1.

Attachment table
Page Section Remarks
6 3.1 Project “....The Project involves the development of a 250MW gas-fired
Description peaking power plant and 150kV & 270kV...”
Correction :
“....The Project involves the development of a 250MW gas-fired
peaking power plant and 150kV & 275kV...”
7 3. Description “....Electricity output will comprise three separate powerlines: a
150kV power line that will be installed between the power station
150 kV substation and the Arun 1 power station...”
Correction :
“....Electricity output will comprise four separate powerlines:
two 150kV power line that will be installed between the power
station 150 kV substation and the Arun 1 power station...”
7 3.3 Status of the “...Standard working hours on-site were reported to be typically
Project at time of the 8am-5pm, five days per week...”
monitoring visit Correction :
“...Standard working hours on-site were reported to be typically
8am-5pm, six days per week...”
7 3.3 Status of the “...An agreement is in place for the Project to notify the
Project at time of the community if later than normal working is to take place on
monitoring visit Thursday evenings...”
Correction:
“...An agreement is in place for the Project to notify the
community if later than normal working is to take place only for
Thursday evenings, in respect to muslim which usually
perform an evening muslim actitities in the Village Islamic
Center nearby the Project...”
14 HSE Operation Chart PLN provide Updated HSE Operation chart as attachmented.
32 3.8 Wastewater “....There are reportedly two septic tanks on-site for the
Management collection of domestic wastewater from toilets...”
Correction :
“....There are reportedly every septic tanks on-site has it own
collection of domestic wastewater from toilets, at the moment
due to limited worker of q1 2019 EPC have three toilets location
...”
...
...
...
...
...
...
GENERAL MANAGER

WEDDY B. SUDIRMAN

BUREAU OF HEALTH,
PROJECT MANAGER SAFETY,
ENVIRONMENTAL
M.E. SUBRATA ARI IRAWAN

SUPERVISOR OF PROJECT
SUPERVISOR FINANCE &
MANAGEMENT MANAGER OF TECHNICAL
ADMINISTRATION
INFORMATION SYSTEM
INDRA SAPUTRA HANIF HENDRI A. RYAN KHARISMA

SITE BUREAU OF HEALTH,


ELECTRICAL ELECTRICAL MECHANICAL SAFETY, ENVIRONMENTAL
CIVIL ENGINEER
ENGINEER ENGINEER ENGINEER SENIOR MANAGER
RONY MUSTOFA KOKOH PRASETIO NOFLI HIDAYAT AHMAD BUHORI DARIS BUDI PRASTYO

SUPERVISOR EPC OF
ENVIRONMENTAL & PRIVATE SECURITY EPC COMMUNITY LIASION
MEDICAL SERVICES ENVIRONMENTAL
SOCIAL CONSULTANT COMPANY OFFICER
CONTROL
ROYAL HASKONING DHV ARUN HOSPITAL BRIMOB & POLRES YULIUS MUHAMMAD REDO

You might also like