VALORIZACION N° 03

PROYECTO: AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 811,690.12
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 31-Jan-15 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. VICTOR COBADIS ROMERO RIVEROS

PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT


AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
1.00 OBRAS PROVISIONALES
1.01 GUARDIANIA, DEPOSITO Y ALMACEN GLB 1.00 1,108.42 1,108.42 1.00 1,108.42 0.00 0.00 1.00 1,108.42 0.00 0.00 100.00%
1.02 CARTEL DE OBRA 3.60 M X 4.80 M UND 1.00 2,176.89 2,176.89 1.00 2,176.89 0.00 0.00 1.00 2,176.89 0.00 0.00 100.00%
2.00 ESTRUCTURAS-01 AULA
2.01 OBRAS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 156.65 2.47 386.93 156.65 386.93 0.00 0.00 156.65 386.93 0.00 0.00 100.00%
02.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 156.65 4.11 643.83 156.65 643.83 0.00 0.00 156.65 643.83 0.00 0.00 100.00%
02.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 156.65 8.19 1,282.96 156.65 1,282.96 0.00 0.00 156.65 1,282.96 0.00 0.00 100.00%
2.02 OBRAS DE CONCRETO SIMPLE
02.02.01 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 129.24 44.28 5,722.75 0.00 0.00 0.00 0.00 0.00 0.00 129.24 5,722.75 0.00%
2.03 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
2.03.01 COLUMNAS
02.03.01.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 6.69 541.94 3,625.58 6.69 3,625.58 0.00 0.00 6.69 3,625.58 0.00 0.00 100.00%
02.03.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,144.08 6.34 7,253.47 1,144.08 7,253.47 0.00 0.00 1,144.08 7,253.47 0.00 0.00 100.00%
02.03.01.03 ENCOFRADO y DESENCOFRADO EN COLUMNAS m2 86.17 67.12 5,783.73 86.17 5,783.73 0.00 0.00 86.17 5,783.73 0.00 0.00 100.00%
2.03.02 VIGAS
02.03.02.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 8.63 454.60 3,923.20 8.63 3,923.20 0.00 0.00 8.63 3,923.20 0.00 0.00 100.00%
02.03.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,167.55 6.42 7,495.67 1,167.55 7,495.67 0.00 0.00 1,167.55 7,495.67 0.00 0.00 100.00%
02.03.02.03 ENCOFRADO y DESENCOFRADO EN VIGAS m2 114.53 78.23 8,959.68 114.53 8,959.68 0.00 0.00 114.53 8,959.68 0.00 0.00 100.00%
2.03.03 COLUMNETAS DE AMARRE
02.03.03.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 1.85 470.02 869.54 1.85 869.54 0.00 0.00 1.85 869.54 0.00 0.00 100.00%
02.03.03.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 141.33 6.34 896.03 141.33 896.03 0.00 0.00 141.33 896.03 0.00 0.00 100.00%
02.03.03.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 27.17 37.04 1,006.38 27.17 1,006.38 0.00 0.00 27.17 1,006.38 0.00 0.00 100.00%
2.03.04 VIGUETAS DE AMARRE
02.03.04.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.36 407.54 146.71 0.00 0.00 0.36 146.71 0.36 146.71 0.00 0.00 100.00%
02.03.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 38.67 6.34 245.17 0.00 0.00 38.67 245.17 38.67 245.17 0.00 0.00 100.00%
02.03.04.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 12.00 37.04 444.48 0.00 0.00 12.00 444.48 12.00 444.48 0.00 0.00 100.00%
2.03.05 LOSA ALIGERADA
02.03.05.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 0.87 443.45 385.80 0.00 0.00 0.00 0.00 0.00 0.00 0.87 385.80 0.00%
02.03.05.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 51.95 6.34 329.36 0.00 0.00 0.00 0.00 0.00 0.00 51.95 329.36 0.00%
02.03.05.03 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m2 11.62 78.23 909.03 0.00 0.00 0.00 0.00 0.00 0.00 11.62 909.03 0.00%
02.03.05.04 LADRILLO HUECO DE ARCILLA h=12 cm PARA TECHO ALIGERADO UND 104.00 2.35 244.40 0.00 0.00 0.00 0.00 0.00 0.00 104.00 244.40 0.00%
2.04 ESTRUCTURAS DE MADERA (TIJERALES)
02.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 6.00 2,331.08 13,986.48 0.00 0.00 6.00 13,986.48 6.00 13,986.48 0.00 0.00 100.00%
02.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 24.00 308.09 7,394.16 0.00 0.00 24.00 7,394.16 24.00 7,394.16 0.00 0.00 100.00%
02.04.03 ANCLAJE DE TIJERAL DE MADERA UND 12.00 1,004.25 12,051.00 0.00 0.00 12.00 12,051.00 12.00 12,051.00 0.00 0.00 100.00%
02.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 175.85 51.94 9,133.65 0.00 0.00 175.85 9,133.65 175.85 9,133.65 0.00 0.00 100.00%
02.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 20.28 41.13 834.12 0.00 0.00 20.28 834.12 20.28 834.12 0.00 0.00 100.00%
2.05 PRUEBAS DE LABORATORIO
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
02.05.01 UND 8.00 42.02 336.16 6.00 252.12 2.00 84.04 8.00 336.16 0.00 0.00 100.00%
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
3.00 ESTRUCTURAS-ADMINISTRACION
3.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 91.08 2.47 224.97 0.00 0.00 91.08 224.97 91.08 224.97 0.00 0.00 100.00%
03.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 111.23 4.11 457.16 0.00 0.00 111.23 457.16 111.23 457.16 0.00 0.00 100.00%
03.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 111.23 8.19 910.97 0.00 0.00 111.23 910.97 111.23 910.97 0.00 0.00 100.00%
03.01.04 DEMOLICION DE MURO DE ADOBE E=0.40m m3 54.99 39.81 2,189.15 0.00 0.00 54.99 2,189.15 54.99 2,189.15 0.00 0.00 100.00%
3.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION PARA ZAPATAS DE 1.70M DE PROFUNDIDAD m3 18.15 44.96 816.02 0.00 0.00 18.15 816.02 18.15 816.02 0.00 0.00 100.00%
03.02.02 EXCAVACION PARA CUNETAS m3 6.85 28.10 192.49 0.00 0.00 0.00 0.00 0.00 0.00 6.85 192.49 0.00%
03.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 11.75 17.36 203.98 0.00 0.00 10.05 174.47 10.05 174.47 1.70 29.51 85.53%
03.02.04 RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO LIVIANO m3 85.36 10.12 863.84 0.00 0.00 0.00 0.00 0.00 0.00 85.36 863.84 0.00%
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 92.94 18.73 1,740.77 0.00 0.00 79.50 1,489.04 79.50 1,489.04 13.44 251.73 85.54%
3.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 13.96 34.43 480.64 0.00 0.00 13.96 480.64 13.96 480.64 0.00 0.00 100.00%
03.03.02 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 3.30 307.69 1,015.38 0.00 0.00 3.30 1,015.38 3.30 1,015.38 0.00 0.00 100.00%
03.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 26.50 76.38 2,024.07 0.00 0.00 26.50 2,024.07 26.50 2,024.07 0.00 0.00 100.00%
03.03.04 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 51.15 44.28 2,264.92 0.00 0.00 0.00 0.00 0.00 0.00 51.15 2,264.92 0.00%
03.03.05 CONCRETO EN CUNETAS FC 175KG/CM2 m3 4.03 282.60 1,138.88 0.00 0.00 0.00 0.00 0.00 0.00 4.03 1,138.88 0.00%
03.03.06 ENCOFRADO DE CUNETAS m2 19.34 42.88 829.30 0.00 0.00 0.00 0.00 0.00 0.00 19.34 829.30 0.00%
3.04 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
3.04.01 ZAPATAS
03.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 7.38 431.54 3,184.77 0.00 0.00 7.38 3,184.77 7.38 3,184.77 0.00 0.00 100.00%
03.04.01.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 213.28 6.34 1,352.20 0.00 0.00 213.28 1,352.20 213.28 1,352.20 0.00 0.00 100.00%
3.04.02 VIGAS DE CIMENTACION
03.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 2.14 448.93 960.71 0.00 0.00 2.14 960.71 2.14 960.71 0.00 0.00 100.00%
03.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 158.10 1,002.35 158.10 1,002.35 0.00 0.00 100.00%
03.04.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 17.10 71.64 1,225.04 0.00 0.00 17.10 1,225.04 17.10 1,225.04 0.00 0.00 100.00%
3.04.03 SOBRECIMIENTO ARMADO
03.04.03.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 158.10 1,002.35 158.10 1,002.35 0.00 0.00 100.00%
3.04.04 COLUMNAS
03.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.13 541.94 1,154.33 0.00 0.00 2.13 1,154.33 2.13 1,154.33 0.00 0.00 100.00%
03.04.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 507.51 6.34 3,217.61 0.00 0.00 507.51 3,217.61 507.51 3,217.61 0.00 0.00 100.00%
03.04.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 24.65 67.12 1,654.51 0.00 0.00 24.65 1,654.51 24.65 1,654.51 0.00 0.00 100.00%
3.04.05 VIGAS
03.04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.37 454.60 1,532.00 0.00 0.00 3.37 1,532.00 3.37 1,532.00 0.00 0.00 100.00%
03.04.05.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 597.24 6.42 3,834.28 0.00 0.00 597.24 3,834.28 597.24 3,834.28 0.00 0.00 100.00%
03.04.05.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 28.09 78.23 2,197.48 0.00 0.00 28.09 2,197.48 28.09 2,197.48 0.00 0.00 100.00%
3.04.06 COLUMNETAS DE AMARRE
03.04.06.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 0.55 470.02 258.51 0.00 0.00 0.55 258.51 0.55 258.51 0.00 0.00 100.00%
03.04.06.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 71.75 6.34 454.90 0.00 0.00 71.75 454.90 71.75 454.90 0.00 0.00 100.00%
03.04.06.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 7.36 37.04 272.61 0.00 0.00 7.36 272.61 7.36 272.61 0.00 0.00 100.00%
3.04.07 VIGUETAS DE AMARRE
03.04.07.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.88 407.54 358.64 0.00 0.00 0.88 358.64 0.88 358.64 0.00 0.00 100.00%
03.04.07.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 64.90 6.34 411.47 0.00 0.00 64.90 411.47 64.90 411.47 0.00 0.00 100.00%
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
03.04.07.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 8.81 37.04 326.32 0.00 0.00 8.81 326.32 8.81 326.32 0.00 0.00 100.00%
3.05 ESTRUCTURAS DE MADERA (TIJERALES)
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
03.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 3.00 2,331.08 6,993.24 0.00 0.00 3.00 6,993.24 3.00 6,993.24 0.00 0.00 100.00%
03.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 12.00 302.09 3,625.08 0.00 0.00 12.00 3,625.08 12.00 3,625.08 0.00 0.00 100.00%
03.04.03 ANCLAJE DE TIJERAL DE MADERA UND 6.00 1,004.25 6,025.50 0.00 0.00 6.00 6,025.50 6.00 6,025.50 0.00 0.00 100.00%
03.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 89.10 51.94 4,627.85 0.00 0.00 89.10 4,627.85 89.10 4,627.85 0.00 0.00 100.00%
03.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 9.90 41.13 407.19 0.00 0.00 9.90 407.19 9.90 407.19 0.00 0.00 100.00%
3.06 PRUEBAS DE LABORATORIO
03.06.01 UND 18.00 42.02 756.36 0.00 0.00 10.00 420.20 10.00 420.20 8.00 336.16 55.56%
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
4.00 ESTRUCTURAS-CERCO PERIMETRICO
4.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 208.21 2.47 514.28 208.21 514.28 0.00 0.00 208.21 514.28 0.00 0.00 100.00%
04.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 208.21 4.11 855.74 208.21 855.74 0.00 0.00 208.21 855.74 0.00 0.00 100.00%
04.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 208.21 8.19 1,705.24 208.21 1,705.24 0.00 0.00 208.21 1,705.24 0.00 0.00 100.00%
4.02 MOVIMIENTO DE TIERRAS
04.02.01 m3 182.99 28.10 5,142.02 182.99 5,142.02 0.00 0.00 182.99 5,142.02 0.00 0.00 100.00%
EXCAVACION PARA CIMIENTOS HASTA 0.70M DE PROFUNDIDAD EN
TERRENO NORMAL
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 157.36 17.36 2,731.77 157.36 2,731.77 0.00 0.00 157.36 2,731.77 0.00 0.00 100.00%
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 33.79 18.73 632.89 33.79 632.89 0.00 0.00 33.79 632.89 0.00 0.00 100.00%
4.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 208.21 34.43 7,168.67 208.21 7,168.67 0.00 0.00 208.21 7,168.67 0.00 0.00 100.00%
04.03.02 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 145.75 232.29 33,856.27 145.75 33,856.27 0.00 0.00 145.75 33,856.27 0.00 0.00 100.00%
04.03.03 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 37.23 307.69 11,455.30 37.23 11,455.30 0.00 0.00 37.23 11,455.30 0.00 0.00 100.00%
04.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 496.44 76.38 37,918.09 496.44 37,918.09 0.00 0.00 496.44 37,918.09 0.00 0.00 100.00%
4.04 OBRAS DE CONCRETO ARMADO
4.04.01 SOBRECIMIENTO ARMADO
04.04.01.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,930.97 6.34 12,242.35 1,930.97 12,242.35 0.00 0.00 1,930.97 12,242.35 0.00 0.00 100.00%
4.04.02 COLUMNAS
04.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 9.45 497.51 4,701.47 7.56 3,761.18 1.89 940.29 9.45 4,701.47 0.00 0.00 100.00%
04.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,510.20 6.34 9,574.67 1,510.20 9,574.67 0.00 0.00 1,510.20 9,574.67 0.00 0.00 100.00%
04.04.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 126.00 67.12 8,457.12 100.80 6,765.70 25.20 1,691.42 126.00 8,457.12 0.00 0.00 100.00%
4.04.03 VIGAS
04.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 87.36 497.51 43,462.47 52.42 26,077.48 34.94 17,384.99 87.36 43,462.47 0.00 0.00 100.00%
04.04.03.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,573.61 6.42 10,102.58 944.17 6,061.55 629.44 4,041.03 1,573.61 10,102.58 0.00 0.00 100.00%
04.04.03.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 173.51 78.23 13,573.69 104.11 8,144.21 69.40 5,429.47 173.51 13,573.68 0.00 0.00 100.00%
5.00 FLETE TERRESTRE
5.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 111,307.41 0.15 16,696.11 111,307.41 16,696.11 0.00 0.00 111,307.41 16,696.11 0.00 0.00 100.00%
1.00 ARQUITECTURA- 01 AULA
1.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 116.61 61.24 7,141.20 102.68 6,288.12 13.93 853.07 116.61 7,141.19 0.00 0.00 100.00%
1.02 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 98.74 39.64 3,914.05 0.00 0.00 98.74 3,914.05 98.74 3,914.05 0.00 0.00 100.00%
01.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 125.65 35.98 4,520.89 0.00 0.00 125.65 4,520.89 125.65 4,520.89 0.00 0.00 100.00%
01.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 55.04 32.12 1,767.88 0.00 0.00 55.04 1,767.88 55.04 1,767.88 0.00 0.00 100.00%
01.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 66.62 47.33 3,153.12 0.00 0.00 66.62 3,153.12 66.62 3,153.12 0.00 0.00 100.00%
01.02.05 TARRAJEO DE ESCALERAS m2 23.78 34.20 813.28 0.00 0.00 0.00 0.00 0.00 0.00 23.78 813.28 0.00%
01.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 13.09 14.06 184.05 0.00 0.00 13.09 184.05 13.09 184.05 0.00 0.00 100.00%
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
01.02.07 BRUÑAS 1" m 158.15 1.25 197.69 0.00 0.00 158.15 197.69 158.15 197.69 0.00 0.00 100.00%
1.03 CIELORRASOS
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO
129.74 129.74
01.03.01 DE 2" x 2" x 10´ m2 52.88 6,860.65 0.00 0.00 6,860.65 129.74 6,860.65 0.00 0.00 100.00%
01.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 7.54 24.45 184.35 0.00 0.00 7.54 184.35 7.54 184.35 0.00 0.00 100.00%
1.04 PISOS Y PAVIMENTOS
01.04.01 PISO DE CONCRETO E=4", PULIDO, BRUÑADO Y COLOREADO m2 112.25 40.73 4,571.94 0.00 0.00 0.00 0.00 0.00 0.00 112.25 4,571.94 0.00%
1.05 ZOCALOS Y CONTRAZOCALOS
01.05.01 74.09 12.35 915.01 0.00 0.00 74.09 915.01 74.09 915.01 0.00 0.00 100.00%
ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5
C:A m
1.06 CARPINTERIA DE MADERA
01.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 2.00 754.00 1,508.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,508.00 0.00%
01.06.02 TICERO DE MADERA CEDRO (L=3.10m) BARNIZADO UND 2.00 70.00 140.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 140.00 0.00%
1.07 CARPINTERIA METALICA
01.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 23.32 198.55 4,630.19 0.00 0.00 0.00 0.00 0.00 0.00 23.32 4,630.19 0.00%
01.07.02 REJILLA METALICA FIJA UND 2.00 112.98 225.96 0.00 0.00 0.00 0.00 0.00 0.00 2.00 225.96 0.00%
01.07.03 PASAMANO DE ACERO TUBO DE 2" m 22.00 96.79 2,129.38 0.00 0.00 0.00 0.00 0.00 0.00 22.00 2,129.38 0.00%
01.07.04 CANTONERA PARA ESCALERA SEGUN PLANOS m 25.00 20.95 523.75 0.00 0.00 0.00 0.00 0.00 0.00 25.00 523.75 0.00%
1.08 CERRAJERIA
01.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" PZA 6.00 29.55 177.30 0.00 0.00 0.00 0.00 0.00 0.00 6.00 177.30 0.00%
01.08.02 CHAPA DE PARCHE DE TRES GOLPES PZA 2.00 88.20 176.40 0.00 0.00 0.00 0.00 0.00 0.00 2.00 176.40 0.00%
1.09 VIDRIOS, CRISTALES Y SIMILARES
01.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 363.53 5.46 1,984.87 0.00 0.00 0.00 0.00 0.00 0.00 363.53 1,984.87 0.00%
1.10 PINTURA
01.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 98.74 10.32 1,019.00 0.00 0.00 0.00 0.00 0.00 0.00 98.74 1,019.00 0.00%
01.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 137.27 7.19 986.97 0.00 0.00 0.00 0.00 0.00 0.00 137.27 986.97 0.00%
01.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 55.04 8.52 468.94 0.00 0.00 0.00 0.00 0.00 0.00 55.04 468.94 0.00%
01.10.04 PINTURA EN VIGAS C/LATEX LAVABLE m2 66.62 8.79 585.59 0.00 0.00 0.00 0.00 0.00 0.00 66.62 585.59 0.00%
01.10.05 PINTURA EN DERRAMES C/LATEX LAVABLE m 13.09 2.18 28.54 0.00 0.00 0.00 0.00 0.00 0.00 13.09 28.54 0.00%
01.10.06 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 129.74 9.77 1,267.56 0.00 0.00 0.00 0.00 0.00 0.00 129.74 1,267.56 0.00%
01.10.07 PINTURA EN PIZARRA m2 7.40 12.77 94.50 0.00 0.00 0.00 0.00 0.00 0.00 7.40 94.50 0.00%
01.10.08 PINTURA EN FRISO DE MADERA m2 7.34 12.62 92.63 0.00 0.00 0.00 0.00 0.00 0.00 7.34 92.63 0.00%
01.10.09 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 74.09 5.66 419.35 0.00 0.00 0.00 0.00 0.00 0.00 74.09 419.35 0.00%
01.10.10 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 5.20 16.18 84.14 0.00 0.00 0.00 0.00 0.00 0.00 5.20 84.14 0.00%
01.10.11 PINTURA ESMALTE EN BRUÑAS DE 1" m 158.15 2.86 452.31 0.00 0.00 0.00 0.00 0.00 0.00 158.15 452.31 0.00%
1.11 VARIOS
01.11.11 JUNTAS SISMICA 1" m 4.46 5.00 22.30 0.00 0.00 4.46 22.30 4.46 22.30 0.00 0.00 100.00%
1.12 SISTEMA DE AGUA FRIA
1.12.01 TUBERIAS Y ACCESORIOS
01.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 24.05 16.31 392.26 0.00 0.00 0.00 0.00 0.00 0.00 24.05 392.26 0.00%
01.12.01.02 CODO PVC-SAP 3" * 90 UND 7.00 13.20 92.40 0.00 0.00 0.00 0.00 0.00 0.00 7.00 92.40 0.00%
01.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 39.22 16.46 645.56 0.00 0.00 0.00 0.00 0.00 0.00 39.22 645.56 0.00%
01.12.01.04 SOPORTE DE CANALETA UND 25.00 3.89 97.25 0.00 0.00 0.00 0.00 0.00 0.00 25.00 97.25 0.00%
01.12.01.05 ABRAZADERA PARA CANALETA UND 13.00 19.54 254.02 0.00 0.00 0.00 0.00 0.00 0.00 13.00 254.02 0.00%
01.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 9.79 37.04 362.62 0.00 0.00 0.00 0.00 0.00 0.00 9.79 362.62 0.00%
01.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.67 393.71 263.79 0.00 0.00 0.00 0.00 0.00 0.00 0.67 263.79 0.00%
01.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 8.14 28.92 235.41 0.00 0.00 0.00 0.00 0.00 0.00 8.14 235.41 0.00%
01.12.01.09 PINTURA EN FALSA COLUMNA m2 8.14 8.52 69.35 0.00 0.00 0.00 0.00 0.00 0.00 8.14 69.35 0.00%
2.00 ARQUITECTURA- ADMINISTRACION
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
02.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE CABEZA J m2 38.57 104.35 4,024.78 0.00 0.00 38.57 4,024.78 38.57 4,024.78 0.00 0.00 100.00%
02.01.02 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 20.77 61.24 1,271.95 0.00 0.00 20.77 1,271.95 20.77 1,271.95 0.00 0.00 100.00%
2.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 58.30 39.64 2,311.01 0.00 0.00 0.00 0.00 0.00 0.00 58.30 2,311.01 0.00%
02.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 61.21 35.98 2,202.34 0.00 0.00 0.00 0.00 0.00 0.00 61.21 2,202.34 0.00%
02.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 10.37 32.12 333.08 0.00 0.00 0.00 0.00 0.00 0.00 10.37 333.08 0.00%
02.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 25.90 47.33 1,225.85 0.00 0.00 0.00 0.00 0.00 0.00 25.90 1,225.85 0.00%
02.02.05 TARRAJEO EN PESTAÑAS CON C:A 1:5 E = 1.50cm m2 8.05 47.33 381.01 0.00 0.00 0.00 0.00 0.00 0.00 8.05 381.01 0.00%
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 33.80 14.06 475.23 0.00 0.00 0.00 0.00 0.00 0.00 33.80 475.23 0.00%
02.02.07 FROTACHADO EN CUNETAS CON C:A 1:5 E = 1.50cm CON IMPERMEABILIZANT m2 36.51 32.88 1,200.45 0.00 0.00 0.00 0.00 0.00 0.00 36.51 1,200.45 0.00%
02.02.08 BRUÑAS DE 1/2" m 263.22 1.25 329.03 0.00 0.00 0.00 0.00 0.00 0.00 263.22 329.03 0.00%
02.02.09 BRUÑAS 3/4" m 50.98 1.25 63.73 0.00 0.00 0.00 0.00 0.00 0.00 50.98 63.73 0.00%
2.03 CIELORRASO
02.03.01 m2 81.83 52.88 4,327.17 0.00 0.00 0.00 0.00 0.00 0.00 81.83 4,327.17 0.00%
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO
DE 2" x 2" x 10´
02.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 5.84 24.45 142.79 0.00 0.00 0.00 0.00 0.00 0.00 5.84 142.79 0.00%
2.04 PISOS Y PAVIMENTOS
02.04.01 PISO MACHIEMBRADO m2 66.00 38.11 2,515.26 0.00 0.00 0.00 0.00 0.00 0.00 66.00 2,515.26 0.00%
02.04.02 VEREDA DE CONCRETO f'c= 175 kg/cm2 H=0.10M m2 34.21 57.94 1,982.13 0.00 0.00 0.00 0.00 0.00 0.00 34.21 1,982.13 0.00%
02.04.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 4.81 76.38 367.39 0.00 0.00 0.00 0.00 0.00 0.00 4.81 367.39 0.00%
2.05 ZOCALOS Y CONTRAZOCALOS
02.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 m 30.51 12.35 376.80 0.00 0.00 0.00 0.00 0.00 0.00 30.51 376.80 0.00%
02.05.02 CONTRAZOCALO DE MADERA CEDRO DE 4" RODON 1" m 28.23 79.85 2,254.17 0.00 0.00 0.00 0.00 0.00 0.00 28.23 2,254.17 0.00%
2.06 CARPINTERIA DE MADERA
02.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 1.00 754.00 754.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 754.00 0.00%
02.06.02 PUERTA CONTRAPLACADA DE MADERA TORNILLO SEGUN DISEÑO INCL. INST UND 2.00 380.00 760.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 760.00 0.00%
02.06.03 TABIQUERIA DE MELAMINE DE 1" m2 22.50 183.03 4,118.18 0.00 0.00 0.00 0.00 0.00 0.00 22.50 4,118.18 0.00%
2.07 CARPINTERIA METALICA
02.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 6.32 198.55 1,254.84 0.00 0.00 0.00 0.00 0.00 0.00 6.32 1,254.84 0.00%
02.07.02 REJILLA METALICA FIJA UND 1.00 112.98 112.98 0.00 0.00 0.00 0.00 0.00 0.00 1.00 112.98 0.00%
2.08 CERRAJERIA
02.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 10.00 29.55 295.50 0.00 0.00 0.00 0.00 0.00 0.00 10.00 295.50 0.00%
02.08.02 CHAPA DE PARCHE DE TRES GOLPES pza 3.00 88.20 264.60 0.00 0.00 0.00 0.00 0.00 0.00 3.00 264.60 0.00%
02.08.03 MANIJA DE BRONCE DE 4" PARA PUERTAS pza 3.00 64.25 192.75 0.00 0.00 0.00 0.00 0.00 0.00 3.00 192.75 0.00%
2.09 VIDRIOS, CRISTALES Y SIMILARES
02.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 88.58 5.46 483.65 0.00 0.00 0.00 0.00 0.00 0.00 88.58 483.65 0.00%
2.10 PINTURA
02.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 58.30 10.32 601.66 0.00 0.00 0.00 0.00 0.00 0.00 58.30 601.66 0.00%
02.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 61.21 7.19 440.10 0.00 0.00 0.00 0.00 0.00 0.00 61.21 440.10 0.00%
02.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 10.37 8.52 88.35 0.00 0.00 0.00 0.00 0.00 0.00 10.37 88.35 0.00%
02.10.04 PINTURA EN COLUMNETAS C/LATEX LAVABLE m2 3.12 8.52 26.58 0.00 0.00 0.00 0.00 0.00 0.00 3.12 26.58 0.00%
02.10.05 PINTURA EN VIGAS C/LATEX LAVABLE m2 25.90 8.79 227.66 0.00 0.00 0.00 0.00 0.00 0.00 25.90 227.66 0.00%
02.10.06 PINTURA EN PESTAÑAS C/LATEX LAVABLE m2 8.05 8.79 70.76 0.00 0.00 0.00 0.00 0.00 0.00 8.05 70.76 0.00%
02.10.07 PINTURA EN DERRAMES C/LATEX LAVABLE m 40.20 2.18 87.64 0.00 0.00 0.00 0.00 0.00 0.00 40.20 87.64 0.00%
02.10.08 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 77.79 9.77 760.01 0.00 0.00 0.00 0.00 0.00 0.00 77.79 760.01 0.00%
02.10.09 PINTURA EN FRISO DE MADERA m2 3.90 12.62 49.22 0.00 0.00 0.00 0.00 0.00 0.00 3.90 49.22 0.00%
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
02.10.10 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 30.51 5.66 172.69 0.00 0.00 0.00 0.00 0.00 0.00 30.51 172.69 0.00%
02.10.11 PINTURA BARNIZ EN CONTRAZOCALO DE MADERA DE CEDRO 4" CON RODO m 28.23 16.18 456.76 0.00 0.00 0.00 0.00 0.00 0.00 28.23 456.76 0.00%
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
02.10.12 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 10.20 16.18 165.04 0.00 0.00 0.00 0.00 0.00 0.00 10.20 165.04 0.00%
02.10.13 PINTURA ESMALTE EN BRUÑAS 1/2" m 263.22 2.86 752.81 0.00 0.00 0.00 0.00 0.00 0.00 263.22 752.81 0.00%
02.10.14 PINTURA ESMALTE EN BRUÑAS DE MUROS EXTERIORES 3/4" m 50.98 2.86 145.80 0.00 0.00 0.00 0.00 0.00 0.00 50.98 145.80 0.00%
2.11 VARIOS
02.11.01 JUNTAS DE DILATACION m 7.10 5.00 35.50 0.00 0.00 0.00 0.00 0.00 0.00 7.10 35.50 0.00%
02.11.02 JUNTAS SISMICA 1" m 18.55 5.00 92.75 0.00 0.00 0.00 0.00 0.00 0.00 18.55 92.75 0.00%
2.12 SISTEMA DE AGUA FRIA
2.12.01 TUBERIAS Y ACCESORIOS
02.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 22.00 16.31 358.82 0.00 0.00 0.00 0.00 0.00 0.00 22.00 358.82 0.00%
02.12.01.02 CODO PVC-SAP 3" * 90 und 12.00 13.20 158.40 0.00 0.00 0.00 0.00 0.00 0.00 12.00 158.40 0.00%
02.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 19.50 16.46 320.97 0.00 0.00 0.00 0.00 0.00 0.00 19.50 320.97 0.00%
02.12.01.04 SOPORTE DE CANALETA und 16.00 3.89 62.24 0.00 0.00 0.00 0.00 0.00 0.00 16.00 62.24 0.00%
02.12.01.05 ABRAZADERA PARA CANALETA und 20.00 19.54 390.80 0.00 0.00 0.00 0.00 0.00 0.00 20.00 390.80 0.00%
02.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 4.95 37.04 183.35 0.00 0.00 0.00 0.00 0.00 0.00 4.95 183.35 0.00%
02.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.34 393.71 133.86 0.00 0.00 0.00 0.00 0.00 0.00 0.34 133.86 0.00%
02.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 4.95 28.92 143.15 0.00 0.00 0.00 0.00 0.00 0.00 4.95 143.15 0.00%
02.12.01.09 PINTURA EN FALSA COLUMNA m3 4.95 8.52 42.17 0.00 0.00 0.00 0.00 0.00 0.00 4.95 42.17 0.00%
3.00 ARQUITECTURA- CERCO PERIMETRICO
3.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 787.50 61.24 48,226.50 472.50 28,935.90 315.00 19,290.60 787.50 48,226.50 0.00 0.00 100.00%
3.02 REVOQUES ENLUCIDOS
03.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 496.44 39.64 19,678.88 0.00 0.00 496.44 19,678.88 496.44 19,678.88 0.00 0.00 100.00%
03.02.02 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 126.00 32.12 4,047.12 0.00 0.00 126.00 4,047.12 126.00 4,047.12 0.00 0.00 100.00%
03.02.03 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 225.56 47.33 10,675.75 0.00 0.00 225.56 10,675.75 225.56 10,675.75 0.00 0.00 100.00%
3.03 CARPINTERIA METALICA
03.03.01 PORTON METALICO 3.50m x 3.00m und 1.00 3,500.00 3,500.00 0.00 0.00 1.00 3,500.00 1.00 3,500.00 0.00 0.00 100.00%
3.04 PINTURA
03.04.01 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 126.00 8.52 1,073.52 0.00 0.00 0.00 0.00 0.00 0.00 126.00 1,073.52 0.00%
03.04.02 PINTURA EN VIGAS C/LATEX LAVABLE m2 225.56 8.79 1,982.67 0.00 0.00 0.00 0.00 0.00 0.00 225.56 1,982.67 0.00%
3.05 VARIOS
03.05.01 JUNTAS DE DILATACION m 630.00 5.00 3,150.00 0.00 0.00 630.00 3,150.00 630.00 3,150.00 0.00 0.00 100.00%
4.00 FLETE TERRESTRE
4.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 173,674.98 0.15 26,051.25 173,674.98 26,051.25 0.00 0.00 173,674.98 26,051.25 0.00 0.00 100.00%
5.00 EQUIPAMIENTO Y MOBILIARIO
5.01 MOBILIARIO DE COLEGIO (ESCRITORIOS,CARPETAS,COMPUTADORAS) glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 0.00%
1.00 INSTALACIONES ELECTRICAS - 01 AULA
1.01 SISTEMA ELECTRICO
1.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 10.00 63.96 639.60 0.00 0.00 10.00 639.60 10.00 639.60 0.00 0.00 100.00%
1.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 4.00 54.26 217.04 0.00 0.00 4.00 217.04 4.00 217.04 0.00 0.00 100.00%
1.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 2.00 47.00 94.00 0.00 0.00 2.00 94.00 2.00 94.00 0.00 0.00 100.00%
1.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 2.00 46.89 93.78 0.00 0.00 2.00 93.78 2.00 93.78 0.00 0.00 100.00%
1.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 8.00 45.81 366.48 0.00 0.00 8.00 366.48 8.00 366.48 0.00 0.00 100.00%
1.02 CANALIZACIONES, TUBERIAS Y/O CABLES
1.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
1.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 109.13 3.58 390.69 0.00 0.00 54.57 195.34 54.57 195.34 54.57 195.35 50.00%
1.02.02 CABLES ELECTRICOS
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
1.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 148.00 2.87 424.76 0.00 0.00 0.00 0.00 0.00 0.00 148.00 424.76 0.00%
1.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 70.26 2.24 157.38 0.00 0.00 0.00 0.00 0.00 0.00 70.26 157.38 0.00%
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
1.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
1.03.01 TABLERO DE DISTRIBUCION
1.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 2.00 249.30 498.60 0.00 0.00 0.00 0.00 0.00 0.00 2.00 498.60 0.00%
1.04 ARTEFACTOS ELECTRICOS
1.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 8.00 107.37 858.96 0.00 0.00 0.00 0.00 0.00 0.00 8.00 858.96 0.00%
1.04.02 SPOT LIGHT und 2.00 41.40 82.80 0.00 0.00 0.00 0.00 0.00 0.00 2.00 82.80 0.00%
2.00 INSTALACIONES ELECTRICAS - ADMINISTRACION
2.01 SISTEMA ELECTRICO
2.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 4.00 63.96 255.84 0.00 0.00 0.00 0.00 0.00 0.00 4.00 255.84 0.00%
2.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 1.00 54.26 54.26 0.00 0.00 0.00 0.00 0.00 0.00 1.00 54.26 0.00%
2.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 3.00 47.00 141.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 141.00 0.00%
2.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 1.00 46.89 46.89 0.00 0.00 0.00 0.00 0.00 0.00 1.00 46.89 0.00%
2.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 6.00 45.81 274.86 0.00 0.00 0.00 0.00 0.00 0.00 6.00 274.86 0.00%
2.02 CANALIZACIONES, TUBERIAS Y/O CABLES
2.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
2.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 42.25 3.58 151.26 0.00 0.00 0.00 0.00 0.00 0.00 42.25 151.26 0.00%
2.02.02 CABLES ELECTRICOS
2.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 50.21 2.87 144.10 0.00 0.00 0.00 0.00 0.00 0.00 50.21 144.10 0.00%
2.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 52.44 2.24 117.47 0.00 0.00 0.00 0.00 0.00 0.00 52.44 117.47 0.00%
2.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
2.03.01 TABLERO DE DISTRIBUCION
2.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 1.00 249.30 249.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 249.30 0.00%
2.03.02 CAJA DE PASO 0.00 0.00 0.00 0.00
2.03.02.01 CAJA DE PASE F.G. 4" x 4" x 2" und 2.00 24.03 48.06 0.00 0.00 0.00 0.00 0.00 0.00 2.00 48.06 0.00%
2.04 ARTEFACTOS ELECTRICOS 0.00 0.00 0.00 0.00
2.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 4.00 107.37 429.48 0.00 0.00 0.00 0.00 0.00 0.00 4.00 429.48 0.00%
2.04.02 SPOT LIGHT und 1.00 41.40 41.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00 41.40 0.00%
3.00 FLETE TERRESTRE
3.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 248.61 0.15 37.29 0.00 0.00 248.61 37.29 248.61 37.29 0.00 0.00 100.00%
COSTO TOTAL DIRECTO 603,397.35 219,943.69 518,186.91 85,210.44 85.88%
GASTOS GENERALES 9% 54,305.76 19,794.93 46,636.82 7,668.94
UTILIDAD 5% 30,169.87 10,997.18 25,909.35 4,260.52
SUB TOTAL 687,872.98 250,735.80 590,733.08 97,139.90
IGV 18% 123,817.14 45,132.44 106,331.95 17,485.19
TOTAL S/, 811,690.12 295,868.24 697,065.03 114,625.09
Avance por mes 295,868.24
Avance acumulado 697,065.03
% DE AVANCE EJECUTADO POR MES 36.45%
% DE AVANCE PROGRAMADO POR MES 30.24%
% DE AVANCE EJECUTADO ACUMULADO 85.88%
% DE AVANCE PROGRAMADO ACUMULADO 72.43%
CURVA "S"
CRONOGRAMA DE AVANCE POR MES PROGRAMADO VS EJECUTADO PORCENTAJE DE AVANCE POR MES PROGRAMADO VS EJECUTADO

Avances por mes Porcentajes de avances mensuales


EL 26 Nov. Al 30 Nov. Al 31 Dic. Al 31 Ene. EL 26 Nov. Al 30 Nov. Al 31 Dic. Al 31 Ene.
AVANCE PROGRAMADO 0.00 35,495.62 307,004.26 245,431.45 PORCENTAJE PROGRAMADO 0% 4.37% 37.82% 30.24%
AVANCE EJECUTADO 0.00 40,284.65 360,912.13 295,868.24 PORCENTAJE EJECUTADO 0% 4.96% 44.46% 36.45%

AVANCE POR MES PROGRAMADO VS EJECUTADO PORCENTAJE DE AVANCE POR MES PROGRAMADO VS EJECUTADO
400,000.00 50%

360,912.13 45% 44%


350,000.00

40%
307,004.26 38%
300,000.00 295,868.24 36%
35%

250,000.00 245,431.45 30% 30%

AVANCE PROGRAMADO PORCENTAJE PROGRAMADO


200,000.00 25%
AVANCE EJECUTADO PORCENTAJE EJECUTADO

20%
150,000.00

15%

100,000.00

10%

50,000.00
40,284.65 5% 5%
35,495.62 4%

0.00 0.00 0% 0%
EL 26 Nov. Al 30 Nov. Al 31 Dic. Al 31 Ene. EL 26 Nov. Al 30 Nov. Al 31 Dic. Al 31 Ene.

CRONOGRAMA DE AVANCES ACUMULADOS PROGRAMADO VS EJECUTADO PORCENTAJE DE AVANCE ACUMULADO PROGRAMADO VS EJECUTADO

Avances acumulados Porcentajes de avances acumulados


EL 26 Nov. Al 30 Nov. Al 31 Dic. AL 31 Ene. Al 28 Feb. Al 25 Mar. EL 26 Nov. Al 30 Nov. Al 31 Dic. AL 31 Ene. Al 28 Feb. Al 25 Mar.
AVANCE PROGRAMADO 0.00 35,495.62 342,499.89 587,931.34 757,580.42 811,690.12 PORCENTAJE PROGRAMADO 0% 4.37% 42.20% 72.43% 93.33% 100.00%
AVANCE EJECUTADO 0.00 40,284.65 401,196.75 697,065.03 PORCENTAJE EJECUTADO 0% 4.96% 49.43% 85.88%

AVANCES ACUMULADOS PROGRAMADOS VS EJECUTADOS PORCENTAJE DE AVANCES ACUMULADOS PROGRADO VS EJECUTADO


900,000.00 120%

811,690.12
800,000.00
757,580.42 100% 100%

700,000.00 697,065.03 93%

86%

600,000.00 80%
587,931.34
72%

500,000.00
AVANCE PROGRAMADO PORCENTAJE PROGRAMADO
60%
AVANCE EJECUTADO PORCENTAJE EJECUTADO
400,000.00 401,196.75
49%
342,499.89
42%
300,000.00 40%

200,000.00
20%

100,000.00

40,284.65 5%
4%
35,495.62
0% 0%
0.00 0.00
EL 26 Nov. Al 30 Nov. Al 31 Dic. AL 31 Ene. Al 28 Feb. Al 25 Mar.
EL 26 Nov. Al 30 Nov. Al 31 Dic. AL 31 Ene. Al 28 Feb. Al 25 Mar.
AVANCES ACUMULADOS PROGRAMADOS VS EJECUTADOS PORCENTAJE DE AVANCES ACUMULADOS PROGRADO VS EJECUTADO
900,000.00 120%

811,690.12
800,000.00
757,580.42 100% 100%

700,000.00 697,065.03 93%

86%

600,000.00 80%
587,931.34
72%

500,000.00
AVANCE PROGRAMADO PORCENTAJE PROGRAMADO
60%
AVANCE EJECUTADO PORCENTAJE EJECUTADO
400,000.00 401,196.75
49%
342,499.89
42%
300,000.00 40%

200,000.00
20%

100,000.00

40,284.65 5%
4%
35,495.62
0% 0%
0.00 0.00
EL 26 Nov. Al 30 Nov. Al 31 Dic. AL 31 Ene. Al 28 Feb. Al 25 Mar.
EL 26 Nov. Al 30 Nov. Al 31 Dic. AL 31 Ene. Al 28 Feb. Al 25 Mar.
CONTROL DE METRADOS EJECUTADOS
PROYECTO:
AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE
ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD: MUNICIPALIDAD DISTRITAL DE ANGASMARCA
UBICACIÓN: LA LIBERTAD - SANTIAGO DE CHUCO - ANGASMARCA - COLPA SECA
FECHA: 31-Jan-15
EJECUTADA: CONTRATISTAS GENERALES VELVAL S.A.C.
RESIDENTE : Ing. OSCAR O. REYES FLORES
SUPERVISOR : Ing. VICTOR C. ROMERO RIVEROS

PRESUPUESTADO VALORIZACION N° 03 SALDO


PART.
SUB ANTERIOR ACTUAL ACUMULADO
Nº DESCRIPCION UNID. METRAD. C.U. METRAD.
TOTAL METRAD. METRAD. METRAD.
2.00 ESTRUCTURAS-01 AULA
2.03.04 VIGUETAS DE AMARRE
02.03.04.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.36 407.54 146.71 0.00 0.36 0.36 0.00
02.03.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 38.67 6.34 245.17 0.00 38.67 38.67 0.00
02.03.04.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 12.00 37.04 444.48 0.00 12.00 12.00 0.00
2.04 ESTRUCTURAS DE MADERA (TIJERALES)
02.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 6.00 2,331.08 13,986.48 0.00 6.00 6.00 0.00
02.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 24.00 308.09 7,394.16 0.00 24.00 24.00 0.00
02.04.03 ANCLAJE DE TIJERAL DE MADERA UND 12.00 1,004.25 12,051.00 0.00 12.00 12.00 0.00
02.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 175.85 51.94 9,133.65 0.00 175.85 175.85 0.00
02.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 20.28 41.13 834.12 0.00 20.28 20.28 0.00
2.05 PRUEBAS DE LABORATORIO
02.05.01 UND 8.00 42.02 336.16 6.00 2.00 8.00 0.00
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
3.00 ESTRUCTURAS-ADMINISTRACION
3.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 91.08 2.47 224.97 0.00 91.08 91.08 0.00
03.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 111.23 4.11 457.16 0.00 111.23 111.23 0.00
03.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 111.23 8.19 910.97 0.00 111.23 111.23 0.00
03.01.04 DEMOLICION DE MURO DE ADOBE E=0.40m m3 54.99 39.81 2,189.15 0.00 54.99 54.99 0.00
3.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION PARA ZAPATAS DE 1.70M DE PROFUNDIDAD m3 18.15 44.96 816.02 0.00 18.15 18.15 0.00
03.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 11.75 17.36 203.98 0.00 10.05 10.05 1.70
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 92.94 18.73 1,740.77 0.00 79.50 79.50 13.44
3.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 13.96 34.43 480.64 0.00 13.96 13.96 0.00
03.03.02 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 3.30 307.69 1,015.38 0.00 3.30 3.30 0.00
03.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 26.50 76.38 2,024.07 0.00 26.50 26.50 0.00
3.04 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
3.04.01 ZAPATAS
03.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 7.38 431.54 3,184.77 0.00 7.38 7.38 0.00
03.04.01.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 213.28 6.34 1,352.20 0.00 213.28 213.28 0.00
3.04.02 VIGAS DE CIMENTACION
03.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 2.14 448.93 960.71 0.00 2.14 2.14 0.00
03.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 158.10 158.10 0.00
03.04.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 17.10 71.64 1,225.04 0.00 17.10 17.10 0.00
3.04.03 SOBRECIMIENTO ARMADO
03.04.03.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 158.10 158.10 0.00
3.04.04 COLUMNAS
03.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.13 541.94 1,154.33 0.00 2.13 2.13 0.00
03.04.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 507.51 6.34 3,217.61 0.00 507.51 507.51 0.00
03.04.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 24.65 67.12 1,654.51 0.00 24.65 24.65 0.00
3.04.05 VIGAS
03.04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.37 454.60 1,532.00 0.00 3.37 3.37 0.00
03.04.05.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 597.24 6.42 3,834.28 0.00 597.24 597.24 0.00
03.04.05.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 28.09 78.23 2,197.48 0.00 28.09 28.09 0.00
3.04.06 COLUMNETAS DE AMARRE
03.04.06.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 0.55 470.02 258.51 0.00 0.55 0.55 0.00
03.04.06.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 71.75 6.34 454.90 0.00 71.75 71.75 0.00
03.04.06.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 7.36 37.04 272.61 0.00 7.36 7.36 0.00
3.04.07 VIGUETAS DE AMARRE
03.04.07.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.88 407.54 358.64 0.00 0.88 0.88 0.00
03.04.07.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 64.90 6.34 411.47 0.00 64.90 64.90 0.00
03.04.07.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 8.81 37.04 326.32 0.00 8.81 8.81 0.00
3.05 ESTRUCTURAS DE MADERA (TIJERALES)
03.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 3.00 2,331.08 6,993.24 0.00 3.00 3.00 0.00
03.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 12.00 302.09 3,625.08 0.00 12.00 12.00 0.00
03.04.03 ANCLAJE DE TIJERAL DE MADERA UND 6.00 1,004.25 6,025.50 0.00 6.00 6.00 0.00
03.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 89.10 51.94 4,627.85 0.00 89.10 89.10 0.00
03.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 9.90 41.13 407.19 0.00 9.90 9.90 0.00
3.06 PRUEBAS DE LABORATORIO
03.06.01 UND 18.00 42.02 756.36 0.00 10.00 10.00 8.00
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
4.00 ESTRUCTURAS-CERCO PERIMETRICO
4.04.02 COLUMNAS
04.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 9.45 497.51 4,701.47 7.56 1.89 9.45 0.00
04.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,510.20 6.34 9,574.67 1,510.20 0.00 1,510.20 0.00
04.04.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 126.00 67.12 8,457.12 100.80 25.20 126.00 0.00
4.04.03 VIGAS
04.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 87.36 497.51 43,462.47 52.42 34.94 87.36 0.00
04.04.03.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,573.61 6.42 10,102.58 944.17 629.44 1,573.61 0.00
04.04.03.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 173.51 78.23 13,573.69 104.11 69.40 173.51 0.00
1.00 ARQUITECTURA- 01 AULA
CRONOGRAMA VALORIZADO PROGRAMADO
AMPLIACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA EN EL CASERIO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD
OBRA

Cliente MUNICIPALIDAD DISTRITAL DE ANGASMARCA


Lugar LA LIBERTAD - SANTIAGO DE CHUCO - ANGASMARCA
PLAZO DE EJECUCION 120 DIAS CALENDARIOS

MESES

N° PARTIDAS MONTO DEL 26/11/14 DEL 01/12/14 DEL 01/01/15 DEL 01/02/15 DEL 01/03/15 TOTAL
AL 30/11/14 AL 31/12/14 AL 31/01/15 AL 28/02/15 AL 25/03/15

ESTRUCTURAS
01 OBRAS PROVISIONALES 3,285.31 100%

3,285.31 3,285.31

02 ESTRUCTURAS AULAS
2.01 OBRAS PRELIMINARES 2,313.72 100%

2,313.72 2,313.72

3 OBRAS DE CONCRETO SIMPLE 5,722.75 100%

5,722.75 5,722.75
4 OBRAS DE CONCRETO ARMADO

4.01 COLUMNAS 16,662.78 40% 60%

6,665.11 9,997.67 16,662.78

05.02 VIGAS 20,378.55 100%

20,378.55 20,378.55

05.06 COLUMNETAS DE AMARRE 2,771.95 100%

2,771.95 2,771.95

05.07 VIGUETAS DE AMARRE 836.36 100%

836.36 836.36

5.08 LOSAS ALIGERADAS 1,868.59 100%

1,868.59 1,868.59

5.09 ESTRUCTURAS DE MADERA (TIJERALES) 43,399.41 40% 60%

17,359.76 26,039.65 43,399.41

5.10 PRUEBAS DE LABORATORIO 336.16 50% 50%

168.08 168.08 336.16

3.00 ESTRUCTURAS - ADMINISTRACION

3.01 OBRAS PRELIMINARES 3,782.25 100%

3,782.25 3,782.25

3.02 MOVIMIENTO DE TIERRAS 3,817.10 100%

3,817.10 3,817.10

3.03 OBRAS DE CONCRETO SIMPLE 7,753.19 100%

7,753.19 7,753.19

3.04 OBRAS DE CONCRETO ARMADO


3.04.01 ZAPATAS 4,536.97 100%

4,536.97 4,536.97

3.04.02 VIGAS DE CIMENTACION 3,188.10 100%

3,188.10 3,188.10

3.04.03 SOBRECIMIENTO ARMADO 1,002.35 100%

1,002.35 1,002.35

3.04.04 COLUMNAS 6,026.45 100%

6,026.45 6,026.45

3.04.05 VIGAS 7563.76 50% 50%

3,781.88 3,781.88 7,563.76


MESES

N° PARTIDAS MONTO DEL 26/11/14 DEL 01/12/14 DEL 01/01/15 DEL 01/02/15 DEL 01/03/15 TOTAL
AL 30/11/14 AL 31/12/14 AL 31/01/15 AL 28/02/15 AL 25/03/15

3.04.06 COLUMNETAS DE AMARRE 986.02 100%

986.02 986.02

3.04.07 VIGUETAS DE AMARRE 1096.43 100%

1,096.43 1,096.43

3.05 ESTRUCTURAS DE MADERA (TIJERALES) 21678.86 100%

21,678.86 21,678.86

3.06 PRUEBAS DE LABORATORIO 756.36 50% 50%

378.18 378.18 756.36

4.00 ESTRUCTURAS - CERCO PERIMETRICO


4.01 OBRAS PRELIMINARES 3075.26 100%

3,075.26 3,075.26

4.02 MOVIMIENTO DE TIERRAS 8506.68 50% 50%

4,253.34 4,253.34 8,506.68

4.03 OBRAS DE CONCRETO SIMPLE 90398.33 70% 30%

63,278.83 27,119.50 90,398.33

4.04 OBRAS DE CONCRETO ARMADO

4.04.01 SOBRECIMIENTO ARMADO 12242.35 70% 30%

8,569.65 3,672.71 12,242.35

4.04.02 COLUMNAS 22733.26 70% 30%

15,913.28 6,819.98 22,733.26

4.04.03 VIGAS 67138.74 70% 30%

46,997.12 20,141.62 67,138.74

5.00 FLETE TERRESTRE 16696.11 30% 70%

5,008.83 11,687.28 16,696.11

ARQUITECTURA
1.00 ARQUITECTURA - 01 AULA
1.01 MUROS Y TABIQUES DE ALBAÑILERIA 7141.2 25% 75%

1,785.30 5,355.90 7,141.20

1.02 REVOQUES ENLUCIDOS 14,550.96 100%

14,550.96 14,550.96

1.03 CIELO RASOS 7,045.00 100%

7,045.00 7,045.00

1.04 PISOS Y PAVIMENTOS 4,571.94 100%

4,571.94 4,571.94

1.05 ZOCALOS Y CONTRAZOCALOS 915.01 100%

915.01 915.01

1.06 CARPINTERIA DE MADERA 1,648.00 100%

1,648.00 1,648.00

1.07 CARPINTERIA METALICA 7,509.28 100%

7,509.28 7,509.28

1.08 CERRAJERIA 353.70 100%

353.70 353.70

1.09 VIDRIOS, CRISTALES Y SIMILARES 1,984.87 100%

1,984.87 1,984.87

1.10 PINTURA 5,499.53 100%

5,499.53 5,499.53

1.11 VARIOS 22.30 100%

22.30 22.30
MESES

N° PARTIDAS MONTO DEL 26/11/14 DEL 01/12/14 DEL 01/01/15 DEL 01/02/15 DEL 01/03/15 TOTAL
AL 30/11/14 AL 31/12/14 AL 31/01/15 AL 28/02/15 AL 25/03/15
MESES

N° PARTIDAS MONTO DEL 26/11/14 DEL 01/12/14 DEL 01/01/15 DEL 01/02/15 DEL 01/03/15 TOTAL
AL 30/11/14 AL 31/12/14 AL 31/01/15 AL 28/02/15 AL 25/03/15

1.12 SISTEMA DE AGUA DE LLUVIA 2,412.66 100%

2,412.66 2,412.66

2.00 ARQUITECTURA - ADMINISTRACION


2.01 MUROS Y TABIQUES DE ALBAÑILERIA 5,296.73 100%

5,296.73 5,296.73

2.02 REVOQUES ENLUCIDOS 8,521.73 50% 50%

4,260.87 4,260.87 8,521.73

2.03 CIELORRASO 4,469.96 50% 50%

2,234.98 2,234.98 4,469.96

2.04 PISOS Y PAVIMENTOS 4,864.78 100%

4,864.78 4,864.78

2.05 ZOCALOS Y CONTRAZOCALOS 2,630.97 100%

2,630.97 2,630.97
2.06 CARPINTERIA EN MADERA 5,632.18 100%

5,632.18 5,632.18

2.07 CARPINTERIA METALICA 1,367.82 100%

1,367.82 1,367.82

2.08 CERRAJERIA 752.85 100%

752.85 752.85

2.09 VIDRIOS, CRISTALES Y SIMILARES 483.65 100%

483.65 483.65

2.10 PINTURA 4,045.08 100%

4,045.08 4,045.08

2.10 VARIOS
2.10.01 JUNTAS DE DILATACION 35.5 100%

35.50 35.50

2.10.02 JUNTAS SISMICA 1" 92.75 100%

92.75 92.75

2.11 SISTEMA DE AGUA DE LLUVIA 1,793.76 100%

3.00 ARQUITECTURA - CERCO PERIMETRICO 1,793.76 1,793.76

3.01 MUROS Y TABIQUES DE ALBAÑILERIA 48,226.50 50% 50%

24,113.25 24,113.25 48,226.50

3.02 REVOQUES ENLUCIDOS 34,401.75 100%

34,401.75 34,401.75

3.03 CARPINTERIA METALICA 3,500.00 100%

3,500.00 3,500.00

3.04 PINTURA 3,056.19 100%

3,056.19 3,056.19

3.05 JUNTAS DE DILATACION 3,150.00 100%

3,150.00 3,150.00

4.00 FLETE TERRESTRE 26,051.25 50% 50%

13,025.63 13,025.63 26,051.25

5.00 EQUIPAMIENTO Y MOBILIARIO 5,000.00 100%

5,000.00 5,000.00

1.00 INSTALACIONES ELECTRICAS

1.01 INSTALACIONES ELECTRICAS 01 AULAS 3,824.09 100%

3,824.09 3,824.09
MESES

N° PARTIDAS MONTO DEL 26/11/14 DEL 01/12/14 DEL 01/01/15 DEL 01/02/15 DEL 01/03/15 TOTAL
AL 30/11/14 AL 31/12/14 AL 31/01/15 AL 28/02/15 AL 25/03/15

1.02 INSTALACIONES ELECTRICAS ADMINISTRACION 1,953.92 100%

1,953.92 1,953.92
MESES

N° PARTIDAS MONTO DEL 26/11/14 DEL 01/12/14 DEL 01/01/15 DEL 01/02/15 DEL 01/03/15 TOTAL
AL 30/11/14 AL 31/12/14 AL 31/01/15 AL 28/02/15 AL 25/03/15

1.03 FLETE TERRESTRE 37.29 100%

37.29 37.29
COSTO DIRECTO 603,397.35 26,386.9 228,222.0 182,449.8 126,114.4 40,224.3 603,397.35
0 GASTOS GENERALES (9% ) 54,305.76 2,374.82 20,539.98 16,420.48 11,350.30 3,620.18 54,305.76
UTILIDAD (5%) 30,169.87 1,319.34 11,411.10 9,122.49 6,305.72 2,011.21 30,169.87
SUB TOTAL 687,872.98 30,081.04 260,173.10 207,992.75 143,770.41 45,855.67 687,872.98
0 IGV (18 % ) 123,817.14 5,414.59 46,831.16 37,438.70 25,878.67 8,254.02 123,817.14
VALOR REFERENCIAL 811,690.12 35,495.62 307,004.26 245,431.45 169,649.08 54,109.69 811,690.12

AVANCE PROGRAMADO POR MES 811,690.12 35,495.62 307,004.26 245,431.45 169,649.08 54,109.69 811,690.12
% DE AVANCE PROGRAMADO POR MES 4.37% 37.82% 30.24% 20.90% 6.67% 100%
AVANCE PROGRAMADO ACUMULADO 35,495.62 342,499.89 587,931.34 757,580.42 811,690.12
% DE AVANCE PROGRAMADO ACUMULADO 100.00% 4.37% 42.20% 72.43% 93.33% 100.00%
VALORIZACION N° 03
PROYECTO: AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 811,690.12
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 31-Jan-15 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. VICTOR COBADIS ROMERO RIVEROS

PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT


AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
1.00 OBRAS PROVISIONALES
1.01 GUARDIANIA, DEPOSITO Y ALMACEN GLB 1.00 1,108.42 1,108.42 1.00 1,108.42 0.00 0.00 1.00 1,108.42 0.00 0.00 100.00%
1.02 CARTEL DE OBRA 3.60 M X 4.80 M UND 1.00 2,176.89 2,176.89 1.00 2,176.89 0.00 0.00 1.00 2,176.89 0.00 0.00 100.00%
2.00 ESTRUCTURAS-01 AULA
2.01 OBRAS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 156.65 2.47 386.93 156.65 386.93 0.00 0.00 156.65 386.93 0.00 0.00 100.00%
02.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 156.65 4.11 643.83 156.65 643.83 0.00 0.00 156.65 643.83 0.00 0.00 100.00%
02.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 156.65 8.19 1,282.96 156.65 1,282.96 0.00 0.00 156.65 1,282.96 0.00 0.00 100.00%
2.02 OBRAS DE CONCRETO SIMPLE
02.02.01 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 129.24 44.28 5,722.75 0.00 0.00 0.00 0.00 0.00 0.00 129.24 5,722.75 0.00%
2.03 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
2.03.01 COLUMNAS
02.03.01.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 6.69 541.94 3,625.58 6.69 3,625.58 0.00 0.00 6.69 3,625.58 0.00 0.00 100.00%
02.03.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,144.08 6.34 7,253.47 1,144.08 7,253.47 0.00 0.00 1,144.08 7,253.47 0.00 0.00 100.00%
02.03.01.03 ENCOFRADO y DESENCOFRADO EN COLUMNAS m2 86.17 67.12 5,783.73 86.17 5,783.73 0.00 0.00 86.17 5,783.73 0.00 0.00 100.00%
2.03.02 VIGAS
02.03.02.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 8.63 454.60 3,923.20 8.63 3,923.20 0.00 0.00 8.63 3,923.20 0.00 0.00 100.00%
02.03.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,167.55 6.42 7,495.67 1,167.55 7,495.67 0.00 0.00 1,167.55 7,495.67 0.00 0.00 100.00%
02.03.02.03 ENCOFRADO y DESENCOFRADO EN VIGAS m2 114.53 78.23 8,959.68 114.53 8,959.68 0.00 0.00 114.53 8,959.68 0.00 0.00 100.00%
2.03.03 COLUMNETAS DE AMARRE
02.03.03.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 1.85 470.02 869.54 1.85 869.54 0.00 0.00 1.85 869.54 0.00 0.00 100.00%
02.03.03.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 141.33 6.34 896.03 141.33 896.03 0.00 0.00 141.33 896.03 0.00 0.00 100.00%
02.03.03.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 27.17 37.04 1,006.38 27.17 1,006.38 0.00 0.00 27.17 1,006.38 0.00 0.00 100.00%
2.03.04 VIGUETAS DE AMARRE
02.03.04.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.36 407.54 146.71 0.00 0.00 0.36 146.71 0.36 146.71 0.00 0.00 100.00%
02.03.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 38.67 6.34 245.17 0.00 0.00 38.67 245.17 38.67 245.17 0.00 0.00 100.00%
02.03.04.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 12.00 37.04 444.48 0.00 0.00 12.00 444.48 12.00 444.48 0.00 0.00 100.00%
2.03.05 LOSA ALIGERADA
02.03.05.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 0.87 443.45 385.80 0.00 0.00 0.00 0.00 0.00 0.00 0.87 385.80 0.00%
02.03.05.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 51.95 6.34 329.36 0.00 0.00 0.00 0.00 0.00 0.00 51.95 329.36 0.00%
02.03.05.03 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m2 11.62 78.23 909.03 0.00 0.00 0.00 0.00 0.00 0.00 11.62 909.03 0.00%
02.03.05.04 LADRILLO HUECO DE ARCILLA h=12 cm PARA TECHO ALIGERADO UND 104.00 2.35 244.40 0.00 0.00 0.00 0.00 0.00 0.00 104.00 244.40 0.00%
2.04 ESTRUCTURAS DE MADERA (TIJERALES)
02.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 6.00 2,331.08 13,986.48 0.00 0.00 6.00 13,986.48 6.00 13,986.48 0.00 0.00 100.00%
02.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 24.00 308.09 7,394.16 0.00 0.00 24.00 7,394.16 24.00 7,394.16 0.00 0.00 100.00%
02.04.03 ANCLAJE DE TIJERAL DE MADERA UND 12.00 1,004.25 12,051.00 0.00 0.00 12.00 12,051.00 12.00 12,051.00 0.00 0.00 100.00%
02.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 175.85 51.94 9,133.65 0.00 0.00 175.85 9,133.65 175.85 9,133.65 0.00 0.00 100.00%
02.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 20.28 41.13 834.12 0.00 0.00 20.28 834.12 20.28 834.12 0.00 0.00 100.00%
2.05 PRUEBAS DE LABORATORIO
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
02.05.01 UND 8.00 42.02 336.16 6.00 252.12 2.00 84.04 8.00 336.16 0.00 0.00 100.00%
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
3.00 ESTRUCTURAS-ADMINISTRACION
3.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 91.08 2.47 224.97 0.00 0.00 91.08 224.97 91.08 224.97 0.00 0.00 100.00%
03.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 111.23 4.11 457.16 0.00 0.00 111.23 457.16 111.23 457.16 0.00 0.00 100.00%
03.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 111.23 8.19 910.97 0.00 0.00 111.23 910.97 111.23 910.97 0.00 0.00 100.00%
03.01.04 DEMOLICION DE MURO DE ADOBE E=0.40m m3 54.99 39.81 2,189.15 0.00 0.00 54.99 2,189.15 54.99 2,189.15 0.00 0.00 100.00%
3.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION PARA ZAPATAS DE 1.70M DE PROFUNDIDAD m3 18.15 44.96 816.02 0.00 0.00 18.15 816.02 18.15 816.02 0.00 0.00 100.00%
03.02.02 EXCAVACION PARA CUNETAS m3 6.85 28.10 192.49 0.00 0.00 0.00 0.00 0.00 0.00 6.85 192.49 0.00%
03.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 11.75 17.36 203.98 0.00 0.00 10.05 174.47 10.05 174.47 1.70 29.51 85.53%
03.02.04 RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO LIVIANO m3 85.36 10.12 863.84 0.00 0.00 0.00 0.00 0.00 0.00 85.36 863.84 0.00%
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 92.94 18.73 1,740.77 0.00 0.00 79.50 1,489.04 79.50 1,489.04 13.44 251.73 85.54%
3.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 13.96 34.43 480.64 0.00 0.00 13.96 480.64 13.96 480.64 0.00 0.00 100.00%
03.03.02 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 3.30 307.69 1,015.38 0.00 0.00 3.30 1,015.38 3.30 1,015.38 0.00 0.00 100.00%
03.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 26.50 76.38 2,024.07 0.00 0.00 26.50 2,024.07 26.50 2,024.07 0.00 0.00 100.00%
03.03.04 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 51.15 44.28 2,264.92 0.00 0.00 0.00 0.00 0.00 0.00 51.15 2,264.92 0.00%
03.03.05 CONCRETO EN CUNETAS FC 175KG/CM2 m3 4.03 282.60 1,138.88 0.00 0.00 0.00 0.00 0.00 0.00 4.03 1,138.88 0.00%
03.03.06 ENCOFRADO DE CUNETAS m2 19.34 42.88 829.30 0.00 0.00 0.00 0.00 0.00 0.00 19.34 829.30 0.00%
3.04 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
3.04.01 ZAPATAS
03.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 7.38 431.54 3,184.77 0.00 0.00 7.38 3,184.77 7.38 3,184.77 0.00 0.00 100.00%
03.04.01.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 213.28 6.34 1,352.20 0.00 0.00 213.28 1,352.20 213.28 1,352.20 0.00 0.00 100.00%
3.04.02 VIGAS DE CIMENTACION
03.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 2.14 448.93 960.71 0.00 0.00 2.14 960.71 2.14 960.71 0.00 0.00 100.00%
03.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 158.10 1,002.35 158.10 1,002.35 0.00 0.00 100.00%
03.04.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 17.10 71.64 1,225.04 0.00 0.00 17.10 1,225.04 17.10 1,225.04 0.00 0.00 100.00%
3.04.03 SOBRECIMIENTO ARMADO
03.04.03.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 158.10 1,002.35 158.10 1,002.35 0.00 0.00 100.00%
3.04.04 COLUMNAS
03.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.13 541.94 1,154.33 0.00 0.00 2.13 1,154.33 2.13 1,154.33 0.00 0.00 100.00%
03.04.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 507.51 6.34 3,217.61 0.00 0.00 507.51 3,217.61 507.51 3,217.61 0.00 0.00 100.00%
03.04.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 24.65 67.12 1,654.51 0.00 0.00 24.65 1,654.51 24.65 1,654.51 0.00 0.00 100.00%
3.04.05 VIGAS
03.04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.37 454.60 1,532.00 0.00 0.00 3.37 1,532.00 3.37 1,532.00 0.00 0.00 100.00%
03.04.05.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 597.24 6.42 3,834.28 0.00 0.00 597.24 3,834.28 597.24 3,834.28 0.00 0.00 100.00%
03.04.05.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 28.09 78.23 2,197.48 0.00 0.00 28.09 2,197.48 28.09 2,197.48 0.00 0.00 100.00%
3.04.06 COLUMNETAS DE AMARRE
03.04.06.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 0.55 470.02 258.51 0.00 0.00 0.55 258.51 0.55 258.51 0.00 0.00 100.00%
03.04.06.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 71.75 6.34 454.90 0.00 0.00 71.75 454.90 71.75 454.90 0.00 0.00 100.00%
03.04.06.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 7.36 37.04 272.61 0.00 0.00 7.36 272.61 7.36 272.61 0.00 0.00 100.00%
3.04.07 VIGUETAS DE AMARRE
03.04.07.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.88 407.54 358.64 0.00 0.00 0.88 358.64 0.88 358.64 0.00 0.00 100.00%
03.04.07.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 64.90 6.34 411.47 0.00 0.00 64.90 411.47 64.90 411.47 0.00 0.00 100.00%
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
03.04.07.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 8.81 37.04 326.32 0.00 0.00 8.81 326.32 8.81 326.32 0.00 0.00 100.00%
3.05 ESTRUCTURAS DE MADERA (TIJERALES)
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
03.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 3.00 2,331.08 6,993.24 0.00 0.00 3.00 6,993.24 3.00 6,993.24 0.00 0.00 100.00%
03.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 12.00 302.09 3,625.08 0.00 0.00 12.00 3,625.08 12.00 3,625.08 0.00 0.00 100.00%
03.04.03 ANCLAJE DE TIJERAL DE MADERA UND 6.00 1,004.25 6,025.50 0.00 0.00 6.00 6,025.50 6.00 6,025.50 0.00 0.00 100.00%
03.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 89.10 51.94 4,627.85 0.00 0.00 89.10 4,627.85 89.10 4,627.85 0.00 0.00 100.00%
03.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 9.90 41.13 407.19 0.00 0.00 9.90 407.19 9.90 407.19 0.00 0.00 100.00%
3.06 PRUEBAS DE LABORATORIO
03.06.01 UND 18.00 42.02 756.36 0.00 0.00 10.00 420.20 10.00 420.20 8.00 336.16 55.56%
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
4.00 ESTRUCTURAS-CERCO PERIMETRICO
4.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 208.21 2.47 514.28 208.21 514.28 0.00 0.00 208.21 514.28 0.00 0.00 100.00%
04.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 208.21 4.11 855.74 208.21 855.74 0.00 0.00 208.21 855.74 0.00 0.00 100.00%
04.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 208.21 8.19 1,705.24 208.21 1,705.24 0.00 0.00 208.21 1,705.24 0.00 0.00 100.00%
4.02 MOVIMIENTO DE TIERRAS
04.02.01 m3 182.99 28.10 5,142.02 182.99 5,142.02 0.00 0.00 182.99 5,142.02 0.00 0.00 100.00%
EXCAVACION PARA CIMIENTOS HASTA 0.70M DE PROFUNDIDAD EN
TERRENO NORMAL
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 157.36 17.36 2,731.77 157.36 2,731.77 0.00 0.00 157.36 2,731.77 0.00 0.00 100.00%
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 33.79 18.73 632.89 33.79 632.89 0.00 0.00 33.79 632.89 0.00 0.00 100.00%
4.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 208.21 34.43 7,168.67 208.21 7,168.67 0.00 0.00 208.21 7,168.67 0.00 0.00 100.00%
04.03.02 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 145.75 232.29 33,856.27 145.75 33,856.27 0.00 0.00 145.75 33,856.27 0.00 0.00 100.00%
04.03.03 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 37.23 307.69 11,455.30 37.23 11,455.30 0.00 0.00 37.23 11,455.30 0.00 0.00 100.00%
04.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 496.44 76.38 37,918.09 496.44 37,918.09 0.00 0.00 496.44 37,918.09 0.00 0.00 100.00%
4.04 OBRAS DE CONCRETO ARMADO
4.04.01 SOBRECIMIENTO ARMADO
04.04.01.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,930.97 6.34 12,242.35 1,930.97 12,242.35 0.00 0.00 1,930.97 12,242.35 0.00 0.00 100.00%
4.04.02 COLUMNAS
04.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 9.45 497.51 4,701.47 7.56 3,761.18 1.89 940.29 9.45 4,701.47 0.00 0.00 100.00%
04.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,510.20 6.34 9,574.67 1,510.20 9,574.67 0.00 0.00 1,510.20 9,574.67 0.00 0.00 100.00%
04.04.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 126.00 67.12 8,457.12 100.80 6,765.70 25.20 1,691.42 126.00 8,457.12 0.00 0.00 100.00%
4.04.03 VIGAS
04.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 87.36 497.51 43,462.47 52.42 26,077.48 34.94 17,384.99 87.36 43,462.47 0.00 0.00 100.00%
04.04.03.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,573.61 6.42 10,102.58 944.17 6,061.55 629.44 4,041.03 1,573.61 10,102.58 0.00 0.00 100.00%
04.04.03.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 173.51 78.23 13,573.69 104.11 8,144.21 69.40 5,429.47 173.51 13,573.68 0.00 0.00 100.00%
5.00 FLETE TERRESTRE
5.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 111,307.41 0.15 16,696.11 111,307.41 16,696.11 0.00 0.00 111,307.41 16,696.11 0.00 0.00 100.00%
130,088.02
GASTOS GENERALES 9% 0.00 11,707.92 0.00 0.00
UTILIDAD 5% 0.00 6,504.40 0.00 0.00
SUB TOTAL 0.00 148,300.34 0.00 0.00
1.00 ARQUITECTURA- 01 AULA
1.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 116.61 61.24 7,141.20 102.68 6,288.12 13.93 853.07 116.61 7,141.19 0.00 0.00 100.00%
1.02 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 98.74 39.64 3,914.05 0.00 0.00 98.74 3,914.05 98.74 3,914.05 0.00 0.00 100.00%
01.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 125.65 35.98 4,520.89 0.00 0.00 125.65 4,520.89 125.65 4,520.89 0.00 0.00 100.00%
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
01.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 55.04 32.12 1,767.88 0.00 0.00 55.04 1,767.88 55.04 1,767.88 0.00 0.00 100.00%
01.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 66.62 47.33 3,153.12 0.00 0.00 66.62 3,153.12 66.62 3,153.12 0.00 0.00 100.00%
01.02.05 TARRAJEO DE ESCALERAS m2 23.78 34.20 813.28 0.00 0.00 0.00 0.00 0.00 0.00 23.78 813.28 0.00%
01.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 13.09 14.06 184.05 0.00 0.00 13.09 184.05 13.09 184.05 0.00 0.00 100.00%
01.02.07 BRUÑAS 1" m 158.15 1.25 197.69 0.00 0.00 158.15 197.69 158.15 197.69 0.00 0.00 100.00%
1.03 CIELORRASOS
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO
129.74 129.74
01.03.01 DE 2" x 2" x 10´ m2 52.88 6,860.65 0.00 0.00 6,860.65 129.74 6,860.65 0.00 0.00 100.00%
01.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 7.54 24.45 184.35 0.00 0.00 7.54 184.35 7.54 184.35 0.00 0.00 100.00%
1.04 PISOS Y PAVIMENTOS
01.04.01 PISO DE CONCRETO E=4", PULIDO, BRUÑADO Y COLOREADO m2 112.25 40.73 4,571.94 0.00 0.00 0.00 0.00 0.00 0.00 112.25 4,571.94 0.00%
1.05 ZOCALOS Y CONTRAZOCALOS
01.05.01 74.09 12.35 915.01 0.00 0.00 74.09 915.01 74.09 915.01 0.00 0.00 100.00%
ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5
C:A m
1.06 CARPINTERIA DE MADERA
01.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 2.00 754.00 1,508.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,508.00 0.00%
01.06.02 TICERO DE MADERA CEDRO (L=3.10m) BARNIZADO UND 2.00 70.00 140.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 140.00 0.00%
1.07 CARPINTERIA METALICA
01.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 23.32 198.55 4,630.19 0.00 0.00 0.00 0.00 0.00 0.00 23.32 4,630.19 0.00%
01.07.02 REJILLA METALICA FIJA UND 2.00 112.98 225.96 0.00 0.00 0.00 0.00 0.00 0.00 2.00 225.96 0.00%
01.07.03 PASAMANO DE ACERO TUBO DE 2" m 22.00 96.79 2,129.38 0.00 0.00 0.00 0.00 0.00 0.00 22.00 2,129.38 0.00%
01.07.04 CANTONERA PARA ESCALERA SEGUN PLANOS m 25.00 20.95 523.75 0.00 0.00 0.00 0.00 0.00 0.00 25.00 523.75 0.00%
1.08 CERRAJERIA
01.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" PZA 6.00 29.55 177.30 0.00 0.00 0.00 0.00 0.00 0.00 6.00 177.30 0.00%
01.08.02 CHAPA DE PARCHE DE TRES GOLPES PZA 2.00 88.20 176.40 0.00 0.00 0.00 0.00 0.00 0.00 2.00 176.40 0.00%
1.09 VIDRIOS, CRISTALES Y SIMILARES
01.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 363.53 5.46 1,984.87 0.00 0.00 0.00 0.00 0.00 0.00 363.53 1,984.87 0.00%
1.10 PINTURA
01.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 98.74 10.32 1,019.00 0.00 0.00 0.00 0.00 0.00 0.00 98.74 1,019.00 0.00%
01.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 137.27 7.19 986.97 0.00 0.00 0.00 0.00 0.00 0.00 137.27 986.97 0.00%
01.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 55.04 8.52 468.94 0.00 0.00 0.00 0.00 0.00 0.00 55.04 468.94 0.00%
01.10.04 PINTURA EN VIGAS C/LATEX LAVABLE m2 66.62 8.79 585.59 0.00 0.00 0.00 0.00 0.00 0.00 66.62 585.59 0.00%
01.10.05 PINTURA EN DERRAMES C/LATEX LAVABLE m 13.09 2.18 28.54 0.00 0.00 0.00 0.00 0.00 0.00 13.09 28.54 0.00%
01.10.06 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 129.74 9.77 1,267.56 0.00 0.00 0.00 0.00 0.00 0.00 129.74 1,267.56 0.00%
01.10.07 PINTURA EN PIZARRA m2 7.40 12.77 94.50 0.00 0.00 0.00 0.00 0.00 0.00 7.40 94.50 0.00%
01.10.08 PINTURA EN FRISO DE MADERA m2 7.34 12.62 92.63 0.00 0.00 0.00 0.00 0.00 0.00 7.34 92.63 0.00%
01.10.09 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 74.09 5.66 419.35 0.00 0.00 0.00 0.00 0.00 0.00 74.09 419.35 0.00%
01.10.10 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 5.20 16.18 84.14 0.00 0.00 0.00 0.00 0.00 0.00 5.20 84.14 0.00%
01.10.11 PINTURA ESMALTE EN BRUÑAS DE 1" m 158.15 2.86 452.31 0.00 0.00 0.00 0.00 0.00 0.00 158.15 452.31 0.00%
1.11 VARIOS
01.11.11 JUNTAS SISMICA 1" m 4.46 5.00 22.30 0.00 0.00 4.46 22.30 4.46 22.30 0.00 0.00 100.00%
1.12 SISTEMA DE AGUA FRIA
1.12.01 TUBERIAS Y ACCESORIOS
01.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 24.05 16.31 392.26 0.00 0.00 0.00 0.00 0.00 0.00 24.05 392.26 0.00%
01.12.01.02 CODO PVC-SAP 3" * 90 UND 7.00 13.20 92.40 0.00 0.00 0.00 0.00 0.00 0.00 7.00 92.40 0.00%
01.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 39.22 16.46 645.56 0.00 0.00 0.00 0.00 0.00 0.00 39.22 645.56 0.00%
01.12.01.04 SOPORTE DE CANALETA UND 25.00 3.89 97.25 0.00 0.00 0.00 0.00 0.00 0.00 25.00 97.25 0.00%
01.12.01.05 ABRAZADERA PARA CANALETA UND 13.00 19.54 254.02 0.00 0.00 0.00 0.00 0.00 0.00 13.00 254.02 0.00%
01.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 9.79 37.04 362.62 0.00 0.00 0.00 0.00 0.00 0.00 9.79 362.62 0.00%
01.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.67 393.71 263.79 0.00 0.00 0.00 0.00 0.00 0.00 0.67 263.79 0.00%
01.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 8.14 28.92 235.41 0.00 0.00 0.00 0.00 0.00 0.00 8.14 235.41 0.00%
01.12.01.09 PINTURA EN FALSA COLUMNA m2 8.14 8.52 69.35 0.00 0.00 0.00 0.00 0.00 0.00 8.14 69.35 0.00%
2.00 ARQUITECTURA- ADMINISTRACION
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
02.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE CABEZA J m2 38.57 104.35 4,024.78 0.00 0.00 38.57 4,024.78 38.57 4,024.78 0.00 0.00 100.00%
02.01.02 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 20.77 61.24 1,271.95 0.00 0.00 20.77 1,271.95 20.77 1,271.95 0.00 0.00 100.00%
2.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 58.30 39.64 2,311.01 0.00 0.00 0.00 0.00 0.00 0.00 58.30 2,311.01 0.00%
02.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 61.21 35.98 2,202.34 0.00 0.00 0.00 0.00 0.00 0.00 61.21 2,202.34 0.00%
02.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 10.37 32.12 333.08 0.00 0.00 0.00 0.00 0.00 0.00 10.37 333.08 0.00%
02.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 25.90 47.33 1,225.85 0.00 0.00 0.00 0.00 0.00 0.00 25.90 1,225.85 0.00%
02.02.05 TARRAJEO EN PESTAÑAS CON C:A 1:5 E = 1.50cm m2 8.05 47.33 381.01 0.00 0.00 0.00 0.00 0.00 0.00 8.05 381.01 0.00%
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 33.80 14.06 475.23 0.00 0.00 0.00 0.00 0.00 0.00 33.80 475.23 0.00%
02.02.07 FROTACHADO EN CUNETAS CON C:A 1:5 E = 1.50cm CON IMPERMEABILIZANT m2 36.51 32.88 1,200.45 0.00 0.00 0.00 0.00 0.00 0.00 36.51 1,200.45 0.00%
02.02.08 BRUÑAS DE 1/2" m 263.22 1.25 329.03 0.00 0.00 0.00 0.00 0.00 0.00 263.22 329.03 0.00%
02.02.09 BRUÑAS 3/4" m 50.98 1.25 63.73 0.00 0.00 0.00 0.00 0.00 0.00 50.98 63.73 0.00%
2.03 CIELORRASO
02.03.01 m2 81.83 52.88 4,327.17 0.00 0.00 0.00 0.00 0.00 0.00 81.83 4,327.17 0.00%
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO
DE 2" x 2" x 10´
02.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 5.84 24.45 142.79 0.00 0.00 0.00 0.00 0.00 0.00 5.84 142.79 0.00%
2.04 PISOS Y PAVIMENTOS
02.04.01 PISO MACHIEMBRADO m2 66.00 38.11 2,515.26 0.00 0.00 0.00 0.00 0.00 0.00 66.00 2,515.26 0.00%
02.04.02 VEREDA DE CONCRETO f'c= 175 kg/cm2 H=0.10M m2 34.21 57.94 1,982.13 0.00 0.00 0.00 0.00 0.00 0.00 34.21 1,982.13 0.00%
02.04.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 4.81 76.38 367.39 0.00 0.00 0.00 0.00 0.00 0.00 4.81 367.39 0.00%
2.05 ZOCALOS Y CONTRAZOCALOS
02.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 m 30.51 12.35 376.80 0.00 0.00 0.00 0.00 0.00 0.00 30.51 376.80 0.00%
02.05.02 CONTRAZOCALO DE MADERA CEDRO DE 4" RODON 1" m 28.23 79.85 2,254.17 0.00 0.00 0.00 0.00 0.00 0.00 28.23 2,254.17 0.00%
2.06 CARPINTERIA DE MADERA
02.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 1.00 754.00 754.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 754.00 0.00%
02.06.02 PUERTA CONTRAPLACADA DE MADERA TORNILLO SEGUN DISEÑO INCL. INST UND 2.00 380.00 760.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 760.00 0.00%
02.06.03 TABIQUERIA DE MELAMINE DE 1" m2 22.50 183.03 4,118.18 0.00 0.00 0.00 0.00 0.00 0.00 22.50 4,118.18 0.00%
2.07 CARPINTERIA METALICA
02.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 6.32 198.55 1,254.84 0.00 0.00 0.00 0.00 0.00 0.00 6.32 1,254.84 0.00%
02.07.02 REJILLA METALICA FIJA UND 1.00 112.98 112.98 0.00 0.00 0.00 0.00 0.00 0.00 1.00 112.98 0.00%
2.08 CERRAJERIA
02.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 10.00 29.55 295.50 0.00 0.00 0.00 0.00 0.00 0.00 10.00 295.50 0.00%
02.08.02 CHAPA DE PARCHE DE TRES GOLPES pza 3.00 88.20 264.60 0.00 0.00 0.00 0.00 0.00 0.00 3.00 264.60 0.00%
02.08.03 MANIJA DE BRONCE DE 4" PARA PUERTAS pza 3.00 64.25 192.75 0.00 0.00 0.00 0.00 0.00 0.00 3.00 192.75 0.00%
2.09 VIDRIOS, CRISTALES Y SIMILARES
02.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 88.58 5.46 483.65 0.00 0.00 0.00 0.00 0.00 0.00 88.58 483.65 0.00%
2.10 PINTURA
02.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 58.30 10.32 601.66 0.00 0.00 0.00 0.00 0.00 0.00 58.30 601.66 0.00%
02.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 61.21 7.19 440.10 0.00 0.00 0.00 0.00 0.00 0.00 61.21 440.10 0.00%
02.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 10.37 8.52 88.35 0.00 0.00 0.00 0.00 0.00 0.00 10.37 88.35 0.00%
02.10.04 PINTURA EN COLUMNETAS C/LATEX LAVABLE m2 3.12 8.52 26.58 0.00 0.00 0.00 0.00 0.00 0.00 3.12 26.58 0.00%
02.10.05 PINTURA EN VIGAS C/LATEX LAVABLE m2 25.90 8.79 227.66 0.00 0.00 0.00 0.00 0.00 0.00 25.90 227.66 0.00%
02.10.06 PINTURA EN PESTAÑAS C/LATEX LAVABLE m2 8.05 8.79 70.76 0.00 0.00 0.00 0.00 0.00 0.00 8.05 70.76 0.00%
02.10.07 PINTURA EN DERRAMES C/LATEX LAVABLE m 40.20 2.18 87.64 0.00 0.00 0.00 0.00 0.00 0.00 40.20 87.64 0.00%
02.10.08 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 77.79 9.77 760.01 0.00 0.00 0.00 0.00 0.00 0.00 77.79 760.01 0.00%
02.10.09 PINTURA EN FRISO DE MADERA m2 3.90 12.62 49.22 0.00 0.00 0.00 0.00 0.00 0.00 3.90 49.22 0.00%
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
02.10.10 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 30.51 5.66 172.69 0.00 0.00 0.00 0.00 0.00 0.00 30.51 172.69 0.00%
02.10.11 PINTURA BARNIZ EN CONTRAZOCALO DE MADERA DE CEDRO 4" CON RODO m 28.23 16.18 456.76 0.00 0.00 0.00 0.00 0.00 0.00 28.23 456.76 0.00%
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
02.10.12 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 10.20 16.18 165.04 0.00 0.00 0.00 0.00 0.00 0.00 10.20 165.04 0.00%
02.10.13 PINTURA ESMALTE EN BRUÑAS 1/2" m 263.22 2.86 752.81 0.00 0.00 0.00 0.00 0.00 0.00 263.22 752.81 0.00%
02.10.14 PINTURA ESMALTE EN BRUÑAS DE MUROS EXTERIORES 3/4" m 50.98 2.86 145.80 0.00 0.00 0.00 0.00 0.00 0.00 50.98 145.80 0.00%
2.11 VARIOS
02.11.01 JUNTAS DE DILATACION m 7.10 5.00 35.50 0.00 0.00 0.00 0.00 0.00 0.00 7.10 35.50 0.00%
02.11.02 JUNTAS SISMICA 1" m 18.55 5.00 92.75 0.00 0.00 0.00 0.00 0.00 0.00 18.55 92.75 0.00%
2.12 SISTEMA DE AGUA FRIA
2.12.01 TUBERIAS Y ACCESORIOS
02.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 22.00 16.31 358.82 0.00 0.00 0.00 0.00 0.00 0.00 22.00 358.82 0.00%
02.12.01.02 CODO PVC-SAP 3" * 90 und 12.00 13.20 158.40 0.00 0.00 0.00 0.00 0.00 0.00 12.00 158.40 0.00%
02.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 19.50 16.46 320.97 0.00 0.00 0.00 0.00 0.00 0.00 19.50 320.97 0.00%
02.12.01.04 SOPORTE DE CANALETA und 16.00 3.89 62.24 0.00 0.00 0.00 0.00 0.00 0.00 16.00 62.24 0.00%
02.12.01.05 ABRAZADERA PARA CANALETA und 20.00 19.54 390.80 0.00 0.00 0.00 0.00 0.00 0.00 20.00 390.80 0.00%
02.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 4.95 37.04 183.35 0.00 0.00 0.00 0.00 0.00 0.00 4.95 183.35 0.00%
02.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.34 393.71 133.86 0.00 0.00 0.00 0.00 0.00 0.00 0.34 133.86 0.00%
02.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 4.95 28.92 143.15 0.00 0.00 0.00 0.00 0.00 0.00 4.95 143.15 0.00%
02.12.01.09 PINTURA EN FALSA COLUMNA m3 4.95 8.52 42.17 0.00 0.00 0.00 0.00 0.00 0.00 4.95 42.17 0.00%
3.00 ARQUITECTURA- CERCO PERIMETRICO
3.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 787.50 61.24 48,226.50 472.50 28,935.90 315.00 19,290.60 787.50 48,226.50 0.00 0.00 100.00%
3.02 REVOQUES ENLUCIDOS
03.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 496.44 39.64 19,678.88 0.00 0.00 496.44 19,678.88 496.44 19,678.88 0.00 0.00 100.00%
03.02.02 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 126.00 32.12 4,047.12 0.00 0.00 126.00 4,047.12 126.00 4,047.12 0.00 0.00 100.00%
03.02.03 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 225.56 47.33 10,675.75 0.00 0.00 225.56 10,675.75 225.56 10,675.75 0.00 0.00 100.00%
3.03 CARPINTERIA METALICA
03.03.01 PORTON METALICO 3.50m x 3.00m und 1.00 3,500.00 3,500.00 0.00 0.00 1.00 3,500.00 1.00 3,500.00 0.00 0.00 100.00%
3.04 PINTURA
03.04.01 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 126.00 8.52 1,073.52 0.00 0.00 0.00 0.00 0.00 0.00 126.00 1,073.52 0.00%
03.04.02 PINTURA EN VIGAS C/LATEX LAVABLE m2 225.56 8.79 1,982.67 0.00 0.00 0.00 0.00 0.00 0.00 225.56 1,982.67 0.00%
3.05 VARIOS
03.05.01 JUNTAS DE DILATACION m 630.00 5.00 3,150.00 0.00 0.00 630.00 3,150.00 630.00 3,150.00 0.00 0.00 100.00%
4.00 FLETE TERRESTRE
4.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 173,674.98 0.15 26,051.25 173,674.98 26,051.25 0.00 0.00 173,674.98 26,051.25 0.00 0.00 100.00%
5.00 EQUIPAMIENTO Y MOBILIARIO
5.01 MOBILIARIO DE COLEGIO (ESCRITORIOS,CARPETAS,COMPUTADORAS) glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 0.00%
88,212.14
GASTOS GENERALES 9% 0.00 7,939.09 0.00 0.00
UTILIDAD 5% 0.00 4,410.61 0.00 0.00
SUB TOTAL 0.00 100,561.84 0.00 0.00
1.00 INSTALACIONES ELECTRICAS - 01 AULA
1.01 SISTEMA ELECTRICO
1.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 10.00 63.96 639.60 0.00 0.00 10.00 639.60 10.00 639.60 0.00 0.00 100.00%
1.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 4.00 54.26 217.04 0.00 0.00 4.00 217.04 4.00 217.04 0.00 0.00 100.00%
1.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 2.00 47.00 94.00 0.00 0.00 2.00 94.00 2.00 94.00 0.00 0.00 100.00%
1.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 2.00 46.89 93.78 0.00 0.00 2.00 93.78 2.00 93.78 0.00 0.00 100.00%
1.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 8.00 45.81 366.48 0.00 0.00 8.00 366.48 8.00 366.48 0.00 0.00 100.00%
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
1.02 CANALIZACIONES, TUBERIAS Y/O CABLES
1.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
1.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 109.13 3.58 390.69 0.00 0.00 54.57 195.34 54.57 195.34 54.57 195.35 50.00%
1.02.02 CABLES ELECTRICOS
1.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 148.00 2.87 424.76 0.00 0.00 0.00 0.00 0.00 0.00 148.00 424.76 0.00%
1.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 70.26 2.24 157.38 0.00 0.00 0.00 0.00 0.00 0.00 70.26 157.38 0.00%
PRESUPUESTADO VALORIZACION N° 03 SALDO PORCENT
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZ
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL ADO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
1.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
1.03.01 TABLERO DE DISTRIBUCION
1.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 2.00 249.30 498.60 0.00 0.00 0.00 0.00 0.00 0.00 2.00 498.60 0.00%
1.04 ARTEFACTOS ELECTRICOS
1.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 8.00 107.37 858.96 0.00 0.00 0.00 0.00 0.00 0.00 8.00 858.96 0.00%
1.04.02 SPOT LIGHT und 2.00 41.40 82.80 0.00 0.00 0.00 0.00 0.00 0.00 2.00 82.80 0.00%
2.00 INSTALACIONES ELECTRICAS - ADMINISTRACION
2.01 SISTEMA ELECTRICO
2.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 4.00 63.96 255.84 0.00 0.00 0.00 0.00 0.00 0.00 4.00 255.84 0.00%
2.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 1.00 54.26 54.26 0.00 0.00 0.00 0.00 0.00 0.00 1.00 54.26 0.00%
2.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 3.00 47.00 141.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 141.00 0.00%
2.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 1.00 46.89 46.89 0.00 0.00 0.00 0.00 0.00 0.00 1.00 46.89 0.00%
2.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 6.00 45.81 274.86 0.00 0.00 0.00 0.00 0.00 0.00 6.00 274.86 0.00%
2.02 CANALIZACIONES, TUBERIAS Y/O CABLES
2.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
2.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 42.25 3.58 151.26 0.00 0.00 0.00 0.00 0.00 0.00 42.25 151.26 0.00%
2.02.02 CABLES ELECTRICOS
2.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 50.21 2.87 144.10 0.00 0.00 0.00 0.00 0.00 0.00 50.21 144.10 0.00%
2.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 52.44 2.24 117.47 0.00 0.00 0.00 0.00 0.00 0.00 52.44 117.47 0.00%
2.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
2.03.01 TABLERO DE DISTRIBUCION
2.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 1.00 249.30 249.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 249.30 0.00%
2.03.02 CAJA DE PASO 0.00 0.00 0.00 0.00
2.03.02.01 CAJA DE PASE F.G. 4" x 4" x 2" und 2.00 24.03 48.06 0.00 0.00 0.00 0.00 0.00 0.00 2.00 48.06 0.00%
2.04 ARTEFACTOS ELECTRICOS 0.00 0.00 0.00 0.00
2.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 4.00 107.37 429.48 0.00 0.00 0.00 0.00 0.00 0.00 4.00 429.48 0.00%
2.04.02 SPOT LIGHT und 1.00 41.40 41.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00 41.40 0.00%
3.00 FLETE TERRESTRE
3.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 248.61 0.15 37.29 0.00 0.00 248.61 37.29 248.61 37.29 0.00 0.00 100.00%
1,643.53
GASTOS GENERALES 9% 0.00 147.92 0.00 0.00
UTILIDAD 5% 0.00 82.18 0.00 0.00
SUB TOTAL 0.00 1,873.62 0.00 0.00
COSTO TOTAL DIRECTO 603,397.35 219,943.69 518,186.91 85,210.44 85.88%
GASTOS GENERALES 9% 54,305.76 19,794.93 46,636.82 7,668.94
UTILIDAD 5% 30,169.87 10,997.18 25,909.35 4,260.52
SUB TOTAL 687,872.98 250,735.80 590,733.08 97,139.90
IGV 18% 123,817.14 45,132.44 106,331.95 17,485.19
TOTAL S/, 811,690.12 295,868.24 697,065.03 114,625.09
Avance por mes 295,868.24
Avance acumulado 697,065.03
% DE AVANCE EJECUTADO POR MES 36.45%
% DE AVANCE PROGRAMADO POR MES 30.24%
% DE AVANCE EJECUTADO ACUMULADO 85.88%
% DE AVANCE PROGRAMADO ACUMULADO 72.43%