You are on page 1of 14

P& M (Excavation)

SLTM-2 Cum
SLTM-4 Cum
RMC
roller
JCB
poklain Ex100
poklain Ex200
Rock bracker
Tipper
Tractor
Dozzar
Manual
Crane
Boom placer
pump
Rock bracker
Bar bending machine
None
Structures
Building
AIS
GIS
Transformer/Reactor
Retaining wall
Tower
Equipment
Cable trench
Drain
Fire wall
Road
Boundary wall
Residential
outdoor
SPR

# Sensitivity: LNT Construction Internal Use


Day wise labour productivity details

Project Name : 400/220 KV GIS SUBSTATION AT MYLASANDRA

Sl.No Sub contractor Name Works description UOM

Note: Formula applied please don’t delete. SQM


a Structural works
Concrete CUM

shuttering SQM

Reinforcement KG

shuttering SQM

shuttering SQM

De-Shuttering SQM

Staging CUM

# Sensitivity: LNT Construction Internal Use


Reinforcement KG

shuttering SQM

b. Finishing works
Brick work CUM

ceiling plastering SQM

Site labour strength on that day


1 Carpentor 20
2 Bar bender 10
3 Masonary 21
4 Helper 83
Total = 134

Note: If any other than the listed item can be added.

# Sensitivity: LNT Construction Internal Use


Drop down List

In time Out time


list 00:00:00 00:00:00
00:30:00 00:30:00
00:30:00 01:00:00 01:00:00
01:30:00 01:30:00
02:00:00 02:00:00
02:30:00 02:30:00
03:00:00 03:00:00
03:30:00 03:30:00
04:00:00 04:00:00
04:30:00 04:30:00
05:00:00 05:00:00
05:30:00 05:30:00
06:00:00 06:00:00
06:30:00 06:30:00
Member 07:00:00 07:00:00
Raf 07:30:00 07:30:00
Beam 08:00:00 08:00:00
Column 08:30:00 08:30:00
Roof beam& slab 09:00:00 09:00:00
Lintel & Sunshade 09:30:00 09:30:00
Walls 10:00:00 10:00:00
Staircase 10:30:00 10:30:00
Corbel 11:00:00 11:00:00
Pocket 11:30:00 11:30:00
12:00:00 12:00:00
12:30:00 12:30:00
13:00:00 13:00:00
13:30:00 13:30:00
14:00:00 14:00:00
14:30:00 14:30:00
15:00:00 15:00:00
15:30:00 15:30:00
16:00:00 16:00:00
16:30:00 16:30:00
17:00:00 17:00:00

# Sensitivity: LNT Construction Internal Use


17:30:00 17:30:00
18:00:00 18:00:00
18:30:00 18:30:00
19:00:00 19:00:00
19:30:00 19:30:00
20:00:00 20:00:00
20:30:00 20:30:00
21:00:00 21:00:00
21:30:00 21:30:00
22:00:00 22:00:00
22:30:00 22:30:00
23:00:00 23:00:00
23:30:00 23:30:00
00:00:00 00:00:00

Jo
RA

Work done Qty Labour inputs

(Y) Labour
Nos In time Out time Hrs worked catageory(Sk/Usk)
1 1 09:00:00 18:00:00 08:00:00 Skilled

6 1 14:00:00 16:00:00 02:00:00 Skilled


5 14:00:00 16:00:00 02:00:00 unskilled
67 8 09:00:00 18:00:00 08:00:00 Skilled
8 09:00:00 18:00:00 08:00:00 unskilled
2 09:30:00 19:00:00 08:30:00 Skilled
5 09:30:00 19:00:00 08:30:00 unskilled
4 08:00:00 19:00:00 10:00:00 Skilled
4 08:00:00 19:00:00 10:00:00 unskilled
3 09:00:00 18:00:00 08:00:00 Skilled
9 09:00:00 18:00:00 08:00:00 unskilled
150 2 09:00:00 18:00:00 08:00:00 Skilled
4 09:00:00 18:00:00 08:00:00 unskilled
2 09:00:00 19:30:00 09:30:00 Skilled

# Sensitivity: LNT Construction Internal Use


8 09:00:00 19:30:00 09:30:00 unskilled
2800 8 09:00:00 18:00:00 08:00:00 Skilled
16 09:00:00 18:00:00 08:00:00 unskilled
18 1 08:30:00 18:30:00 09:00:00 Skilled
3 08:30:00 18:30:00 09:00:00 unskilled

6.5 5 09:30:00 16:00:00 06:30:00 Skilled


5 09:30:00 16:00:00 06:30:00 unskilled
250 16 08:30:00 18:30:00 09:00:00 Skilled
16 08:30:00 18:30:00 09:00:00 unskilled

# Sensitivity: LNT Construction Internal Use


st

constants Type Structural works


00:00:00 Skilled Excavation
9:00:00 AM unskilled Backfilling
1:00:00 AM Surplus eath
8:00:00 shuttering
UOM Reinforcement
KG Concrete
SQM Metal spreading
CUM Area levelling
RM Yard PCC
B.Wall Erection
PCC
Staging
Lining and Supporting
De-Shuttering
House Keeping

# Sensitivity: LNT Construction Internal Use


Job code : LE180328

Date : 20-03-2019

P &m inputs

Equipments Total Hrs worked machine hrs/ Mandays


Boom placer 8 1

Manual 2 0.3
Manual 10 1.3
Manual 64 8.0
Manual 64 8.0
Manual 17 2.1
Manual 42.5 5.3
Manual 40 5.0
Manual 40 5.0
Manual 24 3.0
Manual 72 9.0
Manual 16 2.0
Manual 32 4.0
Manual 19 2.4

# Sensitivity: LNT Construction Internal Use


Manual 76 9.5
Bar bending machine 64 8.0
Bar bending machine 128 16.0
Manual 9 1.1
Manual 27 3.4

Manual 32.5 4.1


Manual 32.5 4.1
Manual 144 18.0
Manual 144 18.0

# Sensitivity: LNT Construction Internal Use


Finishing works
Brick work
ceiling plastering
Internal wall plastering
External plastering 20mm thk
painting
Flooring(RCC)
primer
putty
Flooring (Tiles)
Flooring (Ironite)

# Sensitivity: LNT Construction Internal Use


(X)
Overall Mandays Productivity Idle time if any
(Skilled +Unskilled) (Y/X) Unit in Hrs Structures
1 1.0 Building

Cable trench
1.5 4.0 CuM/Manday
Retaining wall
16 4.2 SQM/Manday
Retaining wall
7.4375 - KG/Manday
Retaining wall
10 - SQM/Manday
Building
12 - SQM/Manday
Building
6 25.0 SQM/Manday
Building
11.875 - CuM/Manday

# Sensitivity: LNT Construction Internal Use


11.875 - CuM/Manday
Building
24 116.7 KG/Manday
Building
4.5 4.0 SQM/Manday

Building
8.13
0.8 SQM/Manday
Building
36.00
6.9 SQM/Manday

# Sensitivity: LNT Construction Internal Use


Remarks
(Lvl,Floor,Area If any)

Member
Raf

Walls

Walls

Raf

Walls

Roof beam& slab Beam side and slab Shuttering @ (+)14.25m

Staircase

Roof beam& slab Beam bottom stagging @ (+)12.7m

# Sensitivity: LNT Construction Internal Use


Roof beam& slab Beam side and slab Shuttering @ (+)14.25m

Lintel & Sunshade 220 kv GIS Building

Walls 400 CRB

Roof beam& slab At 4.75 Height from Basement Slab ceiling

# Sensitivity: LNT Construction Internal Use