Professional Documents
Culture Documents
Purchase Purchase-Executive
Stores Stores-Executive
Production-Supervisor
Quality-Inspector
Required headcount for
Job Description Existing Headcount ISO
Proper
traceability of
documentation
Ordering and -soft copy and
follow-up has to hard copies to
be strictly ensure that all
followed up to related
ensure material information is
availability at readily
Not Applicable 1 right time 1 available
2+1Clerk