Floor systems
The aim of this article is to highlight the requirements that may exist for a given building project, and indicate how
these requirements should drive the designer towards the most appropriate and cost effective choice of floor system.

The range of steel based floor systems is presented in general terms, with the advantages and disadvantages of each
system identified so that these can be compared against the requirements of a given project. The article does not go
into technical detail about the different types of composite, long span, and shallow floor solutions.

Installing re-entrant steel decking

What drives the choice of floor system?


Different buildings have different requirements, so not surprisingly there is no 'one size fits all' most appropriate
solution. Clearly the requirements vary depending on the type of use, but there are also some more subtle issues to
consider and these are highlighted below.

It should not be forgotten that when considering intended use, it may be appropriate to pay attention to a different use
in the future - many steel solutions offer flexibility that can result in high levels of sustainability over the lifetime of a
building.

Simplicity and familiarity

As a rule of thumb designers should adopt the simplest solution that will meet the project requirements. Generally
speaking the simplest solution will also be the most common, and familiarity will facilitate the design, fabrication and
erection processes as no new learning is involved.

Within the context of steel floor systems, simple also means less labour and cost . For example, the simplest solution
of a downstand solid web I-section beam as opposed to a truss means; fewer structural elements, less fabrication ,
fewer surfaces to be fire protected and less time to design.

It is worth adding that this 'simple is best' philosophy also extends to frames as a whole - a simple braced frame will
normally be a more economical solution than, say, a moment resisting frame.

Speed of construction

1 / 12
//www.steelconstruction.info/Floor_systems - 20th January 2019
SteelConstruction.info
The free encyclopedia for UK steel construction information

Rapid construction using steel composite construction and steel infill walls

For some projects the need to reduce to a minimum the construction time (on site) may play a determining role.
Indeed, time is often one of the key drivers for choosing a steel solution. The need for speed may be driven by, for
example, fitting in with vacation breaks for educational buildings , or bringing in income (e.g. retail buildings). It can
lead to consideration of options that minimise wet trades on site (use of precast floor units), minimise the number of
crane lifts and provide working platforms during construction (profiled steel decking), and that do not require propping
between floors.

Service integration

Services integrated within the structural floor depth

The volume of services needed in a building is clearly a function of the end use - hospitals being an obvious example
of a highly serviced building - and design philosophy adopted by the services engineer, e.g. air-conditioned, naturally
ventilated, etc.

When a lot of service ducts are to be accommodated it may be beneficial to adopt a floor solution that provides a flat
soffit in order to maximise the flexibility in routing these ducts beneath the structural floor. It will also be easy to remove
and/or replace these ducts to meet future needs.

2 / 12
//www.steelconstruction.info/Floor_systems - 20th January 2019
SteelConstruction.info
The free encyclopedia for UK steel construction information

Solutions that provide a flat soffit don't also allow long spans. So an alternative in a building that is both highly serviced
and requires long-span floors is to integrate the services within the beam depth (as shown to the right), so that the total
depth of structural floor plus service zone is minimised.

Need for adaptable space

Open floor area providing flexible, adaptable space

One of the long-recognised benefits of steel frame construction has been its ability to span significant distances. This
is particularly true when composite solutions are adopted, given the efficiencies of that form of construction. This
spanning ability allows the number of internal load bearing walls and columns to be minimised - open floor spaces can
be created, or non load-bearing partitions (that are easily moved) used to form (temporary) individual areas.
Adaptability may be more sustainable than the currently fashionable topic of deconstruction, for which steel is also
suited. In recent years a number of steel framed office buildings have been reconfigured to provide residential units.

Daylighting requirements

'Deep' floor plans may mean that, for example, office workers are a long way from natural lighting. Long span solutions
may not then be the most appropriate solution for certain situations, rather a short span design (for example using
shallow floors ) with an internal atrium may provide a more appropriate internal environment. The designer must seek
the best compromise.

Aesthetics

If false ceilings are used then the aesthetics of the soffit of a given structural floor system are clearly irrelevant.
However, a number of clients have recently been looking for exposed soffits, exposed primarily so that the thermal
mass of the floor is exposed. The soffit must also then be visually appealing. In some cases the presence of
downstand beams interrupting the soffit may not be welcome, although it is also true that an expressed structure may
be desired. A number of steel framed options may therefore be appropriate depending on specific requirements.

Acoustics

3 / 12
//www.steelconstruction.info/Floor_systems - 20th January 2019
SteelConstruction.info
The free encyclopedia for UK steel construction information

Deansgate, Manchester – office technology applied to an apartment building

The speed with which they can be constructed, combined with excellent performance in service, was one of the
reasons why steel frames with composite floors played such a central role in the boom in the multi-storey office market
in the UK in the late 1980s and 1990s. When designers wished to transfer this technology to residential buildings
some years later, it was recognised that possibly the biggest difference in requirements was issues associated with
acoustics .

Good detailing is needed to avoid flanking issues, where sound travels around a barrier (such as a floor) by passing
through an adjoining wall. An example, in accordance with the guidance provided in SCI P372, is shown below. The
SCI has also developed an acoustic performance prediction tool for separating floors and walls to assist designers and
architects.

Numerous apartment buildings have now been constructed using steel frames, with a combination of good detailing
and proprietary products used for raised floors, etc providing the necessary levels of performance. Deansgate in
Manchester was an early example of this 'technology transfer' (see right).

4 / 12
//www.steelconstruction.info/Floor_systems - 20th January 2019
SteelConstruction.info
The free encyclopedia for UK steel construction information

Junction of a twin light steel frame separating wall with a shallow composite separating floor

Fire resistance

Fire resistance requirements depend on the use and height (number of storeys) of a building. Between 60 minutes and
120 minutes is typical. The most common solution adopted to provide fire resistance is to protect the steel members
so that they remain at a sufficiently low temperature (recognising that some loss of steel strength as temperature
increases is acceptable as loads in fire are less than ambient loading). Intumescent coatings, (paint like substances
that expand with temperature to provide an insulation layer), are often used. If the steel elements are embedded in
concrete this can provide the necessary insulation. Other options include board protection and the use of a
cementitious spray.

Alternatively, when a 'fire engineering' approach is adopted the steel members are designed so that they are
sufficiently strong, even when material strength has been lost due to exposure to fire, to resist the appropriate levels of
loading. Extensive guidance, based on full scale fire testing of complete buildings, is available (SCI P375)

Thermal mass

5 / 12
//www.steelconstruction.info/Floor_systems - 20th January 2019
SteelConstruction.info
The free encyclopedia for UK steel construction information

Exposed concrete floors supported on steel beams and used to provide thermal mass

Provision of sufficient thermal mass is an important part of a low energy building solution. The mass provides a heat
sink that absorbs heat during the day, and then in combination with natural ventilation the heat is purged during the
cooler night time. Composite floor slabs may even be constructed with integral water ducts to aid this purging. It is
important that the thermal mass is exposed - so false ceilings may be a problem, as is plasterboard attached with dabs
to otherwise massive walls. Horizontal elements (floors) are much more effective at providing mass than vertical
elements.

When deciding how much mass is needed it is important to consider the occupation pattern of a building. Massive
structures can absorb a lot of heat, but they also provide inertia when wanting a building to heat up rapidly. There is a
common misconception that a very massive building is best.

Floor stiffness

Stiffness is needed to ensure that a floor behaves correctly from a dynamic point of view, thereby assuring user
comfort. This is a complex subject, as the real issue is how the floor responds (in terms of acceleration), and that is a
function of a number of variables including stiffness and the mass that is mobilised. The traditional approach, which is
recognised as being crude, for designing a floor to respond acceptably is to check its natural frequency and compare
that with a limiting value (which is a function of the floor mass). A more thorough approach is recommended, which
often yields good, i.e. less conservative but satisfactory, results. See SCI P354.

A web-based Floor response calculator is also available that allows designers to make an immediate assessment of
the dynamic response of a floor solution. The software reports the results of approximately 19,000 arrangements of
floor grid, loading and bay size, which have been investigated using finite element analysis. The results from this
software provide an improved prediction of the dynamic response compared to the ‘manual method’ in SCI P354. The
software may be used to examine complete floor plans or part floor plans, comparing alternative beam arrangements.

The required behaviour depends on the function for a given building/room. Some uses are less tolerant to floor
movements (e.g. an operating theatre). Some uses (e.g. a gymnasium within an office) are more likely to cause
problems and warrant particular attention.

Deconstruction

6 / 12
//www.steelconstruction.info/Floor_systems - 20th January 2019
SteelConstruction.info
The free encyclopedia for UK steel construction information

There has been considerable debate in recent years about deconstruction . The ability to dismantle a building and use
the components again elsewhere is clearly attractive from a sustainability point of view, and steel lends itself to such a
solution. There are some logistical issues associated with this approach (how do you find the 'used' component that
meets your needs), but these can no doubt be overcome given the right drivers. There may also be issues to do with
efficient use of materials - tying materials together into composite forms of construction makes the most of the different
attributes of the individual materials, but may make them more difficult to separate for re-use.

Deconstruction will certainly be on the agenda in future.

Cost

As noted above, unless project specific drivers suggest the adoption of a more sophisticated alternative, then the
simplest solution should be chosen and this will normally prove to be the most cost effective.

Cost is a fundamental consideration in the selection of the frame and floor system. Late in 2016, the BCSA and Steel
for Life commissioned AECOM to provide a series of building type specific cost comparisons for office, education,
residential/mixed-use, retail and industrial buildings, based on actual buildings. The buildings selected were originally
part of the Target Zero study conducted by a consortium of organisations including Tata Steel, AECOM, SCI, Cyril
Sweet (now Currie & Brown) and BCSA in 2010 to provide guidance on the design and construction of sustainable,
low and zero carbon buildings in the UK.

The cost comparisons presented in the ‘Costing Steelwork’ series update the cost models developed for the Target
Zero project, and provide up-to-date costs for the alternative framing solutions considered for each of the five building
types.

The cost comparison studies illustrate that for a range of building types, on a like for like basis steel frame and floor
solutions are highly competitive. The studies also highlighted the importance of considering total building cost not just
structural frame cost, as the choice of the structural frame and floor configuration will have associated impacts on
many other elements, including the substructure, roof and external cladding.

Benefits of different floor systems

Slab options
Composite slabs

Decking being laid out on a steel frame

7 / 12
//www.steelconstruction.info/Floor_systems - 20th January 2019
SteelConstruction.info
The free encyclopedia for UK steel construction information

Composite slabs, comprising lightly reinforced concrete cast on profiled steel decking, are an option whether the
beams are downstand or integrated within the slab depth for a shallow floor form of construction. The slabs are
normally reinforced using an upper layer of mesh and, occasionally, additional bars in the troughs (usually for longer
periods of fire resistance and heavy loads). Fibre reinforcement may also be used. Spans of up to 4.5 m can be
achieved using trapezoidal decking (80 mm deep). Some so-called deep decking profiles also exist (over 200 mm
deep), that can span 6 m or so without propping during construction.

Composite slabs are an excellent choice when speed of construction is important. Bundles of decking are lifted into
place on the steel structure, for distribution by hand. The number of crane lifts needed, when compared with the
precast alternative, is greatly reduced. The ability to stack the pieces of decking into bundles also reduces transport
time and costs.

During construction, once in place the decking provides other benefits in terms of acting as a working platform for
storage of materials. When appropriately orientated and fixed to the steel beams it can restrain them against lateral
torsional buckling. See SCI P300 .

Composite floor systems

In the final state the ribs in the decking serve as void formers in the slab, thereby reducing the weight of floor
construction with the knock-on benefits this can have. It is also possible to suspend services from the soffit of a
composite slab, using anchors that are designed to slot into the decking profile.

A number of methods can be used for controlling the concrete level during construction. Basically, the concrete depth
may be kept constant, or the upper surface may be kept level. Depending which of these is chosen the weight of
concrete will vary, so it is important that the designer communicates clearly with the site team. See SCI AD410.
Further guidance on the installation of metal decking is also available.

When an exposed soffit is required - to expose thermal mass - a thermally transparent suspended ceiling may be used.
The additional surface area of the soffit created by the decking (as opposed to a flat concrete face) can be beneficial.

Precast units

Erecting precast floor slabs on a steel frame


(Image courtesy of Severfield (Design & Build) Ltd.)

Precast concrete units may be used in conjunction with steel beams. The units may be solid or hollow-core, and with
tapered or bluff ends. They are normally prestressed. The beams may also be structurally connected to the slab units
to make them 'composite', provided specific detailing rules are satisfied to ensure that the steel section and concrete
(in-situ topping plus the precast units) act together. SCI P401 gives further information on this.

Floors using precast units offer a number of benefits. The spanning ability of the units is such that the spacing of
secondary beams can be increased (compared to when traditional decking profiles are used). The construction
system is most efficient for column grids of approximately 9 m by 9 m. The units provide a flat soffit.

For semi-exposed applications, such as car parks, precast units may be a more durable alternative than steel decking
(although with the correct detailing and coatings it is certainly possible to use decking in such applications).

Precast floors

Downstand beam systems


8 / 12
//www.steelconstruction.info/Floor_systems - 20th January 2019
SteelConstruction.info
The free encyclopedia for UK steel construction information

Trapezoidal decking installed on downstand beams

The most common type of composite beam is one where a composite slab sits on top of a downstand beam,
connected by the use of through deck welded shear studs. This form of construction offers a number of advantages -
the decking acts as external reinforcement at the composite stage, and during the construction stage as formwork and
a working platform. It may also provide lateral restraint to the beams during construction. The decking is lifted into
place in bundles, which are then distributed across the floor area by hand. This dramatically reduces the crane lifts
when compared with a precast based alternative.

Further guidance on practical aspects of decking placement may be found in the best practice guide SCI P300.

Another common type of composite beam is one where, as with a traditional non-composite steel framed solution, a
precast concrete slab sits on top of the top flange of the steel beam. The effective span range for this type of solution is
around 6 to 12 m, which therefore makes it a competitor to a number of concrete flooring options. Particular detailing is
required for the shear connection when precast units are used, so that the body of the precast units can be mobilised
as part of the concrete compression flange. See SCI P401 for more information.

Long-span beams

A number of variations on the idea of downstand beams is available to meet long-span needs. The use of long span
beams results in a range of benefits, including flexible, column free internal spaces, reduced foundation costs, and
reduced erection times. Many long span solutions are also well adapted to facilitate the integration of services without
increasing the overall floor depth.

Shallow floors

9 / 12
//www.steelconstruction.info/Floor_systems - 20th January 2019
SteelConstruction.info
The free encyclopedia for UK steel construction information

The USFB system


(Image courtesy of Kloeckner Westok)

Shallow floors offer a range of benefits such as minimising the overall height of a building for a given number of floors,
or maximising the number of floors for a given height of building. Additionally, a flat soffit is achieved - there are none
of the interruptions found with downstand beams - which gives complete freedom for the distribution of services below
the floor. These benefits should be considered in the context of a given project to identify when they are most
appropriate.

The shallowness of the floors is achieved by placing the slabs and beams within the same zone. This is achieved by
using asymmetric steel beams with a wider bottom than top flange, which enables the slab to sit on the upper surface
of the bottom flange with adequate bearing, rather than the upper surface of the top flange as found with downstand
beams. The floor slab may be in the form of a precast concrete slab or a composite slab with metal decking (either
shallow or deep decking may be used). An added benefit is that some forms of shallow floor construction inherently
achieve composite interaction between the beams and slab, thereby enhancing structural efficiency.

A number of shallow floor solutions are available, including Ultra Shallow Floor Beams (USFB) from Kloeckner
Westok, and ArcelorMittal's Slim Floor solutions.

USFB with precast hollocore slabs USFB with deep decking


(Image courtesy of Kloeckner Westok) (Image courtesy of Kloeckner Westok)

10 / 12
//www.steelconstruction.info/Floor_systems - 20th January 2019
SteelConstruction.info
The free encyclopedia for UK steel construction information

Kloeckner Westok’s USFB system comprises a shallow and asymmetric Westok cellular beam with reinforcement
placed through the cells to anchor the slab to the beam. This simple detail provides a straightforward and cost-
effective disproportionate collapse detail and is also used to resist torsion in the final condition. For composite slabs
with metal decking the reinforcement is placed in the troughs of the metal decking. With hollowcore slabs, the
reinforcement is placed in alternative cores of the precast unit. To restrain the top-flange of the USFB in the Normal
Stage, the insitu concrete should be cast flush with or over the top-flange, in which case a minimum cover of 30mm is
recommended.

USFB cross-section
(Image courtesy of Kloeckner Westok)

The USFB is manufactured from standard rolled sections, and is available in increments of 1mm depth. They are
typically 150-300mm deep and are sized and designed using Westok’s freely available Cellbeam software package
based on each individual project requirements and floor grids etc. The software carries out all of the necessary
structural checks, including torsion checks in the Construction Stage. USFBs can economically span up to 10m with
structural depths that compare very favourably with R.C. flat slabs. As such, they are popular in many sectors,
particularly Education, Commercial and Residential.

‘Plug Composite Action’ can be mobilised for USFBs, which has been demonstrated using full-scale laboratory testing,
to further enhance the capacity of the section. To mobilise ‘Plug Composite Action’, the following detailing should be
adopted:

Composite slabs with metal decking: Concrete cast level with, or above, the top flange
Precast units generally: Minimum 50mm topping level with, or above the top flange
Hollowcore units: Every 2nd core broken out and filled with concrete and reinforced through the cell
Solid in-situ slabs: Concrete cast level with (or above) the top flange

Resources
SCI P287, Design of Composite Beams using Precast Concrete, 2003 (An updated Eurocode version of this
publication, P401, is available from SCI)
SCI P354, Design of Floors for Vibration. A New Approach, Revised Edition, 2009
SCI P372, Acoustic Detailing for Steel Construction, 2008

11 / 12
//www.steelconstruction.info/Floor_systems - 20th January 2019
SteelConstruction.info
The free encyclopedia for UK steel construction information

SCI P300, Composite Slabs and Beams using Steel Decking: Best Practice for Design and Construction
(Revised Edition), 2009
SCI P375, Fire Resistance Design of Steel Framed Buildings, 2012
SCI P401, Design of composite beams using precast concrete slabs in accordance with Eurocode 4, available
from SCI
SCI AD410, Pouring concrete to a constant thickness or to a constant plane, 2017
SCI Acoustic performance prediction tool for separating floors and walls
Floor response calculator

See also
Sustainability
Thermal mass
Recycling and reuse
Cost of structural steelwork
Cost comparison studies
Fabrication
Education buildings
Healthcare buildings
Residential and mixed-use buildings
Retail buildings
Multi-storey office buildings
Car parks
Acoustic performance of floors
Junction details for acoustic performance
Floor vibrations
Steel construction products
Braced frames
Composite construction
Long-span beams
Structural fire resistance requirements
Design of composite steel deck floors for fire