The standards described in this document are primarily intended for Marine
Engineering Systems Design students enrolled in the three year Diploma of
Technology program.

Introducing design standards to the classroom at the Marine Institute serves two
purposes. First, it makes students aware such standards exist and familiarizes them
with the format and use of such standards as found in the shipbuilding industry.
Secondly, design standards will allow a class of students to work to the same
standard and therefore produce similar quality drawings as would be expected by
industry drawing offices.

This standard can be used as a constant source of reference by all students.

It should be noted that most engineering and design offices employ their own
standards to which all engineers and designers must adhere. The primary purpose of
the standard is to allow the designer to reference a particular standard detail on a
working drawing and thereby not have to draw this detail. In the classroom at the
Marine Institute, this is not the case; standards used by the student are expected to
be drawn and fully detailed.

Instructors may deviate from this standard depending on the type of lab/drawing work
being done.

Page 3 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Index

List of Revisions .................................................................................................................2


Abstract ..............................................................................................................................3
Index ..................................................................................................................................4
General Notes: ...................................................................................................................5
Section 1: Cable Hangers / Supports and Accessories ...............................................13
Section 2: Cable Penetrations .....................................................................................30
Section 3: Mounting for Boxes, Panels, etc .................................................................48
Section 4: Lighting Fixture Mounting Supports & Brackets ..........................................53
Section 5: Stuffing Tubes & Multi-Cable Transits Packing...........................................59
Section 6: Cable Entrance into Equipment ..................................................................68
Section 7: Grounding of Electrical Equipment .............................................................71
Section 8: Cable Penetration and Repair.....................................................................80

Page 4 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

General Notes:

1. Cable type letters and size designations:


Cables are identified by “type and size designations” which consists of letters
indicating the construction, followed by numerals indicating size.

The “type letters” used in describing the construction of the cable are as shown in
the following legend:

Cable Type Insulation Jacket Armor

Moisture Resistant
Single Conductor Ethylene Propylene
S E I Jacket, Type T, CP, or A Aluminum
Distribution Rubber
N
Double Conductor Cross-Linked
D X B Bronze
Distribution Polyethylene
Three Conductor Impregnated Glass
T GVT
Distribution Varnished Cloth
C Control M Mineral
TP Signal (twisted pair) S Silicone

Shielded Signal
TPS T Polyvinyl Chloride
(twisted pair, shielded)

PVC/Polyamide, 75
T/N
degree C cable
LSEPR, Low Smoke
LSE Ethylene Proplene
Rubber
LSXLPE, Low Smoke
Cross Linked
LSX
Polyethylene, 90-deg
C cable
XPLO Cross Linked
P
Polyolefin

Example: Type TXIA = Three conductor, cross-linked, polyethylene insulated,


jacketed, aluminum armor. (IEEE 45)

The “size designation” relates to the conductors and may indicate one or more of
the following:
( A ) Size of Conductor
Example: The conductor are of type TXIA-66 is approximately
66,000 CM (exactly 66,400 CM).

(B) Number of Conductor


Example: C14TIA-14 contains fourteen insulated conductors 4,410
CM each.

Page 5 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

(C) Number of Twisted Pairs


Example: TIPIA-16 contains 16 twisted pairs, or 32 conductors, each
1,119 CM.

( D ) All armored cable installed in the weather shall be impervious sheath,


with bronze armor.

Legend for low smoke cable is in MIL-HDBK-299 (SH), Paragraph 5.1.

2. Cable identification:
All permanently installed cable shall be identified with its circuit designation
embossed on soft aluminum tape 1/2" wide min. as close as practicable to each
point of connection for cables not exposed to the weather. Nylon cable tags shall
be used for tagging cable on weather decks. Brady PVC polyvinyl chloride sleeve
markers or equivalent may also be used to identify circuit designation if installed on
a ty-wrap around the cable and the cable is not exposed to the weather.

Cables shall be tagged in readily accessible positions where they can be read
without danger. to personnel, at cable, ends only if both ends of a cable can be
seen only one tag is needed at either end. Special precautions need not be taken
to prevent paint from covering the cable tags.

Medium voltage (4160) cables shall be identified with a red tag at cable ends.

3. Conductor Identification:

All conductors shall be provided with wire markers or tags at each end by one of
the following methods:
( A ). Synthetic resin tubing or approved plastic wire markers.

( B ). Heat shrink tubing.

( C ), Brady vinyl cloth wire markers, self-sticking.

Where separate markers are used, they shall be attached as near as possible to
the terminals marked so as to preclude faulty identification.

Page 6 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

4. Conductor Phase Identification:


To facilitate identification of conductors and correct connection of phases, the
individual conductors of two, three, and four conductor distribution cables shall be
color coded as follows:
Two conductor cable black, red or white
Three conductor cable black, blue, red
Four conductor cable black, red, blue, orange or white

In three phase circuits the colors shall identify the phases as follows:
Black - phase A
White or blue - phase B
Red - phase C

The connection of single phase. two conductor cables to three phase circuits shall
be as follows:
Phase AB, black " A " , white or red " B "
Phase BC, white or red " B ", black " C "
Phase CA, white or red " C ", black " A "

Phase rotation or sequence for all three-phase systems shall be in the following
order: AB, BC, CA.

The order of the phases in wiring boxes, distribution panels, switchboards, etc.
shall be A , B , C from left to right, top to bottom, front to back as viewed from the
front of the equipment.

5. Cable Lug Terminals:


All cable connections shall be made by solder less type lugs of an approved clamp
or compression type, adjustable within reasonable limits for various conductor
diameters terminal lugs for interior communication or radio cables or for # 16 AWG
or smaller internal control wiring on panels, etc. may be of the soldered or crimped
type, or may have the wire formed into an eye, and solder-dipped. Terminal lugs
shall be of the two-hole type, or for terminals where it is impracticable to use two
fastening bolts, a locking feature shall be used to prevent the one-hole lug from
turning in any direction after fastening.

All lugs and terminals shall be made from high-conductivity copper, UL approved,
tin plated.

All bolts, screws, nuts and washers-shall be made of non-corrosive material or of


material rendered adequately corrosion resistant and be of adequate size for their
function.

Page 7 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

6. Wire nuts:
Approved twist-on pressure type connectors (wire nuts) may be used for
connecting conductors up through no. 10 AWG in 120 and 450 volt power circuits,
in lighting circuits, small appliances and in fractional horsepower motors. Wire nuts
shall not be used in I.C. telephone or electronics systems.

7. Cable location:
Except where unavoidable, cables shall not be installed in the following locations
and hazardous conditions:
1. spaces where excessive heat may be encountered.
2. spaces where inflammable or explosive gases may be present.
3. exposed side of deckhouse.
4, spaces which may subject cable to oil damage.
5. behind or embedded in structural heat insulation.
6. inaccessible spaces.
7. spaces where excessive moisture is encountered.
8. areas where cable would be subjected to mechanical damage.
9. bilges.

Cables shall be run so as to prevent harborage of rats. The running of cables on


weather decks shall be avoided as far as practical. Wherever practical, cables to
weather deck mounted fixtures shall be run on the inside surface of the structure
supporting such fixtures. Cables for weather deck fixtures shall be installed on the
inside surface of house structures supporting such fixtures. At each end of each of
these cables, a length of excess cable in the form of a free loop equal to the length
of cable exposed to the weather shall be included.

8. Cable protection:
All electrical cable to open deck-mounted equipment shall be adequately guarded
with pipe or other substantial protection.

During the course of the work, all new and existing cable ends are to be protected
from the entrance of moisture.

All electrical systems, cable and equipment shall be megger tested prior to
energizing.

9. Cable bends:
All cables shall lie outside a radius which is 8 times the diameter of the largest
cable in a run. Coaxial cable which is not repeatedly flexed shall lie outside a
radius which is 12 times the diameter of the largest cable in the run (10 times is
minimum). Coaxial cable which is repeatedly flexed shall lie outside a radius which
is at least 20 times the diameter of the largest cable in the run.

Page 8 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

10. Cable supports on decks and bulkheads:


Cables in detailed wire ways shall be strapped in position at every hanger on
vertical runs and on horizontal runs at every fourth hanger in straight sections and
every hanger at turns and at break-outs.

11. Cable penetrations through decks and bulkheads:


Where cables pass through watertight bulkheads, a watertight stuffing tube
assembly shall be employed except that multi-cable transits may be used for
groups of cables.

Where cables pass through watertight decks, a watertight stuffing tube assembly
shall be used, except that watertight riser boxes or multi-cable transits may be
used.

For groups of cable, where cables pass through non-watertight bulkheads, beams,
or similar structural parts, where the bearing surface is less than 1/4 inch, the holes
shall be fitted with bushings having rounded edges and a bearing surface for the
cable of at least 1/4 inch in length.

Where cables pass through non-watertight bulkheads, beams, or similar structural


parts, where the bearing surface is 1/4 inch or greater in length, all burrs shall be
removed in way of the hole, and sharp edges shall be eliminated.

12. Stuffing and terminal tube application:

Steel stuffing tube assemblies or multi-cable transit devices shall be used for cable
penetrations of watertight decks and bulkheads.

Nylon terminal tubes can be used for cable entrance into brass, sheet steel and
aluminum enclosures when located in the interior of the ship.

Where space limits the use of nylon terminal tubes, metal terminal tubes may be
substituted.

Where brass enclosures are located in the weather, brass terminal tubes shall be
used.

13. Location of connection boxes:


To the extent possible, all terminal and connection boxes shall be i n a position of
maximum accessibility.

Provide access, identified by nameplates, to all connection and terminal boxes in


finished areas. In general, such locations shall be in wardrobes where possible.

Page 9 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

14. Identification of emergency lighting fixtures:


All emergency lights shall be marked with the letter "e" that is at least one inch high
and red in color.

15. Drip pans and shields:


Where electrical equipment i s exposed to injury or damage caused by leakage of
oil, water, steam, etc., or excessive heat, suitable drip pans or shields shall be
installed.

16. Painting electrical equipment:


Electrical equipment shall be protected from painting where necessary.

17. Painting ship structure in way of equipment:


The surfaces of ship structure, foundations, and mounting brackets in way of
electrical equipment shall be painted before installation of the equipment.

18. Grounding of electrical equipment and cable:


All paint, dirt and rust shall be removed from faying surfaces of equipment feet and
foundation before mounting equipment.

The frames or casings of all permanently installed generators, motors, controllers,


instruments and similar equipment, for which the arrangement and method of
installation does not insure positive grounding, shall be permanently grounded
through separate straps or cable, securely attached and protected against
damage.

All portable equipment energized by a portable cord and plug shall have all
exposed metal parts grounded by the third (green) conductor in the portable cable
and grounding device in the receptacle and plug.

For cable provided with a metallic sheath or armor, the sheath shall be continuous
from outlet to outlet and shall be grounded at each end except that for final sub-
circuits the sheath may be grounded at the supply end only.

Page 10 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

19. Cable slack requirements:


Cables shall be installed so that sufficient slack exists to allow for deflection of
bulkheads.

Where cables spread out to enter bulkhead-stuffing tubes, bends shall have liberal
sweep to provide as much flexibility as practicable.

Cables having only a minimum spread where they pass through bulkhead stuffing
tubes shall have enough slack to give them the same flexibility as other cables in
the group.

Cables from switchboards, or other electrical equipment, shall enter wire ways in a
curve of sufficient radius to prevent transmitting stresses to the equipment during
severe wire way deflections.

20. Cables entering motors and control equipment::


Where possible, cables entering motors and control equipment should enter-from
the bottom.

21. Cable bunching and double banking:


Cable bunching shall be restricted to a maximum of 6 cables. Double banking of
power cables will not be allowed without prior approval from engineering.

Cables serving systems above IKV are not to be bunched with cables serving
systems of IKV and below.

Except for fiber optic cables, non-shielded signal cables for automation and control
systems, essential for the safe 0peration of the vessel which may be affected by
electromagnetic interference are not to be run in the same bunch with power or
lighting cables.

22. Electrical installation methods:


Methods shown on body of wire way plans are typical and not necessarily actual.

Page 11 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

23. Conductor repair of cable:


Should the insulation of an individual conductor be damaged, it shall be
immediately brought to the attention of the attending ABS surveyor.

Inspection by the surveyor is needed to establish the location and extent of the
damage and determination of whether a splice, junction box, or replacement of the
cable in its entirety is needed.

If the cable is repaired, the insulation repair is equivalent to the splice and is to be
to the satisfaction of the surveyor.

Damaged propulsion cables, cables for repeated flexing service, and cables in
hazardous locations are not to be repaired.

Junction box and splice locations are to be shown on the vessel’s Electrical
Equipment Arrangement drawing.

24. Ty-wrapping of cables:


Ty-wraps may be used to band cables 1/2" dia. Or less. In vertical runs, all cable
sizes may be ty-wrapped. In horizontal runs only where cable will not fall if the
retention fails.

Page 12 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Section 1: Cable Hangers / Supports and Accessories

Page 13 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 14 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 15 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 16 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 17 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 18 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 19 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 20 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 21 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 22 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 23 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 24 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 25 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 26 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 27 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 28 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 29 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Section 2: Cable Penetrations

Page 30 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 31 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 32 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 33 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 34 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 35 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 36 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 37 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 38 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 39 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 40 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 41 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 42 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 43 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 44 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 45 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 46 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 47 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Section 3: Mounting for Boxes, Panels, etc

Page 48 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 49 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 50 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 51 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 52 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Section 4: Lighting Fixture Mounting Supports & Brackets

Page 53 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 54 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 55 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 56 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 57 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 58 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Section 5: Stuffing Tubes & Multi-Cable Transits Packing

Page 59 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 60 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 61 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 62 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 63 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 64 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 65 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 66 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 67 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Section 6: Cable Entrance into Equipment

Page 68 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 69 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 70 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Section 7: Grounding of Electrical Equipment

Page 71 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 72 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 73 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 74 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 75 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 76 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 77 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 78 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 79 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Section 8: Cable Penetration and Repair

Page 80 of 81
Electrical Installation Booklet – Shipyard Standards
Marine Engineering Systems Design Department

Page 81 of 81

You might also like