You are on page 1of 3

ACTUAL MT %wt

BLENDING SIMULATION PLAN MT %wt HHS #DIV/0!


HHS 15,700 21% HU #DIV/0!
ETA : Feb 24,2018 LS 21,400 29% LU #DIV/0!
Vessel : MV.ALKYON LU 34,000 46% LS #DIV/0!
Buyer : ADANI HUL 2,900 4% Total - #DIV/0!
Destination : India Total 74,000 100%
Date : 22-Feb
Revision : 0
Stowage : 74000 Mt CONTROL CONTROL APPROVAL
SIMULATION Rapid Actual COA
COAL TM Ash TS GAR BARGE Tonnage TM Ash TS GAR Tonnage (MT) TM Ash TS GAR TM Ash TS GAR
Queue Sequence TONNAGE STOCKPILE
TYPE %wt %wt %wt %wt TUG Actual %wt %wt %wt %wt Actual %wt %wt %wt %wt %wt %wt %wt %wt
Stage 1 1700 HHS 32.5 5.6 2.66 4350 1700 30.9 6.9 2.61 4441
1 Stage 2 2300 7400 LS 33.5 39.6 5.6 4.6 0.55 0.97 4350 3959 BG. LINTAS SAMUDERA 82 2349.849 31.8 3.6 0.49 4538
Stage 3 3400 LU 47.2 3.5 0.41 3500 3400 46.6 3.3 0.41 3509
Stage 1 1700 HHS 32.5 5.6 2.66 4350
2 Stage 2 2300 7400 LS 33.5 39.6 5.6 4.6 0.55 0.97 4350 3959
Stage 3 3400 LU 47.2 3.5 0.41 3500
Stage 1 1450 HUL 47.0 4.8 1.61 3250
Stage 2 1500 LS 32.2 4.4 0.55 4350
3 7400 42.0 4.2 0.99 3744
Stage 3 1050 HHS 32.5 5.6 2.66 4350
Stage 4 3400 LU 47.2 3.5 0.41 3500
Stage 1 1450 HUL 47.0 4.8 1.61 3250
Stage 2 1500 LS 32.2 4.4 0.55 4350
4 7400 42.0 4.2 0.99 3744
Stage 3 1050 HHS 32.5 5.6 2.66 4350
Stage 4 3400 LU 47.2 3.5 0.41 3500
Stage 1 1700 HHS 32.5 5.6 2.66 4350
5 Stage 2 2300 7400 LS 33.5 39.6 5.6 4.6 0.55 0.97 4350 3959
Stage 3 3400 LU 47.2 3.5 0.41 3500
Stage 1 1700 HHS 32.5 5.6 2.66 4350
6 Stage 2 2300 7400 LS 33.5 39.6 5.6 4.6 0.55 0.97 4350 3959
Stage 3 3400 LU 47.2 3.5 0.41 3500
Stage 1 1700 HHS 32.5 5.6 2.66 4350
7 Stage 2 2300 7400 LS 33.5 39.6 5.6 4.6 0.55 0.97 4350 3959
Stage 3 3400 LU 47.2 3.5 0.41 3500
Stage 1 1700 HHS 32.5 5.6 2.66 4350
8 Stage 2 2300 7400 LS 33.5 39.6 5.6 4.6 0.55 0.97 4350 3959
Stage 3 3400 LU 47.2 3.5 0.41 3500
Stage 1 1700 HHS 32.5 5.6 2.66 4350
9 Stage 2 2300 7400 LS 33.5 39.6 5.6 4.6 0.55 0.97 4350 3959
Stage 3 3400 LU 47.2 3.5 0.41 3500
Stage 1 1700 HHS 32.5 5.6 2.66 4350
10 Stage 2 2300 7400 LS 33.5 39.6 5.6 4.6 0.55 0.97 4350 3959
Stage 3 3400 LU 47.2 3.5 0.41 3500

Expected Result 74,000 40.1 4.6 0.97 3916 7,450 38.349126 4.1864541 0.9368915 4046.2451 - .000 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Spec Contract 1.00 4000

Prepared by Acknowledge by Approved By

Hendra Komara Andry Yunandar Mulyanto Wibowo KJ Heo


Spv. QC Sr.Supt QC Manager Shipping GM QC & Shipping
ACTUAL MT %wt
BLENDING SIMULATION PLAN MT %wt HHS 7,200 20
HHS 15,700 21% HUL 2,936 8
ETA : Feb 24,2018 LS 21,400 29% LU 16,249 45
Vessel : MV.ALKYON LU 33,400 46% LS 9,890 27
Buyer : ADANI HUL 2,900 4% Total 36,275 100
Destination : India Total 73,400 100%
Date : 23-Feb
Revision : 01(Stowage Plan)
Stowage : 73050 Mt CONTROL CONTROL APPROVAL
SIMULATION Rapid Actual COA
COAL TM Ash TS GAR BARGE Tonnage TM Ash TS GAR Tonnage (MT) TM Ash TS GAR TM Ash TS GAR
Queue Sequence TONNAGE STOCKPILE
TYPE %wt %wt %wt %wt TUG Actual %wt %wt %wt %wt Actual %wt %wt %wt %wt %wt %wt %wt %wt
Stage 1 1700 HHS 32.5 5.6 2.66 4350 1700 30.9 6.9 2.61 4441
1 Stage 2 2300 7400 LS 33.5 39.6 5.6 4.6 0.55 0.97 4350 3959 BG. LINTAS SAMUDERA 82 2349.849 31.8 3.6 0.49 4538 7449.849 38.3 4.3 0.96 4048
Stage 3 3400 LU 47.2 3.5 0.41 3500 3400 46.6 3.3 0.41 3509
Stage 1 1700 HHS 32.5 5.6 2.66 4350 1700 31.2 4.9 2.41 4504
2 Stage 2 2300 7400 LS 33.5 39.6 5.6 4.6 0.55 0.97 4350 3959 BG. Soekawati 369 2240 32.6 4.0 0.55 4485 7340.27 39.1 4.1 0.95 3992
Stage 3 3400 LU 47.2 3.5 0.41 3500 3400 46.8 3.0 0.36 3494
Stage 1 1450 HUL 47.0 4.8 1.61 3250 1450 47.0 4.2 1.03 3452
Stage 2 1500 LS 32.2 4.4 0.55 4350 1500 30.9 4.3 0.63 4564
7400 42.0 4.2 0.99 3744 BG. LINTAS SAMUDERA 73 6694.992 41.1 4.0 0.96 3854
3 Stage 3 1050 HHS 32.5 5.6 2.66 4350 1050 31.8 4.9 2.45 4479
Stage 4 3400 LU 47.2 3.5 0.41 3500 2694.992 46.8 3.1 0.39 3490
RC Mv.SHINANO 734.731 36.3 7.4 1.99 4030 734.731 36.3 7.4 1.99 4030
Stage 1 1450 HUL 47.0 4.8 1.61 3250 1485.795 48.7 4.2 0.95 3375
Stage 2 1500 LS 32.2 4.4 0.55 4350 1500 32.2 3.5 0.46 4514
4 7400 42.0 4.2 0.99 3744 BG. LINTAS SAMUDERA XVIII 7435.795 41.9 4.4 0.84 3808
Stage 3 1050 HHS 32.5 5.6 2.66 4350 1050 33.1 5.5 2.40 4360
Stage 4 3400 LU 47.2 3.5 0.41 3500 3400 46.2 3.2 0.42 3538
Stage 1 1700 HHS 32.5 5.6 2.66 4350 1700 30.9 5.6 2.22 4510
5 Stage 2 2300 7300 LS 33.5 39.5 5.6 4.7 0.55 0.98 4350 3966 BG. LINTAS SAMUDERA 75 2300 31.7 3.6 0.51 4527
Stage 3 3300 LU 47.2 3.5 0.41 3500 3354.455 46.5 3.1 0.43 3518
Stage 1 1700 HHS 32.5 5.6 2.66 4350
6 Stage 2 2300 7300 LS 33.5 39.5 5.6 4.7 0.55 0.98 4350 3966
Stage 3 3300 LU 47.2 3.5 0.41 3500
Stage 1 1700 HHS 32.5 5.6 2.66 4350
7 Stage 2 2300 7300 LS 33.5 39.5 5.6 4.7 0.55 0.98 4350 3966
Stage 3 3300 LU 47.2 3.5 0.41 3500
Stage 1 1700 HHS 32.5 5.6 2.66 4350
8 Stage 2 2300 7300 LS 33.5 39.5 5.6 4.7 0.55 0.98 4350 3966
Stage 3 3300 LU 47.2 3.5 0.41 3500
Stage 1 1700 HHS 32.5 5.6 2.66 4350
9 Stage 2 2300 7300 LS 33.5 39.5 5.6 4.7 0.55 0.98 4350 3966
Stage 3 3300 LU 47.2 3.5 0.41 3500
Stage 1 1700 HHS 32.5 5.6 2.66 4350
10 Stage 2 2300 7300 LS 33.5 39.5 5.6 4.7 0.55 0.98 4350 3966
Stage 3 3300 LU 47.2 3.5 0.41 3500

Expected Result 73,400 40.0 4.6 0.98 3920 37,010 39.6 4.0 0.91 3970 29,655.637 40.0 4.3 0.95 3930
Spec Contract 1.00 4000

Prepared by Acknowledge by Approved By

Hendra Komara Andry Yunandar Mulyanto Wibowo KJ Heo


Spv. QC Sr.Supt QC Manager Shipping GM QC & Shipping
ACTUAL MT %wt
BLENDING SIMULATION PLAN MT %wt HHS 14,759 21
RC 734.731 1%
HHS 14,735 20% HUL 2,936 4
ETA : Feb 24,2018 LS 20,190 27% LU 31,012 44
Vessel : MV.ALKYON LU 31,949 43% LS 21,190 30
Buyer : ADANI HUL 5,936 8% Total 69,896 100
Destination : India Total 73,545 100%
Date : 23-Feb
Revision : 02(Adjust Seam HUL Lot-8 & Lot-9)
Stowage : 73050 Mt CONTROL CONTROL APPROVAL
SIMULATION Rapid Actual COA
COAL TM Ash TS GAR BARGE Tonnage TM Ash TS GAR Tonnage (MT) TM Ash TS GAR TM Ash TS GAR
Queue Sequence TONNAGE STOCKPILE
TYPE %wt %wt %wt %wt TUG Actual %wt %wt %wt %wt Actual %wt %wt %wt %wt %wt %wt %wt %wt
Stage 1 1700 HHS 30.9 6.9 2.61 4441 1700 30.9 6.9 2.61 4441
1 Stage 2 2349.849 7450 LS Rapid 31.8 38.3 3.6 4.2 0.49 0.94 4538 4046 BG. LINTAS SAMUDERA 82 2349.849 31.8 3.6 0.49 4538 7449.849 38.3 4.3 0.96 4048
Stage 3 3400 LU 46.6 3.3 0.41 3509 3400 46.6 3.3 0.41 3509
Stage 1 1700 HHS 31.2 4.9 2.41 4504 1700 31.2 4.9 2.41 4504
2 Stage 2 2240 7340 LS Rapid 32.6 38.9 4.0 3.7 0.55 0.89 4485 4030 BG. Soekawati 369 2240 32.6 4.0 0.55 4485 7340.27 39.1 4.1 0.95 3992
Stage 3 3400 LU 46.8 3.0 0.36 3494 3400 46.8 3.0 0.36 3494
Stage 1 1450 HUL 47.0 4.2 1.03 3452 1450 47.0 4.2 1.03 3452
Stage 2 1500 LS 30.9 4.3 0.63 4564 1500 30.9 4.3 0.63 4564
BG. LINTAS SAMUDERA 73 6694.992 41.1 4.0 0.96 3854
3 Stage 3 1050 7430 HHS Rapid 31.8 40.5 4.9 4.2 2.45 1.01 4479 3893 1050 31.8 4.9 2.45 4479
Stage 4 2694.992 LU 46.8 3.1 0.39 3490 2694.992 46.8 3.1 0.39 3490
734.731 RC Mv.SHINANO 36.3 7.4 1.99 4030 RC Mv.SHINANO 734.731 36.3 7.4 1.99 4030 734.731 36.3 7.4 1.99 4030
Stage 1 1485.795 HUL 48.7 4.2 0.95 3375 1485.795 48.7 4.2 0.95 3375
Stage 2 1500 LS 32.2 3.5 0.46 4514 1500 32.2 3.5 0.46 4514
4 7436 42.0 3.8 0.81 3818 BG. LINTAS SAMUDERA XVIII 7435.795 41.9 4.4 0.84 3808
Stage 3 1050 HHS Rapid 33.1 5.5 2.40 4360 1050 33.1 5.5 2.40 4360
Stage 4 3400 LU 46.2 3.2 0.42 3538 3400 46.2 3.2 0.42 3538
Stage 1 1700 HHS 30.9 5.6 2.22 4510 1700 30.9 5.6 2.22 4510
5 Stage 2 2300 7354 LS Rapid 31.7 38.3 3.6 3.8 0.51 0.87 4527 4063 BG. LINTAS SAMUDERA 75 2300 31.7 3.6 0.51 4527 7354.455 38.0 4.2 0.95 4088
Stage 3 3354.455 LU 46.5 3.1 0.43 3518 3354.455 46.5 3.1 0.43 3518
Stage 1 1734.730 HHS 30.4 5.4 2.59 4561 1734.730 30.4 5.4 2.59 4561
6 Stage 2 2300 7335 LS Rapid 31.2 37.9 4.7 4.1 0.63 0.98 4544 4088 BG. LINTAS SAMUDERA 73 2300 31.2 4.7 0.63 4544 7334.73 38.1 4.4 0.91 4060
Stage 3 3300 LU 46.6 3.0 0.38 3521 3300 46.6 3.0 0.38 3521
Stage 1 1700 HHS 32.5 5.6 2.66 4350 1723.849 31.0 4.7 2.55 4507
7 Stage 2 2300 7300 LS Predict 33.5 39.5 5.6 4.7 0.63 1.00 4350 3966 BG. LINTAS SAMUDERA 82 2300 32.0 5.0 0.57 4431 7323.849 38.2 4.2 0.89 4051
Stage 3 3300 LU 47.2 3.5 0.41 3500 3300 46.2 3.7 0.36 3525
Stage 1 1200 HHS 32.5 5.6 2.66 4350 1200 31.1 5.2 2.47 4507
Stage 2 1700 LS Predict 33.5 5.6 0.63 4400 1700 31.9 4.5 0.53 4484
8 7300 41.9 4.5 1.08 3798 BG. Soekawati 369 7337.436 41.2 4.1 0.88 3865
Stage 3 2900 LU 47.2 3.5 0.41 3500 2937.436 46.5 3.0 0.34 3529
Stage 4 1500 HUL 48.7 4.2 1.60 3250 1500 48.4 3.7 1.02 3389
Stage 1 1200 HHS 32.5 5.6 2.66 4350 1200 31.2 5.5 2.58 4488
Stage 2 1700 LS Predict 33.5 5.6 0.63 4400 1700 32.0 4.7 0.57 4452
9 7300 41.9 4.5 1.08 3798 BG. TAURUS 09 7280.495 41.0 4.3 0.92 3847
Stage 3 2900 LU 47.2 3.5 0.41 3500 2900 46.6 3.3 0.31 3509
Stage 4 1500 HUL 48.7 4.2 1.60 3250 1480.495 48.0 5.0 1.14 3336
Stage 1 1700 HHS 32.5 5.6 2.66 4350 1700 30.80 4.42 2.76 4548
10 Stage 2 2300 7300 LS Predict 33.5 39.5 5.6 4.7 0.63 1.00 4400 3982 BG. LINTAS SAMUDERA XVIII 3300 46.80 3.57 0.31 3479
Stage 3 3300 LU 47.2 3.5 0.41 3500 2325.064 32.40 5.04 0.53 4425

Expected Result 73,545 39.9 4.2 0.97 3948 73,612 39.5 4.1 0.92 3974 66,286.602 39.6 4.3 0.93 3959
Spec Contract 1.00 4000

Prepared by Acknowledge by Approved By

Hendra Komara Andry Yunandar Mulyanto Wibowo KJ Heo