BILL OF QUANTIT
Dimensions
Sr No Descriptions of Items Nos
Length
A FOUNDATIONS
1 P.C.C (1:2:4) for footings of Coloumns
1.1 F1 2 7.5
1.2 F2 2 10
1.3 F3 7 10
1.4 F4 3 15
1.5 F5 1 25
1 Total P.C.C (1:2:4) for footings of Coloumns
2 P.C.C (1:2:4) for footing beams 1 390
Sub Total 1 & 2
3 App Steel for footings of coloumns
4 App Steel for footing beams
Sub Total 3 & 4
B GROUND FLOOR
App Excavation 1 52
1 App earth filling 1 52
2 Brick ballast for terrazo floor 1 48
3 P.C.C (1:2:4) for terrazo floor 1 48
4 Mortar (1:3) for floor tile 1 48
5 Area for floor tile 1 52
6 Vertical Coloumns
6.1 P.C.C (1:2:4) for C1 13 1.5
6.2 P.C.C (1:2:4) forC2 7 1.25
6.3 Steel for vertical coloumns
7 Floor Beams
7.1 P.C.C (1:2:4) for floor beams 1 390
7.2 App Steel for floor beams
8 Slab
8.1 P.C.C (1:2:4) for slabs 1 52
8.2 App Steel for slabs
9 Brick Work
9.1 Brick work in floors 1 400
9.2 Deductions for openings 1 33
9.3 Remaining
10 Mortar
10.1 Mortar (1:5) For brick work
10.2 Mortar (1:4) for plastering walls 2 400
10.3 Mortar (1:4) for plastering roof 1 48
10.4 Deductions for openings (1:4) 2 33
10.5 Remaining (1:4) for walls
B TOTAL FOR GROUND FLOOR
1 Brick Work (1:5)
2 Mortar (1:3) for floor tile
3 Mortar (1:4) for plastering walls
4 Mortar (1:4) for plastering ceiling
5 Mortar (1:5) For brick work
6 P.C.C (1:2:4)
7 Steel
8 App earth filling
9 Brick ballast for terrazo floor
10 Area for floor tile
11 App Excavation
C FIRST FLOOR
1 Brick ballast for terrazo floor 1 48
2 P.C.C (1:2:4) for terrazo floor 1 48
3 Mortar (1:3) for floor tile 1 48
4 Area for floor tile 1 52
5 Vertical Coloumns
5.1 P.C.C (1:2:4) for C1 13 1.5
5.2 P.C.C (1:2:4) forC2 7 1.25
5.3 Steel for vertical coloumns
6 Floor Beams
6.1 P.C.C (1:2:4) for floor beams 1 390
6.2 App Steel for floor beams
7 Slab
7.1 P.C.C (1:2:4) for slabs 1 52
7.2 App Steel for slabs
8 Brick Work
8.1 Brick work in floors 1 400
8.2 Deductions for openings 1 33
8.3 Remaining
9 Mortar
9.1 Mortar (1:5) For brick work
9.2 Mortar (1:4) for plastering walls 2 400
9.3 Mortar (1:4) for plastering roof 1 48
9.4 Deductions for openings (1:4) 2 33
9.5 Remaining (1:4) for walls
C TOTAL FOR FIRST FLOOR
1 Brick Work (1:5)
2 Mortar (1:3) for floor tile
3 Mortar (1:4) for plastering walls
4 Mortar (1:4) for plastering ceiling
5 Mortar (1:5) For brick work
6 P.C.C (1:2:4)
7 Steel
8 Brick ballast for terrazo floor
9 Area for floor tile
D SECOND FLOOR
1 Brick ballast for terrazo floor 1 48
2 P.C.C (1:2:4) for terrazo floor 1 48
3 Mortar (1:3) for floor tile 1 48
4 Area for floor tile 1 52
5 Vertical Coloumns
5.1 P.C.C (1:2:4) for C1 13 1.5
5.2 P.C.C (1:2:4) forC2 7 1.25
5.3 Steel for vertical coloumns
6 Floor Beams
6.1 P.C.C (1:2:4) for floor beams 1 390
6.2 App Steel for floor beams
7 Slab
7.1 P.C.C (1:2:4) for slabs 1 52
7.2 App Steel for slabs
8 Brick Work
8.1 Brick work in floors 1 400
8.2 Deductions for openings 1 33
8.3 Remaining
9 Mortar
9.1 Mortar (1:5) For brick work
9.2 Mortar (1:4) for plastering walls 2 400
9.3 Mortar (1:4) for plastering roof 1 48
9.4 Deductions for openings (1:4) 2 33
9.5 Remaining (1:4) for walls
D TOTAL FOR SECOND FLOOR
1 Brick Work (1:5)
2 Mortar (1:3) for floor tile
3 Mortar (1:4) for plastering walls
4 Mortar (1:4) for plastering ceiling
5 Mortar (1:5) For brick work
6 P.C.C (1:2:4)
7 Steel
8 Brick ballast for terrazo floor
9 Area for floor tile
E TOP ROOF
1 Area for bitumen coating 1 52
2 Area for polythene sheet 2 52
3 Area for thermopore sheet 1 52
4 Area for brick tiles 1 52
5 soil and mud 1 52
6 Grout (1:3) over brick tiles 1 52
7 Brick work in parapet walls 1 170
9 Mortar (1:4) For brick work parapet walls
10 Mortar (1:4) for plastering parapet walls 2 170
E TOTAL FOR TOP ROOF
1 Brick Work (1:4)
2 Mortar (1:3) for grout
3 Mortar (1:4) brick work parapet walls
4 Mortar (1:4) for plastering parapet walls
5 Area for bitumen coating
6 Area for polythene sheet
7 Area for thermopore sheet
8 Area for brick tiles
9 soil and mud
GRAND TOTAL
1 Brick Work (1:5)
2 Brick Work (1:4) parapet walls
3 Mortar (1:3) for floor tiles
4 Mortar (1:3) for grout top roof
5 Mortar (1:4) for plastering walls
6 Mortar (1:4) for plastering ceiling
7 Mortar (1:4) for brick work parapet walls
8 Mortar (1:5) for brick work
9 P.C.C (1:2:4)
10 Steel
11 Brick ballast for terrazo floor
12 Area for floor tile
13 App earth filling
14 Area for bitumen coating
15 Area for polythene sheet
16 Area for thermopore sheet
17 Area for brick tiles
18 soil and mud
19 App Excavation
20 App Paint
L OF QUANTITIES
Dimensions
Quantity Unit Rate Amount Remarks
width height
TIONS
FLOOR
34 4 7072 Cf
34 3 5304 Cf
30 0.33 475.2 Cf
30 0.12 172.8 Cf
30 0.08 115.2 Cf
34 1768 Sf
1 18 351 cf
1 18 157.5 cf
2600 Kg
1 1.5 585 Cf
1450 Kg
34 0.42 742.56 Cf
1700 Kg
0.75 10 3000 Cf
3 7 693 Cf
2307 Cf
700 Cf
0.06 10 480 Cf
30 0.06 86.4 Cf
0.06 7 27.72 Cf
452.28 Cf
UND FLOOR
2307 Cf
115.2 Cf
452.28 Cf
86.4 Cf
700 Cf
2009 Cf
5750 Kg
5304 Cf
475.2 Cf
1768 Sf
7072 Cf
OOR
30 0.33 475.2 Cf
30 0.12 172.8 Cf
30 0.08 115.2 Cf
34 1768 Sf
1 11 214.5 cf
1 11 96.25 cf
1500 Kg
1 1.5 585 Cf
1450 Kg
34 0.42 742.56 Cf
1700 Kg
0.75 10 3000 Cf
3 7 693 Cf
2307 Cf
700 Cf
0.06 10 480 Cf
30 0.06 86.4 Cf
0.06 7 27.72 Cf
452.28 Cf
RST FLOOR
2307 Cf
115.2 Cf
452.28 Cf
86.4 Cf
700 Cf
1811.11 Cf
4650 Kg
475.2 Cf
1768 Sf
LOOR
30 0.33 475.2 Cf
30 0.12 172.8 Cf
30 0.08 115.2 Cf
34 1768 Sf
1 11 214.5 cf
1 11 96.25 cf
1500 Kg
1 1.5 585 Cf
1450 Kg
34 0.42 742.56 Cf
1700 Kg
0.75 10 3000 Cf
3 7 693 Cf
2307 Cf
700 Cf
0.06 10 480 Cf
30 0.06 86.4 Cf
0.06 7 27.72 Cf
452.28 Cf
OND FLOOR
2307 Cf
115.2 Cf
452.28 Cf
86.4
700 Cf
1811.11 Cf
4650 Kg
475.2 Cf
1768 Sf
OOF
34 1768 Sf
34 3536 Sf
34 1768 Sf
34 1768 Sf
34 0.25 442 Cf
34 0.17 300.56 Cf
0.375 3.5 223.125 Cf
68 Cf
0.06 3.5 71.4 Cf
OP ROOF
223.125 Cf
300.56 Cf
68 Cf
71.4 Cf
1768 Sf
3536 Sf
1768 Sf
1768 Sf
442 Cf
ater tank
0.375 7 157.5 Cf
400 Kg
AL
6921 Cf
223.125 Cf
345.6 Cf
300.56 Cf
1428.24 Cf
259.2 Cf
68 Cf
2100 Cf
7475.455 Cf
20050 Kg
1425.6 Cf
5304 Cf
5304 Cf
1768 Sf
3536 Sf
1768 Sf
1768 Sf
442 Cf
7072 Cf
30000 Sf
1 40 780 cf
1 40 350 cf
7200 Kg
1 1.5 1755 Cf
5500 Kg
34 0.42 2227.68 Cf
5500 Kg
30 0.12 518.4 Cf
3 0.29 37.41 Cf
120 Kg
30 0.33 1425.6 Cf
34 5304 Sf
30 0.08 345.6 Cf
0.75 10 9000 Cf
0.375 3.5 223.125 Cf
3 7 2100 Cf
7125 Cf
2100 Cf
0.06 10 1440 Cf
30 0.06 259.2 Cf
0.06 7 84 Cf
1616 Cf
34 1768 Sf
34 3536 Sf
34 1768 Sf
34 0.25 442 Cf
34 1768 Sf
34 0.17 300.56 Cf
PROJECT TITLE:
DATE OF BOQ:
LOCATION:
CLIENT:
REVISION:
Sr No Material
7 P.C.C (1:2:4)
8 Steel
9 Brick ballast for terrazo floor
12 Bitumen coating
13 Polythene sheet
14 Thermopore sheet
15 Brick tiles
17 Excavation
18 Paint
20 TOTAL
KALAR KAHAR
22/07/2017
KALAR KAHAR
1750
54
1451
263
329
286
3289 6578
20050
1425.6
5304
5304
1768
1768
1768
442
7072
25000
4500
8 540 30
8 540 30
540 30
540 30
540 30
540 30
540 30 65
540 30 80
7
Market Rate (Rs)
Floor Tiles Earth filling Brick Ballast Bitumen Polythene Sheet Thermopore Sheet Mud Clay
(Sft) (Sft) (Cft) (Sft) (Sft) (Sft) (Cft)
30
75
20
3.5
37
2
Percurement Cost
Excavation Paint Termite Proofing Sanitary Sewerage Electrification
(Cft) (Sft) (Sft) (Rs)
988541
32810
200251
36342
57278
49813
1236739
1604000
42768
397800
37128
35360
12376
65416
12376
884
2.5 17680
20 500000
7.5 33750
5361312
Cost for Unit
(Rs)
143
147
140
140
166
166
165
80
30
75
20
37
7
2
20
1006