REKAPITULASI UPAH DAN HARGA BAHAN/MATERIAL

NO BAHAN Satuan Harga Satuan


1 Pasir Urug #N/A 100,000
2 Pasir Pasang #N/A 115,000
3 Pasir Beton #N/A 130,000
Pasir #N/A 115,000
4 Batu Belah #N/A 93,000
5 Batu Split 2/3 #N/A 195,000
6 Batu Pecah 3/5 #N/A 220,000
7 Batu Pecah 1/2 #N/A 220,000
8 Abu Batu #N/A 225,000
9 Sirtu #N/A 80,000
10 Tanah Timbunan #N/A 75,000
11 Bata Merah #N/A 700
12 Semen (@ 50kg) #N/A 64,000
13 Semen warna #N/A 8,500
19 Kayu Kaso 5/7 (3m) #N/A 18,000
20 Kayu Reng 2/3 (3m) #N/A 6,000
23 Papan Kayu bekisting #N/A 22,000
26 Besi Beton Ø12 mm #N/A 100,000
27 Besi Beton Ø10 mm #N/A 80,000
28 Besi Beton Ø 8 mm #N/A 55,000
29 Kawat Beton #N/A 20,000
34 Paku 10-15 cm #N/A 14,000
35 Paku 4 - 7 cm #N/A 14,000
36 Paku 1-3 cm #N/A 21,000
Paku #N/A 14,000
86 Buis Beton Ø 20 cm #N/A 35,000
87 Buis Beton Ø 30 cm #N/A 54,000
88 Buis Beton Ø 40 cm #N/A 90,000
89 Buis Beton Ø 60 cm #N/A 100,000
Bambu suling-2 Ø 1" #N/A 8,000

ALAT
1 Amplas Tembok #N/A 5,000
2 Amplas Kayu #N/A 5,000
3 Kuas 3 - 4" #N/A 7,000
4 Roll Cat #N/A 20,000
5 Slang waterpas #N/A 3,000
6 Ember #N/A 5,000
7 Bak Aduk (Jolang) #N/A 10,000
8 Benangklos #N/A 2,000
9 Ayakan Kawat #N/A 22,000
10 Bak Cat #N/A 10,000
11 Bambu #N/A 8,000
Sekop #N/A 65,000
12 Papan Proyek #N/A 100,000
13 Papan Informasi #N/A 150,000
14 Prasasti #N/A 300,000

1 Mobilisasi #N/A 1,500,000


2 Sewa Alat Berat #N/A 500,000
3 Sewa Molen #N/A 200,000
4 Sewa Gerobak #N/A 10,000

UPAH
1 Pekerja Persiapan #N/A 34,500
2 Pekerja Galian #N/A 34,500
3 Pekerja Konstruksi #N/A 34,500
4 Pekerja #N/A 34,500
5 Tukang #N/A 45,000
VOLUME ANTAR PATOK
( berdasarkan analisa kebutuhan antar patok ) Lembar ke : 1

Kabupaten : Majalengka Kecamatan : Rajagaluh Desa : Teja Rencana Panjang Jalan : 815 m

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
total
Jarak antar Patok m 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 15 815
Lebar antar Patok m 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5
Luas antar Patok m2 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125 37.5 1,913
Tingkat kebutuhan : rata-rata
Sirtu 40 50 10 40 28

-
-

Kebutuhan : total
Faktor Los batu 1.3 -
Tebal 0.15 m
Sirtu 1.300 m3 9.75 12.19 2.44 0.00 9.75 34.13
-
-
-
-

tack coat 0.4 0.4 0.4 0.4 0.4


Jumlah kg/m2 0.4 0.4 0.4 0.4 0.4
Jumlah kg 50 50 50 50 50 250
1

total
815 m
2.5 m
1,913 m2
rata-rata
28 %

- %
- %

total
- m3

34.13 m3
- m3
- m3
- m3
- m3

250 kg
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA


Propinsi : Jawa Barat No. RAB : 02
Kabupaten : Majalengka Program : PNPM-MPd
Kecamatan : Rajagaluh Jenis Kegiatan : TPT
Desa : Teja Ukuran/Dimensi : h =0,6-2 P =255 m'

VOLUME Kate- Harga BIAYA ( Rp. )


URAIAN Dari Dari PNPM Sat. gori Satuan Dari Dari PNPM
Total Biaya (Rp) Total
Swadaya APBD APBN Swadaya APBD APBN
BAHAN
1 Batu belah 49 108 157 m3 I b. 93,000 4,557,000 - 10,044,000 14,601,000
2 Semen (@ 50kg) 366 366 zak I b. 64,000 - - 23,424,000 23,424,000
3 Pasir pasang 10 63 73 m3 I a. 115,000 1,150,000 - 7,245,000 8,395,000
4 Bambu suling-2 Ø 1" 10 - 10 btg I b. 8,000 80,000 - - 80,000

Sub Total 1) 5,787,000 - 40,713,000 46,500,000


ALAT
1 Ember 6 9 15 bh II a. 5,000 30,000 - 45,000 75,000
2 Benangklos 2 1 3 bh II a. 2,000 4,000 - 2,000 6,000
3 Bak aduk (jolang) 3 3 bh II a. 10,000 - - 30,000 30,000
4 Ayakan Kawat 1 - 1 ls II a. 22,500 22,500 - - 22,500

Sub Total 2) 56,500 - 77,000 133,500


UPAH
1 Pekerja 55 - 233 288 HOK III a. 34,500 1,897,500 - 8,038,500 9,936,000
2 Tukang 34 - 86 120 HOK III a. 45,000 1,530,000 - 3,870,000 5,400,000

Sub Total 3) 3,427,500 - 11,908,500 15,336,000


TOTAL BIAYA 61,969,500

Dari PNPM - MP 52,698,500


Sumber Dana
Dari Swadaya 9,271,000
Catatan :
1. Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom volume dari swadaya.
2. Nilai RAB didapat dari kolom volume dari dana dikalikan dengan kolom harga satuan yang kemudian ditotalkan.
3. Sumbangan dalam bentuk uang dimasukan pada baris terbawah (sumber dana dari swadaya).
4. Swadaya dalam bentuk lahan ditulis dalam format lain.
Kategori Biaya :
I a. Pembelian bahan hasil tenaga manusia
I b. Pembelian bahan hasil industri
I c. Pembelian bahan administrasi
II a. Pembelian alat tangan
II b. Pembelian/penyewaan alat mesin
II c. Pembelian alat administrasi
III a. Pembayaran tenaga kerja untuk konstruksi
III b. Pembayaran tenaga kerja untuk pengumpulan bahan
III c. Pembayaran honorarium Tim Pelaksana

Disetujui oleh : Dibuat Oleh :


PJOK FK Ketua TPK

Hj. Kusmiati, S.Sos, Dra. Evi Siti Fatihah Ibrahim M Nur,ST


NIP. 197102181990032004
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA


Propinsi : Jawa Barat No. RAB : 01-B
Kabupaten : Majalengka Program : PNPM MPd
Kecamatan : Rajagaluh Jenis Kegiatan : Gorong-2 Plat
Desa : Teja Ukuran/Dimensi : f = 200 - 5 m (1 unit)

VOLUME Kate- Harga BIAYA ( Rp. )


URAIAN Dari Dari PNPM Sat. gori Satuan Dari Dari PNPM
Total Biaya (Rp) Total
Swadaya APBD APBN Swadaya APBD APBN
BAHAN
1 Batu Belah 5 4.0 9 m3 I b. 93,000 465,000 - 372,000 837,000
2 Batu Split 2/3 1.5 1.5 m3 I b. 195,000 - - 292,500 292,500
3 Pasir Pasang 4 4 m3 I a. 115,000 - - 460,000 460,000
4 Pasir Beton 2 2 zak I b. 130,000 - - 195,000 195,000
5 Pasir Urug 1 1 bh I a. 100,000 - - 50,000 50,000
6 Semen (@ 50kg) 36 36 bh I a. 64,000 - - 2,304,000 2,304,000
7 Kaso 5/7 14 14 Ib 18,000 - 252,000 252,000
8 Papan Kayu bekisting 12 12 Ib 22,000 - 264,000 264,000
9 Besi Tul. Ø 10 53 53 I a. 80,000 - 4,240,000 4,240,000
10 Kawat Beton 5 5 I a. 20,000 - 100,000 100,000
11 Paku 3 3 I a. 14,000 - 42,000 42,000

Sub Total 1) 465,000 - 8,571,500 9,036,500


ALAT
1 Benangklos 2 - 2 bh II a. 2,000 4,000 - - 4,000
2 - - bh II a. 5,000 - - - -
3 - bh II a. 2,500 - -
5
Sub Total 2) 4,000 - - 4,000
UPAH
1 Pekerja 8 - 16 24 HOK III a. 34,500 276,000 - 552,000 828,000
2 Tukang 6 - 50 56 HOK III a. 45,000 270,000 - 2,250,000 2,520,000
3 Pekerja Galian 5 10 15 HOK III a. 34,500 345,000 345,000
Sub Total 3) 546,000 - 3,147,000 3,693,000
TOTAL BIAYA 12,733,500

Dari PNPM - MP 11,718,500


Sumber Dana
Dari Swadaya 1,015,000
Catatan :
1. Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom volume dari swadaya.
2. Nilai RAB didapat dari kolom volume dari dana dikalikan dengan kolom harga satuan yang kemudian ditotalkan.
3. Sumbangan dalam bentuk uang dimasukan pada baris terbawah (sumber dana dari swadaya).
4. Swadaya dalam bentuk lahan ditulis dalam format lain.
Kategori Biaya :
I a. Pembelian bahan hasil tenaga manusia
I b. Pembelian bahan hasil industri
I c. Pembelian bahan administrasi
II a. Pembelian alat tangan
II b. Pembelian/penyewaan alat mesin
II c. Pembelian alat administrasi
III a. Pembayaran tenaga kerja untuk konstruksi
III b. Pembayaran tenaga kerja untuk pengumpulan bahan
III c. Pembayaran honorarium Tim Pelaksana

Disetujui oleh : Dibuat Oleh :


PJOK FK Ketua TPK
Hj. Kusmiati, S.Sos, Dra. Evi Siti Fatihah Ibrahim M Nur,ST
NIP. 197102181990032004
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA


Propinsi : Jawa Barat No. RAB : 01
Kabupaten : Majalengka Program : PNPM-MPd
Kecamatan : Rajagaluh Jenis Kegiatan : Jalan Rabat
Desa : Teja Ukuran/Dimensi : 1.6 x 815 M (2 jalur)

VOLUME Kate- Harga BIAYA ( Rp. )


URAIAN Dari Dari PNPM Sat. gori Satuan Dari Dari PNPM
Total Biaya (Rp) Total
Swadaya APBD APBN Swadaya APBD APBN
BAHAN
1 Batu Split 2/3 6 - 130 136 M3 I b. 195,000 1,170,000 - 25,350,000 26,520,000
2 Pasir Beton 81 81 M3 I b. 130,000 - - 10,530,000 10,530,000
3 Semen (@ 50kg) 682 682 Zak I b. 64,000 - - 43,648,000 43,648,000
4 Pasir Urug 6 41 47 M3 I b. 100,000 600,000 - 4,100,000 4,700,000
5 Sirtu 20 135 155 M3 I b. 80,000 1,600,000 - 10,800,000 12,400,000
6 Papan Kayu bekisting 20 276 296 Lbr I b. 22,000 440,000 - 6,072,000 6,512,000
7 Paku 7 35 42 Kg I b. 14,000 98,000 - 490,000 588,000
8 Aspal 8 8 drum I b. 1,500,000 - - 12,000,000 12,000,000
9 Abu batu 7 7 M3 I b. 100,000 - - 700,000 700,000

Sub Total 1) 3,908,000 - 113,690,000 117,598,000


ALAT
1 Ember 20 20 bh II a. 5,000 - - 100,000 100,000
2 Sekop 2 - - 2 bh II a. 65,000 130,000 - - 130,000
3 Sewa Gerobak 9 - 9 hari II b. 10,000 90,000 - - 90,000
4 Benangklos 2 1 3 bh II a. 2,000 4,000 - 2,000 6,000
5 Sewa Molen 26 26 hari II b. 200,000 - - 5,200,000 5,200,000
6 Prasasti 1 1 bh II c. 300,000 - - 300,000 300,000
7 Papan Proyek 1 1 bh II c. 100,000 - - 100,000 100,000
8 Papan Informasi 1 1 bh II c. 150,000 - - 150,000 150,000
Sub Total 2) 224,000 - 5,852,000 6,076,000
UPAH
1 Pekerja 155 - 600 755 HOK III a. 34,500 5,347,500 - 20,700,000 26,047,500
2 Tukang 48 - 120 168 HOK III a. 45,000 2,160,000 - 5,400,000 7,560,000
Pekerja Persiapan - HOK III a. 34,500 - - - -
Sub Total 3) 7,507,500 - 26,100,000 33,607,500
TOTAL BIAYA 157,281,500

Dari PNPM - MP 145,642,000


Sumber Dana
Dari Swadaya 11,639,500
Catatan :
1. Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom volume dari swadaya.
2. Nilai RAB didapat dari kolom volume dari dana dikalikan dengan kolom harga satuan yang kemudian ditotalkan.
3. Sumbangan dalam bentuk uang dimasukan pada baris terbawah (sumber dana dari swadaya).
4. Swadaya dalam bentuk lahan ditulis dalam format lain.
Kategori Biaya :
I a. Pembelian bahan hasil tenaga manusia
I b. Pembelian bahan hasil industri
I c. Pembelian bahan administrasi
II a. Pembelian alat tangan
II b. Pembelian/penyewaan alat mesin
II c. Pembelian alat administrasi
III a. Pembayaran tenaga kerja untuk konstruksi
III b. Pembayaran tenaga kerja untuk pengumpulan bahan
III c. Pembayaran honorarium Tim Pelaksana

Disetujui oleh : Dibuat Oleh :


PJOK FK Ketua TPK

Hj. Kusmiati, S.Sos, Dra. Evi Siti Fatihah Ibrahim M Nur,ST


NIP. 197102181990032004
PNPM MANDIRI PERDESAAN

Propinsi : Jawa Barat Jenis Prasarana : Perkerasan Rabat Beton


Kabupaten : Majalengka
Kecamatan : Rajagaluh
Take OF Sheet Lokasi : Rt. 01 - 03
Desa : Teja Volume : 815 m1

0.12

0.03

Lebar rabat = 1.60

Perhitungan Volume Beton Kebutuhan Bahan & Upah Pekerjaan Bekisting (3X Pakai)
= 0.12 x 1.60 x 815 = 156.48 M3 Dimensi Bekisting (P = 815 m
(T = 0.12 m
Perhitungan Volume Lapisan Bawah Rabat (Pasir Urug)
= 0.03 x 1.60 x 815 = 39.12 M3 Vol 1
= (T) x P x 4
Perhitungan Volume Sirtu Tengah & Bahu = 0.120 x 815.00 4
= 0.12 x 0.90 x 815 = 88.02 M3 = 391.20 m2
= 0.10 x 0.50 x 815 = 40.75 M3
Vol 2 ( Untuk Dilatasi per 2 m )
Kebutuhan Bahan & Upah Pekerjaan Perkerasan Beton = (( 815 / 2 ) + 1 ) x 1.60 x
(1 Pc : 5 Ps : 7 Kr) beton tumbuk D001 = 78.432 m2
= Volume x Analisa Vol 1 + 2
1. Kebutuhan Split 2/3 = 469.632
= 156 x 0.87 = 136.14 M3 Vol 1/3 +Vol. 2 = m2
2. Kebutuhan Pasir Beton = 208.83 m2
= 156 x 0.52 = 81.37 M3
3. Kebutuhan Semen/PC (50Kg) 1. Kebutuhan Bekisting = 208.83 x 0.011 ( 3 x pakai)
= 156 x 4.36 = 682.25 Zak = 2.3668 M3 = 295.845
4. Kebutuhan Pekerja 2. Kebutuhan Paku = 208.83 x 0.4
= 156 x 2.2 = 344.26 HOK = 83.53 Kg : 2 = 42
5. Kebutuhan Tukang 3. Kebutuhan Pekerja = 469.63 x 0.12
= 156 x 0.3 = 51.64 HOK = 56.36 HOK
Kebutuhan Bahan & Upah Pekerjaan Urugan Pasir 4. Kebutuhan Tukang = 469.63 x 0.15
( Lapisan Bawah Rabat ) = 70.44 HOK
a. Penghamparan
1. Kebutuhan Pasir Urug Kebutuhan Mesin Molen
= 39 x 1.2 = 46.94 M3
2. Kebutuhan Pekerja Kemampuan produktifitas mesin : 0.25 m3 / 20 menit
= 39 x 0.15 = 5.87 HOK 0.75 m3 / 1 jam
1. Kebutuhan Sirtu 0.75 / 8 (hari kerja) = 6 m3 / 1 hari
= 129 x 1.2 = 154.52 M3
2. Kebutuhan Pekerja Jadi Kebutuhan Mesin Molen : Volume Beton / Kemampuan mesin
= 129 x 0.15 = 19.32 HOK 156.48 / 6
b. Pemadatan 26.08 hari
1. Kebutuhan Pekerja REKAP KEBUTUHAN BAHAN & UPAH
= 168 x 0.5 = 83.95 HOK Batu Split 2/3 = 136.1 Dibulatkan 136 M3
2. Kebutuhan Tukang Pasir Beton = 81.4 Dibulatkan 81 M3
= 168 x 0.05 = 8.39 HOK Semen (@50Kg) = 682.3 Dibulatkan 682 Zak #REF!
Pasir Urug = 46.9 Dibulatkan 47 M3
Kebutuhan Bahan & Upah Pekerjaan Aspal sandsheet Sirtu = 154.5 Dibulatkan 155 M3
1. Kebutuhan Aspal Papan Bekisting = 295.8 Dibulatkan 296 Lbr
= 1 x 1.60 x 815 = 1,304.00 kg Paku = 41.8 Dibulatkan 42 Kg
= 8.41 drum Pekerja = 754.9 Dibulatkan 755 HOK
2. Kebutuhan Pasir/abu batu Tukang = 168.3 Dibulatkan 168 HOK
= 0.005 x 1.60 x 815 = 6.52 M3 Sewa Molen = 26.08 Dibulatkan 26 hari
1. Kebutuhan Pekerja Aspal = 8.41 Dibulatkan 8 drum
= 0.188 x 1.60 x 815 = 245.15 HOK Pasir = 6.52 Dibulatkan 7 M3
2. Kebutuhan Tukang
= 0.029 x 1.60 x 815 = 37.82 HOK

Pekerja persiapan #REF! #REF! hok


PNPM MANDIRI PERDESAAN

Tanggal Survey : 4 Desember 2013 Dibuat Oleh :

Propinsi : Jenis Prasarana :


Kabupaten :
Kecamatan :
Take OF Sheet Lokasi :
Desa : Volume : m1

Perhitungan Volume aspal


=

Perhitungan Volume abu batu


=

Perhitungan Volume kayu bakar


=
=

Kebutuhan Bahan & Upah Pekerjaan Perkerasan Beton


(1 Pc : 5 Ps : 7 Kr) beton tumbuk D001
=

1. Kebutuhan Split 2/3


=

2. Kebutuhan Pasir Beton


=

3. Kebutuhan Semen/PC (50Kg)


=

4. Kebutuhan Pekerja
=

5. Kebutuhan Tukang
=

Kebutuhan Bahan & Upah Pekerjaan Urugan Pasir


( Lapisan Bawah Rabat )
a. Penghamparan
1. Kebutuhan Pasir Urug
=

2. Kebutuhan Pekerja
=

1. Kebutuhan Sirtu
=

2. Kebutuhan Pekerja
=
b. Pemadatan
1. Kebutuhan Pekerja
=

2. Kebutuhan Tukang
=
PNPM MANDIRI PERDESAAN
PNPM MANDIRI PERDESAAN

0.12

( 3 x pakai)
lbr

kg

HOK
PNPM MANDIRI PERDESAAN
PNPM MANDIRI PERDESAAN
PNPM MANDIRI PERDESAAN

Propinsi : Jawa Barat Jenis Prasarana : Perkerasan Rabat Beton


Kabupaten : Majalengka
Kecamatan : Rajagaluh
Take OF Sheet Lokasi : Cilimus
Desa : Rajagaluhkidul Volume : 268 m1

0.12 m

0.03 m

2.40 m

Perhitungan Volume Beton Kebutuhan Bahan & Upah Pekerjaan Bekisting (3X Pakai)
= 0.12 x 2.40 x 268 = 77.18 M3 Dimensi Bekisting (P) = 268.00 m
(T) = 0.12 m
Perhitungan Volume Lapisan Bawah Rabat (Pasir Urug)
= 0.03 x 2.40 x 268 = 19.30 M3 Vol 1
= (T) x P x 2
Perhitungan Volume Sirtu bahu = 0.120 x 268.00 2
= 0.10 x 0.50 x 268 = 13.40 M3 = 64.32 m2

Vol 2 ( Untuk Dilatasi per 2 m )


Kebutuhan Bahan & Upah Pekerjaan Perkerasan Beton = (( 268 / 2 ) + 1 ) x 0.12
(1 Pc : 3 Ps : 5 Kr) = 16.200 m2
= Volume x Analisa
1. Kebutuhan Split 2/3 Vol 1 + 2
= 77.18 x 0.87 = 67.15 M3 = 80.520 / 3 = 26.84 m2
2. Kebutuhan Pasir Beton
= 77.18 x 0.52 = 40.14 M3
3. Kebutuhan Semen/PC (50Kg) 1. Kebutuhan Bekisting = 26.84 x 0.011
= 77.18 x 4.36 = 336.52 Zak = 0.3042 M3 = 19.012 lbr
4. Kebutuhan Pekerja 2. Kebutuhan Paku = 26.84 x 0.4
= 77.18 x 1.65 = 127.35 HOK = 10.74 Kg
5. Kebutuhan Tukang 3. Kebutuhan Pekerja = 26.84 x 0.12
= 77.18 x 0.25 = 19.30 HOK = 3.22 HOK
4. Kebutuhan Tukang = 26.84 x 0.15
Kebutuhan Bahan & Upah Pekerjaan Urugan Pasir = 4.03 HOK
( Lapisan Bawah Rabat ) Kebutuhan Mesin Molen
a. Penghamparan Kemampuan produktifitas mesin : 0.25 m3 / 20 menit
1. Kebutuhan Pasir Urug 0.75 m3 / 1 jam
= 19.30 x 1.2 = 23.16 M3 0.75 / 8 (hari kerja) = 6 m3 / 1 hari
2. Kebutuhan Pekerja
= 19.30 x 0.3 = 5.79 HOK Jadi Kebutuhan Mesin Molen : Volume Beton / Kemampuan mesin
b. Pemadatan 77.18 / 6
1. Kebutuhan Pekerja 12.86 hari
= 19.30 x 0.3 = 5.79 HOK

REKAP KEBUTUHAN BAHAN & UPAH


Split 2/3 = 67.2 Dibulatkan 67.0 M3
Kebutuhan Bahan & Upah Pekerjaan Urugan sirtu Pasir Beton = 40.1 Dibulatkan 40.0 M3
( timbunan bahu ) PC (50Kg) = 336.5 Dibulatkan 337.0 Zak
a. Penghamparan Pasir Urug = 23.2 Dibulatkan 23.0 M3
1. Kebutuhan Pasir Urug Bekisting = 19.0 Dibulatkan 19.0 Lembar
= 13.40 x 1.2 = 16.08 M3 Paku = 10.7 Dibulatkan 11.0 Kg
2. Kebutuhan Pekerja Sirtu = 16.08 Dibulatkan 16.0 M3
= 13.40 x 0.3 = 4.02 HOK Pekerja = 200.3 Dibulatkan 200.0 HOK
b. Pemadatan Tukang = 31.1 Dibulatkan 31.0 HOK
1. Kebutuhan Pekerja sewa molen = 12.86 Dibulatkan 13.0 hari
= 13.40 x 0.3 = 4.02 HOK
PNPM MANDIRI PERDESAAN

Tanggal Survey :
PNPM -Mandiri Perdesaan

REKAPITULASI BIAYA PELAKSANAAN PRASARANA


Propinsi : Jawa Barat Kecamatan : Rajagaluh
Kabupaten : Majalengka Desa : Teja

Kegiatan : RABAT Kegiatan : Gorong-2 Kegiatan : TPT

Ukuran : 815 m x 1.6 m Ukuran : Plat Beton Ukuran : h= 0,5-1 m P=401 m' JUMLAH TOTAL
No URAIAN Bobot Bobot Bobot Bobot
Jumlah : 1 Ruas (%) Jumlah : 1 unit
(%) Jumlah : 1 unit (%) (%)
No. RAB : 01 No. RAB : 02 No. RAB : 03
Dari PNPM Dari PNPM
Swadaya Swadaya
(dalam rupiah) APBN APBD PNPM-MP Swadaya APBN APBD PNPM - MP Swadaya
BAHAN
I 113,690,000 - 3,908,000 74.8 8,571,500 465,000 71.0 40,713,000 - 5,787,000 75.0 162,974,500 10,160,000 74.6
(tidak perlu dirinci )
PERALATAN
II 5,852,000 - 224,000 3.9 - 4,000 0.0 77,000 - 56,500 0.2 5,929,000 284,500 2.7
(tidak perlu dirinci )
UPAH
III 26,100,000 - 7,507,500 21.4 3,147,000 546,000 29.0 11,908,500 - 3,427,500 24.7 41,155,500 11,481,000 22.7
(tidak perlu dirinci )

Jumlah 145,642,000 11,639,500 100 11,718,500 1,015,000 100 52,698,500 9,271,000 100 210,059,000 21,925,500 100
IV Operasional UPK 2% 4,422,000
V Operasional TPK 3% 6,634,000
Jumlah Total 145,642,000 11,639,500 11,718,500 1,015,000 52,698,500 9,271,000 221,115,000 21,925,500
Jumlah Biaya Upah 26,100,000 7,507,500 3,147,000 546,000 11,908,500 3,427,500 41,155,500 11,481,000
Jumlah HOK Konstruksi - - HOK 66 14 HOK 319 89 HOK 385 103 HOK

Catatan : Kolom Swadaya diisi swadaya dalam bentuk uang


Teja, Desember 2013
PJOK FK Ketua TPK

Hj. Kusmiati, S.Sos, Dra. Evi Siti Fatihah Ibrahim M Nur,ST


NIP. 197102181990032004
SURVEY ANTAR PATOK Lembar ke 1 dari lembar

Kabupaten : Majalengka Bahan untuk perkerasan : Rabat Beton Panjang Jalan : 815 m'
Kecamatan : Rajagaluh Lebar dan tebal perkerasan : 1,60 x 0,12 m Dimensi Saluran :
Desa : Teja Lebar badan Jalan ( termasuk bahu ) : 3,5 m' Jenis gorong-gorong : Plat Beton

Nomor Patok : P0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Jarak antar patok 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 15


Jarak komulatif 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 815
Arah Trase Jalan 330 340 350 330 340 310 320 290 270 280 290 310 310 320 320 310 310
Tanjakan ( % ) 5 5 6 3 5 5 4 5% 0% 0 0 -3 -3 -3 4 4 3
Panjang tanjakan 50 50 20 20 30 40 38 25 30 30 20 25 25 30 30 15
Keadaan di sekitarnya Sawah Sawah Kebun ------------------------Kebun Sawah -------------------------------------------------- Rumah
Keadaan Jalan lama
Jumlah pohon
Penebasan ( P x L )
Pembersihan ( P x L ) x x

Jenis galian
Volume Galian
Volume Timbunan
Jarak dari sumber timbunan
Saluran ( KR, KN, 2, 0 )
Bangunan yang ada
Letak & jenis bangunan baru
( jarak dari patok )
Ukuran bangunan baru GG Plat TPT TPT TPT TPT TPT TPT
Jarak dari sumber Batu Belah
Jarak dari sumber Pasir
Jarak dari sumber ……………
Kebutuhan gebalan rumput
Jarak dari sumber gebalan
Jenis & kebutuhan vegetasi
tetap yang lain
)
50
0 465
0
465
DATA SURVEY & PENGUKURAN

Desa : Teja TEMBOK PENAHAN TANAH Jenis Usulan : Jalan


Lokasi : RT. 01 - 03 Tanggal Survey : 4/12/2013
Volume : 255 m

Lebar Lebar Jenis Penanganan


bagian bagian Sisi Kiri Sisi kanan Keterangan
No. Patok s/d Patok
Atas Bawah P T Volume P T Volume
(m) (m) (m) (m) (M3) (m) (m) (M3)

1 P0 - P1 0.25 0.35 20 1.5 9 GG Plat

2 P1 - P2 0.25 0.35 20 1.5 9

3 P2 - P3 0.25 0.35 20 1.5 9

4 P2 - P3 0.25 0.35

5 P3 - P4 0.25 0.35 20 1.7 10.2

6 P4 - P5 0.25 0.35

7 P4 - P5 0.25 0.35

8 P5 P6 0.25 0.35 30 1.5 13.5

9 P6 P7 0.25 0.35

P7 P8 0.25 0.35

P8 P9 0.25 0.35

P9 P10 0.25 0.35

P10 P11 0.25 0.35

P11 P12 0.25 0.35

P12 P13 0.25 0.35 25 1.5 11.25 50 2 30

P13 P14 0.25 0.35 20 1.5 9 50 2 30

P14 P15 0.25 0.35

P15 P16 0.25 0.35

P16 P17 0.25 0.35

10 P8 P9 0 0

JUMLAH 125 9.2 57.45 130 5.5 73.5


Sketsa Lokasi/denah :
130.95
0.525 255
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA SPP


Propinsi : Jawa Barat No. RAB : 01
Kabupaten : Majalengka Program : PNPM-MPd
Kecamatan : Rajagaluh Jenis Kegiatan : SPP
Desa : Teja Ukuran/Dimensi : 1 Kelompok

VOLUME Besar BIAYA ( Rp. )


NAMA KELOMPOK Dari Dari PNPM Satuan Pinjaman Dari Dari PNPM
kelompok Total
Swadaya APBD APBN Swadaya APBD APBN

1 Kenanga - 11 org 14,000,000 - 14,000,000 14,000,000

- - 14,000,000 14,000,000

JUMLAH 14,000,000

SPP 14,000,000
Dari PNPM OP UPK 2 % 295,000
SUMBER DANA OPTPK 3 % 442,000
Dari Swadaya -
TOTAL BIAYA 14,737,000

Disetujui oleh : Dibuat Oleh :


PJOK FK Ketua TPK

Hj. Kusmiati, S.Sos, Dra. Evi Siti Fatihah Ibrahim M Nur,ST


NIP. 197102181990032004
294,737
442,105
Kabupaten : Majalengka Jenis Prasarana : Pemb. Jalan
Kecamatan : Rajagaluh TAKE OF SHEET Sub Kegiatan : TPT
Desa : Teja Volume : 255 m'

Jenis Kegiatan : Pemb. Jalan Sub Kegiatan : TPT


Panjang TPT = 255 m

2-5 - 3 M
25 25

0,5 - 1

35 35

Volume Pasangan TPT


Lihat Pada Data Hasil Pengukuran/Survey didapat Volume Upah Pecah batu :
Sebesar : = 0,75 m3 / Hok
= 131 m3
PERHITUNGAN KEBUTUHAN BAHAN, ALAT DAN UPAH :
1. Pasangan Batu belah campuran 1 PC : 5 PS (C003)
- Batu belah 15/20 cm = 1.2 x 131 = 157 m3
- Pasir pasang = 0.544 x 131 = 71.24 m3
- Semen 50 kg = 2.72 x 131 = 356 Zak
- Pekerja = 1.5 x 131 = 196 Hok
- Tukang = 0.6 x 131 = 78.57 Hok
- Upah pecah batu = 30% x 157 x 0.75 = 0 Hok
2. Plesteran 1 PC : 3 PS (ABK.360.03) Panjang Plesteran = 255 m
Volume Plesteran = 0.3 x 255 = 76.5 m2
- Pasir pasang = 0.019 x 76.5 = 1.454 m3
- Semen 50 kg = 0.13 x 76.5 = 9.914 Zak
- Pekerja = 0.2 x 76.5 = 15.3 Hok
- Tukang = 0.15 x 76.5 = 11.48 Hok
3. Galian Tanah (PTO - P3DT)
Volume galian = 0.2 x 0.35 x 255 = 17.85 m3
- Pekerja = 0.25 x 17.85 = 4.463 Hok

Upah Pecah batu :


= 0,75 m3 / Hok

Rekapitulasi Kebutuhan Bahan, Alat dan Upah :

No Bahan,alat, Upah Sat. Pas. Batu Plesteran Galian Jumlah Pembulatan


1 Batu belah M3 157 157 157
2 Semen Zak 356 9.914 366 366
3 Pasir pasang M3 71.24 1.454 72.69 73
4 Pekerja Hok 196.4 15.3 4.5 216 288
5 Tukang Hok 78.6 11.5 90 120
7 Upah Pecah batu Hok 0 0

Tanggal Survey : 4-Dec-13 Dibuat Oleh : Muhtar


1.
2880000
96

4.6666666667

#VALUE!
Kabupaten : Majalengka Jenis Kegiatan : Pemb. Jalan
Kecamatan : Rajagaluh Take of Sheet Nama Kegiatan : G-G Plat Beton
Desa : Teja Ukuran : f 2m - 5m ( 1 Unit )

3.0 G-G pada P


2.6 Panjang (p) = 5 m
2.3 Lebar (l) = 200 cm
Tinggi (h) = 150 cm
0.15 Tebal plat (t) = 15 cm

1.5

I II I 0.2

2.0 Pasir urug 3 cm Kebutuhan Bahan, Alat, Upah


Galian : Pek. Galian :
Vol Galian = 0.50 x 3 x 5.0
0.50 @ 7.5 m3

3.0
Pekerja = 2 HOK/m3 Pekerja Galian = 2 x 7.5 @ 15.0 HOK

Pek. Lap. Pasir Urug : = 3 cm


Vol. Pasir urug = 0.03 x 3.0 x 5.0
@ 0.45 m3
floss pasir = 1.34 S Vol. Pasir urug = 1.34 x 0.45 = 0.60 m3

Pek. Plat Beton :


Vol. Beton = p x t x ( l + 0.2 )
= 5.0 x 0.15 x 2.30
@ 1.73 m3
1 m3 Beton ( 1 : 3 : 5) D002 :
Semen (PC) = 6.76 zak Vol. Semen = 6.76 x 1.73 @ 11.7 zak
Pasir Beton = 0.65 m3 Vol. Psr Beton = 0.65 x 1.73 @ 1.1 m3
Bt. Split = 0.87 m3 Vol. Bt. Split = 0.87 x 1.73 @ 1.5 m3
Pekerja = 2.20 HOK Pekerja = 2.20 x 1.73 @ 3.8 HOK
Tukang = 0.33 HOK Tukang = 0.33 x 1.73 @ 0.6 HOK

Pembesian per 1 m3 Beton : Pek. Penulangan Plat :

Jarak tulangan = 10 cm Butuh besi f10 = 51.00 bh @ p = 4.80 m ---> 22.3 btg
Jarak Sengkang = 10 cm = 48.00 bh @ p = 5.05 m ---> 22.0 btg
S= 44.3 btg
@ 487.2 m
x (
1.2 kf ) = 53.1 btg

BJ Besi f10 = 0.6 kg/m' Besi tul. f10 = 0.6 x 487.2 x 1.2 @ 362.5 kg
Kawat Besi = 0.014 kg per kg besi Kawat Besi = 0.014 x 362.5 @ 4.9 kg

Tukang = 0.091 HOK Tukang = 0.091 x 367.4 @ 33.4 HOK

Tanggal Survey : Dibuat Oleh :


Kabupaten : Majalengka Jenis Kegiatan : Pemb. Jalan
Kecamatan : Rajagaluh Take of Sheet Sub Kegiatan : G-G Plat Beton
Desa : Teja Ukuran : 2m x - 5 m
1 unit

5.0

0.15
2.30 L bekist = 13.7 m2 Pek. Bekisting :
1m2 Bekisting : Kaso 5/7 = 1.00 x 13.7 @ 13.7 btg
Kaso 5/7 = 5 btg Papan = 0.03 x 13.7 @ 0.4 m3
Papan = 0.03 m3 Paku 5-7 = 0.20 x 13.7 @ 2.7 kg
Paku 5-7 = 0.2 kg Alat = 0.03 x 13.7 @ 0.4 set
Pekerja = 0.35 HOK Pekerja = 0.35 x 13.7 @ 4.8 HOK
Tukang = 1.12 HOK Tukang = 1.12 x 13.7 @ 15.3 HOK

0.3 Pek. Pas. Batu :


I. Dudukan = Volume dudukan - Volume plat
loneng 0.6 @ 1.32 - 0.09 x 0.55 x 0.02
IV 1.23 m3
II. Alas = 0.2 x 2.0 x 5.0
@ 2.0 m3
I
III. Pondasi = 2 x 0.5 x 0.3 x 3.0
0.55 @ 0.9 m3

II IV. Loneng = 2 x 0.6 x 0.3 x 2.7


III 0.3 @ 3.2 m3

0.5 S V Pas.Bt. = 7.4 m3


1 m Pas. Batu ( 1 : 4 ) :
3

Batu Belah = 1.2 m3 Vol. Batu Belah = 1.20 x 7.4 @ 8.8 m3


Pasir Pasang = 0.50 m3 Vol. Psr Pasang = 0.50 x 7.4 @ 3.7 m3
Semen (PC) = 3.26 zak Vol. Semen = 3.26 x 7.4 @ 24.0 zak
Pekerja = 2.0 HOK Pekerja = 2.00 x 7.4 @ 14.7 HOK
Tukang = 0.8 HOK Tukang = 0.80 x 7.4 @ 5.9 HOK
Plesteran u/ kepala loneng t = 2.5cm :
Lapis atas = lebar x Ploneng x 2
= 0.35 x 3 x 2
= 1.89 m2

S L plesteran

Lapis sisi ki+ka = tinggi x P x 2 = 2.16 m2


loneng

1 m2 Plesteran (1:3)
Pasir Pasang = 0.04 m3 Vol. Psr Pasang = 0.04 x 2.16 @ 0.09 m3
Tukang = 0.30 HOK Tukang = 0.30 x 2.16 @ 0.6 HOK
Semen (PC) = 0.26 zak Vol. Semen = 0.26 x 2.16 @ 0.6 zak
Pekerja = 0.50 HOK Pekerja = 0.50 x 2.16 @ 1.1 HOK

Tanggal Survey : Dibuat Oleh :

Kabupaten : Majalengka Jenis Kegiatan : Pemb. Jalan


Kecamatan : Rajagaluh Take of Sheet Nama Kegiatan : G-G Plat Beton
Desa : Teja Ukuran : f 2m - 5m ( 1 Unit )

Pembulatan
Rekapitulasi Bahan : Batu Belah = 8.8 m3 = 9.0 m3
Split = 1.50 m3 = 1.5 m3
Pasir Pasang = 3.8 m3 = 4.0 m3
Pasir Beton = 1.1 m3 = 1.5 m3
Pasir Urug = 0.6 m3 = 0.5 m3
Semen = 36.2 zak = 36.0 zak
Kaso 5/7 = 13.7 btg = 14.0 btg
Papan Alba (3m) = 0.4 m3 = 12.0 btg
Besi Tul. Ø 10 = 53.1 btg = 53.0 btg
Kawat Besi = 4.9 kg = 5.0 kg
Paku 5-7 = 2.7 kg = 3.0 kg
-
Upah : Pekerja Galian = 15.0 HOK = 15.0 HOK
Pekerja Konstruksi = 24.4 HOK = 24.0 HOK
Tukang = 55.9 HOK = 56.0 HOK
Tanggal Survey : Dibuat Oleh :
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN
PNPM MPd
KACAMATAN RAJAGALUH KABUPATEN MAJALENGKA
TAHUN ANGGARAN 2014
FOTO 0% DESA TEJA

P0 - P1

P 15 - P16

P 16 - P 17