You are on page 1of 28

Designed To Meet

Individual Needs
PCF SERIES...
COOLING TOWERS
• Induced Draft Counter Flow
• Multiple Cells Configuration
• Small To Large Capacities
• Compact Square Shape
• Small Installation Plot Area
• Light Weight Construction
• High Thermal Efficiency
• Low Power Consumption
• Drift Eliminator Inside
• Low Water Consumption
• Internal Distribution System
• Economical Piping Connections
• Robust Constructions
• Long Life Span

CONTENTS Introduction
Cooling towers designed and manufactured in the past had been
Introduction ............................................................ 2 concentrated in making the cooling tower economical in production cost
to meet the competitive market environment. The cooling towers were either
Multiple Cells System............................................... 3 the prototype with a few smaller models combined together to make up for
the larger capacities; or single large unit of simple construction just merely
Heavy Duty Contruction / Water Distribution System 4 serving the purpose of cooling water without considering other basic
requirement of the end users. As a result, many problems were left to the
Fill Media / Cold Water Basin .................................. 5 end user to solve on their own. And the objective of making cooling tower
economical has never been achieved in actual operation if other factors
Mechanical Equipment / Air Inlet Louvers such as initial overall civil and electrical construction cost, subsequent
operational cost, maintenance cost, spare parts replacement cost, down
/ Drift Eliminators................................................... 6
time cost and tower life span were to put together as overall consideration.
Access Ladder / Access Door / Civil Foundation ........ 7 As capital equipment, inefficient cooling towers cannot be simply
discarded away in most cases but to tolerate with whatsoever shortcomings.
4 Cells Cooling Tower With FRP Basin ....................... 8
With more users nowadays progressively gaining awareness on the
4 Cells Cooling Tower With Concrete Basin ................ 9 importance of the cooling tower, PANWATER has developed the modern
PCF Series cooling towers based on the user’s needs couple with the vast
Design Concepts & Features ................................... 10 experience from more than a decade of making cooling tower using
computerized thermal designing program. As a result, a completely new
PCF 50 - 100 Series Standard Tower ...................... 11 breed of cooling towers had been developed, tested and proven to meet
every individual’s most demanding needs.
PCF 125 - 225 Series Standard Tower ............. 12 - 15

PCF 250 - 500 Series Standard Tower ............. 16 - 19

PCF 600 - 1000 Series Standard Tower ........... 19 - 23

PCF 1200 - 2000 Series Standard Tower ......... 24 - 27


2
Multiple Cells System
Each model of the PCF Series cooling tower has been Whereas in many conventional cooling towers, a single
intentionally designed with multiple cells installation flexibility unit of cooling tower were being used to handle the overall
to meet many cooling tower system overall design nowadays, thermal capacity but lacks the flexibility to take advantage of
so that the cooling tower can be synchronized with the lower ambient wet bulb temperature when it is lower than the
operation of the multiple units of chillers, heat exchangers and design to operate at partial load for energy conservation. And
water pumps for ease of operation control and energy in most cases, maintenance of the larger and crucial components
conservation. For this very important reason, it has been becomes very difficult. Any minor failure usually leads to
designed into multiple cells system to provide flexibility to complete shut down of the entire cooling system. Although
handle partial load for operation with varying capacities at multiple cells cooling towers have emerged in the market
different stages, and for different changing ambient condition recently, but such cooling towers were made for the purpose of
within a day and different season within a year to achieve reducing the production cost with very few model. When larger
highest efficiency. unit is required, the tower size normally become unnecessarily
impractical due to too many small cells. Such solution usually
As a result, PCF Series multiple cells design also simplified involved larger overall plot area, complicated piping system,
the overall system piping works, civil foundation works and high initial civil cost, complicated control system and still lacks
complicated control system. All these associated cost in the the flexibility in operation.
overall cooling water system that provide efficient operation
are normally not reflected from the cooling tower cost alone.

3
Heavy Duty Construction
The external cooling tower casing, which provide the system and valves to achieve efficient water distribution and
enclosure and supporting all the various components are made control is not required. This feature is particularly necessary to
from the high strength, very durable and light weight FRP avoid constant monitoring of water distribution to the cooling
materials. FRP materials offer flexibility to fabricate tower by external piping system in order to achieve the intended
aerodynamic profile such as the fan housing and panels with performance efficiency.
high precision and yet offer very lightweight for ease of
handling and ease of assembly. FRP construction is highly Hot circulation water return to the cooling tower via the
desirable also due to its superior resistance to weathering and main inlet header to each cell is redistributed through a series
corrosion since cooling towers are to be located out door and of smaller diameter lateral pipes and discharge onto the high
are directly subject to severe weathering and in constant contact efficiency PVC fill media below through the Polypropylene
with water. downwards spray nozzles. Since there is no rotating component
in the distribution system, mechanical failure is eliminated.
In order to provide mechanical rigidity to the tower body,
fabricated heavy gauge steel sections with hot-dip galvanized The spray nozzles are screwed-connected onto the lateral
to BS 729 is used In the PCF Series cooling towers to provide pipes with threaded connections and provided with sufficiently
the mechanical necessary for the framework to support the large openings to allow foreign solids to discharge through
mechanical equipment and the entire tower body for rigidity the nozzles without plugging. Should it become necessary, the
and durability as well as to ensure long lasting life span. nozzles can be easily removed from the lateral pipes to
discharge larger debris
trapped in the piping system.
Water Distribution System The overall distribution system
Since the performance of the cooling tower is very much operates from the residual
dependent on the effectiveness of the hot water distribution system pressure and do not
system, complete internal piping system is provided within the requires excessive flow rate or
cooling tower. A single inlet connection flange is provided for pressure to operate. Significant
each cell of the cooling tower is located at the sidewall casing amount of power saving is
panel for direct connection with the overall cooling water system expected from the circulation
piping. Therefore, complicated and costly external piping water pump.

4
Fill Media
Hot water discharge onto the fill media directly below and honeycomb-like packing for maximum uniform water and air
redistribute into very thin water film over the very large surface distribution with air resistance to air flow is kept to minimum,
area provided by the corrugated fill media. While ambient thus giving very high thermal efficiency.
air induced by the fan need to pass through the fill media
before discharge into the atmosphere, the passage taken by However, excessive total surface area of the fill media is
the air allows the two mediums to contact with each other. detrimental because it increase the air resistance to air flow,
Since water flowing downward with the induced air moving while insufficient total surface area requires very much higher
upwards forming counter current flow with each other, this type air flow rate to achieve the desired outlet temperature. In either
of cooling tower is commonly termed as counter flow cooling case, it consumes higher energy to operate the fan. Therefore,
tower. the design of the fill media to achieve an optimum air to water
relationship is the key to the efficiency of the cooling tower.
With the ambient air And both the manufacturing process and materials used for
at lower wet bulb the fill media determine hoe long the efficiency can be
temperature and lower maintained.
enthalpy being induced
into the cooling tower Cold Water Basin
directly in contact with the
Cold water after passing through the fill media is being
hot water film at the fill
collected at the FRP cold-water basin below. The cold water
media, heat energy is
basin is assembled from molded FRP panels and provided with
a hot-dip galvanized steel outlet trough at the bottom complete
with all the
terminating piping
connections
required for the
outlet pipe, make-
up water pipe,
overflow and drain
pipes. The outlet
connection for the
pump suction is
especially provided
with anti-vortex
being transferred from water to air by evaporation process. feature to prevent
The heat transfer process resulted a loss of enthalpy and a pump cavitations. For multiple cell arrangement, each cell is
very small volume of water from the water to the air as provided with its individual hot dip-galvanized steel outlet
evaporation loss. Water is constantly being cooled as it passes trough and piping connections therefore provides multiple outlet
downward the entire fill media with the water finally achieved connections for multiple pumps operation, eliminating the need
it’s designed outlet temperature and collected by the cold of a header pipe to interconnect all the pumps. This feature is
waterbasin below. advantageous when a larger cooling system requires a number
of circulation pumps to serve a number of different applications
The effectiveness of the cooling process is very much or to make up the total flow rate required. The elimination of
dependent upon the total surface area of the water being the large suction header pipes for the pumps provide a spacious
exposed to air, the duration of air and water contact and the pump area for operation and maintenance and reduce the
effectiveness of the air moving through the fill media; the unnecessary initial piping cost.
configuration and the total surface area of the fill media is the
utmost important factor of a cooling tower. The fill media used Since the PCF Series cooling tower allow unlimited multiple
in the PCF Series cooling tower is manufactured from prime cell installation configuration, the single common cold water
PVC materials and capable of withstanding as high as basin serving all the cells allows any one cell or any one pump
continuous operating temperature of 50 C and intermittent to operate individually and independently without complicated
operating temperature of 55 C, exceeding most common control or isolation. Since only a single common cold water
operating temperatures in most applications. The most unique basin is being used for the entire system, cumbersome balancing
and excellent feature of the fill media being its uniform pipes and valves, which is very common in many larger system
configuration when assembled into module to form a consistent using multiple towers installation, is unnecessary.

5
Mechanical Equipment Air Inlet Louvers
The reliability of a cooling tower always depending on the Due to the increasing concern on environment cleanliness
type of prime mover is being used for the fan either to maintain and aesthetic requirement, cooling towers had been forced to
the thermal efficiency or for reliable continuous operation. hide behind buildings or concealed behind walls. In most cases,
Since cooling tower fans, especially with the larger diameter it is due to its ugliness especially with the air inlet louvers used
fans, the operational speed has to be reduced to below the for the cooling tower had been very flimsy and damaged over
maximum tip speed allowed, a speed reducer is always a short period due to weathering, or in most cases, water is
necessary to reduce the speed of the prime mover, i.e. electric still splashing over the tower surroundings causing eyesore to
motor. The PCF Series cooling tower employs the most durable everyone.
and reliable planetary type gear speed reducer developed by
PANWATER as the fan driver. Since it is the utmost important
component of a cooling tower, numerous efforts had been put
into the overall design of the gear speed reducer to transmit
torque from the electric motor to the axial flow fan for efficient
air inducement. And priority had been given to the construction
of the mechanical equipment to ensure continuous and trouble
free operation with minimum maintenance as well as long life
span compatible to the cooling tower.

In view of this conventional problem, the overall outlook


and finishing of the PCF Series cooling towers have been given
a cosmetic finishing and the air inlet louvers, which is part of
the tower exterior, has been designed compatible to the tower
body. Air inlet louvers are provided at the lower section of the
tower side walls to guide air flow into the cooling tower as
well as preventing water droplets splashing out from the cooling
tower causing corrosion to the surrounding area. Again,
For larger models using the planetary gear speed reducer,
louvers made of FRP materials is being used as it is directly
electric motor is directly close coupled to the gear unit forming
subject to weathering to provide smooth air flow into the tower
a single coaxial driver to operate the axial flow fan. The oil
with minimum air resistance and with an inclination to shed
lubricated gear speed reducer is designed with a bearing life
water back into the cold water basin. The air inlet louvers are
of 10,000 hours for continuous and heavy-duty operation. It is
easily removable from its attachment for access into the cold-
capable of withstanding high torque developed by the electric
water basin section for maintenance purpose.
motor during starting and has very uniform torque transmission
from high speed input shaft to the low speed output shaft so
that wear and tear to the components is minimum. Replacement Drift Eliminators
of parts only limit to the bearing and seals annually, which is Air after passing through the fill media is moving upwards
predictable. Therefore eliminate the risk of unpredictable tower with air velocity sufficiently large to provide an upward thrust
break down. for small water droplets in the cooling tower. Careful
observation will notice that a large quantity of small water
The axial flow fans used in the PCF Series cooling tower droplets is ‘floating’ below the operating fan and coalesce into
are adjustable pitch type of cast aluminium alloy with the most larger water droplets and finally being drawn out of the cooling
efficient aerodynamic profile for best efficiency. All attachment tower along with the discharge air if the cooling tower is not
hardware is made of stainless steel material for heavy-duty installed with an effective drift eliminator system. If efficient
operation and long life span. The entire mechanical equipment drift eliminator system is not provided, this water drift loss from
are supported on a heavy gauge hot dip galvanized frame the system can be as higher than 2% - 3% of the total circulation
rigidly installed onto the FRP fan housing and complete with flow rate. Although the drift loss value seems to be small in
safety guards. percentage, but this amount of drift loss is more than sufficient

6
to keep the cooling tower surroundings wet, causing corrosion
problems and health hazards as long as the cooling tower is
Access Door
in operation. And the cost for the total amount of make-up FRP access door is provided for each cell located either at
water necessary to top up the system at all time over a long one of the side panel, or on the fan deck as standard feature.
duration can become very significant. Provision of this door allows the maintenance personal to enter
into the cooling tower easily without troublesome dismantling
The PCF Series cooling towers has the very unique and of any tower components. This direct access into the distribution
efficient drift eliminator system installed over the distribution and fill media sections encourage regular inspection and
system and below cleaning of the fill media and distribution system to maintain
the fan assembly efficient tower operation at all time.
as standard
component. The Civil Foundation
drift eliminator With the cooling tower being designed with multiple cells
system is capable flexibility, and made of light weight materials of construction,
minimize drift tower supporting structures are systematically simple, level,
loss to as low as symmetrical, easy and economical to construct. And it is always
0.005% of the a lot more easily to directly incorporate into the building
total circulation flow structure without complicated construction.
rate. This ver y
small amount of drift Since all the loading points are equal distance to each other
loss is vir tually in both direction, all loading points will eventually aligned into
negligible and shall parallel rows of beams. With this characteristic, it is always
not cause the possible to adjust the seating position of the cooling tower with
surrounding area wet or consume excessive water when all its loading points coincide with structural beams. And the
compare to the amount of water lost due to evaporation. supporting beams can be either concrete of steel construction.

Access Ladder
Hot-dip galvanized access ladder is provided for access
onto the mechanical equipment for routine inspection and
maintenance purpose as standard. For multiple cells model, a
common inspection platform in between tower cells complete
with safety rails of hot-dip galvanized steel construction is
provided as optional item with added cost. This safety platform
makes minor maintenance work on top of tower such as
checking and replacement of gear oils and tightening of
loosened bolts and nuts a lot easier and safer. It also encourages
routine inspection and maintenance work on more regular basis
since the mechanical equipment requires more attention in order
to ensure smooth operation.

Alternatively, the PCF Series towers can be easily installed


onto larger concrete cold-water basin with simple supporting
columns where much longer retention time of the water storage
is necessary. Concrete basin with larger retention volume is
recommended for applications whereby make-up water supply
is expected to be irregular. And for very critical applications,
cooling tower water supply to the plant or equipment cannot
be immediately shut off, larger basin to provide emergency
water supply is recommended in case make-up water is
abruptly being cut off.

7
PCF SERIES...

4 CELLS COOLING TOWER WITH FRP BASIN

UNIQUE ADVANTAGES
This example illustrate a 4 cells cooling tower of an IN-LINE tower Since the cooling tower is designed into square shape for each cell, and
arrangement with each individual cell capacity exactly sized for actual suitable for multiple cells operation with tower and the cold water basin
heat rejection load of serving each intremediate cooling equipment such as specifically made from light weight FRP materials, the final overall operating
heat exchanger or chiller. An additional cell is included serving as the weight is markedly reduced. Therefore, plinths required for the cooling tower
standby unit and provision for unexpectedly high heat load, should there does not require elaborate supporting foundation. As such, the cooling
be any. tower is suitable for installation on any building floors or elevated structures
supported by either simple concrete plinths or structural steel members when
Circulation water pumps is similarly sized in accordance to the exact flow space available is limited.
rate required by the equipment to be cooled and with an additional pump
serving as the standby unit. Return hot water is pump back to the cooling It is due to the increasingly challenging needs of every individuals that
tower via a single header pipe which redistribute the total flow into any leads to the development of the PCF Series cooling tower which provide
individual cell to perform the cooling required. Since the cooling tower is of such high degree of flexibility. The advantages of the PCF Series cooling
the single common basin design, discharge piping is directly connected to tower such as energy conservation, minimum plot area, low piping and
the circulation pumps from the cold-water basin without the need of a common civil construction cost can only be effectively realised if all these associated
suction header pipe. Return hot water enter cooling tower by a single header works are being evaluated initially with different cooling tower of number
pipe and branched into each cell each with an isolating valve. of cells. It is also for every individual to determine the necessity of any
spare or stand-by unit depending on their application. In any case, an
This method of piping arrangement provides flexibility and simplify the entire additional cell of fractional capacity to the cooling tower is always more
cooling system operation by allowing each cooling tower cell, circulation economical and easier to operate than an additional full size cooling tower.
water pumps and cooling equipment to operate independently. It also reduces And similarly, stand-by circulation pump of fractional capacity similar to the
the unnecessary initial construction cost required to provide balancing pipes circulation flow rate of each cell is only required instead of a full sized
and suction header pipes as compared to conventianal design. stand-by pump.

NOTES:
1. SIMILAR MULTIPLE CELLS ARRANGEMENT IS APPLICABLE TO ANY NUMBER OF CELLS.
2. WATER PUMPS AND PIPING ARRANGEMENT ARE PROVIDED FOR REFERENCE ONLY. CONSULT PANWATER FOR OTHER DIFFERENT ARRANGEMENT.
3. MOTORISED ACTUATED CONTROL VALVES CAN BE USED TO INCORPORATE INTO THE OVERALL CONTROL SYSTEM IN LIEU OF THE MANUAL VALVES.
4. PANWATER RESERVES THE RIGHT TO ALTER ORMODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT

8
PCF SERIES...

4 CELLS COOLING TOWER WITH CONCRETE BASIN

UNIQUE ADVANTAGES

This example illustrate a 4 cells cooling tower of an IN-LINE tower Although construction of concrete cold water basin is usually at higher
arrangement seated on a concrete cold water basin which is typical in cost than the integral FRP basin supplied together with the cooling tower,
many industrial cooling system design. The tower is designed to allow the however, concrete cold water basin offer the advantage of providing a
cooling system to operate on partial loads at different stages depending huge amount of water storage for the cooling system. This particularly
on the requirement to conserve electrical power consumption. The total important for critical applications such as in certain process plant and in
number of cells required is very much dependent on the mode of operation. cases where make-up water supply is envisaged to be interrupted at any
In any case, due to the fact that cooling towers are normally designed to time.
cater for the maximum wet bulb temperature foresee in certain period
only,it is common that the cooling tower may not be operating at full load Since each cooling tower cell is square, the multiple cells arrangement
at all time. Although providing lower temperature than required to the only requires equally spaced foundation in both ways. This provide the
equipment to be cooled is generally beneficial, but the power consumed advantage of having all loading positions can be easily designed and
by the cooling tower has to be justified. constructed onto the basin floors using independent column for each loading
point, or using rows of parallel beams as tower supports. In most cases,
Similarly, any number of water circulation pumps can be incorporate into loadings of the cooling tower is quite minimum due to the lightweight
the cooling system to service various cooling needs without complicated construction, making civil foundation construction quite economical.
piping works and operation, making the overall system into a flexible
central cooling reservoir for all applications within a process plant. Alternatively, should cold water basin of larger retention volume is
Therefore, just a matter of initial careful planning and design of the entire necessary, either for installation above ground level or on elevated
cooling system, tremendous amount of long term energy saving from the structures, cold water basin of any desired volume can be easily constructed
cooling tower and the circulation pumps can be realised by employing from any materials of construction to suit the application ranging from
this unique advantage. Energy saving is usually during period of lower using FRP materials to mild steel construction with corrossion resistant linings
ambient wet bulb temperature at night and/or during colder seasons in or coatings, or using stainless steel materials for long life span.
the temperate coutries.

NOTES:
1. SIMILAR MULTIPLE CELLS ARRANGEMENT IS APPLICABLE TO ANY NUMBER OF CELLS.
2. WATER PUMPS AND PIPING ARRANGEMENT ARE PROVIDED FOR REFERENCE ONLY. CONSULT PANWATER FOR OTHER DIFFERENT ARRANGEMENT.
3. MOTORISED ACTUATED CONTROL VALVES CAN BE USED TO INCORPORATE INTO THE OVERALL CONTROL SYSTEM IN LIEU OF THE MANUAL VALVES.
4. PANWATER RESERVES THE RIGHT TO ALTER ORMODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT

9
PCF SERIES...

DESIGN CONCEPTS & FEATURES

STANDARD MATERIAL OF CONSTRUCTION


PCF1000

PCF1200

PCF1400

PCF1600

PCF1800

PCF2000
MODELS

PCF125

PCF150

PCF175

PCF225

PCF250

PCF350

PCF500
PCF100

PCF200

PCF300

PCF400

PCF600

PCF700

PCF800

PCF900
PCF50

PCF60

PCF70

PCF80

PCF90

Tower Assembly Factory Assembled Site Assembly


Electric Motor 380V/415V, 3 PHASE, 50Hz/60Hz, IP 55 Protection
Speed Reducer Direct Motor Drive V-Belt Speed Reducer Spiral Bevel Gear Speed Reducer
Drive Shaft Not Applicable Tubular Floating Shaft
Fan Assembly Aluminium Alloy Fan Blades & Hubs
Mechanical Supports Hot Dip Galvanized Steel To B. S. 729:1971
Fan Stack Fiber-Glass Reinforced Polyester
Inlet Header Connection PVC JIS 10K Inlet Flange
Distribution Pipes PVC / FRP
Spray Nozzles Polypropylene
Drift Eliminator Cellular PVC Extruded Profiles
Fill Packing Modular PVC Fill Media
Tower Casing Fiber-Glass Reinforced Polyester
Cold Water Basin Fiber-Glass Reinforced Polyester Fiber-Glass Reinforced Polyester or Concrete Cold Water Basin By Owner
Tower Structure Hot Dip Galvanized Steel To B. S. 729:1971
Tower Hardware Hot Dip Galvanized Steel To B. S. 729:1971
Access Ladder Not Fitted Hot Dip Galvanized Steel To B. S. 729:1971

NOTES:
1. UNLESS OTHERWISE SPECIFIED, ELECTRIC MOTOR SUPPLIED SHALL BE 415V, 3 PHASE, 50 HZ AS STANDARDS.
2. MATERIALS OF CONSTRUCTION OTHER THAN SPECIFIED HEREIN CAN BE SUPPLIED WITH ADDED COST ON REQUEST.
3. CONSULT PANWATER FOR TOWER SELECTION, DETAIL SPECIFICATION AND DIMENSIONAL DRAWINGS BY GIVING YOUR REQUIREMENT.
4. PANWATER RESERVES THE RIGHT TO THE SPECIFICATION AND DIMENSIONS WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

10
PCF SERIES...

GENERAL ARRANGEMENT & LAYOUT


MODEL PCF 50 TO PCF 100

ENGINEERING DATA
Tower Capacity Heat Load Flow Rate Tower Dimension (mm) Motor Size Fan Diameter Air Volume Inlet / Outlet Pump Head
Model RT Kcal / hour m≥ / hour Length, L Width, W Height, H Kw mm M≥/Min. Pipe Size M
PCF 50-C1 50 195,000 39 1,540 1,540 2,720 0.75 915 288 3 2.8
PCF 60-C1 60 234,000 47 1,540 1,540 3,020 1.10 915 306 3 3.0
PCF 70-C1 70 273,000 55 1,740 1,740 2,740 1.10 1,068 404 4 2.8
PCF 80-C1 80 312,000 62 1,740 1,740 3,040 1.50 1,068 409 4 3.0
PCF 90-C1 90 351,000 70 1,940 1,940 2,920 1.50 1,220 519 4 3.2
PCF 100-C1 100 390,000 78 1,940 1,940 3,220 2.20 1,220 511 4 3.5
Tower Piping Connection Size (mm) NB Vertical Height (mm) Horizontal Distance (mm)
Model Inlet Outlet Auto Make-up Quick Fill Over Flow Drain H1 @ Inlet H2 @ Outlet D1 D2 D3
PCF 50-C1 80 80 20 20 25 25 1,780 115 N/A N/A N/A
PCF 60-C1 80 80 20 20 25 25 2,080 115 N/A N/A N/A
PCF 70-C1 100 100 20 20 25 25 1,780 120 N/A N/A N/A
PCF 80-C1 100 100 20 20 25 25 2,080 120 N/A N/A N/A
PCF 90-C1 100 100 20 20 25 25 1,780 125 N/A N/A N/A
PCF 100-C1 100 100 20 20 25 25 2,080 125 N/A N/A N/A
Tower Center Distance Between Supports (mm) Loading Point Loading Data (KGS) Anchor Bolts Tower Weight (KGS)
Model L1 L2 L3 Quantity Loading @ A Loading @ B Loading @ C Quantity Size Shipping Operating
PCF 50-C1 1,450 1,450 N/A 4 200 N/A N/A 4 M12 480 800
PCF 60-C1 1,450 1,450 N/A 4 205 N/A N/A 4 M12 500 820
PCF 70-C1 1,650 1,650 N/A 4 238 N/A N/A 4 M12 540 950
PCF 80-C1 1,650 1,650 N/A 4 250 N/A N/A 4 M12 590 1,000
PCF 90-C1 1,850 1,850 N/A 4 300 N/A N/A 4 M12 670 1,200
PCF 100-C1 1,850 1,850 N/A 4 325 N/A N/A 4 M12 780 1,300
NOTES:
THERMAL DESIGN CONDITIONS AS PER JIS STANDARDS :
CIRCULATING FLOW RATE = 780 LITRES/HOUR PER RT INLET TEMPERATURE = 370 COUTLET TEMPERATURE = 320C WET BULB TEMPERATURE = 270C

11
PCF SERIES...

GENERAL ARRANGEMENT & LAYOUT


MODEL PCF 125 TO PCF 225

ENGINEERING DATA
Tower Capacity Heat Load Flow Rate Tower Dimension (mm) Motor Size Fan Diameter Air Volume Inlet / Outlet Pump Head
Model RT Kcal / hour m3 / hour Length, L Width, W Height, H1 Height, H2 Kw mm M3/Min. Pipe Size M
PCF 125-C1 125 487,500 98 2,380 2,380 3,610 2,960 2.20 1,373 721 5 3.7
PCF 125-C2 250 975,000 195 4,720 2,380 3,730 3,080 2.2 X 2 1,373 721 5 3.9
PCF 125-C3 375 1,462,500 293 7,060 2,380 3,990 3,340 2.2 X 3 1,373 721 5 4.1
PCF 125-C4 500 1,950,000 390 9,400 2,380 3,990 3,340 2.2 X 4 1,373 721 5 4.1
PCF 150-C1 150 585,000 117 2,380 2,380 3,910 3,260 3.00 1,373 766 5 4.0
PCF 150-C2 300 1,170,000 234 4,720 2,380 4,030 3,380 3.0 X 2 1,373 766 5 4.2
PCF 150-C3 450 1,755,000 351 7,060 2,380 4,290 3,640 3.0 X 3 1,373 766 5 4.4
PCF 150-C4 600 2,340,000 468 9,400 2,380 4,290 3,640 3.0 X 4 1,373 766 5 4.4
PCF 175-C1 175 682,500 137 2,640 2,640 3,750 3,100 4.00 1,525 1,009 6 3.8
PCF 175-C2 350 1,365,000 273 5,240 2,640 3,880 3,230 4.0 X 2 1,525 1,009 6 3.9
PCF 175-C3 525 2,047,500 410 7,840 2,640 4,170 3,520 4.0 X 3 1,525 1,009 6 4.2
PCF 175-C4 700 2,730,000 546 10,440 2,640 4,170 3,520 4.0 X 4 1,525 1,009 6 4.2
PCF 200-C1 200 780,000 156 2,640 2,640 4,050 3,400 5.50 1,525 1,021 6 4.1
PCF 200-C2 400 1,560,000 312 5,240 2,640 4,180 3,530 5.5 X 2 1,525 1,021 6 4.2
PCF 200-C3 600 2,340,000 468 7,840 2,640 4,470 3,820 5.5 X 3 1,525 1,021 6 4.5
PCF 200-C4 800 3,120,000 624 10,440 2,640 4,470 3,820 5.5 X 4 1,525 1,021 6 4.5
PCF 225-C1 225 877,500 176 2,840 2,840 3,780 3,130 5.50 1,830 1,298 6 3.8
PCF 225-C2 450 1,755,000 351 5,640 2,840 3,920 3,270 5.5 X 2 1,830 1,298 6 3.9
PCF 225-C3 675 2,632,500 527 8,440 2,840 4,240 3,590 5.5 X 3 1,830 1,298 6 4.2
PCF 225-C4 900 3,510,000 702 11,240 2,840 4,240 3,590 5.5 X 4 1,830 1,298 6 4.2
NOTES:
1. THE LAST DIGIT OF THE MODEL NUMBER DENOTES NUMBER OF CELLS. CONSULT PANWATER FOR TOWER CONFIGURATION EXCEEDING 4 CELLS.
2. PROVIDE SPACE SURROUNDING THE COOLING TOWER FOR INSTALLATION AND MAINTENANCE ACCESS. AVOID LOCATION TOO NEAR ANY VERTICAL OBSTRUCTIONS.
3. FOR COOLING TOWERS EXCEEDING CONFIGURATIONS NOT SHOWN, CONSULT PANWATER FOR TOWER LAYOUT AND FOUNDATION DIMENSION DRAWINGS.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

12
PCF SERIES...

EXTERNAL PIPING LAYOUT


MODEL PCF 125 TO PCF 225

EXTERNAL PIPING DATA


Tower Piping Connection Size (mm) NB @ Cold Water Basin Vertical Height (mm) Horizontal Distance (mm)
Model Inlet Outlet Auto Make-up Quick Fill Over Flow Drain R1 @ Inlet R2 @ Inlet D @ Outlet L1 L2 L3
PCF 125-C1 125 125 25 25 50 50 2,230 1,580 165 1,755 2,340 585
PCF 125-C2 125 125 25 25 50 50 2,350 1,700 165 1,755 2,340 585
PCF 125-C3 125 125 25 25 50 50 2,580 1,930 165 1,755 2,340 585
PCF 125-C4 125 125 25 25 50 50 2,580 1,930 165 1,755 2,340 585
PCF 150-C1 125 125 25 25 50 50 2,530 1,880 165 1,755 2,340 585
PCF 150-C2 125 125 25 25 50 50 2,650 2,000 165 1,755 2,340 585
PCF 150-C3 125 125 25 25 50 50 2,880 2,230 165 1,755 2,340 585
PCF 150-C4 125 125 25 25 50 50 2,880 2,230 165 1,755 2,340 585
PCF 175-C1 150 150 25 25 65 65 2,270 1,620 165 1,950 2,600 650
PCF 175-C2 150 150 25 25 65 65 2,400 1,750 165 1,950 2,600 650
PCF 175-C3 150 150 25 25 65 65 2,660 2,010 165 1,950 2,600 650
PCF 175-C4 150 150 25 25 65 65 2,660 2,010 165 1,950 2,600 650
PCF 200-C1 150 150 25 25 65 65 2,570 1,920 165 1,950 2,600 650
PCF 200-C2 150 150 25 25 65 65 2,700 2,050 165 1,950 2,600 650
PCF 200-C3 150 150 25 25 65 65 3,000 2,350 165 1,950 2,600 650
PCF 200-C4 150 150 25 25 65 65 3,000 2,350 165 1,950 2,600 650
PCF 225-C1 150 150 25 25 65 65 2,300 1,650 165 2,100 2,800 700
PCF 225-C2 150 150 25 25 65 65 2,440 1,790 165 2,100 2,800 700
PCF 225-C3 150 150 25 25 65 65 2,720 2,070 165 2,100 2,800 700
PCF 225-C4 150 150 25 25 65 65 2,720 2,070 165 2,100 2,800 700
NOTES:
1. ALL INLET AND OUTLET CONNECTIONS SHALL BE FLANGED TO JIS 10K AS STANDARD.
2. CUSTOMER TO PROVIDE ALL NECESSARY EXTERNAL PIPE SUPPORTS FOR ALL INTER-CONNECTING WATER PIPES.
3. FOR COOLING TOWERS EXCEEDING 4 CELLS CONFIGURATION, CONSULT PANWATER FOR TOWER LAYOUT AND FOUNDATION DIMENSIONS.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

13
PCF SERIES...

TOWER FOUNDATION LAYOUT


MODEL PCF 125 TO PCF 225

TOWER FOUNDATION DIMENSION


Tower Center Distance Between Supports (mm) Loading Point Loading Data (KGS) Anchor Bolts Tower Weight (KGS)
Model L1 L2 L3 Quantity Loading @ A Loading @ B Loading @ C Quantity Size Shipping Operating
PCF 125-C1 2,340 2,340 1,170 4 223 372 595 4 M12 1,290 2,380
PCF 125-C2 4,680 2,340 1,170 6 220 367 588 6 M12 2,520 4,700
PCF 125-C3 7,020 2,340 1,170 8 219 366 585 8 M12 3,750 7,020
PCF 125-C4 9,360 2,340 1,170 10 219 365 584 10 M12 4,980 9,340
PCF 150-C1 2,340 2,340 1,170 4 233 388 620 4 M12 1,380 2,480
PCF 150-C2 4,680 2,340 1,170 6 229 382 611 6 M12 2,690 4,890
PCF 150-C3 7,020 2,340 1,170 8 228 380 608 8 M12 4,000 7,300
PCF 150-C4 9,360 2,340 1,170 10 228 379 607 10 M12 5,310 9,710
PCF 175-C1 2,600 2,600 1,300 9 268 447 715 12 M12 1,510 2,860
PCF 175-C2 5,200 2,600 1,300 15 264 441 705 20 M12 2,940 5,640
PCF 175-C3 7,800 2,600 1,300 21 263 439 702 28 M12 4,370 8,420
PCF 175-C4 10,400 2,600 1,300 27 263 438 700 36 M12 5,800 11,200
PCF 200-C1 2,600 2,600 1,300 9 278 463 740 12 M12 1,610 2,960
PCF 200-C2 5,200 2,600 1,300 15 274 456 730 20 M12 3,140 5,840
PCF 200-C3 7,800 2,600 1,300 21 273 454 727 28 M12 4,670 8,720
PCF 200-C4 10,400 2,600 1,300 27 272 453 725 36 M12 6,200 11,600
PCF 225-C1 2,800 2,800 1,400 9 300 500 800 12 M12 1,620 3,200
PCF 225-C2 5,600 2,800 1,400 15 296 494 790 20 M12 3,160 6,320
PCF 225-C3 8,400 2,800 1,400 21 295 492 787 28 M12 4,700 9,440
PCF 225-C4 11,200 2,800 1,400 27 294 491 785 36 M12 6,240 12,560
NOTES:
1. FOUNDATION SHOULD BE DESIGNED TO CATER THE OPERATING WEIGHT OF THE COOLING TOWER.
2. ALL FOUNDATIONS REQUIRED TO BE LEVELLED WITHIN ±3 mm TOLERANCE AND PROVIDED WITH POCKETS FOR ANCHOR BOLTS.
3. FOUNDATION HEIGHT INDICATED IS MINIMUM REQUIREMENT. INCREASE THE HIGHT IF NECESSARY TO SUIT PIPING INSTALLATION.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

14
PCF SERIES...

CONCRETE BASIN LAYOUT


MODEL PCF 125 TO PCF 225

CONCRETE BASIN DIMENSION


Tower Center Distance Between Supports (mm) Loading Point Loading Data (KGS) Anchor Bolts Tower Weight (KGS)
Model L1 L2 L3 Quantity Loading @ A Loading @ B Loading @ C Quantity Size Shipping Operating
PCF 125-C1 2,340 2,340 N/A 4 150 250 400 4 M12 1,300 1,600
PCF 125-C2 4,680 2,340 N/A 6 141 234 375 6 M12 2,600 3,000
PCF 125-C3 7,020 2,340 N/A 8 144 240 383 8 M12 3,900 4,600
PCF 125-C4 9,360 2,340 N/A 10 143 238 381 10 M12 5,200 6,100
PCF 150-C1 2,340 2,340 N/A 4 159 266 425 4 M12 1,400 1,700
PCF 150-C2 4,680 2,340 N/A 6 155 258 413 6 M12 2,800 3,300
PCF 150-C3 7,020 2,340 N/A 8 150 250 400 8 M12 4,200 4,800
PCF 150-C4 9,360 2,340 N/A 10 150 250 400 10 M12 5,600 6,400
PCF 175-C1 2,600 2,600 1,300 9 178 297 475 12 M12 1,500 1,900
PCF 175-C2 2,600 2,600 1,300 15 216 359 575 20 M12 3,000 4,600
PCF 175-C3 2,600 2,600 1,300 21 231 385 617 28 M12 4,500 7,400
PCF 175-C4 2,600 2,600 1,300 27 239 398 638 36 M12 6,000 10,200
PCF 200-C1 2,600 2,600 1,300 9 188 313 500 12 M12 1,600 2,000
PCF 200-C2 2,600 2,600 1,300 15 230 383 613 20 M12 3,200 4,900
PCF 200-C3 2,600 2,600 1,300 21 241 401 642 28 M12 4,800 7,700
PCF 200-C4 2,600 2,600 1,300 27 248 414 663 36 M12 6,400 10,600
PCF 225-C1 2,800 2,800 1,400 9 206 344 550 12 M12 1,650 2,200
PCF 225-C2 2,800 2,800 1,400 15 244 406 650 20 M12 3,300 5,200
PCF 225-C3 2,800 2,800 1,400 21 259 432 692 28 M12 4,950 8,300
PCF 225-C4 2,800 2,800 1,400 27 267 445 713 36 M12 6,600 11,400
NOTES:
1. FOUNDATION SHOULD BE DESIGNED TO CATER THE OPERATING WEIGHT OF THE COOLING TOWER.
2. ALL FOUNDATIONS REQUIRED TO BE LEVELLED WITHIN ±3 mm TOLERANCE AND PROVIDED WITH POCKETS FOR ANCHOR BOLTS.
3. FOR COOLING TOWERS EXCEEDING 4 CELLS CONFIGURATION, CONSULT PANWATER FOR TOWER LAYOUT AND FOUNDATION DIMENSIONS.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

15
PCF SERIES...

GENERAL ARRANGEMENT & LAYOUT


MODEL PCF 250 TO PCF 500

ENGINEERING DATA
Tower Capacity Heat Load Flow Rate Tower Dimension (mm) Motor Size Fan Diameter Air Volum Inlet/Outlet Pump Head
Model RT Kcal / hour m3 / hour Length, L Width, W Height, H1 Height, H2 Kw mm M3/Min. Pipe Size M
PCF 250-C1 250 975,000 195 2,840 2,840 4,130 3,430 5.50 1,830 1,277 6 4.2
PCF 250-C2 500 1,950,000 390 5,640 2,840 4,270 3,570 5.5 X 2 1,830 1,277 6 4.3
PCF 250-C3 750 2,925,000 585 8,440 2,840 4,540 3,840 5.5 X 3 1,830 1,277 6 4.6
PCF 250-C4 1,000 3,900,000 780 11,240 2,840 4,540 3,840 5.5 X 4 1,830 1,277 6 4.6
PCF 300-C1 300 1,170,000 234 3,240 3,240 4,190 3,490 7.50 2,135 1,532 8 4.2
PCF 300-C2 600 2,340,000 468 6,440 3,240 4,350 3,650 7.5 X 2 2,135 1,532 8 4.4
PCF 300-C3 900 3,510,000 702 9,640 3,240 4,710 4,010 7.5 X 3 2,135 1,532 8 4.7
PCF 300-C4 1,200 4,680,000 936 12,840 3,240 4,710 4,010 7.5 X 4 2,135 1,532 8 4.7
PCF 350-C1 350 1,365,000 273 3,440 3,440 4,310 3,560 7.50 2,135 1,787 8 4.3
PCF 350-C2 700 2,730,000 546 6,840 3,440 4,480 3,730 7.5 X 2 2,135 1,787 8 4.5
PCF 350-C3 1,050 4,095,000 819 10,240 3,440 4,860 4,110 7.5 X 3 2,135 1,787 8 4.8
PCF 350-C4 1,400 5,460,000 1,092 13,640 3,440 4,860 4,110 7.5 X 4 2,135 1,787 8 4.8
PCF 400-C1 400 1,560,000 312 3,640 3,640 4,700 3,950 11.00 2,440 2,043 8 4.3
PCF 400-C2 800 3,120,000 624 7,240 3,640 4,880 4,130 11.0 X 2 2,440 2,043 8 4.5
PCF 400-C3 1,200 4,680,000 936 10,840 3,640 5,290 4,540 11.0 X 3 2,440 2,043 8 4.9
PCF 400-C4 1,600 6,240,000 1,248 14,440 3,640 5,290 4,540 11.0 X 4 2,440 2,043 8 4.9
PCF 500-C1 500 1,950,000 390 4,040 4,040 4,960 4,160 11.00 2,440 2,553 8 4.4
PCF 500-C2 1,000 3,900,000 780 8,040 4,040 5,160 4,360 11.0 X 2 2,440 2,553 8 4.6
PCF 500-C3 1,500 5,850,000 1,170 12,040 4,040 5,610 4,810 11.0 X 3 2,440 2,553 8 5.0
PCF 500-C4 2,000 7,800,000 1,560 16,040 4,040 5,610 4,810 11.0 X 4 2,440 2,553 8 5.0
NOTES: THERMAL DESIGN CONDITIONS AS PER JIS STANDARDS :
1. THE LAST DIGIT OF THE MODEL NUMBER DENOTES NUMBER OF CELLS. CONSULT PANWATER FOR TOWER CONFIGURATION EXCEEDING 4 CELLS.CIRCULATING FLOW RATE = 780 LITRES/HOUR PER RT
2. PROVIDE SPACE SURROUNDING THE COOLING TOWER FOR INSTALLATION AND MAINTENANCE ACCESS. AVOID LOCATION TOO NEAR ANY VERTICAL OBSTRUCTIONS. INLET TEMPERATURE = 37 °C
3. FOR COOLING TOWERS EXCEEDING CONFIGURATIONS NOT SHOWN, CONSULT PANWATER FOR TOWER LAYOUT AND FOUNDATION DIMENSION DRAWINGS.OUTLET TEMPERATURE = 32 °C
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.WET BULB TEMPERATURE = 27°C

16
PCF SERIES...

EXTERNAL PIPING LAYOUT


MODEL PCF 250 TO PCF 500

EXTERNAL PIPING DATA


Tower Piping Connection Size (mm) NB @ Cold Water Basin Vertical Height (mm) Horizontal Distance (mm)
Model Inlet Outlet Auto Make-up Quick Fill Over Flow Drain R1 @ Inlet R2 @ Inlet D @ Outlet L1 L2 L3
PCF 250-C1 150 150 38 38 65 65 2,650 1,950 215 2,100 2,800 700
PCF 250-C2 150 150 38 38 65 65 2,790 2,090 215 2,100 2,800 700
PCF 250-C3 150 150 38 38 65 65 3,070 2,370 215 2,100 2,800 700
PCF 250-C4 150 150 38 38 65 65 3,070 2,370 215 2,100 2,800 700
PCF 300-C1 200 200 38 38 80 80 2,710 2,010 215 2,400 3,200 800
PCF 300-C2 200 200 38 38 80 80 2,870 2,170 215 2,400 3,200 800
PCF 300-C3 200 200 38 38 80 80 3,190 2,490 215 2,400 3,200 800
PCF 300-C4 200 200 38 38 80 80 3,190 2,490 215 2,400 3,200 800
PCF 350-C1 200 200 38 38 80 80 2,790 2,040 265 2,550 3,400 850
PCF 350-C2 200 200 38 38 80 80 2,960 2,210 265 2,550 3,400 850
PCF 350-C3 200 200 38 38 80 80 3,300 2,550 265 2,550 3,400 850
PCF 350-C4 200 200 38 38 80 80 3,300 2,550 265 2,550 3,400 850
PCF 400-C1 200 200 38 38 80 80 2,820 2,070 265 2,700 3,600 900
PCF 400-C2 200 200 38 38 80 80 3,000 2,250 265 2,700 3,600 900
PCF 400-C3 200 200 38 38 80 80 3,360 2,610 265 2,700 3,600 900
PCF 400-C4 200 200 38 38 80 80 3,360 2,610 265 2,700 3,600 900
PCF 500-C1 200 200 38 38 100 100 2,930 2,130 250 3,000 4,000 1,000
PCF 500-C2 200 200 38 38 100 100 3,130 2,330 250 3,000 4,000 1,000
PCF 500-C3 200 200 38 38 100 100 3,530 2,730 250 3,000 4,000 1,000
PCF 500-C4 200 200 38 38 100 100 3,530 2,730 250 3,000 4,000 1,000
NOTES:
1. ALL INLET AND OUTLET CONNECTIONS SHALL BE FLANGED TO JIS 10K AS STANDARD.
2. CUSTOMER TO PROVIDE ALL NECESSARY EXTERNAL PIPE SUPPORTS FOR ALL INTER-CONNECTING WATER PIPES.
3. FOR COOLING TOWERS EXCEEDING 4 CELLS CONFIGURATION, CONSULT PANWATER FOR TOWER LAYOUT AND FOUNDATION DIMENSIONS.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

17
PCF SERIES...

TOWER FOUNDATION LAYOUT


MODEL PCF 250 TO PCF 500

TOWER FOUNDATION DIMENSION


Tower Center Distance Between Supports (mm) Loading Point Loading Data (KGS) Anchor Bolts Tower Weight (KGS)
Model L1 L2 L3 Quantity Loading @ A Loading @ B Loading @ C Quantity Size Shipping Operating
PCF 250-C1 2,800 2,800 1,400 9 309 516 825 12 M12 1,800 3,300
PCF 250-C2 5,600 2,800 1,400 15 309 516 825 20 M12 3,600 6,600
PCF 250-C3 8,400 2,800 1,400 21 306 510 817 28 M12 5,300 9,800
PCF 250-C4 11,200 2,800 1,400 27 305 508 813 36 M12 7,000 13,000
PCF 300-C1 3,200 3,200 1,600 9 384 641 1,025 12 M12 2,100 4,100
PCF 300-C2 6,400 3,200 1,600 15 380 633 1,013 20 M12 4,100 8,100
PCF 300-C3 9,600 3,200 1,600 21 381 635 1,017 28 M12 6,200 12,200
PCF 300-C4 12,800 3,200 1,600 27 380 633 1,013 36 M12 8,200 16,200
PCF 350-C1 3,400 3,400 1,700 9 441 734 1,175 12 M12 2,400 4,700
PCF 350-C2 6,800 3,400 1,700 15 436 727 1,164 20 M12 4,710 9,310
PCF 350-C3 10,200 3,400 1,700 21 434 724 1,158 28 M12 7,000 13,900
PCF 350-C4 13,600 3,400 1,700 27 436 727 1,163 36 M12 9,400 18,600
PCF 400-C1 3,600 3,600 1,800 9 478 797 1,275 12 M12 2,600 5,100
PCF 400-C2 7,200 3,600 1,800 15 473 789 1,263 20 M12 5,100 10,100
PCF 400-C3 10,800 3,600 1,800 21 472 786 1,258 28 M12 7,600 15,100
PCF 400-C4 14,400 3,600 1,800 27 471 785 1,256 36 M12 10,100 20,100
PCF 500-C1 4,000 4,000 2,000 9 572 953 1,525 12 M12 2,900 6,100
PCF 500-C2 8,000 4,000 2,000 15 567 945 1,513 20 M12 5,700 12,100
PCF 500-C3 12,000 4,000 2,000 21 566 943 1,508 28 M12 8,500 18,100
PCF 500-C4 16,000 4,000 2,000 27 565 941 1,506 36 M12 11,300 24,100
NOTES:
1. FOUNDATION SHOULD BE DESIGNED TO CATER THE OPERATING WEIGHT OF THE COOLING TOWER.
2. ALL FOUNDATIONS REQUIRED TO BE LEVELLED WITHIN ±3 mm TOLERANCE AND PROVIDED WITH POCKETS FOR ANCHOR BOLTS.
3. FOUNDATION HEIGHT INDICATED IS MINIMUM REQUIREMENT. INCREASE THE HIGHT IF NECESSARY TO SUIT PIPING INSTALLATION.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

18
PCF SERIES...

CONCRETE BASIN LAYOUT


MODEL PCF 250 TO PCF 500

CONCRETE BASIN DIMENSION


Tower Center Distance Between Supports (mm) Loading Point Loading Data (KGS) Anchor Bolts Tower Weight (KGS)
Model L1 L2 L3 Quantity Loading @ A Loading @ B Loading @ C Quantity Size Shipping Operating
PCF 250-C1 2,800 2,800 1,400 9 197 328 525 12 M12 1,700 2,100
PCF 250-C2 5,600 2,800 1,400 15 197 328 525 20 M12 3,400 4,200
PCF 250-C3 8,400 2,800 1,400 21 194 323 517 28 M12 5,000 6,200
PCF 250-C4 11,200 2,800 1,400 27 192 320 513 36 M12 6,600 8,200
PCF 300-C1 3,200 3,200 1,600 9 244 406 650 12 M12 2,000 2,600
PCF 300-C2 6,400 3,200 1,600 15 239 398 638 20 M12 3,900 5,100
PCF 300-C3 9,600 3,200 1,600 21 241 401 642 28 M12 5,900 7,700
PCF 300-C4 12,800 3,200 1,600 27 239 398 638 36 M12 7,800 10,200
PCF 350-C1 3,400 3,400 1,700 9 272 453 725 12 M12 2,200 2,900
PCF 350-C2 6,800 3,400 1,700 15 267 445 713 20 M12 4,300 5,700
PCF 350-C3 10,200 3,400 1,700 21 269 448 717 28 M12 6,500 8,600
PCF 350-C4 13,600 3,400 1,700 27 267 445 713 36 M12 8,600 11,400
PCF 400-C1 3,600 3,600 1,800 9 300 500 800 12 M12 2,400 3,200
PCF 400-C2 7,200 3,600 1,800 15 295 492 788 20 M12 4,700 6,300
PCF 400-C3 10,800 3,600 1,800 21 294 490 783 28 M12 7,000 9,400
PCF 400-C4 14,400 3,600 1,800 27 295 492 788 36 M12 9,400 12,600
PCF 500-C1 4,000 4,000 2,000 9 347 578 925 12 M12 2,700 3,700
PCF 500-C2 8,000 4,000 2,000 15 342 570 913 20 M12 5,300 7,300
PCF 500-C3 12,000 4,000 2,000 21 341 568 908 28 M12 7,900 10,900
PCF 500-C4 16,000 4,000 2,000 27 340 566 906 36 M12 10,500 14,500
NOTES:
1. FOUNDATION SHOULD BE DESIGNED TO CATER THE OPERATING WEIGHT OF THE COOLING TOWER.
2. ALL FOUNDATIONS REQUIRED TO BE LEVELLED WITHIN ±3 mm TOLERANCE AND PROVIDED WITH POCKETS FOR ANCHOR BOLTS.
3. FOR COOLING TOWERS EXCEEDING 4 CELLS CONFIGURATION, CONSULT PANWATER FOR TOWER LAYOUT AND FOUNDATION DIMENSIONS.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

19
PCF SERIES...

GENERAL ARRANGEMENT & LAYOUT


MODEL PCF 600 TO PCF 1000

ENGINEERING DATA
Tower Capacity Heat Load Flow Rate Tower Dimension (mm) Motor Size Fan Size Air Volume Inlet/Outlet Pump Head
Model RT Kcal / hour m3 / hour Length, L Width, W Height, H1 Height, H2 Kw mm M3/Min. Pipe Size M
PCF 600-C1 600 2,340,000 468 4,540 4,540 5,860 5,060 15.00 2,745 3,064 10 4.7
PCF 600-C2 1,200 4,680,000 936 9,040 4,540 6,080 5,280 15.0 X 2 2,745 3,064 10 4.9
PCF 600-C3 1,800 7,020,000 1,404 13,540 4,540 6,530 5,730 15.0 X 3 2,745 3,064 10 5.3
PCF 600-C4 2,400 9,360,000 1,872 18,040 4,540 6,530 5,730 15.0 X 4 2,745 3,064 10 5.3
PCF 700-C1 700 2,730,000 546 4,840 4,840 5,860 5,060 18.50 2,745 3,574 10 4.7
PCF 700-C2 1,400 5,460,000 1,092 9,640 4,840 6,080 5,280 18.5 X 2 2,745 3,574 10 4.9
PCF 700-C3 2,100 8,190,000 1,638 14,440 4,840 6,530 5,730 18.5 X 3 2,745 3,574 10 5.2
PCF 700-C4 2,800 10,920,000 2,184 19,240 4,840 6,530 5,730 18.5 X 4 2,745 3,574 10 5.2
PCF 800-C1 800 3,120,000 624 5,140 5,140 5,870 5,070 18.50 3,050 4,085 10 4.7
PCF 800-C2 1,600 6,240,000 1,248 10,240 5,140 6,120 5,320 18.5 X 2 3,050 4,085 10 5.0
PCF 800-C3 2,400 9,360,000 1,872 15,340 5,140 6,670 5,870 18.5 X 3 3,050 4,085 10 5.5
PCF 800-C4 3,200 12,480,000 2,496 20,440 5,140 6,670 5,870 18.5 X 4 3,050 4,085 10 5.5
PCF 900-C1 900 3,510,000 702 5,440 5,440 5,940 5,140 22.50 3,350 4,596 12 4.8
PCF 900-C2 1,800 7,020,000 1,404 10,840 5,440 6,120 5,410 22.5 X 2 3,350 4,596 12 5.1
PCF 900-C3 2,700 10,530,000 2,106 16,240 5,440 6,750 5,950 22.5 X 3 3,350 4,596 12 5.6
PCF 900-C4 3,600 14,040,000 2,808 21,640 5,440 6,750 5,950 22.5 X 4 3,350 4,596 12 5.6
PCF 1000-C1 1,000 3,900,000 780 5,740 5,740 5,980 5,180 22.50 3,350 5,106 12 4.8
PCF 1000-C2 2,000 7,800,000 1,560 11,440 5,740 6,270 5,470 22.5 X 2 3,350 5,106 12 5.1
PCF 1000-C3 3,000 11,700,000 2,340 17,140 5,740 6,840 6,040 22.5 X 3 3,350 5,106 12 5.7
PCF 1000-C4 4,000 15,600,000 3,120 22,840 5,740 6,840 6,040 22.5 X 4 3,350 5,106 12 5.7
NOTES:
1. THE LAST DIGIT OF THE MODEL NUMBER DENOTES NUMBER OF CELLS. CONSULT PANWATER FOR TOWER CONFIGURATION EXCEEDING 4 CELLS.
2. PROVIDE SPACE SURROUNDING THE COOLING TOWER FOR INSTALLATION AND MAINTENANCE ACCESS. AVOID LOCATION TOO NEAR ANY VERTICAL OBSTRUCTIONS.
3. FOR COOLING TOWERS EXCEEDING CONFIGURATIONS NOT SHOWN, CONSULT PANWATER FOR TOWER LAYOUT AND FOUNDATION DIMENSION DRAWINGS.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

20
PCF SERIES...

EXTERNAL PIPING LAYOUT


MODEL PCF 600 TO PCF 1000

EXTERNAL PIPING DATA


Tower Piping Connection Size (mm) NB @ Cold Water Basin Vertical Height (mm) Horizontal Distance (mm)
Model Inlet Outlet Auto Make-up Quick Fill Over Flow Drain R1 @ Inlet R2 @ Inlet D @ Outlet L1 L2 L3
PCF 600-C1 250 250 50 50 100 100 3,150 2,350 250 2,250 4,500 2,250
PCF 600-C2 250 250 50 50 100 100 3,370 2,570 250 2,250 4,500 2,250
PCF 600-C3 250 250 50 50 100 100 3,820 3,020 250 2,250 4,500 2,250
PCF 600-C4 250 250 50 50 100 100 3,820 3,020 250 2,250 4,500 2,250
PCF 700-C1 250 250 50 50 100 100 3,200 2,400 250 2,400 4,800 2,400
PCF 700-C2 250 250 50 50 100 100 3,430 2,630 250 2,400 4,800 2,400
PCF 700-C3 250 250 50 50 100 100 3,680 2,880 250 2,400 4,800 2,400
PCF 700-C4 250 250 50 50 100 100 3,680 2,880 250 2,400 4,800 2,400
PCF 800-C1 250 250 50 50 100 100 3,240 2,440 250 2,550 5,100 2,550
PCF 800-C2 250 250 50 50 100 100 3,490 2,690 250 2,550 5,100 2,550
PCF 800-C3 250 250 50 50 100 100 4,000 3,200 250 2,550 5,100 2,550
PCF 800-C4 250 250 50 50 100 100 4,000 3,200 250 2,550 5,100 2,550
PCF 900-C1 300 300 50 50 100 100 3,280 2,480 250 2,700 5,400 2,700
PCF 900-C2 300 300 50 50 100 100 3,550 2,750 250 2,700 5,400 2,700
PCF 900-C3 300 300 50 50 100 100 4,090 3,290 250 2,700 5,400 2,700
PCF 900-C4 300 300 50 50 100 100 4,090 3,290 250 2,700 5,400 2,700
PCF 1000-C1 300 300 50 50 100 100 3,330 2,530 250 2,850 5,700 2,850
PCF 1000-C2 300 300 50 50 100 100 3,610 2,810 250 2,850 5,700 2,850
PCF 1000-C3 300 300 50 50 100 100 4,180 3,380 250 2,850 5,700 2,850
PCF 1000-C4 300 300 50 50 100 100 4,180 3,380 250 2,850 5,700 2,850
NOTES:
1. ALL INLET AND OUTLET CONNECTIONS SHALL BE FLANGED TO JIS 10K AS STANDARD.
2. CUSTOMER TO PROVIDE ALL NECESSARY EXTERNAL PIPE SUPPORTS FOR ALL INTER-CONNECTING WATER PIPES.
3. FOR COOLING TOWERS EXCEEDING 4 CELLS CONFIGURATION, CONSULT PANWATER FOR TOWER LAYOUT AND FOUNDATION DIMENSIONS.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

21
PCF SERIES...

TOWER FOUNDATION & LAYOUT


MODEL PCF 600 TO PCF 1000

TOWER FOUNDATION DIMENSION


Tower Center Distance Between Supports (mm) Loading Point Loading Data (KGS) Anchor Bolts Tower Weight (KGS)
Model L1 L2 L3 Quantity Loading @ A Loading @ B Loading @ C Quantity Size Shipping Operating
PCF 600-C1 4,500 4,500 1,500 16 308 514 822 16 M16 3,800 7,400
PCF 600-C2 9,000 4,500 1,500 28 306 510 817 28 M16 7,500 14,700
PCF 600-C3 13,500 4,500 1,500 40 306 509 815 40 M16 11,200 22,000
PCF 600-C4 18,000 4,500 1,500 52 304 507 811 52 M16 14,800 29,200
PCF 700-C1 4,800 4,800 1,600 16 350 583 933 16 M16 4,300 8,400
PCF 700-C2 9,600 4,800 1,600 28 348 580 928 28 M16 8,500 16,700
PCF 700-C3 14,400 4,800 1,600 40 346 576 922 40 M16 12,600 24,900
PCF 700-C4 19,200 4,800 1,600 52 346 576 922 52 M16 16,800 33,200
PCF 800-C1 5,100 5,100 1,700 16 388 646 1,033 16 M16 4,600 9,300
PCF 800-C2 10,200 5,100 1,700 28 385 642 1,028 28 M16 9,100 18,500
PCF 800-C3 15,300 5,100 1,700 40 383 639 1,022 40 M16 13,500 27,600
PCF 800-C4 20,400 5,100 1,700 52 383 639 1,022 52 M16 18,000 36,800
PCF 900-C1 5,400 5,400 1,800 16 421 701 1,122 16 M16 5,000 10,100
PCF 900-C2 10,800 5,400 1,800 28 419 698 1,117 28 M16 9,900 20,100
PCF 900-C3 16,200 5,400 1,800 40 417 694 1,111 40 M16 14,700 30,000
PCF 900-C4 21,600 5,400 1,800 52 416 693 1,108 52 M16 19,500 39,900
PCF 1000-C1 5,700 5,700 1,900 16 454 757 1,211 16 M16 5,200 10,900
PCF 1000-C2 11,400 5,700 1,900 28 450 750 1,200 28 M16 10,200 21,600
PCF 1000-C3 17,100 5,700 1,900 40 450 750 1,200 40 M16 15,300 32,400
PCF 1000-C4 22,800 5,700 1,900 52 449 748 1,197 52 M16 20,300 43,100
NOTES:
1. FOUNDATION SHOULD BE DESIGNED TO CATER THE OPERATING WEIGHT OF THE COOLING TOWER.
2. ALL FOUNDATIONS REQUIRED TO BE LEVELLED WITHIN ±3 mm TOLERANCE AND PROVIDED WITH POCKETS FOR ANCHOR BOLTS.
3. FOUNDATION HEIGHT INDICATED IS MINIMUM REQUIREMENT. INCREASE THE HIGHT IF NECESSARY TO SUIT PIPING INSTALLATION.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

22
PCF SERIES...

CONCRETE BASIN LAYOUT


MODEL PCF 600 TO PCF 1000

CONCRETE BASIN DIMENSION


Tower Center Distance Between Supports (mm) Loading Point Loading Data (KGS) Anchor Bolts Tower Weight (KGS)
Model L1 L2 L3 Quantity Loading @ A Loading @ B Loading @ C Quantity Size Shipping Operating
PCF 600-C1 4,500 4,500 1,500 16 183 306 489 16 M16 3,500 4,400
PCF 600-C2 9,000 4,500 1,500 28 181 302 483 28 M16 6,900 8,700
PCF 600-C3 13,500 4,500 1,500 40 181 301 481 40 M16 10,300 13,000
PCF 600-C4 18,000 4,500 1,500 52 180 300 481 52 M16 13,700 17,300
PCF 700-C1 4,800 4,800 1,600 16 204 340 544 16 M16 4,000 4,900
PCF 700-C2 9,600 4,800 1,600 28 202 337 539 28 M16 7,900 9,700
PCF 700-C3 14,400 4,800 1,600 40 200 333 533 40 M16 11,700 14,400
PCF 700-C4 19,200 4,800 1,600 52 200 333 533 52 M16 15,600 19,200
PCF 800-C1 5,100 5,100 1,700 16 225 375 600 16 M16 4,300 5,400
PCF 800-C2 10,200 5,100 1,700 28 223 372 594 28 M16 8,500 10,700
PCF 800-C3 15,300 5,100 1,700 40 221 368 589 40 M16 12,600 15,900
PCF 800-C4 20,400 5,100 1,700 52 221 368 589 52 M16 16,800 21,200
PCF 900-C1 5,400 5,400 1,800 16 242 403 644 16 M16 4,650 5,800
PCF 900-C2 10,800 5,400 1,800 28 235 392 628 28 M16 9,000 11,300
PCF 900-C3 16,200 5,400 1,800 40 235 392 628 40 M16 13,500 16,950
PCF 900-C4 21,600 5,400 1,800 52 235 392 628 52 M16 18,000 22,600
PCF 1000-C1 5,700 5,700 1,900 16 250 417 667 16 M16 4,800 6,000
PCF 1000-C2 11,400 5,700 1,900 28 248 413 661 28 M16 9,500 11,900
PCF 1000-C3 17,100 5,700 1,900 40 244 407 652 40 M16 14,000 17,600
PCF 1000-C4 22,800 5,700 1,900 52 245 408 653 52 M16 18,700 23,500
NOTES:
1. FOUNDATION SHOULD BE DESIGNED TO CATER THE OPERATING WEIGHT OF THE COOLING TOWER.
2. ALL FOUNDATIONS REQUIRED TO BE LEVELLED WITHIN ±3 mm TOLERANCE AND PROVIDED WITH POCKETS FOR ANCHOR BOLTS.
3. FOR COOLING TOWERS EXCEEDING 4 CELLS CONFIGURATION, CONSULT PANWATER FOR TOWER LAYOUT AND FOUNDATION DIMENSIONS.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

23
PCF SERIES...

GENERAL ARRANGEMENT & LAYOUT


MODEL PCF 1200 TO PCF 2000

ENGINEERING DATA
Tower Capacity Heat Load Flow Rate Tower Dimension (mm) Motor Size Fan Diameter Air Volume Inlet / Outlet Pump Head
Model RT Kcal / hour m3 / hour Length, L Width, W Height, H1 Height, H2 Kw mm M3/Min. Pipe Size M
PCF 1200-C1 1,200 4,680,000 936 6,440 6,440 6,230 5,930 30.00 3,660 6,128 14 4.4
PCF 1200-C2 2,400 9,360,000 1,872 12,840 6,440 6,580 6,280 30.0 X 2 3,660 6,128 14 4.8
PCF 1200-C3 3,600 14,040,000 2,808 19,240 6,440 7,280 6,980 30.0 X 3 3,660 6,128 14 5.4
PCF 1200-C4 4,800 18,720,000 3,744 25,640 6,440 7,280 6,980 30.0 X 4 3,660 6,128 14 5.4
PCF 1400-C1 1,400 5,460,000 1,092 6,840 6,840 6,780 6,480 30.00 3,960 7,149 14 4.5
PCF 1400-C2 2,800 10,920,000 2,184 13,640 6,840 7,180 6,880 30.0 X 2 3,960 7,149 14 4.8
PCF 1400-C3 4,200 16,380,000 3,276 20,440 6,840 7,880 7,580 30.0 X 3 3,960 7,149 14 5.5
PCF 1400-C4 5,600 21,840,000 4,368 27,240 6,840 7,880 7,580 30.0 X 4 3,960 7,149 14 5.5
PCF 1600-C1 1,600 6,240,000 1,248 7,240 7,240 6,850 6,550 37.00 4,270 8,170 16 4.6
PCF 1600-C2 3,200 12,480,000 2,496 14,440 7,240 7,240 6,940 37.0 X 2 4,270 8,170 16 4.9
PCF 1600-C3 4,800 18,720,000 3,744 21,640 7,240 8,020 7,720 37.0 X 3 4,270 8,170 16 5.6
PCF 1600-C4 6,400 24,960,000 4,992 28,840 7,240 8,020 7,720 37.0 X 4 4,270 8,170 16 5.6
PCF 1800-C1 1,800 7,020,000 1,404 7,640 7,640 6,930 6,630 37.00 4,570 9,191 16 4.6
PCF 1800-C2 3,600 14,040,000 2,808 15,240 7,640 7,330 7,030 37.0 X 2 4,570 9,191 16 5.0
PCF 1800-C3 5,400 21,060,000 4,212 22,840 7,640 8,150 7,850 37.0 X 3 4,570 9,191 16 5.8
PCF 1800-C4 7,200 28,080,000 5,616 30,440 7,640 8,150 7,850 37.0 X 4 4,570 9,191 16 5.8
PCF 2000-C1 2,000 7,800,000 1,560 8,040 8,040 6,980 6,680 45.00 4,880 10,213 18 4.7
PCF 2000-C2 4,000 15,600,000 3,120 16,040 8,040 7,430 7,130 45.0 X 2 4,880 10,213 18 5.1
PCF 2000-C3 6,000 23,400,000 4,680 24,040 8,040 8,280 7,980 45.0 X 3 4,880 10,213 18 5.9
PCF 2000-C4 8,000 31,200,000 6,240 32,040 8,040 8,280 7,980 45.0 X 4 4,880 10,213 18 5.9
NOTES:
1. THE LAST DIGIT OF THE MODEL NUMBER DENOTES NUMBER OF CELLS. CONSULT PANWATER FOR TOWER CONFIGURATION EXCEEDING 4 CELLS.
2. PROVIDE SPACE SURROUNDING THE COOLING TOWER FOR INSTALLATION AND MAINTENANCE ACCESS. AVOID LOCATION TOO NEAR ANY VERTICAL OBSTRUCTIONS.
3. FOR COOLING TOWERS EXCEEDING CONFIGURATIONS NOT SHOWN, CONSULT PANWATER FOR TOWER LAYOUT AND FOUNDATION DIMENSION DRAWINGS.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

24
PCF SERIES...

EXTERNAL PIPING LAYOUT


MODEL PCF 1200 TO PCF 2000

EXTERNAL PIPING DATA


Tower Piping Connection Size (mm) NB @ Cold Water Basin Vertical Height (mm) Horizontal Distance (mm)
Model Inlet Outlet Auto Make-up Quick Fill Over Flow Drain R1 @ Inlet R2 @ Inlet D @ Outlet L1 L2 L3
PCF 1200-C1 350 350 65 65 150 150 2,930 2,630 390 5,600 6,400 800
PCF 1200-C2 350 350 65 65 150 150 3,250 2,950 390 5,600 6,400 800
PCF 1200-C3 350 350 65 65 150 150 3,890 3,590 390 5,600 6,400 800
PCF 1200-C4 350 350 65 65 150 150 3,890 3,590 390 5,600 6,400 800
PCF 1400-C1 350 350 65 65 150 150 2,990 2,690 390 5,950 6,800 850
PCF 1400-C2 350 350 65 65 150 150 3,330 3,030 390 5,950 6,800 850
PCF 1400-C3 350 350 65 65 150 150 4,010 3,710 390 5,950 6,800 850
PCF 1400-C4 350 350 65 65 150 150 4,010 3,710 390 5,950 6,800 850
PCF 1600-C1 400 400 80 80 150 150 3,050 2,750 390 6,300 7,200 900
PCF 1600-C2 400 400 80 80 150 150 3,410 3,110 390 6,300 7,200 900
PCF 1600-C3 400 400 80 80 150 150 4,130 3,830 390 6,300 7,200 900
PCF 1600-C4 400 400 80 80 150 150 4,130 3,830 390 6,300 7,200 900
PCF 1800-C1 400 400 80 80 150 150 3,110 2,810 390 6,650 7,600 950
PCF 1800-C2 400 400 80 80 150 150 3,490 3,190 390 6,650 7,600 950
PCF 1800-C3 400 400 80 80 150 150 4,250 3,950 390 6,650 7,600 950
PCF 1800-C4 400 400 80 80 150 150 4,250 3,950 390 6,650 7,600 950
PCF 2000-C1 450 450 80 80 150 150 3,170 2,870 390 7,000 8,000 1,000
PCF 2000-C2 450 450 80 80 150 150 3,570 3,270 390 7,000 8,000 1,000
PCF 2000-C3 450 450 80 80 150 150 4,370 4,070 390 7,000 8,000 1,000
PCF 2000-C4 450 450 80 80 150 150 4,370 4,070 390 7,000 8,000 1,000
NOTES:
1. ALL INLET AND OUTLET CONNECTIONS SHALL BE FLANGED TO JIS 10K AS STANDARD.
2. CUSTOMER TO PROVIDE ALL NECESSARY EXTERNAL PIPE SUPPORTS FOR ALL INTER-CONNECTING WATER PIPES.
3. FOR COOLING TOWERS EXCEEDING 4 CELLS CONFIGURATION, CONSULT PANWATER FOR TOWER LAYOUT AND FOUNDATION DIMENSIONS.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

25
PCF SERIES...

TOWER FOUNDATION LAYOUT


MODEL PCF 1200 TO PCF 2000

TOWER FOUNDATION DIMENSION


Tower Center Distance Between Supports (mm) Loading Point Loading Data (KGS) Anchor Bolts Tower Weight (KGS)
Model L1 L2 L3 Quantity Loading @ A Loading @ B Loading @ C Quantity Size Shipping Operating
PCF 1200-C1 6,400 6,400 1,600 25 314 523 838 30 M16 6,800 13,400
PCF 1200-C2 12,800 6,400 1,600 45 312 520 831 54 M16 13,400 26,600
PCF 1200-C3 19,200 6,400 1,600 65 311 518 829 78 M16 20,000 39,800
PCF 1200-C4 25,600 6,400 1,600 85 310 517 827 102 M16 26,500 52,900
PCF 1400-C1 6,800 6,800 1,700 25 352 586 938 30 M16 7,600 15,000
PCF 1400-C2 13,600 6,800 1,700 45 349 582 931 54 M16 15,000 29,800
PCF 1400-C3 20,400 6,800 1,700 65 348 579 927 78 M16 22,300 44,500
PCF 1400-C4 27,200 6,800 1,700 85 347 578 925 102 M16 29,600 59,200
PCF 1600-C1 7,200 7,200 1,800 25 390 650 1,041 30 M16 8,300 16,650
PCF 1600-C2 14,400 7,200 1,800 45 387 645 1,031 54 M16 16,300 33,000
PCF 1600-C3 21,600 7,200 1,800 65 386 643 1,028 78 M16 24,300 49,350
PCF 1600-C4 28,800 7,200 1,800 85 385 642 1,027 102 M16 32,300 65,700
PCF 1800-C1 7,600 7,600 1,900 25 427 711 1,138 30 M16 8,800 18,200
PCF 1800-C2 15,200 7,600 1,900 45 423 705 1,128 54 M16 17,300 36,100
PCF 1800-C3 22,800 7,600 1,900 65 422 703 1,125 78 M16 25,800 54,000
PCF 1800-C4 30,400 7,600 1,900 85 421 702 1,123 102 M16 34,300 71,900
PCF 2000-C1 8,000 8,000 2,000 25 459 766 1,225 30 M16 9,300 19,600
PCF 2000-C2 16,000 8,000 2,000 45 456 760 1,216 54 M16 18,300 38,900
PCF 2000-C3 24,000 8,000 2,000 65 455 758 1,213 78 M16 27,300 58,200
PCF 2000-C4 32,000 8,000 2,000 85 454 757 1,211 102 M16 36,300 77,500
NOTES:
1. FOUNDATION SHOULD BE DESIGNED TO CATER THE OPERATING WEIGHT OF THE COOLING TOWER.
2. ALL FOUNDATIONS REQUIRED TO BE LEVELLED WITHIN ±3 mm TOLERANCE AND PROVIDED WITH POCKETS FOR ANCHOR BOLTS.
3. FOUNDATION HEIGHT INDICATED IS MINIMUM REQUIREMENT. INCREASE THE HIGHT IF NECESSARY TO SUIT PIPING INSTALLATION.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

26
PCF SERIES...

CONCRETE BASIN LAYOUT


MODEL PCF 1200 TO PCF 2000

CONCRETE BASIN DIMENSION


Tower Center Distance Between Supports (mm) Loading Point Loading Data (KGS) Anchor Bolts Tower Weight (KGS)
Model L1 L2 L3 Quantity Loading @ A Loading @ B Loading @ C Quantity Size Shipping Operating
PCF 1200-C1 6,400 6,400 1,600 25 170 284 454 30 M16 6,300 7,260
PCF 1200-C2 12,800 6,400 1,600 45 168 279 447 54 M16 12,400 14,300
PCF 1200-C3 19,200 6,400 1,600 65 167 279 446 78 M16 18,500 21,400
PCF 1200-C4 25,600 6,400 1,600 85 167 278 445 102 M16 24,600 28,500
PCF 1400-C1 6,800 6,800 1,700 25 189 315 504 30 M16 7,100 8,070
PCF 1400-C2 13,600 6,800 1,700 45 186 311 497 54 M16 13,900 15,900
PCF 1400-C3 20,400 6,800 1,700 65 184 307 492 78 M16 20,700 23,600
PCF 1400-C4 27,200 6,800 1,700 85 184 307 491 102 M16 27,500 31,400
PCF 1600-C1 7,200 7,200 1,800 25 209 348 556 30 M16 7,700 8,900
PCF 1600-C2 14,400 7,200 1,800 45 206 344 550 54 M16 15,200 17,600
PCF 1600-C3 21,600 7,200 1,800 65 205 341 546 78 M16 22,600 26,200
PCF 1600-C4 28,800 7,200 1,800 85 204 340 544 102 M16 30,000 34,800
PCF 1800-C1 7,600 7,600 1,900 25 225 375 600 30 M16 8,100 9,600
PCF 1800-C2 15,200 7,600 1,900 45 223 371 594 54 M16 16,000 19,000
PCF 1800-C3 22,800 7,600 1,900 65 221 368 590 78 M16 23,800 28,300
PCF 1800-C4 30,400 7,600 1,900 85 220 367 588 102 M16 31,600 37,600
PCF 2000-C1 8,000 8,000 2,000 25 234 391 625 30 M16 8,500 10,000
PCF 2000-C2 16,000 8,000 2,000 45 231 385 616 54 M16 16,700 19,700
PCF 2000-C3 24,000 8,000 2,000 65 230 383 613 78 M16 24,900 29,400
PCF 2000-C4 32,000 8,000 2,000 85 229 382 611 102 M16 33,100 39,100
NOTES:
1. FOUNDATION SHOULD BE DESIGNED TO CATER THE OPERATING WEIGHT OF THE COOLING TOWER.
2. ALL FOUNDATIONS REQUIRED TO BE LEVELLED WITHIN ±3 mm TOLERANCE AND PROVIDED WITH POCKETS FOR ANCHOR BOLTS.
3. FOR COOLING TOWERS EXCEEDING 4 CELLS CONFIGURATION, CONSULT PANWATER FOR TOWER LAYOUT AND FOUNDATION DIMENSIONS.
4. PANWATER RESERVES THE RIGHT TO ALTER OR MODIFY THE SPECIFICATION WITHOUT PRIOR NOTICE IN THE INTEREST OF PRODUCT IMPROVEMENT.

27
THE COOLING TOWER BEHIND
THE INDUSTRY

PET Series

Induced draft cross flow cooling towers using timber splash bars as fill
media supported on SS 304 grids. Tower structure constructed from
Malaysian hardwood with heavy duty design mechanical equipment for
continuous operation & long life span. Most commonly used in
applications where water is contaminated and high temperature service.
Industries with dusty environment, minimum maintenance provisions and
continuous operational duration is anticipated.

PEG Series

Induced draft cross flow cooling towers with high efficiency PVC fill
media and drift eliminators. Tower structures are fabricated from hot dip
galvanized heavy gauge sections with FRP hot water basin, cold water
basin and exterior casing. Most suitable for cooling water requires very
low temperature and high efficiency with respect to power consumption.
Applicable to process water with comprehensive water treatment
programme. larger flow capacity and limited plot area.

PCT Series

Induced draft cross flow cooling towers with high efficiency PVC fill
media and drift eliminators. Tower structures are constructed from either
Malaysian hardwood, zinc galvanised steel or FRP pultrusions. Most
commonly used for process water requires very low temperature and
high efficiency with respect to power consumption. Applicable to process
water with comprehensive water treatment programme. larger flow
capacity and limited plot area.

PCC Series

A similar type of cooling tower to the PCT Series except the tower
structure is constructed of reinforced concrete. This type of cooling tower
offer unlimited life span commonly applicable to larger cooling tower
size only. Although the initial construction cost is relatively higher, long
life span and low maintenence cost over a longer term encourage this
type of cooling tower to be used in heavy industries and power plants
where continuous operation over very long term is expected.

Your Local Agent :


Manufacturer :
PANWATER ENGINEERING SDN. BHD (173663-M)
Lot 817, AL 288, Jalan Kampung, Kampung Baru Sungai Buluh,
47000 Sungai Buluh, Selangor Darul Ehsan, Malaysia.
Tel : 603-6157 9399 (Hunting Line) / 603-6157 5199 /
603-6156 8022 / 603-6156 9190 / 603-6156 9189
Fax : 603-6157 0399
E-mail : panwater@po.jaring.my

You might also like