.54 418.48
CORRIENTE
OP-001 INSTALACION DE FAENAS M2 90.41 80.50 57.30 20.59 13.75 7.92 40.57 31.10 10.57 352.71

OG-046 JUNTA DE DILATACIÓN ML 9.60 3.50 2.49 0.89 0.00 0.34 2.52 1.93 0.66 21.93

OG-060 LAVANDERIA DE HoAo PZA 295.00 231.00 164.43 59.08 0.00 22.73 115.84 88.81 30.19 1007.08

OP-002 LETRERO DE OBRAS(LONA PVC) M2 157.80 101.00 71.89 25.83 0.00 9.94 54.97 42.14 14.32 477.89
LLAVE DE PASO CORTINA D=1 1/2"
IS-022 PZA 82.52 25.90 18.44 6.62 0.00 2.55 20.40 15.64 5.32 177.39
(PROV. Y COLOC.)
LLAVE DE PASO CORTINA D=1" (PROV. Y
IS-023 PZA 68.11 22.20 15.80 5.68 0.00 2.18 17.10 13.11 4.46 148.64
COLOC.)
LLAVE DE PASO CORTINA D=1/2" (PROV.
IS-025 PZA 48.10 18.50 13.17 4.73 0.00 1.82 12.95 9.93 3.37 112.57
Y COLOC.)
LLAVE DE PASO CORTINA D=2 1/2"
IS-020 PZA 395.72 25.90 18.44 6.62 0.00 2.55 67.38 51.66 17.56 585.83
(PROV. Y COLOC.)
LLAVE DE PASO CORTINA D=2" (PROV. Y
IS-021 PZA 293.06 25.90 18.44 6.62 0.00 2.55 51.99 39.86 13.55 451.97
COLOC.)
LLAVE DE PASO CORTINA D=3" (PROV. Y
IS-019 PZA 494.16 4.60 3.27 1.18 0.00 0.45 75.55 57.92 19.69 656.82
COLOC.)
LLAVE DE PASO CORTINA D=3/4" (PROV.
IS-024 PZA 80.98 18.50 13.17 4.73 0.00 1.82 17.88 13.71 4.66 155.45
Y COLOC.)
LLAVE DE PASO CORTINA D=4" (PROV. Y
IS-018 PZA 987.50 4.60 3.27 1.18 0.00 0.45 149.55 114.66 38.97 1300.18
COLOC.)
LOSA DE HORMIGON DE 20 CM PARA
CC-020 PAVIMENTO RIGIDO (CON PASAJUNTAS M2 183.77 27.82 19.80 7.11 12.35 2.74 38.04 29.16 9.91 330.70
TRANSVERSALES Y LONGITUDINALES)
LOSA DE HORMIGON DE 20 CM PARA
CC-019 M2 146.11 24.32 17.31 6.22 1.68 2.39 29.70 22.77 7.74 258.24
PAVIMENTO RIGIDO (SIN PASAJUNTAS)
LOSA DE HORMIGON SIMPLE PARA
AD-003 CANCHA CON MALLA DE ACERO M2 83.09 35.00 24.91 8.95 0.00 3.44 23.31 17.87 6.07 202.64
H=10CM
LOSA TAPA DE HORMIGON ARMADO
OG-057 M3 1719.87 814.00 579.41 208.18 33.60 80.08 515.27 395.04 134.27 4479.72
PARA TANQUE DE AGUA
AD-001 MALLA OLIMPICA C/TUBO FG2" C/2,5M M2 141.28 33.30 23.70 8.52 0.00 3.28 31.51 24.16 8.21 273.96

OG-029 MAMPOSTERÍA DE PIEDRA BRUTA M3 364.00 270.50 192.54 69.18 0.00 26.61 138.42 106.13 36.07 1203.45

OG-030 MAMPOSTERÍA DE PIEDRA CORTADA M3 424.84 300.50 213.90 76.85 0.00 29.56 156.85 120.25 40.87 1363.62

IS-026 MEDIDOR DE AGUA (PROV. Y COLOC.) PZA 2542.64 13.80 9.82 3.53 0.00 1.36 385.67 295.68 100.50 3353.00

CC-006 MEJORAMIENTO DE SUBRASANTE M3 0.00 2.98 2.12 0.76 29.88 0.29 5.40 4.14 1.41 46.98

OG-058 MESON HoAo M2 171.25 111.00 79.01 28.39 0.00 10.92 60.09 46.07 15.66 522.39
MONTAJE DE CIERRE PERIMETRAL DE
OP-007 M2 47.80 8.75 6.23 2.24 0.00 0.86 9.88 7.58 2.58 85.92
PROTECCION CON CALAMINA N28
MONTAJE DE CIERRE PERIMETRAL DE
OP-006 M2 17.24 7.00 4.98 1.79 1.80 0.69 5.03 3.85 1.31 43.69
PROTECCION CON YUTE
OG-021 MURO DE ADOBE DE 25CM M2 16.03 52.50 37.37 13.43 0.00 5.16 18.67 14.32 4.87 162.35

OG-022 MURO DE ADOBE DE 40CM M2 50.83 52.50 37.37 13.43 0.00 5.16 23.89 18.32 6.23 207.73

OG-023 MURO DE BLOQUE DE HORMIGON M2 99.81 45.50 32.39 11.64 0.00 4.48 29.07 22.29 7.58 252.76

OG-024 MURO DE BLOQUE DE VIDRIO BLANCO M2 635.04 96.60 68.76 24.70 0.00 9.50 125.19 95.98 32.62 1088.39

OG-025 MURO DE BLOQUE DE VIDRIO COLOR M2 710.04 96.60 68.76 24.70 0.00 9.50 136.44 104.60 35.55 1186.19

OG-028 MURO DE CONTENCIÓN CON GAVIONES M3 344.71 111.00 79.01 28.39 0.00 10.92 86.10 66.01 22.44 748.58
MURO DE CONTENCION DE HORMIGON
OG-026 M3 517.61 269.50 191.83 68.92 0.00 26.51 161.16 123.55 42.00 1401.08
CICLOPEO
MURO DE LADRILLO DE 3H (24*18*12)
OG-018 M2 29.72 48.30 34.38 12.35 0.00 4.75 19.43 14.89 5.06 168.88
E=8CM
MURO DE LADRILLO DE 6H (24*15*9,5)
OG-016 M2 53.08 77.70 55.31 19.87 0.00 7.64 32.04 24.56 8.35 278.55
E=15CM
MURO DE LADRILLO DE 6H (24*18*12)
OG-015 M2 50.28 56.00 39.86 14.32 0.00 5.51 24.90 19.09 6.49 216.45
E=12CM
MURO DE LADRILLO DE 6H (24*18*12)
OG-017 M2 67.57 56.00 39.86 14.32 0.00 5.51 27.49 21.08 7.16 238.99
E=18CM
MURO DE LADRILLO GAMBOTE VISTO
OG-019 M2 83.87 74.20 52.82 18.98 0.00 7.30 35.58 27.28 9.27 309.30
E=12CM
MURO DE LADRILLO GAMBOTE VISTO
OG-020 M2 166.41 100.80 71.75 25.78 0.00 9.92 56.20 43.09 14.65 488.60
E=24CM
AD-002 PELDAÑOS DE HºCº EN GRADERIAS M3 455.71 329.00 234.18 84.14 0.00 32.37 170.31 130.57 44.38 1480.66
PINTADO DE LINEAS DE CANCHA
AD-004 PZA 240.27 296.00 210.69 75.70 0.00 29.12 127.77 97.96 33.30 1110.81
BALONCESTO
PINTURA AL ACEITE SOBRE CARPINTERIA
OF-037 M2 26.58 37.00 26.34 9.46 0.00 3.64 15.45 11.85 4.03 134.35
METALICA
OF-038 PINTURA AL OLEO BRILLO SINTETICA M2 21.19 22.20 15.80 5.68 0.00 2.18 10.06 7.71 2.62 87.44
PINTURA ANTICORROSIVA PARA
OF-039 M2 11.02 14.80 10.53 3.78 0.00 1.46 6.24 4.78 1.63 54.24
CUBIERTAS
PINTURA LATEX EXTERIOR (DOS
OF-034 M2 8.60 16.20 11.53 4.14 0.00 1.59 6.31 4.84 1.64 54.85
MANOS)
OF-035 PINTURA LATEX INTERIOR (DOS MANOS) M2 5.58 13.65 9.72 3.49 0.00 1.34 5.07 3.89 1.32 44.06

OF-036 PINTURA OLEO MATE SINTETICA M2 23.66 22.20 15.80 5.68 0.00 2.18 10.43 8.00 2.72 90.67

OF-043 PIRULEADO EXTERIOR M2 3.18 14.00 9.97 3.58 0.00 1.38 4.82 3.69 1.26 41.88

OF-026 PISO CON ALFOMBRA M2 113.44 11.10 7.90 2.84 0.00 1.09 20.46 15.68 5.33 177.84

OF-027 PISO CON ALFOMBRA AMERICANA M2 219.18 11.10 7.90 2.84 0.00 1.09 36.32 27.84 9.46 315.73

OF-028 PISO CON ALFOMBRA DE ALTO TRAFICO M2 140.41 11.10 7.90 2.84 0.00 1.09 24.50 18.78 6.38 213.00

OF-029 PISO DE ALFOMBRA TAPIZON M2 49.33 14.80 10.53 3.78 0.00 1.46 11.99 9.19 3.12 104.20
PISO DE CARPETA DE HORMIGON
OF-017 M2 43.65 51.10 36.37 13.07 0.00 5.03 22.38 17.16 5.83 194.59
SIMPLE E=7.5CM
PISO DE CEMENTO EN LUCIDO Y
OG-061 M2 59.05 52.50 37.37 13.43 0.00 5.17 25.13 19.27 6.55 218.47
EMPEDRADO
OF-018 PISO DE CEMENTO SOBRE EMPEDRADO M2 31.33 39.20 27.90 10.02 0.00 3.86 16.85 12.92 4.39 146.47
PISO DE CERAMICA CON COLOR
OF-019 M2 86.08 75.25 53.56 19.24 0.00 7.40 36.23 27.78 9.44 314.98
(40*40CM) SOBRE PISO FROTACHADO
PISO DE CERAMICA TIPO GRANITO
OF-020 SOBRE LOSA DE HORMIGON O PISO M2 66.44 52.50 37.37 13.43 0.00 5.17 26.24 20.12 6.84 228.11
FROTACHADO
OF-025 PISO DE PARQUET TAJIBO M2 79.55 66.60 47.41 17.03 0.00 6.55 32.57 24.97 8.49 283.17

OF-021 PISO DE PIEDRA TARIJA M2 82.25 52.50 37.37 13.43 0.00 5.17 28.61 21.93 7.45 248.71

OF-022 PISO DE PORCELANATO PULIDO 6MM M2 252.32 77.00 54.81 19.69 0.00 7.58 61.71 47.31 16.08 536.50

OF-023 PISO DE VINIL M2 46.41 42.00 29.90 10.74 0.00 4.13 19.98 15.32 5.21 173.69
PISO ENTABLONADO MADERA QUINA
OF-030 M2 243.00 61.40 43.70 15.70 0.00 6.04 55.48 42.53 14.46 482.31
QUINA
PISO LAMINADO FLOTANTE COMERCIAL
OF-031 M2 129.60 15.70 11.18 4.02 0.00 1.55 24.31 18.64 6.33 211.33
(ALTO TRAFICO)
OF-024 PISO MACHIMBRE CON ENVIGADO M2 314.36 116.15 82.68 29.71 0.00 11.43 83.15 63.75 21.67 722.90

OF-042 PISO PAEQUETON M2 132.03 43.25 30.79 11.06 0.00 4.26 33.21 25.46 8.65 288.71

IS-007 POZO ABSORBENTE D=12" PZA 612.98 504.00 358.75 128.89 0.00 49.58 248.13 190.23 64.66 2157.22
PROV Y COLOC DE SILLARES TIPO A
OH-001 (30X40X60) H=40CM MORTERO 1:3 CON M2 533.70 135.80 96.66 34.73 0.00 13.36 122.14 93.64 31.83 1061.86
ADITIVO ACELERANTE DE FRAGUADO
PROV Y COLOC DE SILLARES TIPO B
(30X30X40) MORTERO DOSIF 1:3
OH-003 M2 421.88 135.80 96.66 34.73 0.00 13.36 105.36 80.78 27.46 916.03
H=0.30M CON ADITIVO ACELERANTE DE
FRAGUADO EXCENTO DE CLORUROS
IS-006 PROV. COLOC. DE ACCESORIOS DE BAÑO GLB 203.23 35.00 24.91 8.95 0.00 3.44 41.33 31.69 10.77 359.32
PROV. Y COLOC. DE DISPENSADOR DE
IS-009 PZA 102.03 6.90 4.91 1.76 0.00 0.68 17.44 13.37 4.55 151.64
JABON LIQUIDO
PROV. Y COLOC. DE INHODORO
IS-011 PZA 598.19 227.00 161.58 58.05 0.00 22.33 160.07 122.72 41.71 1391.65
TANQUE BAJO
IS-010 PROV. Y COLOC. DE INHODORO TURCO PZA 101.50 227.00 161.58 58.05 0.00 22.33 85.57 65.60 22.30 743.93
PROV. Y COLOC. DE BASE DE DUCHA DE
IS-008 PZA 174.85 68.70 48.90 17.57 0.00 6.76 47.52 36.43 12.38 413.11
FIBRA DE VIDRIO 80X80 cm
PROV. Y COLOC. DE CAJA INTERSEPTORA
IS-005 PZA 52.75 74.00 52.67 18.92 0.00 7.28 30.84 23.65 8.04 268.15
DE PVC 6" X 30 cm
PROV. Y COLOC. DE GRIFO PARA
IS-012 PZA 113.43 37.00 26.34 9.46 0.00 3.64 28.48 21.84 7.42 247.61
LAVAPLATOS
IS-015 PROV. Y COLOC. DE LAVAMANOS PZA 1141.11 148.00 105.35 37.85 0.00 14.56 217.03 166.39 56.56 1886.85
PROV. Y COLOC. DE LAVANDERIA DE
IS-014 PZA 384.82 177.00 125.99 45.27 0.00 17.41 112.57 86.31 29.34 978.71
HORMIGON ARMADO
PROV. Y COLOC. DE MEZCLADORA PARA
IS-017 PZA 568.73 92.50 65.84 23.66 0.00 9.10 113.97 87.38 29.70 990.88
DUCHA
PROV. Y COLOC. DE VENTANA DE
OF-044 M2 461.54 37.00 26.34 9.46 0.00 3.64 80.70 61.87 21.03 701.58
ALUMINIO CON VIDRIO DE 4 mm
PROV. Y COLOC. INODORO TURCO
IS-013 PZA 172.01 74.00 52.67 18.92 0.00 7.28 48.73 37.36 12.70 423.67
TANQUE ALTO
IS-016 PROV. Y COLOC. LAVAPLATOS 1 FOSA PZA 777.86 148.00 105.35 37.85 0.00 14.56 162.54 124.62 42.36 1413.14
PROV. Y COLOC. TANQUE DE AGUA
IS-029 PZA 1100.00 148.00 105.35 37.85 0.00 14.56 210.86 161.66 54.95 1833.23
CAPACIDAD 1000LTS
PROV. Y COLOC. TANQUE DE AGUA
IS-028 PZA 650.00 148.00 105.35 37.85 0.00 14.56 143.36 109.91 37.36 1246.39
CAPACIDAD 500LTS
IS-030 PROV. Y COLOC. TINA CON GRIFERA PZA 1213.50 185.00 131.68 47.31 0.00 18.20 239.35 183.50 62.37 2080.91
PROVICION Y COLOCACION DE VIDRIO
OF-048 M2 67.87 18.50 13.17 4.73 0.00 1.82 15.91 12.20 4.15 138.35
CATEDRAL INCOLORO e=3 mm
PROVICION Y COLOCACION DE VIDRIO
OF-045 M2 54.29 18.50 13.17 4.73 0.00 1.82 13.88 10.64 3.62 120.65
e=3 mm
PROVICION Y COLOCACION DE VIDRIO
OF-046 M2 73.13 18.50 13.17 4.73 0.00 1.82 16.70 12.81 4.35 145.21
e=4 mm
PROVICION Y COLOCACION DE VIDRIO
OF-047 M2 119.41 18.50 13.17 4.73 0.00 1.82 23.64 18.13 6.16 205.56
e=6 mm
PROVISION Y COLOCACION DE VIDRIO
OF-015 M2 85.76 18.50 13.17 4.73 0.00 1.82 18.60 14.26 4.85 161.69
CATEDRAL COLOR E=3MM
PROVISION DE CAPA BASE PARA BACHES
VU-007 PROFUNDOS E=30 CM (CONFORMACION M2 48.84 5.77 4.11 1.48 2.66 0.57 9.51 7.29 2.48 82.71
Y NIVELACION SUELO CEMENTO)
PROVISION DE CAPA BASE PARA BACHES
VU-006 PROFUNDOS E=30 CM (CONFORMACION M2 44.40 8.97 6.38 2.29 1.72 0.88 9.70 7.43 2.53 84.30
Y NIVELACION)
PROVISIÓN E INSTALACIÓN DE CABLE 7
IE-007 pza 3.56 1.08 0.77 0.28 0.00 0.11 0.87 0.67 0.23 7.57
HILOS CU MONOPOLAR Nº14 AWG
PROVISIÓN E INSTALACIÓN DE CABLE
IE-005 M 7.69 1.08 0.77 0.28 0.00 0.11 1.49 1.14 0.39 12.95
NOMOPOLAR Nº 10 AWG THW
PROVISIÓN E INSTALACIÓN DE CABLE
IE-006 M 4.77 1.08 0.77 0.28 0.00 0.11 1.05 0.81 0.27 9.14
NOMOPOLAR Nº 12 AWG THW
PROVISIÓN E INSTALACIÓN DE CABLE
IE-003 M 17.51 1.08 0.77 0.28 0.00 0.11 2.96 2.27 0.77 25.75
NOMOPOLAR Nº 6 AWG THW
PROVISIÓN E INSTALACIÓN DE CABLE
IE-004 M 11.23 1.08 0.77 0.28 0.00 0.11 2.02 1.55 0.53 17.57
NOMOPOLAR Nº 8 AWG 7 HILOS
PROVISIÓN E INSTALACIÓN DE
IE-008 DISYUNTOR TERMOMAGNÉTICO PZA 79.50 43.50 30.96 11.12 0.00 4.28 25.40 19.48 6.62 220.86
BIPOLAR 15 AMP
PROVISIÓN E INSTALACIÓN DE
IE-009 DISYUNTOR TERMOMAGNÉTICO PZA 87.10 43.50 30.96 11.12 0.00 4.28 26.54 20.35 6.92 230.77
BIPOLAR 20 AMP
PROVISIÓN E INSTALACIÓN DE
IE-010 DISYUNTOR TERMOMAGNÉTICO PZA 95.40 43.50 30.96 11.12 0.00 4.28 27.79 21.31 7.24 241.60
BIPOLAR 30 AMP
PROVISIÓN E INSTALACIÓN DE
IE-011 DISYUNTOR TERMOMAGNÉTICO PZA 110.50 43.50 30.96 11.12 0.00 4.28 30.05 23.04 7.83 261.28
BIPOLAR 40 AMP
PROVISION E INSTALACION DE DUCHA
IS-031 PZA 354.87 15.70 11.18 4.02 0.00 1.55 58.10 44.54 15.14 505.10
METALICA
PROVISIÓN E INSTALACIÓN DE FOCO
IE-012 PZA 17.29 10.00 7.12 2.56 0.00 0.98 5.69 4.36 1.48 49.48
AHORRADOR DE 20W CON SOQUET
PROVISION E INSTALACION DE
IE-014 PZA 123.92 86.00 61.21 21.99 0.00 8.46 45.24 34.68 11.79 393.29
INTERRUPTORES ELECTRICOS DOBLES
PROVISION E INSTALACION DE
IE-013 PZA 130.81 24.40 17.37 6.24 0.00 2.40 27.18 20.84 7.08 236.32
LUMINARIAS FLUORESCENTES 2*20W
PROVISION E INSTALACION DE PLACA DE
IE-015 PZA 18.60 29.00 20.64 7.42 0.00 2.85 11.78 9.03 3.07 102.39
INTERRUPTOR SIMPLE
PROVISION E INSTALACION DE PLACA DE
IE-016 PZA 39.00 5.80 4.13 1.48 0.00 0.57 7.65 5.86 1.99 66.48
INTERRUPTOR TRIPLE
PROVISION E INSTALACION DE TUBERIA
IS-034 ML 222.91 122.50 87.20 31.33 0.00 12.05 71.40 54.74 18.61 620.74
DE CONCRETO D=16"
PROVISION Y COLOCACION DE CAPA
CC-008 M2 35.10 8.22 5.85 2.10 47.41 0.81 14.92 11.44 3.89 129.74
BASE E=20CM
PROVISION Y COLOCACION DE CAPA
CC-007 M3 82.00 2.68 1.91 0.69 22.90 0.26 16.57 12.70 4.32 144.03
SUB-BASE
PROVISION Y COLOCACION DE OJOS DE
VU-009 PZA 13.30 4.90 3.49 1.25 15.00 0.48 5.76 4.42 1.50 50.10
GATO
PROVISION Y COLOCACION DE
VU-008 SEÑALIZACION DIRECCIONAL NO PZA 33.06 24.95 17.76 6.38 25.00 2.45 16.44 12.60 4.28 142.92
REFLECTIVA DE 60*20 CM
PROVISION Y COLOCACION DE
VU-010 M2 38.54 3.25 2.31 0.83 3.00 0.32 7.24 5.55 1.89 62.93
SEÑALIZACION HORIZONTAL REFLECTIVA
PROVISION Y COLOCACION DE
VU-011 SEÑALIZACION VERTICAL DE 2 COLORES PZA 633.15 35.00 24.91 8.95 1.78 3.44 106.08 81.33 27.64 922.28
60*60 Y 75*50 GRADO DIAMANTE
PROVISION Y COLOCACION DE
VU-014 SEÑALIZACION VERTICAL GRADO PZA 865.49 85.49 60.85 21.86 3.55 8.41 156.85 120.25 40.87 1363.62
DIAMANTE 90*60 CM 3 COLORES
PROVISION Y COLOCACION DE
SEÑALIZACION VERTICAL LAMINA
VU-013 PZA 703.23 15.00 10.68 3.84 0.00 1.48 110.13 84.44 28.70 957.50
AUTOADHESIVA NO REFLECTIVA 80*80 Y
80*40
PROVISION Y COLOCACION DE
VU-012 SEÑALIZACION VERTICAL NO PZA 340.45 35.00 24.91 8.95 1.78 3.44 62.18 47.67 16.20 540.58
REFLECTIVA 60*60 Y 75*50
PROVISION Y COLOCADO DE CESPED
AV-002 M2 238.10 34.50 24.56 8.82 0.00 3.39 46.41 35.58 12.09 403.45
SINTETICO
AV-001 PROVISION Y COLOCADO DE TEPE M2 33.30 11.50 8.19 2.94 0.00 1.13 8.56 6.56 2.23 74.41

IS-039 PROVISIÓN Y TENDIDO DE FG 2" M 99.08 18.50 13.17 4.73 0.00 1.82 20.60 15.79 5.37 179.06
PROVISION Y TENDIDO DE TUBERIA DE
IS-033 ML 134.37 105.00 74.74 26.85 0.00 10.33 52.69 40.40 13.73 458.11
CONCRETO DE 12"
PROVISION Y TENDIDO DE TUBERIA DE
IS-032 ML 88.79 77.00 54.81 19.69 0.00 7.58 37.18 28.51 9.69 323.25
CONCRETO DE D=10"
PROVISION Y TENDIDO DE TUBERIA DE
IS-038 ML 73.72 14.80 10.53 3.78 0.00 1.46 15.64 11.99 4.08 136.00
FG 1 1/2"
PROVISION Y TENDIDO DE TUBERIA DE
IS-037 ML 48.96 14.80 10.53 3.78 0.00 1.46 11.93 9.15 3.11 103.72
FG 1"
PROVISION Y TENDIDO DE TUBERIA DE
IS-036 ML 36.66 12.21 8.69 3.12 0.00 1.20 9.28 7.12 2.42 80.70
FG 3/4"
PROVISIÓN Y TENDIDO DE TUBERÍA DE
IS-042 M 79.70 12.95 9.22 3.31 0.00 1.27 15.97 12.24 4.16 138.82
POLIPROPILENO DE 1"
PROVISIÓN Y TENDIDO DE TUBERÍA DE
IS-040 M 30.75 11.10 7.90 2.84 0.00 1.09 8.05 6.17 2.10 70.00
POLIPROPILENO DE 1/2"
PROVISIÓN Y TENDIDO DE TUBERÍA DE
IS-041 M 43.54 11.10 7.90 2.84 0.00 1.09 9.97 7.64 2.60 86.68
POLIPROPILENO DE 3/4"
PROVISIÓN Y TENDIDO DE TUBERIA DE
IS-047 M 17.32 14.80 10.53 3.78 0.00 1.46 7.18 5.51 1.87 62.45
PVC 1" E=40
PROVISIÓN Y TENDIDO DE TUBERÍA DE
IS-044 M 15.67 20.35 14.49 5.21 0.00 2.00 8.66 6.64 2.26 75.28
PVC 2" C-9
PROVISIÓN Y TENDIDO DE TUBERIA DE
IS-048 M 27.99 20.35 14.49 5.21 0.00 2.00 10.51 8.06 2.74 91.35
PVC 2" E=40
PROVISIÓN Y TENDIDO DE TUBERÍA DE
IS-046 M 7.51 16.20 11.53 4.14 0.00 1.59 6.15 4.71 1.60 53.43
PVC 3/4" E=40
PROVISIÓN Y TENDIDO DE TUBERÍA DE
IS-045 M 56.16 3.70 2.63 0.95 0.00 0.36 9.57 7.34 2.49 83.20
PVC 4" C-9
PROVISIÓN Y TENDIDO DE TUBERIA DE
IS-049 M 72.60 3.72 2.65 0.95 0.00 0.37 12.04 9.23 3.14 104.70
PVC 6" SDR 35
PROVISION Y TENDIDO DE TUBERIA DE
IS-035 ML 29.59 12.21 8.69 3.12 0.00 1.20 8.22 6.30 2.14 71.47
TUBERIS DE FG 1/2"
PROVISIÓN Y TENDIDO DE TUBO DE PVC
IS-050 M 12.57 16.20 11.53 4.14 0.00 1.59 6.90 5.29 1.80 60.02
DESAGUE 2"
PROVISIÓN Y TENDIDO DE TUBO DE PVC
IS-051 M 19.65 18.50 13.17 4.73 0.00 1.82 8.68 6.66 2.26 75.47
DESAGUE 3"
PROVISIÓN Y TENDIDO DE TUBO DE PVC
IS-052 M 29.90 20.35 14.49 5.21 0.00 2.00 10.79 8.27 2.81 93.82
DESAGUE 4"
PROVISIÓN Y TENDIDO DE TUBO DE PVC
IS-053 M 69.14 25.90 18.44 6.62 0.00 2.55 18.40 14.11 4.79 159.95
DESAGUE 6"
PROVISIÓN Y TENDIDO E TUBERÍA DE
IS-043 M 9.00 11.10 7.90 2.84 0.00 1.09 4.79 3.67 1.25 41.64
PVC 1/2" C-9
IE-018 PUNTO TELEFONO PTO 72.05 101.71 72.40 26.01 0.00 10.01 42.33 32.45 11.03 367.99
IE-017 PUNTO TV PTO 111.46 95.33 67.86 24.38 0.00 9.38 46.26 35.47 12.06 402.20
RASGOS Y BUÑAS CON ESTUCO SOBRE
OF-049 ML 1.39 28.00 19.93 7.16 0.00 2.75 8.88 6.81 2.32 77.24
MURO DE LADRILLO
IS-027 REJILLA DE PISO DE BRONCE PZA 37.00 35.00 24.91 8.95 0.00 3.44 16.40 12.57 4.27 142.54

CC-021 RELLENO CON MATERIAL GRANULAR M3 62.23 52.50 37.37 13.43 0.00 5.17 25.61 19.63 6.67 222.61

MT-010 RELLENO CON TIERRA CERNIDA M3 0.00 35.00 24.91 8.95 0.00 3.44 10.85 8.32 2.83 94.30
RELLENO Y COMPACTADO CON
MT-006 M3 0.00 21.00 14.95 5.37 12.22 2.07 8.34 6.40 2.17 72.52
COMPACTADORA SALTARINA
RELLENO Y COMPACTADO CON
MT-011 M3 72.45 35.00 24.91 8.95 10.47 3.44 23.28 17.85 6.07 202.42
TIERRA(MAT. DE PRESTAMO
MT-005 RELLENO Y COMPACTADO MANUAL M3 0.00 28.00 19.93 7.16 0.00 2.75 8.68 6.65 2.26 75.43

AV-003 REMOCIN DE TEPE M2 0.00 17.50 12.46 4.48 0.00 1.72 5.42 4.16 1.41 47.15

CC-004 REMOCION DE DERRUMBES M3 0.00 1.73 1.23 0.44 17.08 0.17 3.10 2.38 0.81 26.94
REPLANTEO Y TRAZADO CON EQUIPO
OP-003 M2 2.04 1.03 0.73 0.26 1.50 0.10 0.85 0.65 0.22 7.38
TOPOGRAFICO(AREA)
OP-005 REPLANTEO Y TRAZADO DE CANALES ML 0.75 4.33 3.08 1.11 1.50 0.43 1.68 1.29 0.44 14.61

OP-004 REPLANTEO Y TRAZADO LINEAL ML 0.95 2.30 1.64 0.59 1.50 0.23 1.08 0.83 0.28 9.40

MT-009 RETIRO DE EXCOMBROS CON VOLQUETA M3 0.00 5.90 4.20 1.51 40.00 0.58 7.83 6.00 2.04 68.06
REVESTIMIENTO DE CERAMICA CON
OF-032 M2 88.64 85.10 60.57 21.76 0.00 8.37 39.67 30.41 10.34 344.86
COLOR (INCLUYE REVOQUE DE PARED)
REVESTIMIENTO DE PIEDRA PIZARRA
OF-033 M2 126.00 74.00 52.67 18.92 0.00 7.28 41.83 32.07 10.90 363.67
CORTADA
REVOQUE CAL-CEMENTO EXTERIOR
OF-012 M2 30.13 81.40 57.94 20.82 0.00 8.01 29.75 22.81 7.75 258.61
SOBRE ADOBE
REVOQUE CASTIGADO DE CEMENTO
OF-010 M2 15.24 74.00 52.67 18.92 0.00 7.28 25.22 19.33 6.57 219.23
S/LADRILLO
REVOQUE CASTIGADO DE CEMENTO
OF-011 M2 23.52 100.40 71.46 25.68 0.00 9.88 34.64 26.56 9.03 301.17
SOBRE ADOBE
OF-005 REVOQUE CIELO RASO M2 87.63 81.00 57.66 20.72 0.00 9.56 38.49 29.51 10.03 334.60
OF-006 REVOQUE CIELO RASO SOBRE LOSA M2 10.06 74.00 52.67 18.92 0.00 7.28 24.44 18.74 6.37 212.48
REVOQUE DE CEMENTO SOBRE MURO
OF-009 M2 12.12 74.00 52.67 18.92 0.00 7.28 24.75 18.97 6.45 215.16
DE PIEDRA
OF-008 REVOQUE EXTERIOR M2 21.56 62.90 44.77 16.09 0.00 6.19 22.73 17.42 5.92 197.58

OF-007 REVOQUE INTERIOR DE YESO M2 5.39 59.20 42.14 15.14 0.00 5.82 19.15 14.68 4.99 166.51

CC-018 RIEGO DE LIGA M2 1.94 0.14 0.10 0.04 0.72 0.01 0.44 0.34 0.12 3.85

DE-007 ROTURA DE ACERAS M2 0.00 10.35 7.37 2.65 6.00 1.02 4.11 3.15 1.07 35.72

DE-008 ROTURA DE ASFALTO M2 0.00 12.40 8.83 3.17 15.00 1.22 6.09 4.67 1.59 52.97

CC-016 SEÑAL PREVENTIVA PZA 816.59 35.00 24.91 8.95 0.00 3.44 133.33 102.22 34.75 1159.19

CC-015 SEÑAL REGLAMENTARIA PZA 816.59 35.00 24.91 8.95 0.00 3.44 133.33 102.22 34.75 1159.19
SEÑALIZACION HORIZONTAL PINTADO
CC-017 M2 3.15 0.59 0.42 0.15 0.96 0.06 0.80 0.61 0.21 6.95
DE CALZADA ANCHO=10CM
SILLARES TIPO A EXTRACCION Y
SUSTITUCION H=0.3M CON ADITIVO
OH-002 M2 429.90 157.50 112.11 40.28 0.00 15.49 113.29 86.86 29.52 984.95
ACELERANTE DE FRAGUADO EXCENTO
DE CLORUROS
CC-005 SOBRECARREO Y TERRAPLENES M3 0.00 0.25 0.18 0.06 2.63 0.02 0.47 0.36 0.12 4.09
SOBRECIMIENTO DE HORMIGON
OG-009 M3 453.61 310.00 220.66 79.28 0.00 30.50 164.11 125.82 42.76 1426.74
CICLOPEO
CC-010 TRATAMIENTO SUPERFICIAL DOBLE M2 28.04 1.08 0.77 0.28 7.73 0.11 5.70 4.37 1.49 49.57