ALAT
1 Amplas Tembok #N/A 5,000
2 Amplas Kayu #N/A 5,000
3 Kuas 3 - 4" #N/A 7,000
4 Roll Cat #N/A 20,000
5 Slang waterpas #N/A 3,000
6 Ember #N/A 5,000
7 Bak Aduk (Jolang) #N/A 10,000
8 Benangklos #N/A 2,000
9 Ayakan Kawat #N/A 22,000
10 Bak Cat #N/A 10,000
11 Bambu #N/A 8,000
Sekop #N/A 65,000
12 Papan Proyek #N/A 100,000
13 Papan Informasi #N/A 150,000
14 Prasasti #N/A 300,000
UPAH
1 Pekerja Persiapan #N/A 34,500
2 Pekerja Galian #N/A 34,500
3 Pekerja Konstruksi #N/A 34,500
4 Pekerja #N/A 34,500
5 Tukang #N/A 45,000
VOLUME ANTAR PATOK
( berdasarkan analisa kebutuhan antar patok ) Lembar ke : 1
Kabupaten : Majalengka Kecamatan : Rajagaluh Desa : Teja Rencana Panjang Jalan : 815 m
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
total
Jarak antar Patok m 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 15 815
Lebar antar Patok m 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5
Luas antar Patok m2 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125 37.5 1,913
Tingkat kebutuhan : rata-rata
Sirtu 40 50 10 40 28
-
-
Kebutuhan : total
Faktor Los batu 1.3 -
Tebal 0.15 m
Sirtu 1.300 m3 9.75 12.19 2.44 0.00 9.75 34.13
-
-
-
-
total
815 m
2.5 m
1,913 m2
rata-rata
28 %
- %
- %
total
- m3
34.13 m3
- m3
- m3
- m3
- m3
250 kg
PNPM - Mandiri Perdesaan
0.12
0.03
Perhitungan Volume Beton Kebutuhan Bahan & Upah Pekerjaan Bekisting (3X Pakai)
= 0.12 x 1.60 x 815 = 156.48 M3 Dimensi Bekisting (P = 815 m
(T = 0.12 m
Perhitungan Volume Lapisan Bawah Rabat (Pasir Urug)
= 0.03 x 1.60 x 815 = 39.12 M3 Vol 1
= (T) x P x 4
Perhitungan Volume Sirtu Tengah & Bahu = 0.120 x 815.00 4
= 0.12 x 0.90 x 815 = 88.02 M3 = 391.20 m2
= 0.10 x 0.50 x 815 = 40.75 M3
Vol 2 ( Untuk Dilatasi per 2 m )
Kebutuhan Bahan & Upah Pekerjaan Perkerasan Beton = (( 815 / 2 ) + 1 ) x 1.60 x
(1 Pc : 5 Ps : 7 Kr) beton tumbuk D001 = 78.432 m2
= Volume x Analisa Vol 1 + 2
1. Kebutuhan Split 2/3 = 469.632
= 156 x 0.87 = 136.14 M3 Vol 1/3 +Vol. 2 = m2
2. Kebutuhan Pasir Beton = 208.83 m2
= 156 x 0.52 = 81.37 M3
3. Kebutuhan Semen/PC (50Kg) 1. Kebutuhan Bekisting = 208.83 x 0.011 ( 3 x pakai)
= 156 x 4.36 = 682.25 Zak = 2.3668 M3 = 295.845
4. Kebutuhan Pekerja 2. Kebutuhan Paku = 208.83 x 0.4
= 156 x 2.2 = 344.26 HOK = 83.53 Kg : 2 = 42
5. Kebutuhan Tukang 3. Kebutuhan Pekerja = 469.63 x 0.12
= 156 x 0.3 = 51.64 HOK = 56.36 HOK
Kebutuhan Bahan & Upah Pekerjaan Urugan Pasir 4. Kebutuhan Tukang = 469.63 x 0.15
( Lapisan Bawah Rabat ) = 70.44 HOK
a. Penghamparan
1. Kebutuhan Pasir Urug Kebutuhan Mesin Molen
= 39 x 1.2 = 46.94 M3
2. Kebutuhan Pekerja Kemampuan produktifitas mesin : 0.25 m3 / 20 menit
= 39 x 0.15 = 5.87 HOK 0.75 m3 / 1 jam
1. Kebutuhan Sirtu 0.75 / 8 (hari kerja) = 6 m3 / 1 hari
= 129 x 1.2 = 154.52 M3
2. Kebutuhan Pekerja Jadi Kebutuhan Mesin Molen : Volume Beton / Kemampuan mesin
= 129 x 0.15 = 19.32 HOK 156.48 / 6
b. Pemadatan 26.08 hari
1. Kebutuhan Pekerja REKAP KEBUTUHAN BAHAN & UPAH
= 168 x 0.5 = 83.95 HOK Batu Split 2/3 = 136.1 Dibulatkan 136 M3
2. Kebutuhan Tukang Pasir Beton = 81.4 Dibulatkan 81 M3
= 168 x 0.05 = 8.39 HOK Semen (@50Kg) = 682.3 Dibulatkan 682 Zak #REF!
Pasir Urug = 46.9 Dibulatkan 47 M3
Kebutuhan Bahan & Upah Pekerjaan Aspal sandsheet Sirtu = 154.5 Dibulatkan 155 M3
1. Kebutuhan Aspal Papan Bekisting = 295.8 Dibulatkan 296 Lbr
= 1 x 1.60 x 815 = 1,304.00 kg Paku = 41.8 Dibulatkan 42 Kg
= 8.41 drum Pekerja = 754.9 Dibulatkan 755 HOK
2. Kebutuhan Pasir/abu batu Tukang = 168.3 Dibulatkan 168 HOK
= 0.005 x 1.60 x 815 = 6.52 M3 Sewa Molen = 26.08 Dibulatkan 26 hari
1. Kebutuhan Pekerja Aspal = 8.41 Dibulatkan 8 drum
= 0.188 x 1.60 x 815 = 245.15 HOK Pasir = 6.52 Dibulatkan 7 M3
2. Kebutuhan Tukang
= 0.029 x 1.60 x 815 = 37.82 HOK
4. Kebutuhan Pekerja
=
5. Kebutuhan Tukang
=
2. Kebutuhan Pekerja
=
1. Kebutuhan Sirtu
=
2. Kebutuhan Pekerja
=
b. Pemadatan
1. Kebutuhan Pekerja
=
2. Kebutuhan Tukang
=
PNPM MANDIRI PERDESAAN
PNPM MANDIRI PERDESAAN
0.12
( 3 x pakai)
lbr
kg
HOK
PNPM MANDIRI PERDESAAN
PNPM MANDIRI PERDESAAN
PNPM MANDIRI PERDESAAN
0.12 m
0.03 m
2.40 m
Perhitungan Volume Beton Kebutuhan Bahan & Upah Pekerjaan Bekisting (3X Pakai)
= 0.12 x 2.40 x 268 = 77.18 M3 Dimensi Bekisting (P) = 268.00 m
(T) = 0.12 m
Perhitungan Volume Lapisan Bawah Rabat (Pasir Urug)
= 0.03 x 2.40 x 268 = 19.30 M3 Vol 1
= (T) x P x 2
Perhitungan Volume Sirtu bahu = 0.120 x 268.00 2
= 0.10 x 0.50 x 268 = 13.40 M3 = 64.32 m2
Tanggal Survey :
PNPM -Mandiri Perdesaan
Ukuran : 815 m x 1.6 m Ukuran : Plat Beton Ukuran : h= 0,5-1 m P=401 m' JUMLAH TOTAL
No URAIAN Bobot Bobot Bobot Bobot
Jumlah : 1 Ruas (%) Jumlah : 1 unit
(%) Jumlah : 1 unit (%) (%)
No. RAB : 01 No. RAB : 02 No. RAB : 03
Dari PNPM Dari PNPM
Swadaya Swadaya
(dalam rupiah) APBN APBD PNPM-MP Swadaya APBN APBD PNPM - MP Swadaya
BAHAN
I 113,690,000 - 3,908,000 74.8 8,571,500 465,000 71.0 40,713,000 - 5,787,000 75.0 162,974,500 10,160,000 74.6
(tidak perlu dirinci )
PERALATAN
II 5,852,000 - 224,000 3.9 - 4,000 0.0 77,000 - 56,500 0.2 5,929,000 284,500 2.7
(tidak perlu dirinci )
UPAH
III 26,100,000 - 7,507,500 21.4 3,147,000 546,000 29.0 11,908,500 - 3,427,500 24.7 41,155,500 11,481,000 22.7
(tidak perlu dirinci )
Jumlah 145,642,000 11,639,500 100 11,718,500 1,015,000 100 52,698,500 9,271,000 100 210,059,000 21,925,500 100
IV Operasional UPK 2% 4,422,000
V Operasional TPK 3% 6,634,000
Jumlah Total 145,642,000 11,639,500 11,718,500 1,015,000 52,698,500 9,271,000 221,115,000 21,925,500
Jumlah Biaya Upah 26,100,000 7,507,500 3,147,000 546,000 11,908,500 3,427,500 41,155,500 11,481,000
Jumlah HOK Konstruksi - - HOK 66 14 HOK 319 89 HOK 385 103 HOK
Kabupaten : Majalengka Bahan untuk perkerasan : Rabat Beton Panjang Jalan : 815 m'
Kecamatan : Rajagaluh Lebar dan tebal perkerasan : 1,60 x 0,12 m Dimensi Saluran :
Desa : Teja Lebar badan Jalan ( termasuk bahu ) : 3,5 m' Jenis gorong-gorong : Plat Beton
Nomor Patok : P0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Jenis galian
Volume Galian
Volume Timbunan
Jarak dari sumber timbunan
Saluran ( KR, KN, 2, 0 )
Bangunan yang ada
Letak & jenis bangunan baru
( jarak dari patok )
Ukuran bangunan baru GG Plat TPT TPT TPT TPT TPT TPT
Jarak dari sumber Batu Belah
Jarak dari sumber Pasir
Jarak dari sumber ……………
Kebutuhan gebalan rumput
Jarak dari sumber gebalan
Jenis & kebutuhan vegetasi
tetap yang lain
)
50
0 465
0
465
DATA SURVEY & PENGUKURAN
4 P2 - P3 0.25 0.35
6 P4 - P5 0.25 0.35
7 P4 - P5 0.25 0.35
9 P6 P7 0.25 0.35
P7 P8 0.25 0.35
P8 P9 0.25 0.35
10 P8 P9 0 0
- - 14,000,000 14,000,000
JUMLAH 14,000,000
SPP 14,000,000
Dari PNPM OP UPK 2 % 295,000
SUMBER DANA OPTPK 3 % 442,000
Dari Swadaya -
TOTAL BIAYA 14,737,000
2-5 - 3 M
25 25
0,5 - 1
35 35
4.6666666667
#VALUE!
Kabupaten : Majalengka Jenis Kegiatan : Pemb. Jalan
Kecamatan : Rajagaluh Take of Sheet Nama Kegiatan : G-G Plat Beton
Desa : Teja Ukuran : f 2m - 5m ( 1 Unit )
1.5
I II I 0.2
3.0
Pekerja = 2 HOK/m3 Pekerja Galian = 2 x 7.5 @ 15.0 HOK
Jarak tulangan = 10 cm Butuh besi f10 = 51.00 bh @ p = 4.80 m ---> 22.3 btg
Jarak Sengkang = 10 cm = 48.00 bh @ p = 5.05 m ---> 22.0 btg
S= 44.3 btg
@ 487.2 m
x (
1.2 kf ) = 53.1 btg
BJ Besi f10 = 0.6 kg/m' Besi tul. f10 = 0.6 x 487.2 x 1.2 @ 362.5 kg
Kawat Besi = 0.014 kg per kg besi Kawat Besi = 0.014 x 362.5 @ 4.9 kg
5.0
0.15
2.30 L bekist = 13.7 m2 Pek. Bekisting :
1m2 Bekisting : Kaso 5/7 = 1.00 x 13.7 @ 13.7 btg
Kaso 5/7 = 5 btg Papan = 0.03 x 13.7 @ 0.4 m3
Papan = 0.03 m3 Paku 5-7 = 0.20 x 13.7 @ 2.7 kg
Paku 5-7 = 0.2 kg Alat = 0.03 x 13.7 @ 0.4 set
Pekerja = 0.35 HOK Pekerja = 0.35 x 13.7 @ 4.8 HOK
Tukang = 1.12 HOK Tukang = 1.12 x 13.7 @ 15.3 HOK
S L plesteran
1 m2 Plesteran (1:3)
Pasir Pasang = 0.04 m3 Vol. Psr Pasang = 0.04 x 2.16 @ 0.09 m3
Tukang = 0.30 HOK Tukang = 0.30 x 2.16 @ 0.6 HOK
Semen (PC) = 0.26 zak Vol. Semen = 0.26 x 2.16 @ 0.6 zak
Pekerja = 0.50 HOK Pekerja = 0.50 x 2.16 @ 1.1 HOK
Pembulatan
Rekapitulasi Bahan : Batu Belah = 8.8 m3 = 9.0 m3
Split = 1.50 m3 = 1.5 m3
Pasir Pasang = 3.8 m3 = 4.0 m3
Pasir Beton = 1.1 m3 = 1.5 m3
Pasir Urug = 0.6 m3 = 0.5 m3
Semen = 36.2 zak = 36.0 zak
Kaso 5/7 = 13.7 btg = 14.0 btg
Papan Alba (3m) = 0.4 m3 = 12.0 btg
Besi Tul. Ø 10 = 53.1 btg = 53.0 btg
Kawat Besi = 4.9 kg = 5.0 kg
Paku 5-7 = 2.7 kg = 3.0 kg
-
Upah : Pekerja Galian = 15.0 HOK = 15.0 HOK
Pekerja Konstruksi = 24.4 HOK = 24.0 HOK
Tukang = 55.9 HOK = 56.0 HOK
Tanggal Survey : Dibuat Oleh :
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN
PNPM MPd
KACAMATAN RAJAGALUH KABUPATEN MAJALENGKA
TAHUN ANGGARAN 2014
FOTO 0% DESA TEJA
P0 - P1
P 15 - P16
P 16 - P 17