SOUTH PARS FIELD DEVELOPMENT

(PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
Job No. : 99012 Page : 1/23
INSPECTION & TEST PLAN FOR
Doc No. : INSP 99012 999
ELECTRICAL
8700 0004 Rev. 4

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

INSPECTION & TEST PLAN


FOR
ELECTRICAL

4 07/01/01 ISSUE OF APPROVED FINAL DOCUMENT M. G. KIM S. Y. KIM S. K. AN


3 21/12/00 ISSUE OF APPROVED FINAL DOCUMENT M. G. KIM S. Y. KIM S. K. AN
2 20/12/99 APPROVED FOR CONSTRUCTION M. G. KIM S. Y. KIM Y. H. KIM
1 17/11/99 APPROVED FOR CONSTRUCTION M. G. KIM S. Y. KIM Y. H. KIM
0 30/09/99 ISSUED FOR APPROVAL M. G. KIM S. Y. KIM Y. H. KIM
REV. DATE DESCRIPTION BY REVIEWED APPROVED

TOTAL SOUTH PARS


SOUTH PARS FIELD DEVELOPMENT (PHASE TWO & THREE)

INSPECTION & TEST PLAN FOR


DOCUMENT TITLE
ELECTRICAL

INSP 99012 999 8700 0004 4 IAFD NONE 2 1/23

DOCUMENT No. REV STATUS SCALE CLASS PAGE


SOUTH PARS FIELD DEVELOPMENT
(PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
Job No. : 99012 Page : 2/23
INSPECTION & TEST PLAN FOR
Doc No. : INSP 99012 999
ELECTRICAL
8700 0004 Rev. 4

TABULATION OF REVISED PAGES

PAGE Rev.1 Rev.2 Rev.3 Rev.4 PAGE Rev.1 Rev.2 Rev.3 Rev.4
1 45 X
2 46
3 X X 47 X
4 X X X 48 X
5 X X X 49 X
6 X X 50 X
7 X X 51
8 X X 52
9 X X 53
10 X X X 54
11 X X X 55
12 X X 56
13 X X 57
14 X X 58
15 X X 59
16 X X 60
17 X X 61
18 X X 62
19 X X X 63
20 X X X 64
21 X X 65
22 X X 66
23 X 67
24 X 68
25 X 69
26 X 70
27 X 71
28 X 72
29 X 73
30 X 74
31 75
32 76
33 77
34 X 78
35 X 79
36 80
37 81
38 82
39 83
40 84
41 85
42 86
43 87
44 X 88
SOUTH PARS FIELD DEVELOPMENT
(PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
Job No. : 99012 Page : 3/23
INSPECTION & TEST PLAN FOR
Doc No. : INSP 99012 999
ELECTRICAL
8700 0004 Rev. 4

CONTENTS

A. EARTHING AND LIGHTNING INSTALLATION ---------------------------------------- PAGE 4

B. CABLE LADDER INSTALLATION --------------------------------------------------------- PAGE 6

C. CABLE INSTALLATION ---------------------------------------------------------------------- PAGE 8

D. EQUIPMENT INSTALLATION -------------------------------------------------------------- PAGE 11

E. LIGHTING AND SMALL POWER INSTALLATION ----------------------------------- PAGE 18

F. HEAT TRACING INSTALLATION --------------------------------------------------------- PAGE 20

G. CATHODIC PROTECTION INSTALLATION ------------------------------------------- PAGE 22

H. TELECOMMUNICATION INSTALLATION --------------------------------------------- PAGE 23

NOTE :
COMPANY reserves the right to increase surveillance from SW to W and from W to H
depending on results of site surveillance activities.
COMPANY shall be notified of inspection points by CONTRACTOR at least 3 days in Advance
of the Activity
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Earthing and Lightning Installation PAGE 4 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST REMARK
OR PROCEDURE FORMAT SUBCON HDEC/ COMPANY
TPA

A EARTHING AND LIGHTNING INSTALLATION

1 Material Verification(Receiving Inspection) RP 5561V 999 QP 550 002


1630 029
Verify the Material Type/Size/Quantity - SW SW
PP 99012 999
Check the Damage 0001 550 - SW SW

Review the Test Report - R R

RP 5561V 999
Earthing Installation 1620 001 CPX26

Cable Type/Size Related DWG W SW SW

Location & Routing SP-COM-511 W SW SW

Bolts and Nuts Tighting Related STD W SW SW


: IEC 364
Compression Type Connection W SW SW

1.1

1.2
1.3

2.1

2.2

2.3

2.4

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Earthing and Lightning Installation PAGE 5 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
3 Test
RP 5561V 999
Continuity Test 1620 001 TPX26 W SW SW

Earthing Resistance Test H W W


3.1

3.2

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Cable Ladder Installation PAGE 6 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
B CABLE LADDER INSTALLATION
PP 99012 999
1 Material Verification(Receiving Inspection) 0001 550 QP 550 002

Verify the Material Type/Size/Quantity Related DWG - SW -

Check the Damage & Sharp Edge - SW -

Review the Related Document - R -

Cable Ladder Installation CPX30


Related DWG
Proper Type / Size W SW SW
RP 5561V 999
Cable Ladder Location / Routing 1630 007 W SW W

Cable Ladder Damage, Sharp Edge, Burr RP 5561V 999 W SW SW


1620 001
1.1

1.2

1.3

2.1

2.1

2.3

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Cable Ladder Installation PAGE 7 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA

Support(Type/Size/Welding/Anchoring ) W SW W

Coating(touch up paint) on cut end & damage W SW W


Portions

Earthing / Bonding W SW SW

Final Inspection W W W

2.4

2.5

2.6

2.7

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Cable Installation PAGE 8 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA

C CABLE INSTALLATION

1 Material Verification(Receiving Inspection) RP 5561V 999 QP 550 002


1630 029
1.1 Verify the Material Type/Size/Quantity - SW -
PP 99012 999
1.2 Check the Cable Damage 0001 550 - SW SW

1.3 Review the Related Test Record - R -

2 Cable Installation
CPX08
2.1 Cable Type / Size / Routing Related DWG (HV cable) W SW SW

2.2 Cable Arrangement RP 5561V 999 CPX09(LV W SW SW


1630 007 power/control)
2.3 Cable Damage W SW SW
RP 5561V 999
2.4 Cable Pulling Tension 1630 008 SW SW SW
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Cable Installation PAGE 9 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA

2.5 Cable Installation(In Cable Trenches) RP 5561V 999


1630 029
- Cable Trenches Preparation W W W

- Cable Segregation W SW W

- Sand Bedding and Depth W SW SW

Cable Termination
CPX08
Crimping Lug or Plug Size / Bolting (HV cable) W SW SW

Cable Bending Radius CPX09(LV W SW SW


power/control)
Gland , Fitting W SW SW

ID Marker & Wire ID Marker W SW SW

Cable Splicing( If required ) H W W


3

3.1

3.2

3.3

3.4

3.5

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Cable Installation PAGE 10 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
4 Cable Test
SP-COM-511
4.1 Above 1000V Cable TPX08
RP 5561V 999
- Continuity Test 1630 029 H W W

- Insulation Resistance Test H H W

- High-Voltage Test H H H

Up to 1000 V Cable TPX09

- Continuity Test W W W

- Insulation Resistance Test H W W

4.2

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 11 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA

D EQUIPMENT INSTALLATION

1 Equipment Verification(Receiving Inspection) RP 5561V 999 QP 550 002


1630 007
Verify the Equipment Type/Size/Quantity - SW -
PP 99012 999
Check the Physical Damage 0001 550 - SW SW

Review the Related Document - R -

Generator Installation Related DWG CPX01

Foundation/Level/Alignment RP 5561V 999 W W -


1630 033
Anchor Bolt Setting H W -
Vendor Spec
Physical Damage/Loose Parts W W -

1.1

1.2

1.3
2

2.1

2.2

2.3

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 12 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
Earthing / Bonding W W W

Cleaning W SW SW

Electrical Test SP-COM-511 TPX01 H W W

Power Transformer Installation


RP 5561V 999 CPX02
Location/Foundation/Level/Alignment 1630 007 H W W

Anchor Bolt Setting RP 5561V 999 W SW SW


1630 021
Physical Damage/Loose Parts H W W
Vendor Spec
Bushing joint / Seal W W W
2.4

2.5

2.6

3.1

3.2

3.3

3.4

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 13 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA

Oil Level / No Leak W W W

Tap change mechanism W SW W

Earthing / Bonding W SW W

Electrical Test SP-COM-511

- HV Transformer Vendor Spec TPX02 H H H

- LV Transformer TPX03 W W W

3.5

3.6

3.7

3.8
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 14 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
4. Bus Duct Installation Related DWG
CPX07
Bus Duct Location / Routing RP 5561V 999 W SW W
1630 007
Support Type/Foundation/Welding/Anchoring W SW SW
Vendor Spec
Bus Duct Level / Alignment W SW SW

Bus Bar Connection(Bolt tighting) H W W

Earthing / Bonding W SW W

Cleaning W SW SW

Electrical Test SP-COM-511 TPX07 H W W

4.1

4.2

4.3

4.4

4.5

4.6

4.7

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 15 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA

5 HV/LV SWITCHGEAR/MCC Installation Related DWG CPX04(HV)

Location / Level / Foundation RP 5561V 999 CPX05(LV) W SW W


1630 007
Support /Welding/Anchoring/Bolting W SW SW
RP 5561V 999
Alignment of Total Board 1630 022 H SW SW

Bus Bar Connection RP 5561V 999 H W SW


1630 023
Physical Damage W SW SW
Vendor Spec
Earthing / Bonding H SW W

Mechanical operation & CT’s data W W W

Cleaning TPX04(HV) W SW SW

Electrical Test SP-COM-511 TPX05(LV) H H H

5.1

5.2
5.3

5.4

5.5

5.6

5.7

5.8

5.9

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 16 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
6 Battery/Charger/Inverter Installation Related DWG CPX16/17

Location / Level / Foundation RP 5561V 999 W SW W


1630 007
Support /Welding/Anchoring/Bolting W SW SW
RP 5561V 999
Number of Cells Inter-connected 1630 025 W W W

Polarity of Interconnections between Cells RP 5561V 999 W W W


1630 026
Bolts, Nuts Washer Assembly Tighting W SW SW
Vendor Spec
Physical Damage W SW SW
SP-COM-511
Earthing / Bonding W SW W

Cleaning W SW SW

Electrical Test TPX16/17 H W W

6.1

6.2

6.3

6.4

6.5

6.6

6.7

6.8
6.9

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 17 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
7 Miscellaneous Equipment Installation
(LV DB, Control Station, NER, Control Panel, Related DWG CPX06/15/21/
etc) 23/24/32
RP 5561V 999
Name Plate 1630 007 W SW SW

Location / Level / Foundation RP 5561V 999 W SW SW


1630 008
Support /Welding/Anchoring/Bolting W SW SW
Vendor Spec
Bolts, Nuts Washer Assembly Tighting W SW SW

MCB’s rating W SW SW

Physical Damage W SW SW

Electrical Test SP-COM-511 H W W


7.1

7.2

7.3

7.4

7.5

7.6

7.7
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Lighting and Small Power Installation PAGE 18 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA

E LIGHTING AND SMALL POWER INSTALLATION

1 Material Verification(Receiving Inspection) RP 5561V 999 QP 550 002


1640 001
1.1 Verify the Material Type/Size/Quantity - SW SW

1.2 Check the Physical Damage - SW SW

1.3 Review the Related Document - R -

2 Lighting and Small Power Installation Related DWG

2.1 Lighting Distribution Board Installation RP 5561V 999 CPX 15 W W W


1640 001
2.2 Lighting Fixture / Power Socket / Welding
Socket Installation RP 5561V 999 CPX18/19/25
- Raceway installation 1630 029 W SW SW

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Lighting and Small Power Installation PAGE 19 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA

- Cable / Wire installation RP 5561V 999 W SW SW


1640 001
- Lighting Fixture / Power Socket / Welding W SW SW
Socket Installation

- Final inspection W W W

Test
SP-COM-511
Continuity Test TPX18/19/25 H W W
RP 5561V 999
Insulation Resistance Test 1630 029 H W W

RP 5561V 999
1640 001

3
3.1

3.2

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Heat Tracing Installation PAGE 20 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
F HEAT TRACING INSTALLATION

1 Material Verification(Receiving Inspection) RP 5561V 999 QP 550 002


1630 007
Verify the Material Type/Size/Quantity - SW -
Vendor spec
Check the Physical Damage - SW SW

Review the Related Document - R -

Heat Tracing Installation RP 5561V 999


1630 007 CPX22
Heating Cable Installation
- Cable Type / Size / Route Related DWG W SW SW
- Cable Tie or Tape Binding
1.1 Vendor spec

1.2

1.3

2.1

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Heat Tracing Installation PAGE 21 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA

Accessory(Junction Box, Thermostats, Sensor) Related DWG W SW SW

Vendor spec
Test
SP-COM-511
Insulation Resistance Test TPX22 H W W
( Before insulation ) RP 5561V 999
1630 007
Insulation Resistance Test H W W
( After insulation)
2.2

3.1

3.2
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Cathodic Protection Installation PAGE 22 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
G CATHODIC PROTECTION INSTALLATION

1 Material Verification(Receiving Inspection) RP 5561V 999 QP 550 002


1630 017, 1300 082
Verify the Material Type/Size/Quantity - SW SW

Check the Physical Damage Vendor spec - SW SW

Review the Related Document - R -

Cathodic Protection Installation


CPX33
Anode / Anode Cable Installation RP 5561V 999 W SW W
1630 007,1300 082
Cable connection/bonding W W W
Related DWG
Test Box, Reference Electrode, etc W SW W
Vendor spec
Electrical test
- Loop resistance for anode cable SP-COM-511 TPX33 W W W
- Potential test for reference cell
1.1

1.2
1.3

2.1

2.2

2.3

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE : ELECTRICAL ITP No. INSP 99012 999 8700 0004

SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Telecommunication Installation PAGE 23 OF 23

PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
H TELECOMMUNICATION INSTALLATION

Above item is separated from ITP for electrical.

ITP for telecommunication will be issued later.

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold


FORM NO. QP 545 002 2