Professional Documents
Culture Documents
What benefit does the predictive loading capacity Which bushing monitoring do ABB recommend?
function in CoreTec give the grid owners? For the moment Doble IDD.
The loading capacity function gives improved control and
greater assurance of the load ability of the transformers when Which PD monitoring do ABB recommend?
emergency situations in the grid occurs. ABB does not recommend PD measurement in transformer
monitoring. It is costly and not reliable and does not provide
How much can typically an air cooled transformer be added value in terms of data for conclusions and actions. For
loaded, if CoreTec Overload capacity function is used? more information please examine the CoreTec Sales tool.
An overload of 10-30 % is usual.