You are on page 1of 4

13/07/2018

TO,
Sony Engineering,
Sector No-10,Plot no-4/32 & 47,
PCNTDA, Bhoosari Pune-29.

Kindly Attention – Mr. Chandrakant Sir

Work : Proposed Construction Of Industrial PEB Shed 30 mtr*24mtr


At Chakan MIDC

Dear Sir,

THANK YOU VERY MUCH For giving us chance to quote your job.

This is with reference our Meeting dated on 10/07/2018 and subsequent


discussion withYou,we are submitting our lowest possible quotation, Most competitive
offer for your kind consideration. Hope will find this offer in order and you will give us
chance to serve you.

A waiting Hopeful Reply at the earliest.

Thanking you and assuring our best service always.


QUOTATION FOR CONSTRUCTION OF PEB SHED
24.0 mtr * 30.0 mtr(9mtr side height & 11 mtr centre height)

Sr.
Description Unit Quantity Rate Amount
No.
1. Construction of PEB shed

A) Fabrication & Erection of PEB


structures including transportation of
structures with sand blasting one
coat of red oxide and two coat of
enamel paint
B) Essar Pre coated sheet of .5 mm thk
will used In each bay poly corbonate
sheet and turbo ventilators will be
used
C) 10 ton capacity gantry girder will be SQFT 7747.0 895.00/- 69,33,565.00/-
provided
D) 3 mtr brick work surrounding
E) Both Inner & outer side sand phase
plaster will be provided
F) In each bay sliding window will be
provided
G) 4” concrete floaring will be provided
without reinforcement steel
H) 16 colums will be provided
including gable end

2. Construction of compound wall


A) Dabar Bandhkam Brass ---- 24,800.00/-
B) Excavation 2 Foot* 2 foot
C) 4” PCC
D) After dabar Bandhkam 4” Cuping
E) Brick Work of 9” thk Brass ------ 13,940.00/-
F) Plaster Brass ----- 5,980.00/-
G) Murrum filling at corner of plot M3 ----- 450.00/-
brought from out side
Terms & Conditions
1) Water and electricity supply Will BE Provided by Company at free of cost on
site
2) Fabrication will be done in our work shop
3)Above rates are including transportation of fabricated structures loading &
Unloading
4) Taxes extra as applicable.
5) Payment terms
a) 35% advance with work order
b) and balance will be as per RA bill submitted within 10 days
6) Pl release the work order

REGARDS

FOR S M INFRA PROJECTS