2012
CTT-1
NOTE :
1.* For these places, Only Mono Rail beam shall be provided at the transfer towers. Out of total five such applications, one hoist may be kept as spare.
2. This schedule does not cover the hoists in CTT-1 and CT-2 for conveyors GCR-1, GCR-2 and GCR-3 coming under FGI scope.
3. The "Remarks' column indicate nearest available size of Existing Hoist (Already procured) to be utilised.
Refer email
Electric hoist dated 22-05-
2012
Use 5Tx21m
Electric hoist lift Existing
Hoist
Use 5Tx11m
Electric hoist lift Existing
Hoist
Use 5Tx24m
Electric hoist lift Existing
Hoist
spare.