PROGRAM OF THE DAY:

1) Introduction of TECHNIP (and myself)


2) Process related aspects in offshore
oil and gas
3) Specific lay-out aspects of offshore
platforms (piping / mechanical)
Lecture for Avans 2015, Baijan Savalan – Process technologist
Herman Hamhuis

 8 jaar werkzaam in Engineering


 Ervaring in Olie/Gas, Petrochemie, en Chemie
 Werkzaam bij TECHNIP-EPG
 Huidige functie: Lead process engineer (hiervoor Tebodin, Zeton)
 Bijzonderheden: Ook werkzaam geweest als project engineer en site
engineer
Introduction Technip
Technip Today
With engineering, technologies and project management, on land and at sea, we safely and
successfully deliver the best solutions for our clients in the energy business
Worldwide presence with 36,500 people in 48 countries
Industrial assets on all continents, a fleet of 34 vessels (of which 5 under construction)
2013 revenue: €9 billion (€15 billion backlog)

Energy is at the core of Technip


4 Technip Presentation
Three Business Segments, One Technip

Subsea Offshore Onshore


Design, manufacture and supply of Engineering and fabrication of fixed Gas treatment and liquefaction
deepwater flexible and rigid platforms for shallow waters (TPG (LNG), Gas-to-Liquids (GTL)
pipelines, umbilicals and riser 500, Unideck®) Oil refining (refining, hydrogen and
systems Engineering and fabrication of sulphur units)
Subsea construction, pipeline floating platforms for deep waters Onshore pipelines
installation services and Heavy Lift (Spar, semi-submersible Petrochemicals (ethylene,
Six state-of-the-art flexible pipe and / platforms, FPSO) aromatics, olefins, polymers,
or umbilical manufacturing plants Leadership in floatover technology fertilizers)
Five spoolbases for reeled pipeline Floating Liquefied Natural Gas Process technologies (proprietary or
assembly as well as four logistic (FLNG) through alliances)
bases Construction yard Biofuel and renewable energies
A constantly evolving fleet (including offshore wind)
strategically deployed in the world's Non-oil activities (principally in life
major offshore markets sciences, metals & mining,
construction)

The best solutions across the value chain


5 Technip Presentation
A Unique Worldwide Footprint

6 Technip Presentation
Subsea:
Worldwide Leading Integrated Player
Services Architecture Products

Deep water installation Flexible pipe


& construction (in house manufacturing)

Flexible/rigid pipelaying Rigid pipelines


(Reel, S-Lay & J-Lay)
Heavy Lift Operations

Vertical integration
In-house technologies
Umbilicals
Worldwide leadership (in-house manufacturing)
Inspection,
repair & maintenance First class assets
7 Technip Presentation
Offshore:
Expertise in High Added-value Technology

TPG 500 Unideck® TLP Semi-submersible Spar FPSO/FLNG Wind

Innovative capabilities
Heavy lift capabilities
Proprietary platform design
Proven track record in engineering & construction
8 Technip Slide Library
Technip Onshore Segment

 Refining & heavy oil Gas Processing Petrochemicals Others


 Clean fuels Gas treatment Ethylene Mining and metals
 Grassroots GTL Polyolefins Infrastructures
 Heavy oil upgraders LNG Aromatics Buildings
 Hydrogen Fertilizers Life sciences,…

Project management consultancy


Strong process engineering capabilities
Process technologies (Hydrogen, Ethylene, Refining, Petrochemical & GTL)
Solid reputation with NOCs & IOCs

9 Technip Presentation
Floating LNG Solutions

Cryogenic flexible pipe Processing system Subsea services FPSO


& product provider

Cryogenic pipe-in-pipe

A unique combination of technologies and know-how


from our 3 business segments

10 Technip Presentation
Technip in the Benelux

11 Technip Presentation
Technip in the Benelux

• Turnover, MM Euro : 160-170


• Employees : 600
• Project hrs / yr : 650,000+
Zoetermeer

Capelle a/d IJssel Bergen op Zoom ‘s-Hertogenbosch Zoetermeer

Rotterda
Rotterdam

's Hertogenbosch

Bergen op
Zoom

Antwerpen

Antwerpen
Technip Benelux B.V.
Technip-EPG B.V.
Technip Benelux N.V.

12 Technip Presentation
Technip Manpower in the Benelux

Staff Technip Benelux

160
140
120
100
Staff 80 TP Antwerp
60 TP EPG
TP Zoetermeer
40
20

Constructio…
Civil &…

Finance &…
0
HVAC

Execution

Others
Mechanical

Procurement
Process

E&I

Discipline

13 Technip Presentation
Technip Benelux - NL Headquarters

 Full EPC capabilities


 From pre-feasibility up to start-up
 Project Management
 Strong front-end engineering capabilities
and advisory services
 Procurement, Expediting, QA/QC
 Construction, Commissioning, Start-up

 Technology center for Ethylene,


Hydrogen and Syngas

14 Technip Presentation
Technip Benelux B.V. – Main Product Lines
Petrokemya, Saudi Arabia

Over 550 ethylene furnaces built

15 Technip Netherlands Presentation


Technip-EPG

16 Technip Presentation
Engineering Services

 Studies and Consultancy

 Engineering
 Basic Engineering
 Detail Engineering
 Scope definition and (cost) estimating

 Procurement
 Purchasing
 Inspection
 Expediting

 Construction
 Construction management

17 Technip Presentation
Engineering Services

 Engineering Procurement Construction (EPC)


 Revamp and Grass Root
 100 – 100.000 hours

 Contracts
 Lump Sum Turnkey
 Reimbursable
 Incentive

 High Value Technip centers

18 Technip Presentation
Process + HSE

 Process Study
 Flow Assurance
 Process Flow Diagrams PFD’s
 Piping Instrumentation Diagrams P&ID’s
 Equipment-specification
 Hazard & Operability studies (HAZOP)
 Validation processes

19 Technip Presentation
Electrical & Instrumentation

 High, mid and low voltage


 ATEX 95/137
 DCS/PLC-configuration
 Instrumentation
 Fieldbus; Foundation Fieldbus, Profibus
 Load-flow and motorstart calculations
 Short-circuit calculations
 NEN 3140-Inspection
 NEN 1010-Inspection
 SIL - Classification

20 Technip Presentation
Mechanical / piping

 3D-Design, new installation and modifications


 Plot study
 Pipe stress calculations
 Pipe specification-calculations
 Pressure vessel calculations
 PED-classification

21 Technip Presentation
G17d-AP
Technip-EPG

 Segment : Oil & Gas Offshore


 Client : GDF Suez E&P Nederland B.V.
 Project : G17d-AP Compression
 Scope : Integration of the Low Low
compression facilities

 Platform & Compressor modifications


 Hang-of module 10 x 7 x12,5 mtr
 Lifting weight 200 ton.

 Disciplines :
 Project management, Process, Piping and
Structural, Instrumentation and Electrical

 Execution: 2011 - present Technip is qualified to perform the works


with the highest HSSE standards

22 Technip Presentation
K2b-A
Technip-EPG

 Segment : Offshore
 Client : Gaz de France
 Project : K2bA Compression
 Detail engineering for compressor unit, to be
installed on existing platform
 Disciplines
 Project management
 Piping
 Pipestress
 Structural
 Execution: 2007-2008, 9.000 hrs

Vibration study & analysis


and coördination with TNO
were subject to this project

23 Technip Presentation
K5-A /K4-Z
Technip-EPG

 Segment : Oil & Gas Offshore


 Client : Total E&P Nederland
 Project : K4-Z / Topside modifications K5-A
 Scope : Engineering & Procurement
 New equipment/facilities to be installed
 Water Treatment unit, Oil Absorption filters, Methanol and
KHI/CI Injection skids, Separator modifications, E&I room,
HPU, Fire walls.
 ESD valves, Choke valve and Electrical Heater are
installed in a new Hang off Module.
 Additional Weight
 Steel 50 Ton, Equipment 50 Ton (dry weight)
Piping and supports 25 Ton (dry weight)
 Disciplines
 Project management, HSE, Process, Mechanical, Piping &
Pipe Stress, Structural, Electrical & Instrumentation,
Procurement, Expediting and QA/QC.
 Execution: 2011/2012, 20.000 hrs

24 Technip Presentation
K4-BE
Technip-EPG

 Segment : Oil & Gas Offshore


 Client : Total E&P Nederland
 Project : K4-BE
 Scope : Engineering & procurement services
 New equipment to be installed
 Skimmer tank (3 phase separation)
 Disciplines
 Project management, Process, Piping, Mechanical,
 Structural, Instrumentation, Electrical,
 Procurement services (Expediting QA/QC)

 Execution: 2011, 2000 hrs

25 Technip Presentation
Why Technip is an excellent choice

 Broad experience in the industry

 Flexible set-up of project team

 State-of-the-Art tools

 Located close to the client, therefore able to


immediately respond to requests

 Committed to a code of business ethics

 Full access to resources and technologies


of TECHNIP GROUP, ranking top 5 major
players in engineering and construction
services worldwide

Our knowledge and experience contribute


to the success of our clients

26 Technip Presentation
Process related aspects in
offshore oil and gas
Table of contents

1. General

2. Process Flow Diagram (In satellite and central processing platforms)

3. Gas / Liquid separation

4. Water / Condensate Separation

5. Chemical Injection

6. Compression

7. Dehydration

8. Export Pipeline

9. Pigging

28 Technip EPG
Table of contents

1. General

2. Process Flow Diagram(In satellite and central processing platforms)

3. Gas / Liquid separation

4. Water / Condensate Separation

5. Chemical Injection

6. Compression

7. Dehydration

8. Export Pipeline

9. Pigging

29 Technip EPG
1. General
Gas Reservoir

Sea water

Gas
Condensate
Water
Water

30 Technip EPG
1. General
Exploration

 Seismic survey

31 Technip EPG
1. General
“Nederlands plat”

•Government sells clusters to O&G operators

32 Technip EPG
1. General
“Nederlands plat”

33 Technip EPG
Het Nederlands plat
Olieveld Gasveld Gaz de France

Wintershall Bloknummer

Nederlandse
Aardolie
Maatschappij

Clyde
Nu Wintershall
1. General
Gas Field Layout

Satellites

Central
Processing
1. General
Satellite Platform

 Well fluid gathering manifold

 Bulk water separation

 Chemical injection

 Pig launcher

...
1. General
Satellite Platform

Gas Metering
Wellheads Bulk Separation
Gas Export

Pumping/Metering
Crude Export

Produced Water Overboard

Flare/Vent Sea Water

Diesel Closed, Haz Drains

Diesel Power Gen Crane

Chemical Injection
Pig Launcher
1. General
Central Processing Platform

 Gathering manifold of all the


connected satellites

Fine tuned water separation

 Dehydration

 Compresssion

 Chemical injection

 Pig launcher / Receiever

...
1. General
Central Processing Platform

Dehydration Export Compression

Flash Gas Gas Metering


Satellites Bulk Separation
Compression Gas Export

Wellheads Final Separation Pumping/Metering


Crude Export

Produced Water Overboard

Flare/Vent Fuel Gas Cooling Medium Sea Water Non-Haz Drains

DCS Diesel Water Injection Closed, Haz Drains Accommodation

Gas Turbine Power Gen Instrument Air Pig Launcher / Receiver

Fire Water Potable Water Chemical Injection


Table of contents

1. General

2. Process Flow Diagram(In satellite and central processing platforms)

3. Gas / Liquid separation

4. Water / Condensate Separation

5. Chemical Injection

6. Compression

7. Dehydration

8. Export Pipeline

9. Pigging

40 Technip EPG
MEG-CI Injection

2. Process Flow Diagram


Satellite Platform
Gas + Cond. To
Central Processing
Platform
Gas/Liq
Separator

Degassing
Wat / Cond. Drum
Separator
MeOH or
MEG Injection

Water Overboard

Skimmer
2. Process Flow Diagram
Central Processing Platform DEG

Metering

KO Gas/Liq
Drum HP
Separator
Gas/Liq
LP
Separator

Degassing
Drum

Degassing
Drum

Export Gas
To Pipeline
Cond. Storage
Skimmer Water Overboard drum
HP LP
Table of contents

1. General

2. Process Flow Diagram(In satellite and central processing platforms)

3. Gas / Liquid separation

4. Water / Condensate Separation

5. Chemical Injection

6. Compression

7. Dehydration

8. Export Pipeline

9. Pigging

43 Technip EPG
3. Gas/Liq. Separation

 Purpose
 Removal of water and condensate from gas

44 Technip EPG
3. Gas/Liq. Separation
Gas Outlet
Two-Phase Separator

Gas / Liq. Inlet

Liq. (Cond. + Water) Outlet


3. Gas/Liq. Separation
Two-Phase Separator
3. Gas/Liq. Separation

Two-Phase Separator
Table of contents

1. General

2. Process Flow Diagram(In satellite and central processing platforms)

3. Gas / Liquid separation

4. Water / Condensate Separation

5. Chemical Injection

6. Compression

7. Dehydration

8. Export Pipeline

9. Pigging

48 Technip EPG
4. Water /Condensate Separation

 Purpose
 Separate water from condensate

 Separate remaining condensate from water to make the water


ready for overboard conditions

49 Technip EPG
MEG-CI Injection

4. Water /Condensate Separation


Gas + Cond. To
Central Processing
Platform
Gas/Liq
Separator

Degassing
Wat / Cond. Drum
Separator
MeOH or
MEG Injection

Water Overboard

Skimmer
4. Water/Condensate Separation

51 Technip EPG
MEG-CI Injection

4. Water/Condensate Separation
Gas + Cond. To
Central Processing
Platform
Gas/Liq
Separator

Degassing
Wat / Cond. Drum
Separator
MeOH or
MEG Injection

Water Overboard

Skimmer
4. Water/Condensate Separation

53 Technip EPG
Table of contents

1. General

2. Process Flow Diagram(In satellite and central processing platforms)

3. Gas / Liquid separation

4. Water / Condensate Separation

5. Chemical Injection

6. Compression

7. Dehydration

8. Export Pipeline

9. Pigging

54 Technip EPG
5. Chemical Injection

 Purpose
 Prevent piping and pipeline from rupture

 Prevent hydrate/wax formation and blocking of piping / pipeline

55 Technip EPG
5. Chemical Injection
Hydrate Inhibitor (MeoH / MEG)

 Hydrate (Ice that burns)

Crystalline compounds of water and light hydrocarbon molecules


 Ice-like solid crystals
 Cages of water molecules surrounding hydrocarbon molecules
 Can form in gas, gas-condensate and black oil systems
 Forms at temperatures higher than 32ºF (up to 80°F) at high pressure
 Transient operations are very susceptible to hydrate blockages
 Blockages can occur very rapidly

56 Technip EPG
5. Chemical Injection
Corrosion Inhibitor (CI)

Pipeline corrosion can be inhibited


by several means.

Choice of corrosion-resistant
metals, alloys

Injection of corrosion inhibitors

Cathodic protection

External and/or internal


protective coatings

57 Technip EPG
5. Chemical Injection
Wax Inhibitor

58 Technip EPG
5. Chemical Injection
Foam injection

 Purpose
 Prevention of killing the well in order to explore the “latest” gas

59 Technip EPG
Table of contents

1. General

2. Process Flow Diagram(In satellite and central processing platforms)

3. Gas / Liquid separation

4. Water / Condensate Separation

5. Chemical Injection

6. Compression

7. Dehydration

8. Export Pipeline

9. Pigging

60 Technip EPG
6. Compression

 Purpose
 Boost the gas to the conditions (higher pressure) of delivery
for export gas

61 Technip EPG
6. Compression
DEG

Metering

KO Gas/Liq
Drum HP
Separator
Gas/Liq
LP
Separator

Degassing
Drum

Degassing
Drum

Export Gas
To Pipeline
Cond. Storage
Skimmer Water Overboard drum
HP LP
6. Compression
Centrifugal Compressor

63 Technip EPG
6. Compression
Axial Compressor

64 Technip EPG
6. Compression
Rotary Compressor

65 Technip EPG
6. Compression
Recip. Compressor

66 Technip EPG
Table of contents

1. General

2. Process Flow Diagram(In satellite and central processing platforms)

3. Gas / Liquid separation

4. Water / Condensate Separation

5. Chemical Injection

6. Compression

7. Dehydration

8. Export Pipeline

9. Pigging

67 Technip EPG
7. Dehydration

 Purpose

 Dry gas to avoid gas hydrate formation as well as to reduce


corrosion

 Meet delivery specifications (dew point e.g -8°C @ 72 barg)

68 Technip EPG
7. Dehydration
DEG

Metering

KO Gas/Liq
Drum HP
Separator
Gas/Liq
LP
Separator

Degassing
Drum

Degassing
Drum

Export Gas
To Pipeline
Cond. Storage
Skimmer Water Overboard drum
HP LP
7. Dehydration

Dry Gas

Wet Gas
Glycol
Rich

70 Technip EPG
7. Dehydration

71 Technip EPG
7. Dehydration

72 Technip EPG
Table of contents

1. General

2. Process Flow Diagram(In satellite and central processing platforms)

3. Gas / Liquid separation

4. Water / Condensate Separation

5. Chemical Injection

6. Compression

7. Dehydration

8. Export Pipeline

9. Pigging

73 Technip EPG
8. Export Pipeline

74 Technip EPG
8. Export Pipeline

75 Technip EPG
Table of contents

1. General

2. Process Flow Diagram(In satellite and central processing platforms)

3. Gas / Liquid separation

4. Water / Condensate Separation

5. Chemical Injection

6. Compression

7. Dehydration

8. Export Pipeline

9. Pigging

76 Technip EPG
9. Pigging

 Purpose
 Check wall thickness and find damaged sections of lines
(intelligent pigging / imposed by SODM)
 Remove debris such as dirt and wax from lines
 Provide a known volume for calibrating flow meters
 Coat inner pipe walls with inhibitors
 Remove condensed hydrocarbon liquids and water in two phase
pipelines

77 Technip EPG
9. Pigging

78 Technip EPG
9. Pigging

Large amounts of liquid can collect in front of the pig

79 Technip EPG
3) Specific lay-out aspects of
offshore platforms (piping /
mechanical)
De bovenbouw ”TOPSIDE”
De configuratie wordt bepaald door:
Samenstelling van het gas.
• De productiecapaciteit
• Permanente of tijdelijke boortoren
• Accommodatiefaciliteit
• Helikopterdek
• Opslagcapaciteit
• Brugverbindingen met andere platforms
• Hijskraanfaciliteit
• Utiliteitsystemen
Onderbouw ”JACKET”
TOPSIDE

0
50
100 JACKET
150
200

Afhankelijk van de waterdiepte worden verschillende jackets toegepast


Onderbouw ”JACKET”

Jackets zijn globaal te verdelen in

• Een stalen buizen frame

• Betonnen structuren

•Tension Leg Platform


Onderbouw ”JACKET”
Een stalen buizen frame.
Onderbouw ”JACKET”
Een stalen buizen frame
Onderbouw ”JACKET”
Een stalen buizen frame.
Het frame wordt met heipalen in de zeebodem bevestigd.

JACKET

Heiblok

Heipaal
geleider
Onderbouw “jacket”
Betonnen structuren
Onderbouw “jacket”
Tension Leg Platform
Installatie van een platform op de Noordzee

Het platform en de jacket worden met een kraanschip


naar de lokatie gebracht.

Platform
Installatie van een platform op de Noordzee

Jacket wordt vast geheid in de zee bodem.

JACKET

Heiblok
Installatie van een platform op de Noordzee

Topside
De topside wordt op het jacket geplaatst

JACKET
Installatie van een platform op de Noordzee

De topside wordt op het jacket geplaatst

Topside

JACKET
Installatie van een platform op de Noordzee

Het platform wordt door een transportleiding met het hoofdplatform verbonden.

Aanvoer transportleiding
Pijpenlegger
Installatie van een platform op de Noordzee

De Solitaire 1
Installatie van een platform op de Noordzee

Bevoorrading pijpenlegger op zee


Installatie van een platform op de Noordzee

Lassen van de transportleiding op de pijpenlegger


Installatie van een platform op de Noordzee

Voorbereiding voor aansluiten transport leiding op hoofdeiland


Installatie van een platform op de Noordzee

Als laatste wordt de definitieve put geboord


De FPSO

 Voor olie en gaswinning op grote diepte en kleine velden worden FPSO’s


toegepast.
 FPSO is Floating Production Storage and Offloading vessel
 Boven het scheepsdek worden alle productie faciliteiten voor de olie en gas
behandeling geplaatst.
 De productie unit is modulair opgebouwd.
Equipment layout

Een offshore platform is uit de volgende dekken opgebouwd

 helicopter deck (heli deck)


 main deck (upper deck)
 intermediate deck (mezzanine deck)
 cellar deck
 sub-cellar deck
Equipment layout

Heli deck

Main deck

intermediate
deck

Cellar deck

Sub Cellar
deck
Equipment layout

Helicopterdeck (heli deck)


 Bevindt zich boven het living quarter.
 Vrij van obstakels
 Afmetingen worden bepaald door het type helicopter wat in het veld
gebruikt wordt.
Equipment layout
Helicopterdeck (heli deck)
Equipment layout
Helicopterdeck (heli deck)
Equipment layout

main deck (upper deck)


 Utility equipment
 Generatoren
 Gascompressoren
 Koelerbanken
 Hijskraan
 Toegangsluiken voor onderhoud
 Toegangsluiken van de putten
 Container opslag
 Wire line unit
Equipment layout

Wire line unit


Equipment layout
main deck (upper deck)
Equipment layout

intermediate deck (mezzanine deck)


 instrumentation/ switchgear/ battery and transformer room
 Instrument air vessel
 Methanol injection pumps
Equipment layout
Intermediate deck (Mezzanine deck)
Equipment layout

Cellar deck

Hazardous area
 Wellheads
 Separatoren
 Test & production manifold
 Vent knock-out drum
 Condensate injection pumps
 Methanol injection pumps
 Inhibitor injection pumps
Equipment layout

Cellar deck

Non hazardous area


 Deluge skid
 Koelwater pompen
 Brandbestrijdingspompen
 Personeelsaccomodatie (living quarter)
 Evacuatieplaatsen
Equipment layout
Celllar deck
Equipment layout

Sub-cellar deck

 noodafsluiters (emergency shut down valves)


in de in en uitgaande export leidingen.

 de pig launchers/ receivers.

 de closed en open drain tanks inclusief pompen.

 skimmer tank.
Equipment layout
Sub-Celllar deck
Platform oriëntatie
Bepaald door

 Stromingsrichting van het zeewater

 Meest voorkomende windrichting (prevailing wind)

 Plaats van de risers die langs het jacket naar de zeebodem lopen

 De plaats van de aanlanding (boat-landing) voor bevoorrading


Platform oriëntatie

Bepaald door
Platform oriëntatie

Bepaald door
 Toekomstige putboringen

 De helicopter moet in alle windrichtingen kunnen landen en opstijgen.

 Plaats van de fakkel en vent leidingen.

 De hoogte van het sub-cellar deck wordt bepaald door de 100 jarige golf
plus de air gap van 1 meter.
Platform elevatie

Bepaald door
 De hoogte van het sub-cellar deck wordt bepaald door de 100 jarige golf
plus de air gap van 1 meter.
Platform elevatie
Design criteria voor equipment location plan

 Equipment op een logische plaats

 Economische equipment opstelling

 Veiligheidsvoorschriften raadplegen

 Toegankelijkheid voor het plegen van onderhoud en bedienbaarheid


Design criteria voor equipment location plan

 Voldoende onderlinge ruimte

 Hazardous en non-hazardous.

 Fire-wall (brandbescherming) of een blast-wall.

 Vluchtwegen aangeven 1200 mm breed 2300mm hoog

 Onderhoud en inspectie 800 mm breed

 Lay-down area aangeven


Escape routes/fire-fighting layouts

 Vluchtwegen naar de evacuatie plaatsen


 Reddingsboten (escape capsules of free fall boats)

 Locatie van brandblusmiddelen