You are on page 1of 1

NOTE:

1. FOR SYMBOLS & LEGENDS REFER DRAWING NO. TCE.11191A-D-4211.


2. THE VALUES OF PRESSURE AT THE CONSUMPTION POINTS AS SHOWN IN THE TABLE BELOW ARE
TENTATIVE AND SAME WILL BE FINALIZED LATER.

INSTRUMENT AIR

F-2 TCE.11191A-D-4206
SHEET 1 OF 1

AIR DRYER
(2 x 100%)

AFTER FILTER INSTRUMENT AIR RECEIVER


#1 AIR COMPRESSOR PRE FILTER (1 x 100%)
(2 x 100%)
(2 x 100%) CAP.: 2 m³

SERVICE AIR

F-6 TCE.11191A-D-4206
SHEET 1 OF 1

#2 AIR COMPRESSOR SERVICE AIR RECEIVER


(1 x 100%)
AFTER COOLER CAP.: 2 m³
(2 x 100%)

AIR COMPRESSOR
(2 x 100%)
CAP.: 120 Nm³/ Hr.

FIRE PUMP AREA

WTP AREA
WTP AREA

-
X -

GTG AREA UNIT11


GENERATOR UNIT11

GAS TURBINE AREA

VALVES UNIT11
GAS TURBINE

IPBD UNIT11

SHEET 1 OF 1
PNEUMATIC
-

-
-

-
-

CONDITIONING AREA KP/


P1 17-01-2019 FOR REVIEW RK KSN JNR
CRUDE OIL

KP/
P0 14-12-2018 FOR REVIEW RK KSN JNR

GTG AREA UNIT12


TREATMENT SYSTEM
-

DG AREA
FUEL OIL

-
-

GENERATOR UNIT12

GAS TURBINE AREA


-

PESCO
IPBD UNIT12
VALVES UNIT12
GAS TURBINE

PNEUMATIC
-
-

-
-

-
-

SERVICE AIR
INSTRUMENT AIR TCE.11191A-D-4206 B-7
SHEET 1 OF 1
TCE.11191A-D-4206 A-7
SHEET 1 OF 1

ADEN POWER PLANT - PHASE 1

PFD - COMPRESSED AIR SYSTEM


³ 17 17 1.25 1.25 2.5 3.5 40 40 40 40 60 40

60 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50

8.6 8.5 8.5 8.5 8.4 8.1 8 8 8.5 8.5 7.9 7.9 7.9 7.9 7.9 7.8 8.5 8.4 8.4 8.4 8.3 8.3 TCE.11191A-D-4206 P1

You might also like