Professional Documents
Culture Documents
STATUS
FORWARD TO ENGR GALLATO (for signature)
FORWARDED TO TABUK OFFICE
APPROVED BY CONSTRUCTION DIVISION (currently at BHM BAGUIO OFFICE)
LEGEND
TO BE SENT TO MA'AM VANGIE (see date on comments)
DESCRIPTION Project ID
Time Extension 4 18PK0037
Received Request For Time Extension 4 18PK0051
Received Request For Time Extension 4 18PK0030
18PK0014
18PK0030
18PK0037
18PK0041
18PK0051
18PK0065
18PK0066
18PK0067
18PK0071
Request for Time Extension Due To Weather 17PL0211
Request for Time Extension Due To Weather 17PL0182
Request for Time Extension Due To Weather 17PL0217
Request for Time Extension Due To Weather 17PL0183
Request for Time Extension Due To Weather 17PL0184
Request for Time Extension Due To Weather 17PL0181
Checklist Deficit 17PL0220
Checklist Deficit 18PK0037
Checklist Deficit 18PK0051
Checklist Deficit 18PK0030
FOR Signature of Gallato 17PL0211
FOR Signature of Gallato-Request for TIME EXTENSION 2 17PL0220
FOR Signature of Gallato-Request for TIME EXTENSION 2 17PL0183
FOR Signature of Gallato-Request for TIME EXTENSION 2 17PL0184
FOR Signature of Gallato-Request for TIME EXTENSION 2 17PL0181
FOR Signature of Gallato-Request for TIME EXTENSION 2 17PL0217
FOR Signature of Gallato-Request for TIME EXTENSION 2 11PL0182
or signature)
Construction of Taga Flood Control along Balbalan-Pinukpuk Road Barangay Poblacion, Taga , Pinukpuk, Kalinga
Wagud Flood Control along Cal-owan River Pinukpuk, Kalinga
Package 4: a) Liplipoken-Pinukpuk Flood Control Along Balbalan-Pinukpuk Road, Taga, Pinukpuk; b) Capegan Flood Control
Ammacian Floo Control along Cal-owan River, , Pinukpuk, Kalinga
Ammacian Floo Control along Cal-owan River, , Pinukpuk, Kalinga
Wagud Flood Control along Cal-owan River Pinukpuk, Kalinga
Package 6: CONSTRUCTION OF FLOOD CONTROL a) Apantan Flood Control along Saltan River, Ammacian, Pinukpuk, Kalinga
CONSTRUCTION OF CONCRETE ROAD Bul0-Nawoy Road Leading To Bulo-Nawoy Roce Terraces Balbalan, Kalinga
CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT of Various Infrastructure Including Local Project / Construction
Construction of Gravel Road-Uguid Subterranean Tourism Destination Access Road, Maling (Kabugao)
Construction of Taga Flood Control along Balbalan-Pinukpuk Road Barangay Poblacion, Taga , Pinukpuk, Kalinga
Alias Project Location TIME EXTENSION
✘ TE4
✘ TE 3
✘ TE 3
✘ TE 2
✘ TE 1
TE 1
✘ WSO 1
PICTURES Remarks
Construction/ Improvement of Access Road Leading To Trade and Industries and Economic Zones; B
coffee processing industry, homestyle industry(Basketry and soft broom making) and food processin
000+340
Bridge-Retrofitting/ Strengthening of Binwaan Bridge (BO4364LZ) along Kalinga-Abra Road, Balbalan
40M TAGA FC
FIAT
SP
DPWH
PROJECT ID
18PK0030
17PL0182
17PL0183
17PL0181
17PL0220
17PL0184
18PK0014
18PK0037
18PK0041
18PK0041
18PK0030
18PK0037
18PK0071
18PK0071
18PK0051
18PK0007
18PK0066
18PK0051
18PK0066
18PK0071
17PL0184
17PL0220
17PL0217
17PL0181
17PL0183
17PL0182
18PK0071
18PK0014
18PK0071
18PK0066
18PK0067
18PK0051
STATUS
GR GALLATO (for signature)
TABUK OFFICE
NSTRUCTION DIVISION (currently at BHM BAGUIO OFFICE)
DESCRIPTION
WSO 01
TE 02
TE 02
TE 02
TE 02
TE 02
WSO 01
WSO 02
WSO 01
TE 02
TE 03
TE 03
TE 01
TE 02
TE 03
TE 01
TE 01
WSO 01
WSO 01
WSO 01
Lease Contract
REQUEST FOR TE 02 (DUE TO WEATHER)
REQUEST FOR APPROVAL OF TE 02
REQUEST FOR TE 02 (DUE TO WEATHER)
REQUEST FOR TE 02 (DUE TO WEATHER)
REQUEST FOR TE 02 (DUE TO WEATHER)
REQUEST FOR TE 02 (DUE TO WEATHER)
TE 01
TE 03
WSO 01
WSO 01
TE 01
Te02
ALIAS
25M UGUID KABUGAO MALING TOURISM
53M WAGUD FC 2
53M AMMACIAN FC 1
51M WAGUD FC 1
88M APATAN FC
58M AMMACIAN FC 2
96M BALBALAN REHAB
42M RICE TERRACES ROAD BULO-NAWOY
POBLACION MULTIPURPOSE BLDG
POBLACION MULTIPURPOSE BLDG
25M UGUID KABUGAO MALING TOURISM
42M RICE TERRACES ROAD BULO-NAWOY
BALBALAN AGRI-INDUSTRIAL SCHOOL (WORKSHOP BLDG)
BALBALAN AGRI-INDUSTRIAL SCHOOL (WORKSHOP BLDG)
ACIGA-TAWANG-BUAYA-MABACA KO000+000 - KO0001+500
17PL0217
17PL0220
18PK0037
18PK0041
18PK0041
18PK0065
18PK0065
15PH0080
17PL0051
17PL0183
17PK0071
18PK0030
18PK0030
18Z00038
January 18, 2019
18PK0071
18PK0066
17PL0182
17PL0183
17PL0220
17PL0181
Time Extension 03
1) Straight Line Diagram
WSO 01
WSO 01
TE 03
TE 01
TE 02
TE 01
TE 02
WSO 01
53M WAGUD FC 2
53M AMMACIAN FC 1
88M APATAN FC
51M WAGUD FC 1
for approval
approved
approved
for checking
for checking
for checking
for checking
for checking
for checking
LOGS
DATE SENT
17PK0004 9M BANGAD FC
17PK0005 9M MALING FC
17PK0008 9M LUPLUPA FC
17PK0010 9M IBONG FC
17PK0011 9M MAATOP FC
17PK0012 9M CAGALUAN FC
17PK0015 9M TALALANG FC
17PK0016 9M BALBALSANG FC
17PK0017 CAPT. BALANSI 3.1M
17PK0018 PANTIKIAN FMR
17PK0024 9M BUGNAY CREEK FC
17PK0025 9M POSWOY FC
17PK0031 6M TALALANG-GAANG RD 1
17PK0036 14M BONOG BRIDGE REHAB
17PK0057 CLUSTER 2- CALAMITY (LAWIN)
17PK0058 (Calamity)
17PK0061 45M PURAG FC
17PK0062 45M BONOG (LEFT) FC
17PK0063 45M BONOG (RIGHT) FC
17PK0066 45M TALALANG FC
17PK0067 45M CAGALUAN FC
17PK0069 4M BALANTOY-BULO FC
17PK0071 29M BALBALAN REHAB
17PK0072 9M DANGLIS CREEK FC
17PK0074 2M BINWAAN BRIDGE
17PK0075 6.6M BALBALAN-PASIL REHAB
17PK0076 2.1M DAO-ANGAN REHAB
17PK0077 9M REHAB - LUBUAGAN-BATONG BUHAY ROAD
17PK0080 45M SALTAN FC
17PK0081 38M REHAB (SLOPE PROTECTION RECONSTRUCTION)
17PK0083 45M BALBALASANG FC
17PK0085 47 AMBATO FC
17PK0086 45M DUCLIGAN FC
17PK0098 WESTERN KALINGA HS
17PK0100 UBUAL ELEM SCHOOL
17PK0110 AB-ABAN ELEM SCHOOL
17PK0133 7.8M KALINGA-ABRA ROAD REHAB
17PK0134 2.1M BALBALAN-PINUKPUK ROAD REHAB
17PK0137 3.3M AGRI-INDUSTRIAL SCHOOL
17PK0138 3.5M KABUGAO ELEM SCHOOL
17PK0139 3.5M SESEC-AN PRIMARY SCHOOL
17PK0142 3.4M PANTIKIAN ELEM SCHOOL
17PK0143 5M AGRI-INDUSTRAL CHOOL 1
17PK0144 5M AGRI-INDUSTRIAL SCHOOL 2
17PK0148 1.9M KABUGAO ELEM SCHOOL
18PK0001 9.6M TIMOD FC
18PK0003 4.6M ASSET PRESERVATION PASIL
18PK0004 2.3M ASSET PRESERVATION BALBALAN
18PK0005 9.6M TAWANG FC
18PK0014 96M BALBALAN REHAB
18PK0017 BALBALAN ELEM SCHOOL
18PK0018 SALEGSEG COMMUNITY SCHOOL
18PK0019 TALALANG ELEM SCHOOL
18PK0022 SADSADAN ELEM SCHOOL
18PK0024 BALBALAN AGRI-INDUSTRIAL SCHOOL
18PK0025 16M GAPS BALBALAN
18PK0030 25M KABUGAO MALING TOURISM
18PK0033 6.7M TALALANG-GAANG RD 2
18PK0037 42M RICE TERRACES ROAD BULO-NAWOY
18PK0038 MATACOB BRIDGE
18PK0041 POBLACION MULTIPURPOSE BLDG
18PK0043 GAANG FOOT BRIDGE
18PK0044 BULALAYAO/ABLEG WATER WORKS REHAB
17PK0148 1.9M KABUGAO ELEM SCHOOL
18PK0001 9.6M TIMOD FC
18PK0003 4.6M ASSET PRESERVATION PASIL
18PK0004 2.3M ASSET PRESERVATION BALBALAN
18PK0005 9.6M TAWANG FC
18PK0014 96M BALBALAN REHAB
18PK0017 BALBALAN ELEM SCHOOL
18PK0018 SALEGSEG COMMUNITY SCHOOL
18PK0019 TALALANG ELEM SCHOOL
18PK0022 SADSADAN ELEM SCHOOL
18PK0024 BALBALAN AGRI-INDUSTRIAL SCHOOL
18PK0025 16M GAPS BALBALAN
18PK0030 25M KABUGAO MALING TOURISM
18PPK0033 6.7M TALALANG-GAANG RD 2
LOCATION
PARINA, APAYAO
BALBALAN, KALINGA
BALBALAN, KALINGA
BALBALAN, KALINGA
BALBALAN AND PASIL, KALINGA
NAMALTUGAN, APAYAO
BALBALAN, KALINGA
BALBALAN, KALINGA
BALBALAN, KALINGA
MUSIMOT, KABUGAO, APAYAO
(POBLACION) CLAVERIA, CALANASAN, APAYAO
KABUGAWAN, CALANASAN, APAYAO
Balbalan, Kalinga
Balbalan, Kalinga
EKC
BHM CONSTRUCTION
BHM CONSTRUCTION
balan, Kalinga
REMARKS
INTERIM PROGRESS BILLING
INTERIM PROGRESS BILLING
DISBURSEMENT VOUCHER
To be submitted by the Contractor
1. Letter Request of Contractor For Payment
2. Statement of Work Accomplished and Monthly Certificate of Payment
3. BIR FORM NO. 2307 (Certificate of Creditable Taxes Withheld at Source), if any
4. BIR FORM NO. 2550 M- VAT Declaration
5.Certifacate of Materials Quality Test (Materials on Site), if any
6. Materials Test Report/ Quality Test
7. Certification of Clearance for Equipment Rentals and/or Lease (Concerned RES/ Area Shop) if any
8.Certififcation of Clearance on Labor and Materials Payment
9. Certificate of Materials Quality Control Assurance (QCA)
10. Contractor's Affidavit- duly notarized
11. Statement of Time Elapsed (Justification Letter including complianceith calibrated actions is needed if accomplishment is ne
12. Backup Computation
13. Pictures of Work Accomplished (size 3R)- "with proper labeling''
14. Change Order/ Extra Work Order/ Time Extension/Suspension and Resume Order, if needed
15. Copy of Contract Lease/ Rental Agreement for Facilities to the Engineer and Official Receipt for Lease/ Rent/Purchase- OR a
16. Official Receipt of the previous payment, if not yet submitted to the Accounting Division or copy of duly received OR by the
17. One set certified true copy of all the documents submitted for accounting's copy