You are on page 1of 2

Revision

Indication UOP LLC


PROJECT SPECIFICATION
25 East Algonquin Road
Des Plaines, Illinois 60017-5017 USA 9004898—835 SHEET 1
Note: The information in this document is confidential and the property of UOP LLC and must not be disclosed to others or reproduced in any manner or used for any purpose whatsoever without its written permission.
REV DATE BY APVD REV DATE BY APVD
0 01Feb16 SM CNP
CLOSED SAMPLING SYSTEM

Polybed PSA System


PSA Feed Ammonia Removal Section
9004898
1. A closed sampling system is required at each sample point as specified on the UOP Piping and
Instrument Diagram. Each system shall be complete with 500 ml sample cylinder, shutoff valves,
pressure gauges and, when indicated on the UOP Piping and Instrument Diagram, a heated enclosure.
The metallurgy of all fluid handling equipment shall be austenitic stainless steel when process piping
is carbon, low alloy or austenitic stainless steel. When process piping is not carbon, low alloy or
austenitic stainless steel, the metallurgy of all fluid handling equipment shall be the same as the
metallurgy of the process piping. The pressure rating shall be 10.342 MPag at -29 to 66°C.

The purpose of the system is to provide sampling cylinders and their corresponding handling station
for taking samples of a designated process stream by allowing a slipstream of process fluid to pass
through the sample cylinder while the plant is on stream without exposing the operator or environment
to the contents of the process stream.

2. Where indicated, on the UOP Piping and Instrument Diagram as Type A (8-133), the system shall be
the flow-through to process type.

The sample stream is connected to the process inlet connection, flows through the sample cylinder and
is returned to the process via the outlet connection. The inlet and outlet return connections must have
a minimum pressure differential of 0. 0.069 MPag to maintain flow through the sample cylinder. A
third connection on the sampling system provides venting to the relief header.

3. Where indicated on the UOP Piping and Instrument Diagram as Type B (8-134), the system shall be
the flow-through to vent type.

The sample stream is connected to the process inlet connection, flows through the sample cylinder and
is vented to the relief header.

4. a. Each handling station shall have its own valves, independent of the cylinder valves, for controlling
flow, venting, and isolating the system from the process. Valves shown on the UOP Piping and
Instrument Diagram are not included with the sampling system and are required for installation
and emergency shutoff. Connections to the process shall be 3/4 inch NPS.

b. Each station shall have a flexible hose connection for the sample cylinder outlet and a fixed
connection for the sample cylinder inlet. Quick disconnect connections shall be used and shall be
capable of self-sealing with the ability to withstand at least 1.034 MPag internal pressure when
disconnected from the cylinder.

c. The system shall include provisions for flow bypassing of the cylinder and for depressuring the
system before cylinder removal.

d. The system shall include provisions for securely holding the sample cylinder during sampling.

Other specifications UOP Standard Specification:


referenced in this UOP Standard Drawing:
specification: UOP Project Specification:
Form QUA-04-5 835-13 XXX-XXX
Revision
Indication UOP LLC
PROJECT SPECIFICATION
25 East Algonquin Road
Des Plaines, Illinois 60017-5017 USA 9004898—835 SHEET 2
Note: The information in this document is confidential and the property of UOP LLC and must not be disclosed to others or reproduced in any manner or used for any purpose whatsoever without its written permission.
REV DATE BY APVD REV DATE BY APVD
0 01Feb16 SM CNP
CLOSED SAMPLING SYSTEM

5. The system shall bear a label indicating the maximum allowable operating pressure, which is defined
as the lesser of the equipment rating or the maximum pressure of the installed pressure gauges. Each
unit is also labeled with proper operating instructions.

6. Sample cylinder unloading stations are required for the laboratory.

7. Sample coolers are required when the process material being sampled is at a temperature of 66ºC or
higher.

Supplier (Recommended):

UOP LLC
Key Mechanical Equipment
25 East Algonquin Road
Des Plaines, Illinois 60017-5017
USA
Fax: (847) 391-2592
E-mail: mailto:KME@uop.com

Form QUA-04-5 835-13 XXX-XXX