You are on page 1of 4

List of Documentary Exhibits for the Defense

Exhibits Description
1 Counter - Affidavit
2 Complaint in Civil Case
3 Construction Agreement
4 Plans Design & Specification
5 Scope of Work
6 Bill of Materials
6-A Summary of Completed Construction 1
6-B Summary of Completed Construction 2
6-C Summary of Completed Construction 3
6-D Summary of Completed Construction 4
6-E Summary of Completed Construction 5
6-F Summary of Completed Construction 6
7 Construction Cost – Payment Schedule
8 First Billing 1
8-A First Billing 2
8-B First Billing 3
8-C First Billing 4
8-D First Billing 5
9 Second Billing 1
9-A Second Billing 2
9-B Second Billing 3
9-C Second Billing 4
9-D Second Billing 5
9-E Second Billing 6
10 Third Billing 1
10-A Third Billing 2
10-B Third Billing 3
10-C Third Billing 4
10-D Third Billing 5
10-E Third Billing 6
11 Memorandum of Agreement & Contractor Undertaking
12 Supplemental Construction Agreement for 3 rd Floor
13 Notice of Suspension of Work March 06, 2017
14 Letter dated March 10, 2017
15 Letter Reply March 10, 2017
16 Letter dated March 14, 2017
17 Footing the Beam Plan
17-A Ground Floor plan
17-B Second Floor Plan
17-C Roof Deck Plan
17-D Stone Works Design
17-E Cement Plastered
17-F Rear Design Plan
17-G Ground Floor
17-H Second Floor
17-I Roof Deck
18 Letter Reply dated March 18, 2017
19 Letter Request of Ladrigan dated March 21, 2017
20 Letter dated March 31, 2017
21 Letter dated April 03, 2017
22 Demand Letter dated April 05, 2017
22-A Receipt dated April 05, 2017
22-A-1 Signature of Sender
23 Supplemental Demand Letter dated April 20, 2017
24 Affidavit of Allan Urbano
25 Affidavit of Ernesto Ramos dated February 02, 2018
26 Adroit Construction
26-A Certificate of Philgeps
26-B Mayors Permit
26-C Certificate of Registration
26-D Tax Clearance
26-E Key Personnel
26-F I.D. of Divina Enrico
26-G Memorandum of Agreement dated April 1, 2017
26-H Report of Final Inspection
26-I Resolution of Final Inspection
26-J Certificate of Final Inspection
26-K Letter dated January 27, 2012
26-L Special Power of Attorney
26-M Special Power of Attorney
26-N Special Power of Attorney
26-O Special Power of Attorney
26-P Special Power of Attorney
26-Q Cost of Conversion
26-R Resolution of Final Completion
27 Letter dated May 11, 2017
28 Denial of Issuance of Building Permit
29 Minutes of Administrative Hearing
30 Cease and Desist Order
31 Site Development Plan
31-A Signature of Allan Urbano
31-B Signature of Cesar B. Ladringan
32 Lighting Layout
32-A Signature of Emmanuel R. Ona
32-B Signature of Czarina Ladringan
33 Power Layout Plan
33-A Signature of Emmanuel R. Ona
33-B Signature of Czarina Ladringan
34 Plumbing Layout
34-A Signature of Armando G. Urbano
34-B Signature of Czarina Ladringan
35 Isometric Layout
35-A Signature of Armando Urbano
36 Structural Design Plan
36-A Signature of Ariel S. Najera
36-B Signature of Cesar B. Ladringan
37 Structural Design Plan
37-A Signature of Ariel S. Najera
38
38-A
38-B Picture: Front View
38-C Picture: Rear View
38-D Picture: Left Side
38-E Picture: Right Side
38-F Picture: Main Entrance
38-G Picture: Four Panel Sliding Glass Door
38-H Picture: High-ceiling
38-I High-fixed Window
38-J Open Concept Living Room
38-K Dining Area
38-L Kitchen
38-M Kitchen Counter A
38-N Kitchen Counter B
38-O Storage Room
38-P Main Door Master Bedroom
38-Q Inside Master Bedroom
38-R Rest Room Master
38-S Walk-in Closet Master
38-T Inside Master Bedroom B
38-U Master Bedroom B leading to terrace
38-V Wash Area B
38-W Walk-in closet B
38-X Rest room Master Bedroom B
38-Y Guest room A
38-Z Rest room guest room A
38-AA Stainless Steel Railings
38-BB Skylight
38-CC Hallway 2 nd floor
38-DD Common CR Lower Ground Floor
38-EE Stairs 2 nd floor
38-FF Stairs 3 rd
38-GG Machine room
38-HH Guest room 3 rd floor
38-II Guest room B
38-JJ Guest room C
38-KK Rest room Guest room C
38-LL Hallway 3 rd floor
38-MM Rooftop
39
40 Affidavit of Ernesto Ramos September 17, 2018
Reserved Evaluation of Engr. Antonio Aldovino Jr.

You might also like