You are on page 1of 318

Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
e de
clFinancial
Oracle Projecto r a
G ui
r i a @ ent
z a ud
ka St11.1.2:
Planning Create
e dฺ Projects
this
m e
o ham to us
i a (m nse
k a r l i ce
d Za rable Student Guide

m e sfe
n
o ham n-tra
M no

D76116GC10
Edition 1.0
September 2012
D78925
Author Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

Theresa Songco Disclaimer

This document contains proprietary information and is protected by copyright and


Technical Contributors other intellectual property laws. You may copy and print this document solely for your
and Reviewers own use in an Oracle training course. The document may not be modified or altered
in any way. Except where your use constitutes "fair use" under copyright law, you
Liz Kasabian may not use, share, download, upload, copy, print, display, perform, reproduce,
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

publish, license, post, transmit, or distribute this document in whole or in part without
Shankar Viswanathan
the express authorization of Oracle.
Manish Daga
The information contained in this document is subject to change without notice. If you
Ron Reiley find any problems in the document, please report them in writing to: Oracle University,
Eleanor Salerno 500 Oracle Parkway, Redwood Shores, California 94065 USA. This document is not
warranted to be error-free.
Amish Patel
Ankit Rastogi Restricted Rights Notice

If this documentation is delivered to the United States Government or anyone using


the documentation on behalf of the United States Government, the following notice is
Publisher applicable:
s a
Michael Sebastian Almeida
U.S. GOVERNMENT RIGHTS ) h a
c om ฺ
The U.S. Government’s rights to use, modify, reproduce, release, perform, display, or

cle uide
disclose these training materials are restricted by the terms of the applicable Oracle

r
o tG a
license agreement and/or the applicable U.S. Government contract.

Trademark Notice
r @
iofaOracle and/or
e n
a a d
kowners. Stu its affiliates. Other names
Oracle and Java are registered trademarks
z
dฺ this
may be trademarks of their respective

m se e
h a m u
o t o
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no
Contents
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

1 Project Financial Planning Overview


Objectives 1-2
Oracle Hyperion Planning 1-3
Planning Components 1-4
Product Integration 1-6
Planning Architecture 1-7
Client Tier 1-8
s a
Middle Tier 1-9 ) h a
Data Tier 1-10
ฺ c om ฺ
External Services 1-11
r a cle uide
Oracle Project Financial Planning 1-12
@ o tG
a r
Project Financial Planning Features 1-13 ia den
ฺ z ak s Stu
Project Financial Planning Process 1-15

m ed e thi
Step 1: Entering Project Details 1-16

ham to us
Step 2: Planning for Expenses 1-17
o
i a (m nse
Step 3: Planning for Revenue 1-18

k a r l i ce
Step 4: Reviewing Financials 1-19
Za rable
Step 5: Managing Funding 1-20
d
m e sfe
Step 6: Submitting Plans for Approval 1-21
n
o ham n-tra
Project Financial Planning Business Scenario 1-22
M no Training Environment 1-24
Quiz 1-25
Summary 1-27
Practice 1-1 Through 1-4 1-28

2 Administration Tasks
Objectives 2-2
Lesson Agenda 2-3
Initial Implementation Tasks 2-4
Loading Required Dimensions and Members 2-6
Loading Data 2-7
Templates Overview 2-9
Extracting Template Files 2-10
Template Format 2-11
Data Load File Order 2-12

iii
Running the Import Utility 2-14
Setting Substitution Variables 2-15
Managing Smart Lists 2-17
Selecting User Variable Members 2-18
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Lesson Agenda 2-20


Project Administration 2-21
Project Administration Task List Tasks 2-22
Project Assumptions 2-23
Setting Discount Rates and Taxes 2-24
Project Scoring 2-26
Investment Criteria 2-28
Defining Weightage for Criteria 2-30
s a
Defining Weightage for Financial Goals 2-31
) h a
Defining Weightage for Subjective Groups 2-32
ฺ c om ฺ
Defining Weightage for Subjective Goals 2-33
r a cle uide
Overhead Assumptions 2-34
@ o tG
Overhead Assumptions: Indirect Costs 2-35
a r ia den
ฺ z ak s Stu
Overhead Assumptions: General and Administrative Costs 2-36
ed e thi
Allocation Basis Assumptions 2-37
m
ham to us
Approval Settings 2-38
o
Key Performance Indicators 2-39
(m nse
a r i a ce
Intercompany Partners 2-40
i
k l
Za rable
Preparing Base Forecast Data 2-41
d
m e sfe
Lesson Agenda 2-43
n
ham n-tra
Workforce Administration 2-44
o
M no Setting Workforce Global Rates 2-45
Importing Employees 2-47
Calculating Employee Compensation 2-48
Lesson Agenda 2-49
Capital Asset Administration 2-50
Importing Existing Assets 2-51
Asset Class and Asset Detail 2-52
Setting Capital Assumptions 2-54
Rolling Up Asset Expenses 2-56
Verifying Loaded Depreciation and Amortization 2-57
Calculating Asset Related Expenses 2-58
Quiz 2-59
Summary 2-61
Practice 2-1 Through 2-4 2-62

iv
3 Creating Projects
Objectives 3-2
Determining a Project Type 3-3
Capital Projects 3-4
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Types of Capital Projects 3-5


Contract Projects 3-6
Types of Contract Projects 3-7
Indirect Projects 3-8
Preparing Project Tasks 3-9
Entering New Project Details 3-10
Capital Projects: Adding Projects 3-11
Capital Projects: Adding Project Details 3-12
s a
Capital Projects: Adding Capital Sub-Projects 3-13
) h a
Contract Projects: Adding Projects 3-14
ฺ c om ฺ
Contract Projects: Adding Project Details 3-15
r a cle uide
Indirect Projects: Adding Projects 3-17
@ o tG
r ia den
Indirect Projects: Adding Project Details 3-18
a
Viewing Project Proposals 3-19
ฺ z ak s Stu
ed e thi
Capital Projects: Deleting Project Proposals 3-20
m
ham to us
Contract Projects: Deleting Project Proposals 3-21
o
Indirect Projects: Deleting Project Proposals 3-22
(m nse
a r i a ce
Changing Project Status 3-23
i
k l
Za rable
Project Status Runtime Prompts 3-24
d
m e sfe
Reconciling Projects 3-25
n
ham n-tra
Moving Projects 3-26
o
M no Quiz 3-27
Summary 3-30
Practice 3-1 Through 3-4 3-31

4 Planning for Project Expenses


Objectives 4-2
Expense Planning: Task Overview 4-3
Assigning and Calculating Labor Expenses 4-4
Adding Labor 4-5
Calculating Labor Expenses 4-8
Reviewing Labor Expenses 4-9
Assigning and Calculating Equipment Expenses 4-10
Adding Equipment 4-11
Calculating Equipment Expenses 4-13
Reviewing Equipment Expenses 4-14
Adding and Calculating Material and Other Requirements 4-15

v
Adding and Calculating Material and Other Resources 4-16
Calculating Material and Other Expenses 4-18
Reviewing Material and Other Expenses 4-19
Entering Direct Project Expenses 4-20
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Calculating Overhead Expenses 4-21


Reviewing Indirect and G&A Expenses 4-22
Reviewing Total Expenses 4-24
Quiz 4-25
Summary 4-27
Practice 4-1 Through 4-7 4-28

5 Planning for Contract Project Revenues


s a
Objectives 5-2
) h a
Revenue Planning: Task Overview 5-3
ฺ c om ฺ
r a cle uide
Entering Revenue Drivers for Cost Plus Projects 5-4
Adding and Removing Revenue Assumptions 5-6
@ o tG
r ia den
Calculating Revenue for Cost Plus Projects 5-8
a
Quiz 5-9
ฺ z ak s Stu
ed e thi
Entering Revenue Drivers for Time and Materials Contract Projects 5-11
m
ham to us
Viewing Standard Hourly Rates 5-12
o
Copying the Base Billing Rate 5-13
(m nse
a r i a ce
Calculating Labor Revenue 5-14
i
k l
Za rable
Calculating Material Revenue 5-15
d
m e sfe
Calculating Equipment Revenue 5-16
n
ham n-tra
Calculating Total Project Revenue 5-17
o
M no Entering Revenue Drivers Based on Units Sold and Sales Price Per Unit 5-18
Entering Direct Project Revenue 5-20
Revenue Recognition 5-21
Summary 5-22
Practice 5-1 Through 5-2 5-23

6 Reviewing Project Financials


Objectives 6-2
Reviewing Project Financials Overview 6-3
Performing Calculations 6-4
Reviewing Project Financial Statements 6-5
Reviewing Project Metrics and KPIs 6-6
Reviewing Project Justification 6-8
Reviewing Project Score 6-9
Requesting Project Funding 6-10
Adding and Canceling Funding Requests 6-12

vi
Reviewing Allocated Funds 6-14
Quiz 6-15
Summary 6-18
Practices 6-1 Through 6-8 6-19
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

7 Managing Intercompany Projects


Objectives 7-2
Managing Intercompany Projects 7-3
Limitations of Intercompany Projects 7-4
Tasks for Intercompany Projects 7-5
Calculating Cost Plus Intercompany Revenue 7-6
Calculating Project Data 7-7
s a
Reviewing Intercompany Reconciliations 7-8
) h a
Summary 7-9
ฺ c om ฺ
Practices 7-1 Through 7-9 7-10
r a cle uide
@ o tG
8 Managing Existing Projects
a r ia den
Objectives 8-2
ฺ z ak s Stu
Managing Existing Projects 8-3
m ed e thi
h a m 8-4us
Process for Managing Existing Projects

m o
Managing Existing Projects Task to 8-5
List Tasks
e
i a ( ns
Quiz 8-7
r c e
Summary 8-9
Z aka ble li
Practices
m f era 8-8 8-10
ed 8-1sThrough
h9am - t r anand Approving Projects
o
M non Reviewing
Objectives 9-2
Lesson Agenda 9-3
Process for Reviewing Projects 9-4
Calculating Departmental Financial Statements 9-5
Reviewing Project Proposals 9-6
Reviewing Existing Projects 9-7
Comparing Project Scores 9-8
Reviewing Project Performance 9-9
Reviewing Departmental Financial Performance 9-10
Reviewing the Impact on Financial Statements 9-11
Lesson Agenda 9-12
Project Financials Overview 9-13
Finance Analysis Task List 9-14
Running Rollups 9-15
Viewing the Financial Overview 9-16

vii
Financial Overview: Allocating Funds 9-17
Financial Overview: Changing Funding Status 9-19
Financial Overview: Reviewing the Impact on Financial Statements 9-20
Financial Overview: Reviewing Project KPIs 9-21
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Performing Detailed Analysis 9-22


Reviewing Project Funding 9-23
Approving Projects 9-24
Submitting Plans for Approval 9-25
Reviewing Projects 9-27
Quiz 9-29
Summary 9-32
Practices 9-1 Through 9-4 9-33
s a
) h a
10 Analyzing the Workforce
ฺ c om ฺ
Objectives 10-2
r a cle uide
Analyzing the Workforce 10-3
@ o tG
r ia den
Driver-Based Planning for Workforce Costs 10-4
a
ฺ z ak s Stu
Required Metadata and Data Overview 10-5
ed e thi
Analyzing Workforce: Task Overview 10-7
m
ham to us
Task Lists for Workforce Analysis and Planning 10-8
Rolling Up Data 10-9 o
(m nse
a r i a ce
Reviewing the Resource Manager Dashboard 10-10
i
k l
Za rable
Utilization Trend Chart 10-11
d
m e sfe
Hiring Plan Chart 10-12
n
ham n-tra
Project Staffing Request – FTE 10-13
o
M no Project Staffing Request – Labor Hrs 10-14
Reviewing Resource Utilization 10-15
Reviewing Resource Requests Across Projects 10-16
Staffing Projects 10-17
Requesting New Hires 10-19
Recalculating Compensation Costs 10-20
Reviewing Total Compensation 10-21
Reviewing Employee Headcount and FTE 10-22
Quiz 10-23
Summary 10-26
Practices 10-1 Through 10-8 10-27

11 Analyzing and Planning for Capital Assets


Objectives 11-2
Analyzing Capital Assets 11-3
Required Metadata and Data Overview 11-4

viii
Analyzing Capital Assets and Equipment 11-6
Task Lists for Capital Asset Analysis and Planning 11-7
Reviewing Equipment 11-8
Reviewing Equipment Utilization 11-9
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Asset Utilization Calculation Examples 11-10


Reviewing Equipment Requests Across Projects 11-11
Assigning Equipment to Projects 11-12
Requesting New Equipment 11-13
Recalculating Equipment Costs 11-14
Reviewing the Impact on Financial Statements 11-15
Capital Planning 11-16
Reviewing Existing Assets 11-17
s a
Reviewing and Updating Asset-Related Expenses 11-19
) h a
Adding New Assets 11-20
ฺ c om ฺ
Adding New Leased Assets 11-21
r a cle uide
Reviewing Construction-In-Progress Assets 11-23
@ o tG
Calculating Asset-Related Expenses 11-24
a r ia den
ฺ z ak s Stu
Reviewing Asset Per Unit Cost Detail 11-25
Quiz 11-26
m ed e thi
ham to us
Summary 11-29
o
Practices 11-1 Through 11-7 11-30
(m nse
a r i a i ce
k l
d Za rable
m e sfe
n
o ham n-tra
M no

ix
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Project Financial Planning Overview

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no
Objectives

After completing this lesson, you should be able to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Describe Oracle Hyperion Planning (Planning) and its


components
• Identify the main components of the Planning architecture
• Describe the features of Oracle Project Financial Planning
(Project Financial Planning)
• Describe the Project Financial Planning process s a
) h a
• Describe the business scenario om
c l eฺc deฺ
o ra Gui
r i a @ ent
z a ka Stud
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 2


Oracle Hyperion Planning

Oracle Hyperion Planning:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Streamlines data entry through web and Excel interfaces


• Provides a calculation engine to promote business
modeling with complex business rules and allocations
• Enables annotations at multiple levels to capture budget
details
• Accommodates potentially sophisticated budget review as a
processes m )h
• Facilitates dynamic reporting by using Financiall e ฺco eฺ
Reporting
c id ra Gu
@ ento
r i a
z a ka Stud
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
Oracle Hyperion
a a n (Planning) is a budgeting and planning solution that provides
m trPlanning
h
o onmethods
streamlined - for entering data through web and Excel interfaces. Planning supports
M n plans that are based on global assumptions, such as interest rates and headcount,
driver-based
and promotes modeling with complex business rules and allocations. It enables users to annotate
and justify data at multiple levels to capture budget details. It enables decision makers and
managers to collaborate with budget holders during potentially complex budget review processes,
and provides the tools to create and publish dynamic financial reports by using Oracle Hyperion
Financial Reporting (Financial Reporting).

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 3


Planning Components
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Relational
Database
s

s a
Planning User Application Server
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu Essbase
m ed e thi Databases

o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m trserver
The application
a a n provides the environment for running Planning applications. Oracle
h
o oServer
WebLogic n-in theis Planning
the application server provided with Planning. It facilitates user access to non-
M
numericndata relational database and to numeric data in Oracle Essbase
databases.
Planning requires a system database and a database for each deployed application. The Planning
application database is used primarily to store the application’s definition.

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 4


The following information is stored in relational databases:
• Smart lists
• Approvals hierarchies
• Approvals details
• Annotations, comments in cells, and supporting details
• Task lists
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Preferences
• Application setup
• Data forms and data form validation rules
• User variables
• Non-numeric data
The following information is stored in Essbase databases:
• Smart lists numeric values
s a
• Numeric data
) h a
• Currency calculation scripts
ฺ c om ฺ
• Substitution variables
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 5


Product Integration

• EPM System: Profitability and Cost Management,


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Performance Scorecard, Strategic Finance, Financial


Management, and FDM
• ERP systems: Oracle E-Business Suite, Oracle
PeopleSoft Enterprise, and Oracle Fusion Applications
• Oracle Business Intelligence Suite, Enterprise Edition
for dashboards and real-time reports a
h a s
• Data management applications: Oracle Data Integrator )
o m
and ERP Integrator (FDM module) leฺc ฺ e
o rac Guid
r i a @ ent
z a ka Stud
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
mbee sfe
Planningm
a can
t r a n
integrated with the following products:
h -Enterprise Performance Management System (EPM System) product suite,
M•o Oracle’s
non
including Oracle Hyperion Profitability and Cost Management, Oracle Hyperion Performance
Scorecard, Oracle Hyperion Strategic Finance, Oracle Hyperion Financial Management, and
Oracle Hyperion Financial Data Quality Management (FDM).
• Enterprise resource planning (ERP) systems, including Oracle E-Business Suite, Oracle
PeopleSoft Enterprise, and Oracle Fusion Applications
• Oracle Business Intelligence Suite, Enterprise Edition for interactive dashboards and real-
time reports
• Data management applications, including Oracle Data Integrator and Oracle Hyperion
Financial Data Quality Management ERP Integration Adapter for Oracle Applications (ERP
Integrator; FDM module)

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 6


Planning Architecture
Client Tier
Workspace: Microsoft Office Web Analysis
Administration
Planning, EPMA, Integration Studio and
Services Console,
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Reporting and Reporting Studio


Smart View Essbase Studio
Analysis Clients

Middle Tier

Application Server Web Server Services


s a
) h a
Data Tier
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
Relational Databases ak
ฺ z S tu Databases
Essbase
ed ERP is
thSystems
External Oracle Data Integrator/ m e
Services ERP Integrator
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
ism
Planningm n application that combines the advantages of Essbase (a multidimensional
a multitier
h a t r a
- a relational database to optimize performance and maintenance.
o oand
database)
M n n
The slide illustrates the client, middle, and data tiers as well as external services that integrate
with Planning.

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 7


Client Tier

• Workspace for accessing the Planning web interface,


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

creating and deploying classic and Performance


Management Architect applications, and creating and
publishing reports
• Smart View for entering Planning data in Excel
• Administration Services Console and Essbase Studio for
modifying multidimensional outlines and calculation scripts a
h a s
• Reporting Studio for developing and running financial )
reports ฺ c om ฺ
le ac uide
Client Tier o r G
Workspace:
i a @ n t
Planning, Microsoft Office
k a r ude Studio
Administration
Web Analysis
Performance Integration
ฺ z a Services S t
Console,
and
Management
Architect, Reporting ed e thEssbase
Smart View is Studio Reporting Studio
Clients
m
ham to us
and Analysis

(m nseo
a i a
r © 2012, i ceOracle and/or its affiliates. All rights reserved.
kCopyright
l
d Za rable
m e sfe
a m contains
The client tier
t r a n Oracle Enterprise Performance Management Workspace (Workspace),
h
M on- Smart View
o Hyperion
Oracle
Consolen(Administration
for Office (Smart View), Oracle Essbase Administration Services
Services Console), Oracle Essbase Studio (Essbase Studio), Hyperion
Web Analysis Studio, and Oracle Hyperion Financial Reporting Studio (Reporting Studio).
You access and manage Planning applications, Oracle Hyperion Enterprise Performance
Management Architect (Performance Management Architect) applications, and reports in
Workspace.
On the client tier, Planning administrators and users enter data, perform approvals tasks, manage
users and security, launch business rules, copy versions, develop data forms, work with Financial
Reporting, and perform other administrative tasks, such as updating Essbase outlines.

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 8


Middle Tier

• Application server for running applications


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Supported web servers for handling HTTP requests from


Planning
• Services for Performance Management Architect, Essbase
Studio, and Financial Reporting

s a
) h a
ฺ c om ฺ
Middle Tier
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
Application Server me WebeServer
d thi Services
m
ha to u s
o
(m nse
a i a
r © 2012, i ceOracle and/or its affiliates. All rights reserved.
kCopyright
l
d Za rable
m e sfe
a m tconsists
The middle tier
r a n of Oracle WebLogic Server (the application server) for running Planning
h -
o onsupported
applications, web servers for handling Hypertext Transfer Protocol (HTTP) requests
M n and the required services for Performance Management Architect, Essbase Studio,
from Planning,
and Financial Reporting.
The web server can be on a separate machine or on the same machine as the Planning
application server. The web server enables you to access Planning applications from a web client
through a browser. The web server uses HTTP as the communications protocol.

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 9


Data Tier

• Relational databases store data for Shared Services,


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Performance Management Architect, Calculation Manager,


Reporting and Analysis, Administration Services, and
Planning.
• Essbase databases store security, Planning data and
metadata, and calculation scripts.

s a
) h a
ฺ c om ฺ
r a cle uide
Data Tier
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
Relational
h a m
Databases u s Essbase Databases
m o et o
i a ( nsand/or its affiliates. All rights reserved.
r c e
aka ble li
Copyright © 2012, Oracle
Z
m ed sfera
The datam
a tier consists
t r a n of the relational (non-numeric) and Essbase (numeric) databases.
h
o following -components require a relational database:
non
The
M
• Oracle Hyperion Shared Services
• Oracle Hyperion Performance Management Architect
• Oracle Hyperion Calculation Manager
• Oracle Hyperion Reporting and Analysis
• Oracle Essbase Administration Services
• Oracle Hyperion Planning

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 10


External Services

• Integration with Oracle and other systems


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Oracle Data Integrator and ERP Integrator for data and


metadata integration
• ERP systems integration for drill-back capabilities

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
External Oracle Data Integrator/ed t i Systems
hERP
m e
ham to us
Services ERP Integrator
o
(m nse
a i a
r © 2012, i ceOracle and/or its affiliates. All rights reserved.
kCopyright
l
d Za rable
To load m me and
metadata n s fe
data from Oracle and other systems into Planning applications, you can
o
work
a several
hwith n - traexternal services, including Oracle Data Integrator, ERP Integrator, and, for
M no
classic applications, Outline Load Utility.

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 11


Oracle Project Financial Planning
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
Project Financial
a n bridges the gap between the detailed projects an organization
m traPlanning
h
o onand- the overall corporate impact/resources. It gives organizations a high-level
undertakes
M
snapshotnof how their assets and resources are allocated, and then it monitors performance and
provides information about return on investment.
Project Financial Planning addresses planning for the various tasks and resources for any project
initiative with an underlying multidimensional database. Specific functionality was built to handle
various scenarios and calculations that are typically used in Project Financial Planning.

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 12


Project Financial Planning Features

Project Financial Planning features enable you to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Perform planning for Indirect, Capital, and Contract


projects
• Import metadata and data (using the provided template
files)
• Perform expense planning at detail level or account level
(labor, material, equipment)
• Allocate workforce resources and capital assets to projects s a
• Calculate driver-based overheads for projects ) ha
m
• Perform different types of revenue planning andlerevenue ฺco eฺ
recognition based on the type of Contract o rac G(Time
projects uid
and Material, Fixed Price, Cost Plus,riOther)
a @ ent
• View the impact on financial statements
z a ka Sfrom
t ud a project
ฺ Loss,
level or an entity level (Profit
m e dand
e this Cash Flow, key
am us
performance indicators(KPIs))
o h to
( m e
nsand/or its affiliates. All rights reserved.
r i a c e
aka ble li
Copyright © 2012, Oracle
Z
m ed sfera
Project Financial
a n leverages core Planning features to enable you to accomplish the tasks
m traPlanning
h
o on the
listed -
slide.
M non

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 13


Project Financial Planning Features

• Rank and approve projects based on a project score using


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

financial measures and subjective measures (net present


value, return on investment, payback, lifetime investment,
risk assessment, strategic assessment, business
assessment, organization missions)
• Perform planning for intercompany projects and reconcile
them a
• Request funding h a s
m )
o
• Track the project approval flow
c l eฺc deฺ
• Use out-of-the-box reports o ra Gui
r i a @ ent
• Leverage from sample projects forka tud technology
information
ฺ za is S
d
e e th
m
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran Planning features listed are a continuation from the previous slide.
The Project Financial

Mo non-

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 14


Project Financial Planning Process

1 2 3
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Enter project details. Plan for expenses. Plan for revenue


(Contract projects only).

s a
) h a
6 5 ฺ c om
4
a c le ideฺ
@ or t Gu
a r ia den
ฺ z ak s Stu
Submit the plan for Managem ed e thi Review the financials.
funding.
ham to us
approvals.
o
(m nse
a i a
r © 2012, i ceOracle and/or its affiliates. All rights reserved.
k Copyright
l
d Za rable
m e sfe
h a m tran Planning process includes the following steps:
The Project Financial

M1.o Enter - details.


non
project
2. Plan for expenses.
3. Plan for revenue (Contract projects only).
4. Review the financials.
5. Manage funding.
6. Submit the plan for approvals.

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 15


Step 1: Entering Project Details

Enter project details:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Determine the project type: Capital, Indirect, or Contract.


• Enter any new project details, such as new project
assumptions and supplemental information.

s a
) h a
ฺ c om ฺ
r a cle uide1
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us Enter project details.

i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
You canm me anproject
propose s fe by launching the Enter New Project Details task to open the New
o haProposals
Project n - traform. You use the New Project Proposals form to gather basic project
M nosuch as type of project, project start and end dates, project location, and project
information
manager. You can add properties to the application, as needed.

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 16


Step 2: Planning for Expenses

Expense planning:
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Add labor.
• Add equipment.
• Add material and other resources.
• Enter direct project expenses.
• Apply overheads.
a
• Review indirect and general and administrative (G&A) has
m )
allocated expenses. o
l e ฺc eฺ
• Review total expenses. ra c uid 2
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
h a m us Plan for expenses.

m o et o
i a ( nsand/or its affiliates. All rights reserved.
r c e
aka ble li
Copyright © 2012, Oracle
Z
m ed sfera
You usem
a the tasks in
t r a nthe Expense Planning task list folder to guide you through the process of
h
o odetails
providing - about the expense components of a project.
M n n

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 17


Step 3: Planning for Revenue

Revenue planning:
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Enter revenue drivers:


– Cost Plus
– Time and Materials
– Unit Price
• Enter direct project revenue.
s a
) h a
ฺ c om3ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi Plan for revenue

h a m us (Contract projects only).

m o et o
i a ( nsand/or its affiliates. All rights reserved.
r c e
aka ble li
Copyright © 2012, Oracle
Z
m ed sfera
You usem
a the tasks in
t r a nthe Revenue Planning task list folder to guide you through the process of
h
M on-based
o details
entering
differentnways
about the revenue components for a Contract project. Revenue can be derived in
on the category of the project (Cost Plus, Time and Material, and Unit Price).
Note: Revenue planning can only be performed for projects classified as Contract projects.

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 18


Step 4: Reviewing Financials

Review the project financials:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Calculate the financial statements.


• Review the impact on the financial statements.
• Review the project KPIs.
• Review the project justification.
• Review the project score.
s a
) h a
ฺ c om ฺ
r a cle uide4
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us Review the financials.

i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
You usemthemtasks in nthe Review Project Financials task list folder to review the project impact on
h a
theocompany - t r a
financial statements.
M non
These tasks are discussed in Lesson 9, “Reviewing and Approving Projects.”

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 19


Step 5: Managing Funding

Review project funding:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Request the funding.


• Review the allocated funds.

s a
) h a
ฺ c om ฺ
a c le ide5
@ or t Gu
a r ia den
ฺ z ak s Stu
m ed e thi
h a m us Manage funding.
m o et o
i a ( nsand/or its affiliates. All rights reserved.
r c e
aka ble li
Copyright © 2012, Oracle
Z
m ed sfera
You usem
a the tasks in
t r a nthe Project Funding task list folder to manage funding.
h
Mo non-

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 20


Step 6: Submitting Plans for Approval

Submit the plan for approval:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Promote the plan for approval.


• Review the plan’s approval status.

s a
) h a
ฺ c om6ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi Submit the plan for
m
ha to u s approvals.
o
(m nse
a i a
r © 2012, i ceOracle and/or its affiliates. All rights reserved.
kCopyright
l
d Za rable
m e sfe
Once you
a have
r a n
m tcompleted all of the tasks for the project and you have reviewed the financial
h
o oand
statements n- requested funding, you can promote your plan to another user for approval. You
M
use the n
“Submit Plan for Approval” task list to promote your plan.
Project approval is separate from plan approval.
Consider the following layers of approval:
• Labor request approval
• Equipment request approval
• Funding request approval
• Project approval
• Planning unit approval
Labor, equipment, and funding requests are typically approved when the request is fulfilled.
Project approval locks the project for editing, sets the status, and copies over project information
to the Final and Forecast Final intersections. Plan approval goes through the planning unit review
cycle.

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 21


Project Financial Planning Business Scenario

ABC Training Corporation recently purchased Oracle’s EPM


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

System and implemented Project Financial Planning and


supporting tools. Project Financial Planning will enable the
company to manage projects in line with its efforts to expand its
business and track training development projects.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
Build classrooms
m ed e thi Develop a Scope and
Deliver end-user
training. s
m Track system.
h
o et a o u
a ( m nsand/or its affiliates. All rights reserved.
r i c e
aka ble li
Copyright © 2012, Oracle
Z
m ed sfera
a m its efforts
In line with
t r a nto expand its business and track training development projects, Project
h
o oPlanning
Financial - will enable ABC Training Corporation to manage the following projects:
M • n n
Capital project: Build classrooms in a newly purchased training facility.
• Contract project: Deliver end-user training to Miller Corporation.
• Indirect project: Develop a Scope and Track system to monitor billing hours.

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 22


The following stakeholders are involved in these projects:
• Martha Jones, Program Manager Head Office: Responsible for creating, tracking, and
managing projects required for the expansion.
• Will Mott, Program Manager Human Resources: Responsible for tracking the utilization of
employees across projects, review new hire requests, forecast work orders, and manage the
schedule and use of resources.
• Thomas Martin, Program Manager Asset Management: Responsible for tracking the
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

utilization of assets across projects, manage the use of existing assets, approve asset
requisitions, and reconcile Construction In Progress assets, new assets, leased assets with
existing assets.
• Mickey Smith, Application and Budget Administrator: Responsible for approving projects
and budgets before they are submitted to Finance for funding.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 23


Training Environment
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Planning and Data Sources Third-Party Software Web Application


Product Components and Web Servers

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran is a single-server compact deployment that combines all tiers on one
The training environment

M o oOracle
machine.
who rolln
n- recommends this configuration for a development environment or for customers
out Planning to a very limited number of users.
For a list of products and modules that are included in the training environment, see “Planning
Architecture” in this lesson.

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 24


Quiz

Select three Planning components.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

a. Dimension Services
b. Application Server
c. Essbase databases
d. Relational databases

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
Answer:
h a m dtran
b, c,
Mo non-

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 25


Quiz

Revenue planning is required for all types of projects:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
Answer:
o h am -tran
b
M non only.
Contract Projects

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 26


Summary

In this lesson, you should have learned how to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Describe Oracle Hyperion Planning (Planning) and its


components
• Identify the main components of the Planning architecture
• Describe the features of Oracle Project Financial Planning
(Project Financial Planning)
• Describe the Project Financial Planning process s a
) h a
• Describe the business scenario om
c l eฺc deฺ
o ra Gui
r i a @ ent
z a ka Stud
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 27


Practice 1-1 Through 1-4

The practice covers the following topics:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Starting EPM Services


• Identifying Your Server Name
• Preparing the Browser
• Reviewing the Business Scenario, Users, and Roles

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 1 - 28


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Administration Tasks

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no
Objectives

After completing this lesson, you should be able to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Identify project administration tasks


• Enter values for user variables
• Set discount rates
• Set investment criteria
• Enter overhead assumptions
s a
• Select approval settings
) h a
• Set KPIs o m
c l eฺc deฺ
• Identify intercompany partners o ra Gui
• Set workforce and capital asset global r i a @ ent
rates
a d ak s Stu
ฺ z
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 2


Lesson Agenda

• Application Administration
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Project Administration
• Workforce Administration
• Capital Asset Administration

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m trantasks discussed in this lesson are divided into the following sections:
The administration
- Administration
Mo• Application

non
Project Administration
• Workforce Administration
• Capital Asset Administration

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 3


Initial Implementation Tasks

1. Install and configure Project Financial Planning.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

2. Create and initialize the Project Financial Planning


application.
3. Load the required dimensions and dimension members.
4. Refresh the application.
5. Load data.
6. Set values for substitution variables. s a
) h a
7. Manage Smart Lists. o m
l e ฺc eฺ
8. Set user variables. ra c uid
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
From a m meAdministrator
Global n s fe standpoint, you must perform the tasks listed on the slide prior to
o
working n tra Financial Planning.
ha in Project
-
MInitial project,
no workforce, and capital assumptions can be loaded using the utilities specified in
the next sections. You can then manage these assumptions through the administration task
lists covered in this lesson.
Installing and Configuring Project Financial Planning
See the Oracle Enterprise Performance Management System Installation and Configuration
Guide.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 4


Creating and Initializing the Project Financial Planning Application
To create a new Project Financial Planning application using Planning application
administration, see the Oracle Hyperion Planning Administrator’s Guide. When using the
Planning Application Wizard to create a Project Financial Planning application, select the
Oracle Project Financial Planning application type. You can select to initialize the application
with the IT Industry sample.
Note the following when initializing Project Financial Planning:
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• If you are creating a basic Project Financial Planning application, select None. You will
then be prompted to define the application calendar, set currency options, and set the
customizable plan types, if required.
• If you are creating an information technology (IT) industry-specific Project Financial
Planning application, select Information Technology. You will not be prompted to define
the application calendar, currency, and plan types. They will be set automatically with
predefined settings. For details about creating, loading security for, and loading data for
an IT industry–specific Project Financial Planning sample application, see Appendix B, s a
) h a
“Sample Project: Information Technology” of the Oracle Project Financial Planning User’s
Guide.
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 5


Loading Required Dimensions and Members

Load the required dimensions and members that correspond to


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the following metadata in your organization:


• Entity
• Job
• Employee (Existing Employees)
• Asset Class
• Asset Detail s a
) h a
• Existing Projects c o m
a c leฺ ideฺ
@ or t Gu
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Note them me nwhen
following s feloading dimensions:
o
• - tra You do not need to bring every asset into the application. Project Financial
haAssetnClass:
M no Planning enables you to group together similar assets. For example, if your organization
is using 1,000 laptops, you do not need to add 1,000 members to the Asset Detail
dimension. You can add just one Laptop member to the Asset Detail dimension and while
loading the data corresponding to this asset, specify the Asset Units as 1000.
• Existing Projects: Ensure that you are loading the project under the correct project
classification hierarchy. For example, before loading a project in Project Financial
Planning, if it is determined to be a Contract project, it should be added under the Existing
Contract Project hierarchy. Failing to do so may result in loss of functionality associated
with the project.
Refreshing the Application
After loading metadata (dimensions and members), you must refresh the application to
synchronize it with Oracle Essbase.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 6


Loading Data

Before you import data, you must ensure that the members in
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the data load files are specified in the data load settings of your
Project Financial Planning application.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Project m me Planning
Financial n s fe provides utilities that leverage the Outline Load Utility in Planning.
htoa loading
- a with the PFPImportUtility, you ensure that driver members are specified on
trdata
o
Prior
Mthe Planningn
no Data Load Administration page.
You import the following Workforce, Capital Asset, and Project data into your application:
• Assumptions
- Capital Assumptions
- Overhead Assumptions
- Workforce Assumptions
• Asset Depreciation and Amortization
• Project Details
- Existing Project
- New Project
• Project Actuals
- Project Expenses
- Project Revenues

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 7


• Employee Project Assignments
• Asset Project Assignments
• Project Material Requirements
• Existing Employee Data
• Existing Major Asset Data
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 8


Templates Overview

Project Financial Planning provides import utilities and sample


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

template files that you can use to import data and metadata into
your application.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
mExport
Import m
a and
t r a nUtilities
h -
o ExportPFPTemplates
MThe non utility extracts the sample template files to a user-defined root folder.
The PFPImportUtility imports the data and metadata into the Project Financial Planning
application.
Sample Template Files
After extracting the sample template files, you use them to format your metadata and data in
order to load it to a Project Financial Planning application. The template files are saved in a
comma-separated values (CSV) file type.
After preparing your metadata and data using the template files, you use the PFPImportUtility
to load the information into your application.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 9


Extracting Template Files
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m trsample
You extract the a n template files from the HspPPIT.JAR file using the
h
o on-
MExportPFPTemplates
n
utility.
To extract the sample template files:
1. Open a command prompt, and navigate to the Planning installation location. For example,
if your Oracle instance is C:\Oracle, navigate to
C:\Oracle\Middleware\user_projects\epmsystem1\Planning\planning1.
2. Enter ExportPFPTemplates.cmd <root folder location> <language>, where <root folder
location> is the directory where you want to extract the sample template files and
<language> is the language code of your Planning locale (for example, fr for French, en
for English, or zh_cn for Simplified Chinese). Use lowercase letters for the language
code.
3. Navigate to the <root folder location> and review its contents.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 10


Template Format

This sample data row loads Laptop Lenovo T400 data to the
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Capex cube at Plan (Scenario), Working (Version), Laptop


(Asset Class), Contract Project 1 (Project), USA (Entity), FY11
(Year), Jan (Period), Local (Currency).

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
The firstm mine a sample
row n s fe template file contains the header records, which identify the member
ha and - a values to load. The header records include the budget item (for example,
trthe
o
properties n
MEntity, Asset
no Class, Employee, or Project), the data load cube name, the kind of data to be
loaded (for example, project start and end dates, asset descriptions, or employee types), and
the point of view (POV) to which you are loading data. The POV column contains information
about the budget to which you are loading data (the scenario and version) and the artifacts that
are associated with the data that you are loading (such as entity, position, employee, and so
on).

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 11


Data Load File Order

When loading metadata and data using templates, consider the


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

following:
• Create and test CSV load files using a copy of the current
application in a test environment prior to running them in
your production environment.
• Load metadata first, and then data using the order
specified in the next section. a
h a s
• Load data only to level 0 members, and then roll up the)
data to parent members as required. ฺ c om ฺ
r a cle uide
• All dates should be in the format mm-dd-yyyy o fort Gthe CSV
@ n
file data. aria de ak s Stu
ฺ z
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m tryour
To ensure that a nsource data loads correctly, metadata and data are loaded in this order by
h
o when n-you use the PFPImportUtility script:
Mdefault n o
• Smart List: SmartList.csv
• Asset Detail metadata: AssetMem.csv
• Employee metadata: EmployeeMem.csv
• Entity metadata: EntityMem.csv
• Project metadata: ProjectMem.csv
• Capital Assumptions: ImportGlobalCapitalAssumptions.csv
• Overhead Assumptions: ImportOverheadAssumptions.csv
• Workforce Assumptions: ImportWFPAssumptions_1.csv
• Asset Depreciation and Amortization data: Asset Depreciation and Ammortization.csv
• Existing Project data: ProjectDetails.csv
• New Project data: NewProjectDetails.csv
• Project Actual Expense data: ProjectActualsExpense.csv

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 12


• Project Actual Revenue data: ProjectActualsRevenue.csv
• Existing Employees’ Assignment to Projects: ImportEmployeeProjectAssignment.csv
• New Employees’ Assignment to Projects: ImportNewEmployeeProjectAssignment.csv
• Existing Asset Assignment to Projects: ImportProjectAssetAssignments.csv
• Material Requirements for Projects: ImportProjectMaterialRequirements.csv
• Existing Employee data: ImportExistingEmployees.csv
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Existing Major Asset data: ImportAssets.csv


Note: After loading metadata and before loading data, you must refresh your application to
synchronize it with Oracle Essbase.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 13


Running the Import Utility
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m the
After creating
t r a n files, you can run the PFPImportUtility.bat. Ensure the data load file has
load
h
osameoname - as the template file and that the format of the data load file is the same format
Mthe n n template.
as the provided
To import the CSV data load files:
1. Navigate to the Planning installation location. For example, if your Oracle instance is
C:\Oracle, navigate to
C:\Oracle\Middleware\user_projects\epmsystem1\Planning\planning1.
2. Run PFPImportUtility.bat.
3. When prompted, enter the application, username, and the location for the root folder that
contains the data load files, password, and language code.
4. When finished, open your Project Financial Planning application and verify that the data
was loaded.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 14


Setting Substitution Variables

Essbase Administration Console Planning


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran are used in Project Financial Planning forms and in predefined reports.
Substitution variables
- the application, you must set values to the following substitution variables:
o to accessing
MPrior
• non
LastYr: Set this to the previous year (for example, FY11).
• CurYr: Set this to the current year. For example, if the current year is 2012, set this to
FY12.
• NextYear: Set this to the next year (for example, FY13).
• Yr2: Set this to the year after NextYear (for example, FY14).
• Yr3: Set this to the year after Yr2 (for example, FY15).
• Yr4: Set this to the year after Yr3, for example, FY16.
• ThisMonth: Set this to the current month.
• CurScenario: Set this to the current scenario (for example, Current).
• CurVersion: Set this to the current version (for example, Working).
• ActVersion: Set this to the actual version (for example, Prior FCST).

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 15


• ForVersion: Set this to the forecast version (for example, Prior FCST).
• PlanVersion: Set this to the working version (for example, Working).
Ensure that these values are existing dimension members in your application.
You can use Essbase Administration Console to manage substitution variables.
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 16


Managing Smart Lists

You must update the following Smart Lists based on your


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

business needs:
• AssignmentLocation
• Customer
• FundingSource
• PhysicalLocation
• ProjectCostLevel s a
) h a
• ProjectManager o m
l e ฺc eฺ
• SkillSet c
ra Guid
o
@ ent
• Grade r i a
• Project Billing Level z a ka Stud
dฺ is e e th
m
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m trcustom
Smart Lists are a n drop-down lists that users access from form cells. When you click cells
h
o members - are associated with a Smart List (as a member property), you select items
Mwhose non lists instead of entering data.
from drop-down
Note: You cannot type in cells that contain Smart Lists.
Oracle recommends using the Project Financial Planning template and import/export utility
delivered with the product to load Smart List values. After you load Smart Lists to the
application, you manage the values using the Manage Smart Lists page.
To create or work with Smart Lists:
1. In your application, select Administration, then Manage, and then Smart Lists.
2. Perform one of the following actions:
- To create a Smart List, click Create, enter the name, and click OK.
- To change a Smart List, select it and click Edit.
- To delete Smart Lists, select them, and click Delete and OK. Deleting Smart Lists
also deletes any associated mappings with dimension members and reporting
applications.
- Optional: Click Synchronize to synchronize Smart Lists between an application that
uses Planning application administration and a reporting application.
Note: Data cells can display only one Smart List. If multiple Smart Lists intersect at cells, set
which one takes precedence.
Oracle Project Financial Planning 11.1.2: Create Projects 2 - 17
Selecting User Variable Members

You select user variable members before accessing Project


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Financial Planning forms.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
You setm me to the
values n s fe
following user variables to limit the number of displayed members in
h a t r a
- Planning forms:
o Financial
MProject
• non
Scenario View
• Version View
• Entity View
• Reporting Currency
To select user variable members:
1. In your application, select File, and then Preferences.
2. Click the Planning icon, and then select User Variable Options.
If a user variable is set, an entry displays in Selected Member.
3. To select members, click the Select Members icon.
4. Select members from the left pane.
5. Click the Expand All icon or the Collapse All icon to expand or collapse the list.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 18


6. In Member Selection, perform one of the following actions:
To select, click the Add icon.
To remove, click the Remove icon.
To remove all members, click the Remove All icon.
7. Click Save.
8. In User Variable Options, click OK.
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 19


Lesson Agenda

• Application Administration
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Project Administration
• Workforce Administration
• Capital Asset Administration

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m trantasks discussed in this lesson are divided into the following sections:
The administration
- Administration
Mo• Application

non
Project Administration
• Workforce Administration
• Capital Asset Administration

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 20


Project Administration

Administrators perform the following tasks:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Setting discount rate and tax rates


• Setting investment criteria
• Entering overhead assumptions
• Setting approval settings
• Setting KPIs
s a
• Managing intercompany project partner relationships
) h a
• Preparing base forecast data o m
ฺc ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran
The Project Administration task list guides administrators through the project administration
- tasks and instructions to ensure that all relevant data is collected and
o byonlisting
Mprocessn
calculated.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 21


Project Administration Task List Tasks
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranthe Project Administration Tasks List Tasks:
The slide displays
Mo• Set -
non
Discount Rate and Tax Rate: Enter values for discount rate and tax rate
assumptions.
• Set Investment Criteria: Enter investment criteria, including defining weight and
reviewing criteria.
• Enter Overhead Assumptions: Enter overhead assumptions, including indirect cost and
general and administrative cost assumptions.
• Approval Settings: Set the approval status for labor, asset, and funding requests.
• Import Projects: Import projects and refresh the application.
• Set KPIs for Projects: Set key performance indicators (KPIs) for projects.
• Intercompany: Add intercompany partners for a project and review intercompany
reconciliations.
• Prepare Base Forecast Data: Prepare and clear base forecast data.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 22


Project Assumptions

Administrators enter the following assumptions at the entity


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

level:
• Discounting approach and related information used to
derive the effective discount rate
• Taxes applicable for the entity
• Predefined rules for apportioning to projects the entity’s
indirect and general and administrative expenses s a
) h a
• Setup requirements for intercompany projects m
o
• Upper and lower limits for KPIs for project evaluation
c l eฺc deฺ
o ra Gui
• Rules for processing large amounts ofadata @ en nmasse
t for
r i e
forecasting, indirect expenses, and
z a S t ud for the
kacalculations
Essbase database edฺ this m se
h a m u
o t o
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran
The project administration process enables administrators to set up the required assumptions
n- that will
o information
Mand noinformation
the setup
be used for project planning and forecasting. Administrators can import
from transactional systems or they can add it manually.
The setup information is used as defaults for planning newly created projects or for forecasting
existing projects. Assumptions provided here are entered at the entity level and, when a project
is created for an entity, these assumptions are used as a starting point when you begin your
planning.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 23


Setting Discount Rates and Taxes

Administrators provide the discount and tax rate information


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

using the Set Discount Rate and Tax Rate task:

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m truse
Administrators
a a nthe Set Discount Rate and Tax Rate task to open the Global Discount Rate
h
o Tax Rate -Assumptions form to define values for the following:
Mand
• non
Tax Rate: Enter the rate at which taxes are paid for the given period.
• Discount Rate Approach: Select the approach for discounting your project’s cash flows
to determine their NPV. There are two predefined approaches: Direct Discount Rate
Approach, whereby you input the discount rate, and Capital Asset Pricing Model (CAPM),
which considers the systematic risk or market risk of the project in the industry.
• Discount Rate: Enter the rate of return that could be earned on an investment in the
financial markets with similar risk.
• Beta: Enter the expected rate of return and risk-free return.
• Riskless Rate: Enter the minimum return the business expects for an investment.
• Market Risk Premium: Enter the difference between the expected return on a market
portfolio and the risk-free rate. Market risk premium is equal to the slope of the security
market line (SML), a capital asset pricing model.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 24


• Debt Ratio: Enter the proportion of debt your company has relative to your assets.
• Cost of Borrowing: Enter the interest rate paid for funds that the business spends in
total for goods or services including money, time, and labor.
The Effective Discount Rate value is the interest rate used in discounted cash flow analysis to
determine the present value of future cash flows. The value can be calculated either by Direct
Discount Rate Approach or CAPM (Capital Asset Pricing Model).
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

The effective discount rate drives the following accounts:


• Discounting factor
• Present value (PV) of cash flow
• Net present value (NPV)
The rates entered in the Global Discount Rate and Tax Rate Assumptions task are the default
for all new projects created in Project Financial Planning if the rates are not defined at the
project level. The details entered can be overridden later for a specific project.
To set discount rates and taxes: s a
) h a
1. If task lists are not displayed, select View, then Task List, and then Task List.
ฺ c om ฺ
2. In the Task List Tasks – All content area, expand Expand Project Administration.
r a cle uide
3. For Set Discount Rate and Tax Rate, click the Launch Tasklist Wizard icon in the Action
column. @ o tG
a r ia den
ฺ z ak s Stu
4. Verify the Scenario and Version selections.
ed e thi
5. Select an Entity for the page dimension.
m
ham to us
6. Click Go.
o
(m nse
a r i a i ce
k l
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 25


Project Scoring

Project scoring tracks a project’s performance against a


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

predefined set of targets at the entity and project level and


scores projects based on subjective and financial factors.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
mthese
You canm
a use
t r a nscores to rank a project and analyze the performance of a project with
h
o tooother - projects and to a predefined set of limits. Financial scores are dependent on
Mrespect n nmetrics and factors of the project, and are based on financial planning, while
the financial
subjective scores are based on qualitative factors and responses to some predefined questions
and their assessment by the entity head. You can review project scores for individual projects
and across projects.
Process for Project Scoring
1. The entity head defines the weightings for the components of the project score. These
weightings are defined at the subjective and financial level, and the subjective weightings
are further divided into components and subcomponents. Subjective scoring is based on
the questions that are defined by the entity head and which pertain to the project’s
performance.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 26


2. After the project manager completes financial planning for the project, details about
calculated financial metrics and parameters help in calculating the financial scores
automatically. For subjective scores, the project manager must answer a set of predefined
questions and, based on the responses, the entity head can determine the project’s
subjective score.
3. The combination of financial and subjective scores is used to rank the project. Project
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

ranking helps the entity, Finance, and corporate management to determine whether to
approve of a project and fund it.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 27


Investment Criteria

Administrators define investment criteria based on financial and


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

strategic factors:
• Weightage for criteria
• Weightage for financial goals
• Weightage for subjective groups
• Weightage for subjective goals
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranweights for scoring the projects are defined at the organization level, taking
These predefined
- the corporate strategic plan and goals. They help to determine the factors
o consideration
Minto nothenproject performance based on the parameters defined at corporate level.
affecting

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 28


Investment Criteria

Administrators use the Set Investment Criteria task to open the


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Investment Criteria form:

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m truse
Administrators
a a nthe Set Investment Criteria task to open the Investment Criteria form and
h n- criteria in terms of detailed financial and strategic factors for scoring the
o investment
Mdefine byogiving weights to them.
project n
The Investment Criteria contains four sections, which are discussed in the succeeding sections.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 29


Defining Weightage for Criteria
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m trdefine
Administrators
a a n weightage for the following criteria:
h - Criteria enables weighting and evaluating based on the financial metrics and
Mo• Financial
non
factors of the project, and financial planning.
• Subject Criteria enables weighting and evaluating a project’s value beyond its financial
(objective) merits alone. Examples of Subjective Criteria: how strongly a project expands
a product line or contributes to meeting a company strategy.
• Investment Criteria allows projects to be evaluated against other projects on the basis of
objective financial measures, such as its NPV or Benefit Cost Ratio, and subjective
measures.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 30


Defining Weightage for Financial Goals
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m trdefine
Administrators
a a n weightage for the following financial goals:
h - Value (NPV) is an indicator of how much value an investment or project
Mo• Net
non
Present
adds to an organization. It is calculated as a sum of all net cash flows over the years
discounted to their present value.
• Return on Investment (ROI) is a performance measure used to evaluate the efficiency of
an investment or to compare the efficiency of a number of different investments. To
calculate ROI, the benefit (return) of an investment is divided by the cost of the
investment; the result is expressed as a percentage or a ratio.
• Payback Period is the amount of time taken to break even on an investment.
• Benefit Cost Ratio (BCR) is an indicator of the overall value of a project, based on the
ratio of the benefits of a project or proposal, expressed in monetary terms, relative to its
costs, also expressed in monetary terms.
• Lifetime Investment (LI) is a KPI that measures the amount of a project’s funding over
the project’s life.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 31


Defining Weightage for Subjective Groups
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranis divided into the following groups. Administrators define the weightage for
Subjective criteria
Mtheofollowing -groups:
• non
Risk Assessment/Impact is used for scoring the project based on various risks, such as
schedule, cost, resource, time to market.
• Strategic Assessment/Impact is used for assessing projects based on alignment to
business unit or corporate strategy.
• Business Assessment/Impact is used for scoring based on revenue potential.
• Organization Missions is used to assess the project based on how it will help improve
the process efficiency in the organization. Organization missions are commonly used in
Indirect projects.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 32


Defining Weightage for Subjective Goals
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m tscores,
For subjective
r a n the project planner must answer a set of predefined questions and,
h
o onothe -responses, the entity head can determine the project’s subjective score.
Mbased n nis entered in the Define Weightage for Subjective Goals section of the Investment
Weightage
Criteria form.
The objective weights correspond to questions answered in the Detailed Justification task. The
project administrator defines the subjective score for the corresponding questions. If no data is
entered for a goali n the Define Weightage Subjective Goals section, that item is not included in
project scoring.
For example in the slide, there is no weightage entered for Resource and Time to Market.
These goals are not included in project scoring even if the project planner enters responses to
these questions in the Detailed Justification task.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 33


Overhead Assumptions

You enter overhead assumptions for indirect expense, and


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

general and administrative expenses by using the Enter


Overhead Assumptions task:

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
Overheads
a are a n
m trexpenses necessary for the performance of a job or continued functioning of the
h
o obutn-cannot be specifically attributed to a project. Examples of overhead expenses are
Mbusinessn expenses, direct material expenses, and facilities allocation expenses.
direct labor

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 34


Overhead Assumptions: Indirect Costs

Project Financial Planning provides the following indirect cost


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

pool categories:
• Labor Overhead
• Engineering Overhead
• Manufacturing Overhead
• Material Overhead
• Information System Overhead s a
) h a
• Training Overhead o m
l e ฺc eฺ
• Fringe Overhead c
ra Guid
o
@ ent
• Common Overhead Pool r i a
• Facilities Allocation z a ka Stud
dฺ is e e th
m
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Indirect m meare necessary
costs n s fe to a job but are difficult to assign to a project. Costs to a project
o
are
a -based
hallocated
n tra on the Indirect Cost Rate (ICR) and an ICR can be set for different types of
Mexpenses.noThe project administrator sets the indirect cost pool and allocation basis for each
overhead line item, and then provides the ICR.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 35


Overhead Assumptions:
General and Administrative Costs
General and administrative costs are:
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Related to the entire company


• Necessary to run the business but cannot be assigned to a
specific job or project
• Used to calculate the general and administrative cost rate
(GACR) for each general and administrative cost pool
Project Financial Planning provides one general and s a
h a
administrative cost pool category: Corp G&A m)
l e ฺco eฺ
o rac Guid
r i a @ ent
z a ka Stud
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran sets the general and administrative cost pool and allocation basis for
The project administrator
o general
Meach -and administrative element, and then provides the GACR.
non

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 36


Allocation Basis Assumptions

Project Financial Planning provides the following allocation


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

basis options for indirect cost assumptions and for general and
administrative cost assumptions:
• Total Direct Labor Cost
• Total Direct Labor Hours
• Total Direct Material Cost
• Total Number of Employees s a
) h a
• Total Direct Costs o m
• Total Square Footage c l eฺc deฺ
o ra Gui
• Total Machine Hours r i a @ ent
• Value Added Cost Input z a ka Stud
ฺ ed e this
m
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 37


Approval Settings

You use the Approval Settings task to set whether the project
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

can be approved directly without first obtaining the approval of


the resource, asset, or finance manager:

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranis set to Yes, the project can be approved without the resource, asset, or
If the auto approval
o manager’s
Mfinance - approval. The project status is set to Approved.
non
f the auto approval is set to No, the resource, asset, or funding must be approved before the
project can be approved.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 38


Key Performance Indicators

Key performance indicators (KPIs) are high-level snapshots


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

of a project based on specific predefined measures.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m truse
Administrators
a a nthe Set KPIs for Projects task to define the upper and lower limits of KPIs
h n- attargets.
oall projects
Mfor nolevel
with entity
the entity level. These limits will be used for tracking performance of projects
If projects are not within these limits, warnings will result.
You set KPI limits to the following:
• NPV
• ROI
• Payback Period (Years)
• Benefit Cost Ratio
• Lifetime Investment

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 39


Intercompany Partners

Administrators perform the following intercompany tasks:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Adding intercompany partner relationships


• Rolling up intercompany transactions
• Reconciling intercompany transactions

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a r a n
m tpartnerships
Intercompany arise when the scope of the work requires multiple entities to work
h - to complete it. Intercompany partnerships consist of:
Monothe project
• non
An owning entity, who assigns the project work and is responsible for the overall delivery
of the project
• A service-provider entity, who completes the project work within the time line provided by
the owning entity.
The service-provider entity charges the owning entity for the expense incurred on the project.
The reimbursement for these expenses are considered intercompany revenue to the service
provider and become an intercompany expense for the owning entity. At the corporate level,
these intercompany charges are eliminated.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 40


Preparing Base Forecast Data

The following business rules help you prepare base forecast


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

data: PrepareDetailForecastBaseData,
PrepareHighLevelForecastBaseData, and ClearForecastData.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Project m me Planning
Financial n s fe helps you prepare base forecast data by copying the actual data and
a to the
hdata - a
trspecified
o
plan
Mon factors n forecast version. Then, you can adjust created forecast version based
nolike pending work and resource availability. You can set the actual data to read-only
by setting the start and end period or year for the scenario. Forecasting can occur at a high
level or at the detailed assignment level of the project.
Note: Actual data must be loaded to the Actual scenario for “Direct Cost Input” and “Revenue
Direct Input.”
Preparing Forecast Data with Assignment Details
The Preparing Forecast Data with Assignment Details task launches the
PrepareDetailForecastBaseData business rule, which helps you prepare the data for
forecasting project expenses and revenues at a detailed resource level.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 41


This business rule does the following:
• The rule deletes existing data in the “Prior FCST” forecast version.
• The rule copies data from the “Final” forecast version and moves it into the “Prior FCST”
forecast version.
• The rule copies detailed data (including employee, asset, and material assignments) from
the “Final” actual version into the “FORECAST VERSION” version.
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• If data is not available in the “FORECAST VERSION” version, the rule copies the data
with assignment details from the “Final” plan version into the “FORECAST VERSION”
forecast version for the remainder of the budget cycle.
• The rule copies assumptions from the “Prior FCST” forecast version to the “FORECAST
VERSION” version.
Preparing Forecast Data Without Assignment Details
The Preparing Forecast Data without Assignment Details task launches the
PrepareHighLevelForecastBaseData business rule, which helps you prepare the data for s a
) h a
forecasting project expenses and revenues at a high level. Assignment details are not copied.
This business rule does the following: ฺ c om ฺ
r a cle uide
• The rule deletes existing data in the “Prior FCST” forecast version.
@ o tG
a r ia den
• The rule copies data from the “Final” forecast version and moves it into the “Prior FCST”
forecast version.
ฺ z ak s Stu
VERSION” version. m ed e thi
• The rule copies high-level data from the “Final” actual version into the “FORECAST

o ham to us
• If future data is not available in the “FORECAST VERSION” version, the rule copies high-
i a (m nse
level data from the “Final” plan version into the “FORECAST VERSION” version for the
a r l i ce
remainder of the budget cycle.
k
Za rable
• The rule copies assumptions from the Prior FCST forecast version to the “FORECAST
d
me sfe
VERSION” version.
hamForecast
Clearing - t r anData
o
M non
This task launches the ClearForecastData business rule, which deletes the data from the
selected Forecast Version.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 42


Lesson Agenda

• Application Administration
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Project Administration
• Workforce Administration
• Capital Asset Administration

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m trantasks discussed in this lesson are divided into the following sections:
The administration
- Administration
Mo• Application

non
Project Administration
• Workforce Administration
• Capital Asset Administration

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 43


Workforce Administration

The Workforce Administration task list enables administrators


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

to:
• Set global rates
• Import employees
• Calculate compensation

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran represents one of a company’s largest expenses and its most critical
Employee compensation
o oAsn-you prepare plans to help manage future expenses, you can use Workforce
Mresource.
n to manage and prioritize resources.
Planning
Administering workforce expenses involves planning or forecasting employee compensation
expenses. The Workforce Administration task list includes tasks involved in this process:
• Importing Employees: Track whether this process has completed.
• Set Global Rates: Set and update workforce compensation assumptions (also called
“global rates”) that drive various expense calculations and include such elements as
salary, health care expenses, merit increases, taxes, and default working days, hours,
and standard hourly rates
• Calculate Compensation: Calculate and roll up compensation by Entity, Scenario,
Version, and Year to aggregate expense totals

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 44


Setting Workforce Global Rates

Administrators use the Set Global Rates task under Workforce


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Administration to enter assumptions for the following:


• Midpoint salary compensation assumptions
• Employee benefits assumptions
• Default working days and hours
• Standard hourly labor rates
• Base billing rate s a
) h a
These assumptions are set at the entity or the No Entity o m
level,
but can be changed at the project level. c l eฺc deฺ
ra i o t Gu
r @
ia den
a
ak s Stu
ฺ z
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m traused
Global rates
a are n in various calculations to derive costs. These assumptions are often set
h n- and,byforgrade,
oa high olevel
Matmidpoint
nsalaries
certain assumptions, can be changed at a lower level. Administrators set
employee benefits assumptions, default working days and hours,
and standard hourly rates.
The following forms are included in the Set Global Rates task under Workforce Administration:
• Set Mid Salary Compensation Assumptions enables the administrator to enter
midpoint salaries by grade. The form displays 13 predefined grade levels. Administrators
can add, edit, and delete grade levels by using the Grade Smart List and Assumption
Input member under Workforce Planning - Accounts of the Account dimension.
• Set Employee Benefits Assumptions enables the administrator to enter benefit rates
used to calculate for annual salary increases, merit increases, health care costs, and
merit increases.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 45


• Set Default Working Days and Hrs enables you to enter default number of hours per
week and number of working days.
• Enter Standard Hrly Labor Rates enables you to enter standard hourly compensation
for employee positions.
• Set Base Billing Rate enables you to set the different billing rates for the project. Three
predefined levels allow you to bill based on varied levels. Administrators can add, edit,
delete billing levels.
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Note: At the project level, Project managers can only override values to the billing rates.
Values for Mid Salary Compensation Assumptions, Employee Benefit Assumptions, Default
Working Days and Hrs, and Standard Hrly Labor Rates must be set by Project Administrators
at the entity level.
If the assumptions are set at the entity level, they will be used for calculations; otherwise, the
assumptions set for the organization will be used.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 46


Importing Employees

You must import employee metadata and data to integrate


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Workforce Planning with Project Financial Planning.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
Workforce primarily requires you to import z k Stufor the Employee
amembers
and Job dimensions.

ed e this
m
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
o h am -tran
Employee Dimension
MTo noninto
perform
employees
detailed employee planning in Project Financial Planning, you must upload existing
Project Financial Planning, including the existing employee structure and
employee properties account members such as Grade or Salary.
Job Dimension
To perform high-level employee planning in Project Financial Planning with the Job dimension,
ensure that all the positions present in the organization are present in Project Financial
Planning as members of Job dimension. When importing the data for existing employees from
the company’s HRMS, the data should be imported at the correct intersection of the Job and
Employee.
For more information on loading metadata and data, see “Initial Implementation Tasks” in this
lesson.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 47


Calculating Employee Compensation

You complete the Calculate Compensation task to view the


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

updated total compensation for an entity.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
mCalculate
You runm
a the
t r a n Total Employee Compensation business rule associated with the
h n- execute thetask
o oCompensation
MCalculate
n can
data. You
to calculate employee compensation by entity, based on expense
Calculate Total Employee Compensation business rule either in a
batch process after loading employee data from the source HRMS or after you plan resources
for an entity.
To calculate employee compensation:
1. Under the Workforce Administration task list, select Calculate Compensation.
2. Click the Launch button to run the Calculate Total Employee Compensation business
rule.
3. In the Calculate Total Employee Compensation runtime prompt, enter the required
values.
4. Click Launch.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 48


Lesson Agenda

• Application Administration
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Project Administration
• Workforce Administration
• Capital Asset Administration

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m trantasks discussed in this lesson are divided into the following sections:
The administration
- Administration
Mo• Application

non
Project Administration
• Workforce Administration
• Capital Asset Administration

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 49


Capital Asset Administration

The Capital Administration task list enables administrators to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Import existing assets


• Set capital assumptions
• Run rollup rules
• Verify loaded depreciation and amortization
• Calculate asset-related expenses
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m tcapital
Administering
r a n assets begins with setting several company assumptions for capital
h n- depreciation methods, useful life of assets, depreciation conventions, and
o including
Massets noassumptions.
other key
Oracle recommends that you update existing asset category and asset detail data (dimensions
and data) before preparing financial plans, either Plan or Forecast. After you update the two
dimensions and refresh the application, you can execute asset-related expense calculations to
consolidate up-to-date asset-related expenses for plans or forecasts.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 50


Importing Existing Assets

Capital planning typically starts by loading existing major


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

assets from your company’s source fixed asset system.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran and expensing existing assets to projects, Project Financial Planning
To facilitate assigning
o oimport
Mprovides n- utilities and sample template files that you can use to import data and metadata
n application.
into your
Note the following when importing existing assets:
• Oracle recommends loading data from external systems for future periods because
depreciation and amortization for existing assets are typically calculated for future periods
in the source system (for example, the fixed asset ledger). To accurately reflect the
impact of purchases and retirements on depreciation and amortization, you must regularly
refresh this data from the source system.
• You must regularly maintain the Asset Detail dimension to reflect newly-acquired assets
and remove retired assets.
• Oracle recommends that you not load every asset from your fixed asset system into
Project Financial Planning. You need load only those assets that will be used in projects.
• After updating capital asset information, you synchronize the application with Oracle
Essbase by refreshing the application.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 51


Asset Class and Asset Detail
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
o h am -tran
Asset Class
MThe Asset n dimension details the different categories of assets that a company owns. You
noClass
update the following asset class members:
• Tangible assets (furniture and fixtures, machinery and equipment, computers, and so on)
• Intangible assets (leasehold improvements, software rights, goodwill).
The Asset Class dimension contains a list of standard equipment that you may request for use
on projects. When you request for resources, you can only specify the type of equipment
needed for the project.
The Standard Equipment member provides a concise list of material assets that are requested
for use on a project. Other types of assets should not be included.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 52


You must add Standard Equipment to the application before using Project Financial Planning
and that you update Standard Equipment data (dimensions and data) before you prepare
financial plans, either Plan or Forecast.
Asset Detail
You can perform detailed asset planning in Project Financial Planning. The process involves
uploading existing assets into Project Financial Planning, including asset properties (Account
members) such as Useful Life, In Service Date, Capacity, and Cost should
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Oracle recommends that you update existing major equipment information (dimensions and
data) before preparing financial plans, either Plan or Forecast.
You load asset details by using a data file with the same format as the AssetMem.csv template
load file. For more information on loading metadata and data, see “Initial Implementation
Tasks” in this lesson.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 53


Setting Capital Assumptions

Administrators use the Set Capital Assumptions task under


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Capital Administration to enter rates for the following:


• Tangible assets
• Intangible assets
• Equipment
If no assumptions are set at the entity level, global assumptions
will be used in calculations. a
as )h
m
l e ฺco eฺ
o rac Guid
r i a @ ent
z a ka Stud
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m truse
Administrators
a a nthe Set Capital Assumptions task to work with asset information, set drivers
h
Mby on- global
oestablishing
or for allntangible
assumptions for each asset class (for example, buildings or machinery)
or intangible assets.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 54


Setting Capital Assumptions

Set drivers by entering global assumptions for each asset class


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

(for example, buildings or machinery) or for all tangible or


intangible assets. You can set these default assumptions at the
entity level or at the “No Entity” (global) level.
• Useful life of assets
• Depreciation methods
• Depreciation conventions s a
) h a
• Amortization methods m
o
• Taxes (%) c l eฺc deฺ
o ra Gui
• Insurance expenses (%) a @ ent
a r i d
• Repairs and maintenance expenses zak (%)Stu dฺ this
m see
h a m u
o t o
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m rates
The standard
t r a nfor equipment that you set in this form are used to calculate the cost of
o h - to a project. The standard rate is multiplied by the units requested by the
Mequipment
project.no
nusage

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 55


Rolling Up Asset Expenses

Before reviewing asset expenses, you must launch the


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

business rule to consolidate the data in the assets hierarchy.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a the a n
m trRollupCapexCube
You launch business rule to calculate and consolidate asset data.
h n- asset expenses:
MTooroll up
nocapital
1. Under the Capital Administration task list, select Run Rollup Rules.
2. Click the Launch button.
3. Enter the required runtime prompt values.
4. Click Launch.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 56


Verifying Loaded Depreciation and Amortization

You view the loaded depreciation and amortization values


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

using the Verifying Loaded Depreciation and Amortization task.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m and
After loading
t r a n up capital asset expenses, you verify existing assets for each period
rolling
h
o entityobyn-launching the Verify Loaded Depreciation and Amortization on Existing Assets
Mand n task enables you to review depreciation and amortization amounts by period for
task. This
existing tangible assets.
To verify loaded depreciation and amortization:
1. Under the Capital Administration task list, select “Verify Loaded Depreciation and
Amortization.”
2. Review the Verify Loaded Depreciation and Amortization form.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 57


Calculating Asset Related Expenses

To view the total expenses for asset related expenses, launch


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the Calculate Asset Related Expenses business rule from the


Calculate Asset Related Expenses task.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m tAsset
The Calculate
r a n Related Expenses task enables asset managers to calculate the asset
h
o expensesn- (Taxes, Insurance, Repairs and Maintenance) based on the assumptions
Mrelated
definednatothe entity level for the asset and asset class combination. Taxes, Insurance, Repairs,
and Maintenance expense are entered as a percentage of the asset value. The rates are
defined on a yearly basis.
To calculate asset related expenses:
1. Under the Capital Administration task list, select Calculate Asset Related Expenses.
2. Click the Launch button.
3. Enter the required values in the runtime prompt.
4. Click Launch.

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 58


Quiz

Administrators enter which of the following assumptions at the


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

entity level and when a project is created for an entity?


a. Discounting process and factors
b. Predefined debt ceilings at the project level
c. Average cost of revenue
d. Taxes applicable for the entity
e. Predefined rules for apportioning to projects the entity’s has
a
indirect and general and administrative expenses om)
c l eฺc deฺ
o ra Gui
r i a @ ent
z a ka Stud
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
Answer:
h a m td,raen
a, b,
Mo non-

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 59


Quiz

Only administrators can set up intercompany partner


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

relationships.
a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: a
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 60


Summary

In this lesson, you should have learned how to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Identify project administration tasks


• Enter values for user variables
• Set discount rates
• Set investment criteria
• Enter overhead assumptions
s a
• Select approval settings
) h a
• Set KPIs o m
c l eฺc deฺ
• Identify intercompany partners o ra Gui
• Set workforce and capital asset global r i a @ ent
rates
a d ak s Stu
ฺ z
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 61


Practice 2-1 Through 2-4

The practice covers the following topics:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Accessing Project Financial Planning from Workspace


• Setting User Variable Options
• Reviewing Project Administration Tasks
• Accessing Essbase Administration Services Console

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 2 - 62


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Creating Projects

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no
Objectives

After completing this lesson, you should be able to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Describe project types


• Create projects
• Prepare for project task lists and tasks
• Enter new project details

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 2


Determining a Project Type

Project Financial Planning enables you to propose new


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

contracts for the following types of projects:


• Capital
• Contract
• Indirect

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 3


Capital Projects

Capital projects are long-term and capital-intensive, resulting in


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the creation of a new company asset.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m traisna long-term investment project undertaken for construction of a capital asset
A Capital project
- bridges, and roads).
o as obuildings,
M(such n n
If a project has a classification of Capital, you can perform only expense budgeting for the
project. Project Financial Planning tracks the incurred expenses for a Capital project as
Construction in Progress (CIP) on the Balance Sheet while the assets are being developed.
Once a Capital project is placed in service and the assets are ready, the CIP assets must be
reconciled with existing assets.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 4


Types of Capital Projects

Project Financial Planning supports two types of capital


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

projects:

s a
) h a
ฺ c om ฺ
Single-Asset Capital Projects Multiple-Assetra cle uProjects
Capital ide
@ o t G
i a n
a k ar tude
e dฺz this S
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m trnew
When creating
a a nCapital projects, you must select a project type, also referred to as a
h
o Project n- Asset property:
MCapital n o
• Single-Asset Capital projects are projects that consist of building one Capital asset
using different resources.
• Multiple-Asset Capital Projects are projects that consist of building a group of assets
called sub-projects. The parent project is used to track the budget for all of the sub-
projects.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 5


Contract Projects

A Contract project is work performed for a customer and the


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

customer reimburses the company.

Expenses

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
Revenue ria
d e n
a
ak s Stu
ฺ z
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranis work performed for and reimbursed by a customer. Contract projects
A Contract project
o oboth
Mgenerate n- expenses
n revenue,
expenses,
and revenue based on an underlying contract. The Contract project
and billing can be for services performed and reimbursed by a customer.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 6


Types of Contract Projects
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Time and Materials Cost Plus

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
Fixed Price
h a m us Other
m o et o
i a ( nsand/or its affiliates. All rights reserved.
r c e
aka ble li
Copyright © 2012, Oracle
Z
m ed sfera
Project m
a t r n
FinancialaPlanning supports the following types of Contract projects:
h - Materials: A project billing type whereby the customer is charged for all of the
Mo• Time
non
and
hours of work performed, for asset expenses, for any direct expenses incurred, and for
materials purchased during project delivery. Examples of Time and Materials
arrangements are typically found in the construction industry, for contractors, and for
consulting firms.
• Cost Plus: An agreement to pay a company for a job based on the expenses required to
complete the job (for example, materials and labor), plus an added payment (or margin).
You can set different Cost Plus margins for different expenses (for example, set a
different margin for labor, materials, and equipment).
• Fixed Price: A project billing type whereby the customer is charged a set negotiated price
for the work performed on the contract (for example, sales revenue with a specified value
of $200,000). This contract type places upon the contractor maximum risk and full
responsibility for all costs and resulting profit or loss.
• Other: A project billing type that can be used for complex contract terms. For example, a
customer may be charged a fixed price for some services delivered as part of a project
while they may also be charged time and material or a markup on expenses.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 7


Indirect Projects

Indirect projects are also known as administrative projects.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
They have a cost impact but do not generate r ia revenue.d e n
a
ak s Stu
ฺ z
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Indirect m me arensalso
projects
fe known as administrative projects and have a cost impact but do not
o ha revenue.
generate n - tra For example, you create a project for your IT department to create a
Msolution/portal
no for the Human Resources team to track personal details of employees.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 8


Preparing Project Tasks

As a Project Manager, you perform the following tasks to create


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

projects:
1. Enter new project details.
2. Plan for expenses.
3. Plan for revenue for contract projects.
4. Review project financials.
5. Manage funding. s a
) h a
6. Submit project for approval. c o m
a c leฺ ideฺ
@ or t Gu
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Project m me nperform
managers s fe the following tasks to create projects:
o
1.
ra and enter any new project details, such as new project assumptions and
haCreaten-atproject
M no supplemental information.
2. Perform expense planning, such as adding labor resources, project equipment, material
and other requirements, entering direct project expenses, applying overheads to the
project, reviewing indirect and general and administrative allocated expenses, and
reviewing total expenses.
3. For Contract projects only, perform revenue planning, such as entering revenue drivers
and entering direct project revenue.
4. Review the project’s financials, such as calculating financial statements and reviewing the
project’s impact on financial statements, reviewing project KPIs, providing a detailed
project justification, and reviewing the project score.
5. Request project funding and review allocated funds.
6. Submit the project for approval.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 9


Entering New Project Details

Enter New Project Details


for Capital Projects
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Enter New Project Details


for Contract Projects

s a
) h a
ฺ c om ฺ
cle uide
Enter New Project Details
for Indirect Projects
r
o tGa
r @
ia den
a
ak s Stu
ฺ z
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Project m meare grouped
tasks n s fe by project type. To create a new project, you launch the Enter New
ha Details - a under the project type that you want to propose.
trtask
o
Project
M no n

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 10


Capital Projects: Adding Projects
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Right-click a row and select Add Project.

s a
Select to add Capital or
) h a
sub-projects.
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m traEnter
By selecting
a the n New Project Details task for Capital projects, you launch the New Project
h
o o–nCapital-
MProposals
n
form.
To add a Capital project in the form, right-click a row and select Add Project and select one of
the following:
• Add Capital Project: To create a parent single-asset or multiple-asset project.
• Add Capital Sub Project: To create a sub-project associated with a parent multiple-
asset project.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 11


Capital Projects: Adding Project Details

You add project details in the Add Project runtime prompt:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a the
r a n information in the Add Project runtime prompt:
m tfollowing
You enter
h -Enter a name for the project.
Mo• Name:
non
• Description: (Optional) Enter a description for the project to describe its purpose.
• Capital Project Asset: Select Single Asset or Multiple Asset
• Project Start Date and Project End Date: Enter the start and end dates for the project.
• Project Location: Select from a predefined list of locations.
• Project Manager: Select from a predefined list of managers.
The predefined list of locations and managers are based on Smart Lists prepared by the project
administrator.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 12


Capital Projects: Adding Capital Sub-Projects

You enter sub-project details for multiple-asset Capital projects


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

in the Add Sub Project runtime prompt:

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a the
r a n information in the Add Sub Project runtime prompt:
m tfollowing
You enter
h - Project: Select a parent project. For multiple-asset Capital projects, you must
Mo• Enter
non
Base
select a Base CPx base project.
• Name: Enter a name for the project.
• Description: (Optional) Enter a description for the sub-project to describe its purpose.
• Project Start Date and Project End Date: Enter the start and end dates for the sub-
project. If you do not specify a start and end date for the sub-project, the values default to
the base project’s start and end dates.
The base project is the parent Capital project that contains the project properties, including
Start Date, End Date, and so on. You should not use the base project for budgeting expenses.
When planning expenses for each asset, you should use the corresponding sub-project.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 13


Contract Projects: Adding Projects
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Right-click a row and select


Add Contract Project .

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
By selecting
a the n New Project Details task for Contract projects, you launch the New
m traEnter
h
o Proposals - – Contract form.
MProject non
To add a Contract project, in the form, right-click a row and select Add Contract Project.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 14


Contract Projects: Adding Project Details

You add project details in the Add Contract Project runtime


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

prompt:

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m tfollowing
You enter the
r a n information in the Add Contract Project runtime prompt:
h -Enter a name for the project.
Mo• Name:
non
• Description: (Optional) Enter a description for the project to describe its purpose.
• Project Start Date and Project End Date: Enter the start and end dates for the project.
• Project Type: Select Time and Material, Cost Plus, Fixed Price, or Other.
• Revenue Cash Flow Incidence: Select how cash will be collected from revenues: Before
2 Months, Before 1 Month, Same Month, Next Month, After 2 Months, After 3 Months, or
After 4 Months. The selection directly impacts the cash flow statement. If the same month
is selected, the cash flow statement will show an inflow of cash from customers in the
amount of the contract revenue in the same period. If the next month is selected, the cash
flow statement will show an inflow of cash from the customer with a one month lag. Two
months will be a two month lag, and so on.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 15


• Revenue Recognition: Select when revenue will be recognized: Monthly, Quarterly,
SemiAnnual, After Completion, or When Billed. The default, Monthly, recognizes revenue
in the month the work is performed. If Quarterly is selected, the revenue is recognized in
the last month of each contract quarter. If SemiAnnual is selected, revenue is recognized
in the sixth and twelfth month of the contract. If After Completion is selected, revenue is
recognized after the last month of the contract. If revenue can only be recognized when a
milestone is reached or there is no predefined time frame, select When Billed.
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 16


Indirect Projects: Adding Projects
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Right-click a row and select Add


Indirect Project .

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m traEnter
By selecting
a the n New Project Details task for Indirect projects, you launch the New
h
o Proposals - – Indirect form. To add an Indirect project, in the form, right-click a row and
MProject nonIndirect Project.
select Add

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 17


Indirect Projects: Adding Project Details

You add project details in the Add Indirect Project runtime


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

prompt:

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a the
r a n information in the Add Indirect Project runtime prompt:
m tfollowing
You enter
h -Enter a name for the project.
Mo• Name:
non
• Description: (Optional) Enter a description for the project to describe its purpose.
• Project Category: Select Annual by Fiscal Year if a project must be annually closed out,
justified, or approved. Select Multi-Year if the project can continue year after year.
• Project Start Date and Project End Date: Enter the start and end dates for the project.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 18


Viewing Project Proposals

View proposed projects by selecting the Review Project


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Proposals task:

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m projects,
After creating
t r a n you view them by selecting the Review Project Proposals task under the
h
o Projects n- updating
MReview noand
white cell
task list folder. You can edit project details on this form by double-clicking a
the information.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 19


Capital Projects: Deleting Project Proposals

Right-click a project and


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

select Delete Project.

s a
) h a
ฺ c om ฺ
Select to delete Capital or

r a cle uide
sub-projects.

@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a Capital n
m traprojects,
To delete in the New Project Proposals – Capital form, right-click a project and
h
o Delete -Project. Then, select one of the following:
Mselect
• non
Delete Capital Project
• Delete Sub Capital Project

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 20


Contract Projects: Deleting Project Proposals
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Right-click a project and select


Delete Contract Project.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranprojects, in the New Project Proposals – Contract form, right-click a project
To delete Contract
- Contract Project.
o selectoDelete
Mand n n

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 21


Indirect Projects: Deleting Project Proposals
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Right-click a project and select


Delete Indirect Project.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a Indirect n
m traprojects,
To delete in the New Project Proposals – Indirect form, right-click a project
h - Indirect Project.
o selectoDelete
Mand n n

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 22


Changing Project Status

In the New Project Proposals form for Capital, Contract, and


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Indirect projects, right-click a row and select Change Project


Status.
Right-click a project and select
Change Project Status.

s a
) h a
ฺ c om ฺ
r a cle uide
Then, select a newoprojecttstatus.G
i a @ n
a k ar tude
e dฺz this S
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Project m me isnseparate
approval s fe from plan approval. Approving the project sets the status of the
o
project n tra and locks the project for editing. You cannot make any changes to
hato Approved
-
Mapprovednoprojects.
The approved project will be copied to current scenario Final and to the Forecast Final
intersections.
To start updating the project status, right-click a project and select Change Project Status.
Then, select Approve Project, Disapprove Project, or Put Project on Hold.
The project status must be changed by the approving authority before promoting the project
through the Approvals process.
Note: You can change the project status if you have access permissions for this task.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 23


Project Status Runtime Prompts
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
After selecting
a n status, the corresponding runtime prompt is displayed. In the runtime
m taraproject
h
o verify - the project name, (optionally) enter comments, and click OK.
Mprompt, non

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 24


Reconciling Projects

Reconciling a project moves the new project to an existing


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

project:
For Capital projects, right-click and select
Reconcile Capital Project.

Enter and verify the source (proposed) project


and existing (imported) projects in the
Reconcile Project runtime prompt.
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
When you
h a m tran projects, the data for the source project is moved to an existing project in
reconcile
n- and
osameoentity,
Mthe n projects
reconcile
then the source project is deleted from the entity. For example, you
to assign a true project number (existing project) to a temporary project. This
moves the data from the (source) temporary project to the existing (destination) project, and
then deletes the source project.
To reconcile Capital, Contract, and Indirect projects in their corresponding New Projects
Proposals forms, right-click a project and select Reconcile Capital Project. Then, enter and
verify the source and destination projects.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 25


Moving Projects

Right-click and select Move


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Projects.

Select the project, existing version,


and destination version in the Move
Projects runtime prompt.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
You canm mea project
move n s fefrom one version to another. For example, from Working to Final.
o hayou move
When n - traprojects, the selected projects will be deleted from the source version and
Mmoved ntoothe destination version.
For example, in a use case scenario, you can move projects with a status of On-hold or
Unapproved from the Working version so that the entity-level financials will reflect only those
projects that are Proposed or Approved.
Note: You must have rights to move a project to perform this task.

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 26


Quiz

As a Project Manager, you perform which of the following tasks


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

to create projects?
a. Enter existing project details.
b. Plan for expenses.
c. Plan for revenue for contract projects.
d. Submit plan for approval.
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
Answer:
h a m tdran
b, c,
Mo non-

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 27


Quiz

When you reconcile a project, you transfer it from one version


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

to another.
a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: b
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 28


Quiz

You enter sub-project details for multiple-asset Capital projects.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: a
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 29


Summary

In this lesson, you should have learned how to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Describe project types


• Create projects
• Prepare for project task lists and tasks
• Enter new project details

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 30


Practice 3-1 Through 3-4

The practice covers the following topics:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Capital Project: Furnishing Classrooms


• Contract Project: Delivering Training to Miller Corporation
• Contract Project: Developing Scope and Track
• Indirect Project: Training for Scope and Track

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 3 - 31


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Planning for Project Expenses

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no
Objectives

After completing this lesson, you should be able to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Assign and calculate labor expenses


• Assign and calculate equipment expenses
• Assign and calculate material and other requirements
• Enter direct project expenses
• Calculate overhead expenses
s a
• Review indirect and G&A expenses
) h a
• Review total project expenses o m
ฺc ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 2


Expense Planning: Task Overview

You use the Expense Planning task list to guide you through
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the process of providing details about the expense components


of a project, including the following:
• Add labor
• Add equipment
• Add material and other resources
• Enter direct project expenses s a
) h a
• Apply overheads o m
l ฺc eฺ
e(G&A)
• Review indirect and general and administrative c
ra Guid
allocated expenses o
@ ent
a r i a d
• Review total expenses zak Stu
dฺ this
m se e
h a m u
o t o
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 3


Assigning and Calculating Labor Expenses

When assigning labor, you perform the following tasks:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Add labor
• Calculate labor expenses
• Review labor expenses

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 4


Adding Labor

You add labor to projects by using the Add Labor task.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
You canm me ornsdecrease
increase
fe labor hours, add more resources to the project, change the
h a t r a
- frame, and so on. Changes made here are reflected in the revised Total Labor
o ontime
Massignment
n for the project.
Expense
To assign labor resources to a project:
1. Navigate to one of the new project proposal task lists.
2. Expand Expense Planning, and then expand Add Labor.
3. Under the Add Labor task list folder, select Add Labor.
4. Review the Labor Assignment Details form.
5. Right-click a row and select Add Labor Assignment.
.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 5


6. Enter the following information in the Add Labor Resource runtime prompt:
- Select Job: Select the type of job required for the project from a predefined list of
jobs.
- Enter Headcount: Enter the number of resources needed to accomplish the work. If
more than 1 is entered, the hours are calculated.
- Enter Skill Sets: Select the skills needed to perform the job from a predefined list of
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

skills. This field is informational and does not impact the labor calculations. You can
customize this field by adding new members to the Smart List. Adding additional
values to the Smart List will not impact the business rules.
- Assign for Project Duration (Y/N): The default is Yes. Select Yes if the resource
will be assigned for the duration of the project. If Yes is selected, you do not need to
enter the assignment start and end dates. The rule will automatically take the project
start and end dates. Select No if the resource will not be assigned for the duration of
the project. If No is selected, you must enter the assignment start and end dates for
the resource. If a resource is used sporadically, enter the resource start and ends a
h a
dates for the first period of the project to add the resource line item to the form. Then
)
ฺ c om ฺ
expand the year in the form to add additional hours for the resource by period.

r a cle uide
- Assignment Start Date/Assignment End Date: If the resource will not be
o tG
assigned for the project duration, you must enter the start and end dates. If the start
@
a r ia den
and end dates are not completed, the rule assumes the resource will be assigned
for the duration of the project.
ฺ z ak s Stu
ed e thi
- Allocation Percentage: (For Capital and Indirect projects only) Enter the
m
ham to us
percentage of time a labor resource is allocated to a project. The Allocation
o
Percentage drives the labor expense of that resource to a project.
a (m nse
- Enter Labor Hours per Headcount: (For Capital and Indirect projects only) If
i
k a r l i ce
requesting more than one headcount, enter the number of hours per headcount for
Za rable
the calculation.
d
m e sfe
- Onsite Labor Hours: (For Contract projects only) Enter the number of hours the
n
o ham n-tra
resource will perform project work onsite. Onsite labor hours is used in the Contract
M no revenue calculation.
- Offsite Labor Hours: (For Contract projects only) Enter the number of hours the
resource will work on the project. Offsite labor hours is used in the Contract revenue
calculation.
- Non-Billable Hours: (For Contract projects only) Enter the number of labor hours
that needs to be included on the project but cannot be billed to the customer. Non-
billable hours is used in the labor expense calculation, but is excluded from the
Contract revenue calculation.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 6


- Spreading Logic: Select the logic that determines how values are distributed:
Fill: Copies the value entered to all of the cells in a grid. For example, if a value of 200
hours is entered for a project, then the values for each month between the start and end
dates of the project are set to 200.
EvenlySplit: Divides the value entered between all of the cells in a grid. For example, if a
value of 200 hours is entered for a project, then the 200 is divided over the number of
months between the start and end dates.
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

- Comments: (Optional) Enter comments about the labor assignment.


7. Click OK.
Note: For Contract projects, the project billing level is unspecified by default. Update it to
correct the billing level, if required. This is used for calculating revenue.
From the form, you can use the shortcut menus to add and remove labor assignments,
calculate project labor, change labor assignments, view the standard hourly cost, and remove
an employee assignment.
Removing a Labor Assignment s a
) h a
or to remove a labor assignment that was added by mistake. ฺ c om ฺ
You use the shortcut menu to remove a labor resource that is no longer required on the project

Changing Assignments r a cle uide


@ o tG
ia dYou
You use the shortcut menu to make changes to a labor assignment.
r e ncan extend or shorten
the labor assignment, change the headcount, or change a a tu of hours assigned to the
kthe number
ฺ z
project. The spreading logic field indicates how todapply theis
S
m e e th changes.
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 7


Calculating Labor Expenses

Calculating project labor is a critical step for costing the project.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

After completing the Assign Labor Resources task, you must


launch the business rule that calculates labor expenses.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m traaren calculation based on the hours per month and standard hourly labor rates,
Labor expenses
Masoshown - formula:
in this
non
Hours per month * Standard Hourly Rates of Labor = Project Labor
To calculate labor for new projects:
1. Navigate to one of the new project proposal task lists.
2. Expand Expense Planning, and then Add Labor.
3. Select the Calculate Labor Expenses task.
4. Launch one of the following business rules:
- For Contract projects: CalculateProjectLaborExpenses-Contract
- For Capital and Indirect projects: CalculateProjectLaborExpenses-Other
5. Enter the required information in the runtime prompt.
6. Click OK.
Alternatively, you can use the shortcut menu on the Labor Assignment Details form (Add Labor
task) to calculate labor expenses for the project.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 8


Reviewing Labor Expenses

You review labor resource requests and their financial impact in


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the Project Labor Detail form.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m tlabor
To review the
r a nexpense:
h - to one of the new project proposal task lists.
Mo1. Navigate
non
2. Expand Expense Planning, and then Add Labor.
3. Launch the Review Labor Expense task.
4. Review the Project Labor Detail form.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 9


Assigning and Calculating Equipment Expenses

You can request use of equipment for a project based on


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

project requirements. When assigning equipment, you perform


the following tasks:
• Add equipment
• Calculate equipment expenses
• Review equipment expenses
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
You canm mefor related
plan n s feproject expenses and to update assumptions about the use of the
ha nFor - a
trexample,
o
equipment.
Mequipment you can increase, decrease, or remove equipment hours. The
nocost to the project is based upon the standard rates for equipment.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 10


Adding Equipment

You specify the equipment requirements for the project by


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

using the Add Equipment task.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran based on values defined in the Standard Equipment member. For
You assign equipment
o oyou
Mexample, -can request for laptops by selecting the Laptop standard equipment member.
nunits
Specifynthe required and the duration of the assignment.
To assign project equipment:
1. Navigate to one of the new project proposal task lists.
2. Expand Expense Planning, and then expand Add Equipment.
3. Under the Add Equipment task list folder, select Add Equipment.
4. Review the Add Equipment form.
From the form, you can use the shortcut menu to add, remove, and change equipment
requisitions, calculate equipment expenses, and view standard equipment rates.
To add equipment to a new project:
1. Open the Add Equipment form.
2. Right-click a row and select Add Equipment Requisition.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 11


3. In the Add Equipment Requisition runtime prompt, specify or select the settings that are
applicable for your project:
- Standard Equipment: Select the equipment needed from a predefined list of
equipment.
- Equipment Description: (Optional) Provide details about equipment specifications.
- Equipment Units: Enter the number of equipment units needed for the project. For
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

example, if two cranes are needed for 200 hours per month, enter 2 in this field and
200 in the Equipment Usage/Unit field.
- Equipment Usage/Unit: Enter the number of hours per equipment unit for the
calculation. This is optional and you need only enter usage per unit if it is required
for the project. For example, if three laptops are needed per month, enter 3 in the
Equipment Units field and leave this field blank.
- Assign for Project Duration (Y/N): The default is Yes. Select Yes if the equipment
will be assigned for the duration of the project. If Yes is selected, you do not need to
enter the assignment start and end dates. The rule automatically takes the project s a
) h a
start and end dates. Select No if the equipment will not be assigned for the duration
ฺ c om ฺ
of the project. If No is selected, you must enter the assignment start and end dates

r a cle uide
for the equipment. If the equipment is used sporadically, enter the equipment start
o tG
and end dates for the first period of the project to add the resource line item to the
@
a r ia den
form. Then expand the year in the form to add additional hours for the equipment by
period.
ฺ z ak s Stu
ed e thi
- Assignment Start Date/Assignment End Date: If the equipment will not be
m
ham to us
assigned for the project duration, enter the start and end dates. If the start and end
o
dates are not entered, the rule assumes the equipment will be assigned for the
i a (m nse
project duration.
k a r l i ce
- Spreading Logic: Select the logic that determines how values are distributed in a
d Za rable
grid:
m e sfeFill: Copies the value entered to all of the cells in a grid. For example, if a value of
n
o ham n-tra 200 hours is entered for a project, then the values for each month between the
M no start and end dates of the project are set to 200.
EvenlySplit: Divides the value entered between all of the cells in a grid. For
example, if a value of 200 hours is entered for a project, then the 200 is divided
over the number of months between the start and end dates.
Note: If the start and end dates are not completed, the Spreading Logic will use
the full project duration to populate the months appropriately.
- Justification: Provide a reason why the equipment is needed.
4. Click OK.
Removing Equipment Requisitions
You use the shortcut menu to remove an equipment requisition that is no longer required on the
project or to remove an equipment requisition that was added by mistake.
Changing Equipment Requisitions
You use the shortcut menu to make changes to an equipment assignment. You can extend or
shorten the assignment, or change the equipment units assigned to the project.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 12


Calculating Equipment Expenses

After equipment requisitions have been entered or modified,


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

you must run calculations to derive the project expenses for


equipment usage based on equipment units and standard
equipment rates.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
When the
h a m tran is executed, it determines the cost for all equipment assigned to the
calculation
o forothe
Mproject - duration of the project based on the following formula:
n n
Equipment Usage * Equipment Standard Rate = Equipment Expense
If there is no Equipment Usage, then Equipment Units will be used instead and Equipment
Expense will be calculated as follows:
Equipment Units * Equipment Standard Rate = Equipment Expense
To calculate project equipment expenses:
1. Navigate to one of the new project proposal task lists.
2. Expand Expense Planning, and then expand Add Equipment.
3. Select Calculate Equipment Expense.
4. Launch the CalculateProjectAssetExpenses business rule.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 13


Reviewing Equipment Expenses

You review expenses for the assigned equipment for a project


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

in the Project Expense for Equipment – Detail form.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a project n
m traequipment
To review expenses:
h - to one of the new project proposal task lists.
Mo1. Navigate
non
2. Expand Expense Planning, and then expand Add Equipment.
3. Select Review Equipment Expenses.
4. Review the Project Expense for Equipment – Detail form.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 14


Adding and Calculating Material
and Other Requirements
With the Add Material and Other Resources task list, you
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

manage project materials, subcontractors, and other expenses


resources.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 15


Adding and Calculating
Material and Other Resources
You add materials, subcontractors, and other resources for
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

project expenses by using the Add Material & Other Resources


task.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
To add m me andnsother
material
fe resources to a project:
o
1.
haNavigate
n - trtoaone of the new project proposal task lists.
M no
2. Expand Expense Planning, and then expand “Add Material and Other Resources.”
3. Select Add Material & Other Resources.
4. Review the Material and Other Requirement form.
From the form, you can use the shortcut menu to add and remove material and other
requirements, and calculate material and other resources.
You use this task to enter labor and material resources not available within the organization.
For example, you can hire a subcontractor as a potential labor resource and rent an asset that
you do not need to purchase.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 16


To add material and other requirements to a project:
1. Open the Material and Other Requirement form.
2. Right-click a row and select “Add Material and Other Requirements.”
3. In the Add Material and Other Requirements runtime prompt, specify or select the settings
that are applicable for your project:
- Enter Resource Name: Enter the name of the material or other expense to be
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

added.
- Resource Descriptions: (Optional) Provide details about the resource being
added.
- Resource Class: Select from the following predefined resource classes: Material,
Subcontractor, and Other.
- Assign for Project Duration (Y/N): The default is Yes. Select Yes if the resource
will be assigned for the duration of the project. If Yes is selected, you do not need to
enter the requirement start and end dates. The rule will automatically take the
s a
) h a
project start and end dates. Select No if the resource will not be assigned for the

ฺ c om ฺ
duration of the project. If No is selected, you must enter the requirement start and
end dates for the resource. If the resource is used sporadically, enter the
a cle uide
requirement start and end dates for the first period of the project to add the resource
r
o tG
line item to the form. Then expand the year in the form to add additional units for the
@
resource by period. a r ia den
ฺ z ak s Stu
- Requirement Start Date/Requirement End Date: If the requirement will not be
ed e thi
assigned for the project duration, enter the start and end dates. If the start and end
m
o ham to us
dates are not completed, the rule assumes the requirement will be assigned for the
duration of the project.
i a (m nse
k a r l i ce
Note: The requirement start and end dates must occur within the project start and

d Za rable
end dates. Assignments cannot start before the project start date nor can they end
after the project end date.
m e sfe
n
ham n-tra
- Spread Logic: Select the logic that determines how values are distributed in a grid:
o
M no Fill: Copies the value entered to all of the cells in a grid. For example, if a value of
200 hours is entered for a project, then the values for each month between the
start and end dates of the project are set to 200.
EvenlySplit: Divides the value entered between all of the cells in a grid. For
example, if a value of 200 hours is entered for a project, then the 200 is divided
over the number of months between the start and end dates.
- Units Required: Enter the number of units required for the material or other
expense.
- Cost UOM: Select from a predefined list the unit of measure for the cost.
- Cost/Unit: Enter the cost per unit for the material and other expense. The materials
and other expenses calculation will be based on Units Required × Cost/Unit.
4. Click OK.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 17


Calculating Material and Other Expenses

You run business rules to calculate the expenses for materials


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

and other expenses. This calculation multiplies the number of


units entered by the cost per unit on a monthly basis for the
duration of the project.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran and other expenses for a project:
To calculate material
Mo1. Navigate- to one of the new project proposal task lists.
2.
non
Expand Expense Planning, and then expand Add Material & Other Resources.
3. Select Calculate Material & Other Expenses.
4. Launch the CalculateMaterialExpenses_Ruleset business rule.
5. In CalculateMaterialExpenses_Ruleset, specify or select the settings that are applicable
for your project.
6. Click Launch.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 18


Reviewing Material and Other Expenses

You review summaries of the total material and other expenses


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

associated with a project in the Total Material and Other


Expenses form.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranand other expenses for a project:
To review material
- to one of the new project proposal task lists.
Mo1. Navigate
non
2. Expand Expense Planning, and then Add Material & Other Resources.
3. Select Review Material & Other Expenses.
4. Review the Total Material and Other Expenses form.
You can use the shortcut menu to calculate project expenses.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 19


Entering Direct Project Expenses

You enter lump sum amounts for expenses that do not have
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

any logic defined to arrive at the values in the Enter Direct


Project Expenses task.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Project m me Planning
Financial n s fe provides two methods for getting project data into the application.
o
You
a -tra
hcan:
M non
• Perform detailed planning that uses rules to add data.
• Import data from a source system, and use Project Financial Planning to consolidate the
projects.
• Enter expenses directly to a project.
To enter direct expenses for a project:
1. Navigate to one of the new project proposal task lists.
2. Expand Expense Planning.
3. Select Enter Direct Project Expenses.
4. Review and update the Enter Direct Project Expenses form.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 20


Calculating Overhead Expenses

You apply overheads for a project by using the Apply


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Overheads task.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a are a n that are necessary for the performance of a job or continued
m trexpenses
Overheads
h
o onof-the business but cannot be specifically attributed to a project. With the Apply
Mfunctioning
n task list, you run the CalculateOverheads business rule that applies the overheads,
Overheads
both indirect expenses and general and administrative expenses, to the projects to arrive at a
fully-loaded cost of the project.
To apply overheads to a new project:
1. Navigate to one of the new project proposal task lists.
2. Expand Expense Planning, and select Apply Overheads.
3. Launch the CalculateOverheads business rule.
4. In CalculateOverheads, specify or select the settings that are applicable for your project.
5. Click Launch.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 21


Reviewing Indirect and G&A Expenses

You use the Review Indirect and G&A Allocated Expenses task
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

to review the drivers and the associated costs for each


overhead line item that is applied to your project.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
Generalm &m n (G&A) expenses relate to the company as a whole. These expenses
Administrative
a
h a t r
- administration, and general costs, such as:
o facilities,
Minclude
• non
Lease or mortgage
• Utilities, electric, and gas
• Cleaning
• Routine building maintenance
• Administering employee benefits, employee reviews, and related human resource activity
• Company parties
• All-hands staff meetings
• Employee training on soft skills

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 22


Indirect expenses are costs that do not logically fit into overhead and are usually included in
G&A. Examples of indirect expenses include:
• Company-paid portion of health insurance
• Salary for time taking training related to the type of project
• Paid time off
• Company cost of relocating a new hire
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Unemployment compensation premiums


To review indirect and general and administrative allocated expenses:
1. Navigate to one of the new project proposal task lists.
2. Expand Expense Planning.
3. Select “Review Indirect and G&A Allocated Expenses.”
4. Review the Review Indirect and G&A Allocated Expenses form.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 23


Reviewing Total Expenses
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
After allm me nhave
expenses s febeen planned and associated overheads applied, you use the Review
o haExpense
Project n - traform to review the expenses for a project.
M no
To review project expenses:
1. Navigate to one of the new project proposal task lists.
2. Expand Expense Planning.
3. Select Review Total Expenses.
4. Review the Review Project Expense form.

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 24


Quiz

The Adding Equipment task enables you to request use of


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

equipment for a project based on project requirements.


a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: a
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 25


Quiz

Overheads are expenses that are necessary for the


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

performance of a job or continued functioning of the business


but cannot be specifically attributed to a project.
a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: a
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 26


Summary

In this lesson, you should have learned how to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Assign and calculate labor expenses


• Assign and calculate equipment expenses
• Assign and calculate material and other requirements
• Enter direct project expenses
• Calculate overhead expenses
s a
• Review indirect and G&A expenses
) h a
• Review total project expenses o m
ฺc ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 27


Practice 4-1 Through 4-7

The practice covers the following topics:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Capital Projects: Adding Equipment


• Reviewing Total Expenses for Capital Projects
• Contract Project: Adding Labor for PLNIU-Miller
• Contract Project: Adding Equipment for PLNIU-Miller
• Contract Project: Adding Other Expenses to PLNIU-Miller
s a
• Reviewing Total Project Expenses for PLNIU-Miller
) h a
• Indirect Projects: Adding Expenses o m
ฺc ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 4 - 28


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Planning for Contract Project Revenues

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no
Objectives

After completing this lesson, you should be able to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Enter revenue drivers for Cost Plus Contract projects


• Enter revenue drivers for Time and Materials Contract
projects
• Enter revenue drivers based on units sold and sales price
per unit
• Enter direct project revenue s a
) h a
• Calculate project revenue o m
• Identify revenue recognition options c l eฺc deฺ
ra i o tG u
r @
ia den
a
ak s Stu
ฺ z
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 2


Revenue Planning: Task Overview

You use the Revenue Planning task list to plan for project
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

revenue based on one of the following categories:


• Cost Plus
• Time and Materials
• Fixed Price
• Direct Revenue
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
Revenue
h a m tranapplies to projects classified as Contract projects. Project Financial Planning
planning
- revenue for Indirect or Capital projects. If these projects need to generate
onot calculate
Mwill
revenue,noyoun must reclassify the project.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 3


Entering Revenue Drivers for Cost Plus Projects

You define revenue parameters for a Cost Plus project


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

category by providing margin requirements for different types of


project expenses.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m the
You manage
t r a n
contractual arrangement for Cost Plus contracts in the Enter Revenue Drivers
h - The form enables you to view the Cost Plus revenue assumptions and the
o Plusonform.
M-revenue
Cost
nrecognition for a project.
The Cost Plus margin percent (%) can be defined at the detail level (labor, equipment,
materials, and other) or for total expenses. If the revenue definition is based on total expenses,
Project Financial Planning will not allow you to build your assumptions at the detail level. The
margin can be defined on a monthly basis, if needed. Expand the columns to override the
margin % for a period.
The Cost Plus driver is defined for the duration of the project. In the lower half of the form, you
can review the revenue generated.
Cost Plus revenue is also known as markups. The driver calculates the cost of the product,
then adds a proportion of it as markup. For example, you enter labor expenses as the cost
basis. Then you enter a 40% markup as revenue.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 4


To enter revenue drivers for Cost Plus Contract projects:
1. Navigate to the Propose New Contract Projects task list.
2. Expand Revenue Planning.
3. Select Enter Revenue Drivers - Cost Plus.
4. Review the Enter Revenue Drivers - Cost Plus form.
In the form, you can use the shortcut menus to add and remove revenue assumptions,
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

calculate Cost Plus revenue, and calculate intercompany revenue.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 5


Adding and Removing Revenue Assumptions

You can add and remove Cost Plus revenue assumptions in


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the Enter Revenue Drivers – Cost Plus form.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Addingm me nAssumptions
Revenue s fe
o a -tra
hPlus
Cost n
M noassumptions are set by selecting a Cost Plus driver base from which the margin is
applied.
To add revenue assumptions:
1. Open the Enter Revenue Drivers - Cost Plus form.
2. Right-click the form, and select Add Revenue Assumptions.
3. In Add Revenue Assumptions, specify or select the settings that are applicable for your
project:
- Cost Plus Driver: Select the expense base to which the margin will be applied. The
margin can be set to Labor Expenses, Material Expenses, or Equipment Expenses
or it can be applied in total to Total Expenses.
- Revenue Source Description: An optional field to add a description for the
revenue source.
- Cost Plus Margin %: Enter the Margin % or mark-up that will be applied to
expenses.
4. Click OK.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 6


Note: If the Cost Plus revenue was set to Total Expenses, Project Financial Planning does not
allow you to also build assumptions at the detail level (for labor, equipment, and materials). To
change the manner in which revenue is earned, you must first change the driver from Total
Expense to a detail line item, then you can add detail line items.
Removing Revenue Assumptions
You can remove revenue assumptions that are no longer required on the project or that were
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

added by mistake.
To remove revenue assumptions:
1. Open the Enter Revenue Drivers - Cost Plus form.
2. In the form, right-click the revenue element that you want to remove.
3. Select Remove Revenue Assumptions.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 7


Calculating Revenue for Cost Plus Projects

You use a task-based business rule to calculate project


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

revenue based on the assumptions provided.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a project n
m trarevenue
Cost Plus is calculated from the details (labor, equipment, and materials) or
h
o the total-expenses for the project duration:
Mfrom non
Labor Expense *(1 + Margin %)
or
Total Expense *(1 + Margin %)
If a revenue assumption is not specified for a particular expense, it will be assumed at the cost
(0% margin).
To calculate Cost Plus revenue:
1. Open the Enter Revenue Drivers - Cost Plus form.
2. Right-click the form, and select Calculate Revenue.
3. Click OK.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 8


Quiz

You must enter revenue information for all types of projects.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
o h am -tran
Answer: b
n only.
MContractnoProjects

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 9


Quiz

You can plan for revenue based on which of the following


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

drivers?
a. Cost Plus
b. Total Capital
c. Time and Materials
d. Fixed Price
e. Direct Revenue s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
Answer:
a m d,
a, c, en
a
h t r
Mo non-

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 10


Entering Revenue Drivers for Time and Materials
Contract Projects
You define revenue parameters for the time and material
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

project category by providing revenue details at the per-unit


level of project resources.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
mEnter
You usem
a the
t r a nRevenue Drivers - Time and Material form to manage time and materials
h -
o onarrangements
Mcontractual for the project. Project Financial Planning helps you build revenue
n for labor, equipment, and materials. You can enter the billing rates at the project
assumptions
level or they can be derived from company assumptions. Billing rates can be defined at the
resource level (that is, at the employee or equipment level).
Labor revenue is based on the billing level of the employee. Each labor resource has an
associated billing level; you can override the assigned billing level on a monthly basis, if
necessary. Billing rates for the project are defined on a monthly/yearly basis for the duration of
the project.
To enter revenue drivers for Time and Material Contract projects:
1. Navigate to the Propose New Contract Projects task list.
2. Expand Revenue Planning.
3. Launch the Enter Revenue Drivers - Time and Materials task.
4. Review the Enter Revenue Drivers - Time and Materials form.
5. From the tabbed area of the composite form, you can use the shortcut menus to view
standard hourly rates, copy the base billing rate, calculate labor, material, and equipment
revenue, and calculate total project revenue.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 11


Viewing Standard Hourly Rates

You view the standard hourly rates in the Enter Standard


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Hourly Labor Rates form.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran Hourly Labor Rates form displays the costs by job level that were used in
The Enter Standard
Mthe
form. no
n-
olabor calculation. You cannot override or change the labor rates that are displayed in this

To view standard hourly labor rates:


1. Open the Enter Revenue Drivers - Time and Materials form.
2. Right-click the Employee Billing Detail form, and select View Standard Hourly Labor
Rates.
The Enter Standard Hourly Labor Rates form displays standard rates for each job.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 12


Copying the Base Billing Rate

Standard billing rates are set by entity.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranrates in the labor revenue calculation, you must perform the Copy Base
To use the default
o Rate
MBilling - to copy the default rates to the project. Alternatively, you can set the billing
ontask
rates fornthe project.
To copy the base billing rates:
1. Open the Enter Revenue Drivers - Time and Materials form.
2. Right-click the Set Project Billing Rate form, and select Copy Base Billing Rate.
3. Click OK.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 13


Calculating Labor Revenue

You run the Calculate Labor Revenue business rule to update


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the total labor revenue for the project.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
This task
h a m tran the labor revenue. Labor revenue is calculated by multiplying Labor Hours
calculates
Mpero resource -per month times Billing Rate per month:
non
Labor Hours * Billing Rate
To calculate labor revenue:
1. Open the Enter Revenue Drivers - Time and Materials form.
2. Right-click the Employee Billing Detail form or the Set Project Billing Rate form, and
select Calculate Labor Revenue.
3. Click OK.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 14


Calculating Material Revenue

You run the Calculate Material Revenue business rule to


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

update the total material revenue for the project.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran the material revenue. Material revenue is calculated by multiplying Material
This task calculates
o times
MUnits - Rate per Material.
Billing
non
To calculate material revenue:
1. Open the Enter Revenue Drivers - Time and Materials form.
2. Right-click the “Billing - Material and Other Resources” form, and select Calculate Material
Revenue.
3. Click OK.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 15


Calculating Equipment Revenue

You run the Calculate Equipment Revenue business rule to


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

update the total equipment revenue for the project

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m tEquipment
The Calculate
r a n Revenue task calculates the equipment revenue. Equipment revenue
h -by multiplying Equipment Usage, or Equipment Units if an Equipment Usage value
Misisonot
calculated
nontimes the Equipment Billing Rate.
used,
Equipment Usage * Equipment Billing Rate
To calculate equipment revenue:
1. Open the Enter Revenue Drivers - Time and Materials form.
2. Right-click the Billing – Equipments form, and select Calculate Equipment Revenue.
3. Click OK.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 16


Calculating Total Project Revenue

You can calculate each type of revenue individually or calculate


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

all of the sources at once.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m tTotal
The Calculate
r a nProject Revenue task calculates the revenue for the following sources:
h
o Material,- and Equipment.
MLabor, non
To calculate the total project revenue:
1. Open the Enter Revenue Drivers - Time and Materials form.
2. Right-click the tabbed area of the form, and select Calculate Total Project Revenue.
3. Click OK.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 17


Entering Revenue Drivers Based on Units Sold
and Sales Price Per Unit
You define revenue parameters for revenue that are based on
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

sales price per unit.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran the Enter Revenue Drivers – Unit Price form helps you define the
For Contract projects,
Mrevenue
unit. no
n-
o assumptions for projects that earn revenue based on units sold and sales price per

For example, you enter sales revenue for 10 units of licenses sold at $1500 each.
You can review, update, or add any additional revenue assumptions.
To enter revenue drivers for Unit Price Contract projects:
1. Navigate to the Propose New Contract Projects task list.
2. Expand Revenue Planning.
3. Launch the Enter Revenue Drivers - Unit Price task.
4. Review the Enter Revenue Drivers - Unit Price form.
5. Right-click the tabbed area of the form, and use the shortcut menu to add and remove
revenue assumptions and to calculate Unit Price revenue.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 18


After you enter revenue drivers for Unit Price, you must run the calculation to update the
revenue for the project based on all of the assumptions defined.
Revenue is calculated as Units Sold multiplied by Price Per Unit.
Revenue will be recognized in accordance with the revenue recognition defined under the
contract terms.
To calculate Unit Price revenue:
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

1. Open the Enter Revenue Drivers - Unit Price form.


2. Right-click the tabbed area of the form, and select Calculate Revenue.
3. Click OK.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 19


Entering Direct Project Revenue

You enter revenue for sources that are not derived at a detailed
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

level.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
mReview
You usem
a the
t r a n and Update Direct Revenue form to enter all other revenue that the project
h -to generate, but that is not covered in the other methodologies.
Misoanticipated
non
Project Financial Planning provides two methods for getting project data into the application:
• Perform detailed planning by using rules to add data.
• Import data from a source system and use Project Financial Planning to consolidate the
projects.
If the import method is used, the project revenue is displayed in this form.
To view and enter direct revenue for Contract projects:
1. Navigate to the Propose New Contract Projects task list.
2. Expand Revenue Planning.
3. Launch the Enter Direct Project Revenue task.
4. Review the Review and Update Direct Revenue form.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 20


Revenue Recognition

Revenue recognition options:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Monthly
• Quarterly
• Semi-Annual
• After Completion
• When Billed
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
Revenue
h a m tran based on the value defined in the Revenue Recognition text box when
is recognized
Myouo created - project proposal.
your
• non
Monthly: (Default) Revenue is recognized in the month the work is performed.
• Quarterly: Revenue will be recognized in the last month of each contract quarter.
• SemiAnnual: Revenue will be recognized in the 6 and the 12 month of the contract.
• After Completion: Revenue will be recognized after the last month of the contract.
• When Billed: Revenue will be recognized when a milestone is reached. Typically, this
option is selected when there is no predefined time frame as to when revenue will be
recognized.
Revenues are recognized when they are realized, realizable, or earned, depending on your
company’s policies. Revenue is often recognized when goods are transferred or services
rendered, no matter when cash is received.
Revenue recognition affects when the income is included in the company’s financial
statements.

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 21


Summary

In this lesson, you should have learned how to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Enter revenue drivers for Cost Plus Contract projects


• Enter revenue drivers for Time and Materials Contract
projects
• Enter revenue drivers based on units sold and sales price
per unit
• Enter direct project revenue s a
) h a
• Calculate project revenue o m
• Identify revenue recognition options c l eฺc deฺ
ra i o tG u
r @
ia den
a
ak s Stu
ฺ z
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 22


Practice 5-1 Through 5-2

The practice covers the following topics:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Entering Revenue Fixed Price Drivers


• Entering Time and Material Revenue

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 5 - 23


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Reviewing Project Financials

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no
Objectives

After completing this lesson, you should be able to review:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Review project financial statements


• Review project metrics and KPIs
• Review project justifications
• Review project score
• Review project funding
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 2


Reviewing Project Financials Overview

This lesson covers the following tasks under the Propose New
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Projects task list for all types of projects.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
After allm me and
revenue n s fe
expenses are entered and calculated, you can view the financial
h a t r a
o onfor- a project. This step assists you in evaluating projects before submitting them for
Mstatements
n You begin reviewing projects by calculating the financial statements. After they are
approval.
calculated, you can review the project’s impact on the Cash Flow and Income statements. You
can then review the project KPIs, provide a detailed project justification, and review the project
score so you can start analyzing the full financial outlook of the project and request funding.

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 3


Performing Calculations

Prior to viewing financial statements, you must run a business


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

rule that calculates the financial statements for a project.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran
The CalculateFinancialStatements business rule calculates project cash flow, taxes, and KPIs,
- up with a project score based on the financial impact. This calculation must be
o then ocomes
Mand n innorder to view complete and correct data in financial statements.
executed
To calculate financial statements:
1. Navigate to one of the new project proposal task lists.
2. Expand Review Project Financials.
3. Launch the Calculate Financial Statements task.
4. Launch the CalculateFinancialStatements business rule.
5. In CalculateFinancialStatements, enter the values that are applicable for your project.

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 4


Reviewing Project Financial Statements

You review the effects of the project on cash flow and income.
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
After allm me and
revenue n s fe
expenses are entered and calculated, you can view the financial
h a t r a
o onfor- a project.
Mstatements
n
To review the project impact on financial statements:
1. Navigate to one of the new project proposal task lists.
2. Expand Review Project Financials.
3. Launch the Review Impact on Financial Statements task.
4. Review the Review Impact on Financial Statements form.
5. From the tabbed area of the form, you can use the shortcut menu to calculate the project.
Oracle recommends that you review the project’s impact on Cash Flow and Income statements
before submitting the project for approval.

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 5


Reviewing Project Metrics and KPIs

You next calculate the project metrics and review and compare
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the performance of the project with corporate objectives.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
You canm me thenkey
review s feperformance indicators (KPIs) for Contract projects. Some KPIs are
o haand nsome
yearly - traare based on the life of the project. Review the project-level defaults for
Mdiscountnrate
o and tax rate that were defined in the entity, and make necessary changes.
Before reviewing project KPIs, you must run the business rule that calculates all the KPIs and
yearly performance indicators for a project.
To open the Review Project KPIs form:
1. Navigate to the Propose New Contract Projects task list.
2. Expand Review Project Financials.
3. Launch the Review Project KPIs task.

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 6


To calculate project metrics:
1. Open the Review Project KPIs form.
2. Select the Yearly Performance Indicators tab.
3. Right-click and select Calculate Project Metrics.
4. Click OK.
After calculating project metrics, review the contents of the Review Project KPIs form.
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Note: If you modify the global discount rate and assumptions at the project level, you must
recalculate project data by running the CalculateFinancialStatements business rule.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 7


Reviewing Project Justification

You complete the project justification by reviewing and


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

answering predefined questions.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m tproject
You justify the
r a n by providing responses to a list of predefined subjective questions; doing
h
ohelps the -
Mso onbusiness
used fornproject
unit manager assign subjective scores to projects, which will then be
ranking. Additional questions can be added to the application.
The Detailed Project Justification form also enables you to rate a project for the subjective
score.
To review the detailed justification for a project:
1. Navigate to one of the new project proposal task lists.
2. Expand Review Project Financials.
3. Launch the Detailed Project Justification task.
4. Review the Additional Information - Project Justification form.
The questions correspond to the subjective criteria on the right side of the form. The subjective
scoring is based on the weightage for subjective goals defined in the Project Administration
task list.
Administrators can update the justification questions defined in the Accounts dimension.

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 8


Reviewing Project Score

You calculate the project score to measure the performance of


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the project based on predefined sets of financial and strategic


targets.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Project m me is used
scoring n s feto track a project’s performance against a predefined set of targets at
o
the n ra level, and to score projects based on subjective and financial factors. You
a and-tproject
hentity
Mcan usenthese
o scores for ranking a project and for analyzing the performance of the project with
respect to other projects and to a predefined set of limits.
Financial scores depend on the financial metrics and factors of the project, which are based on
financial planning. Subjective scores are based on qualitative factors and on the responses to
some predefined questions and their assessment by the entity manager. You can review
project scores for individual projects and across projects.
To review the project score:
1. Navigate to one of the new project proposal task lists.
2. Expand Review Project Financials.
3. Launch the Review Project Score task.
4. Review the Review Project Score form.
For more information on project scoring and criteria, see Lesson 2.

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 9


Requesting Project Funding

After planning expenses for a project, you determine the


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

funding required for the project, and create a funding request.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Projectsm me funding
require n s feto offset their expenses. Usually, projects require more funding at the
o
start, n ra streams come later in the project cycle. While some of the expense
a -trevenue
hbecause
Mfundingncan
o be taken from project revenue, the rest of the expenses must be funded from other
sources.
Funding requests are typically submitted to a company’s financial department. After a funding
request is approved, the project can be assigned with the sources of funds, its cost-of-capital
details, and time line of funding. This will help in calculating the cost of capital (interest
expense) to be allocated for the project.
Project Financial Planning provides funding request forms and predefined business rules so
that you can create the funding request.
For capital projects with multiple assets, you must request funding at the sub project level.

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 10


To request funding for a project:
1. Navigate to one of the new project proposal task lists.
2. Expand Project Funding.
3. Launch the Request Project Funding task.
4. Enter the required information in the Request Project Funding form.
5. In the form, you can use the shortcut menus to add new fund requests, cancel fund
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

requests, and calculate the project.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 11


Adding and Canceling Funding Requests
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Addingm me Requests
Funding n s fe
o a -tra
hAdd
M noNew
The n Fund Request task enables you to request funds for a project. In the runtime
prompt, you enter the funding request amount for the periods where the project requires
additional money to meet the financial obligations of the project.
To add a new fund request:
1. Open the Request Project Funding form.
2. In the form, right-click and select Add New Fund Request.
3. In the Add New Fund Request runtime prompt, specify or select the settings that are
applicable for your project:
Funding Request Type: Select the type of funding request:
- Initial Request: This is the initial funding request.
- Request for Change: You are changing an existing request for funding.
- Off Specification: The funding request is due to an omission in the product or
service that is being offered

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 12


- Funding Comment: (Optional) Provide comments about the funding request.
- Requested Amount: Enter the amount of the funds that you are requesting.
- Month/Year: For a lump sum requests, specify the month and year of the request. If
funding is needed on a regular basis, enter a single month and year and then enter
the additional months as needed.
4. Click OK.
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Canceling Funding Requests


You run the Cancel Fund Request task to cancel a previously entered funding request.
To cancel a fund request:
1. Open the Request Project Funding form.
2. Right-click the request that you want to cancel.
3. Select Cancel Fund Request.
4. Click OK. a
h a s
)
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 13


Reviewing Allocated Funds

The Review Allocated Funds task enables you to analyze


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

apportioned project funds.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m be
A project can
t r a n
approved for the full amount of the funding requested, or just a portion can be
h -
o Additionally,
Mfunded. if a company obtains outside financing for projects, you can review how
nonare allocated to each project.
those funds
The Review Allocated Funds task enables you to review the allocated funds, the sources of the
funds, fund time lines, cost of funds, and repayment frequency for a project. Each finance round
has different terms (for example, the interest rate), so each round of funding will impact the
project differently.
To review the allocated funds for a project:
1. Navigate to one of the new project proposal task lists.
2. Expand Project Funding.
3. Launch the Review Allocated Funds task.
4. Review the Review Allocated Funds form.
5. From the Fund Requests form, you can use the shortcut menu to add or cancel a fund
request.

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 14


Quiz

You calculate the project score to measure the performance of


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the project based on predefined sets of financial and strategic


targets.
a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: a
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 15


Quiz

A project can only be approved for the full amount of the


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

funding requested.
a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: b
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 16


Quiz

You must run a business rule that calculates the financial


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

statements for a project prior to viewing financial statements.


a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: a
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 17


Summary

In this lesson, you should have learned how to review:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Review project financial statements


• Review project metrics and KPIs
• Review project justifications
• Review project score
• Review project funding
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 18


Practices 6-1 Through 6-8

The practice covers the following topics:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Reviewing the Impact on Financial Statements


• Rolling Up Project Data
• Reviewing Contract Project KPIs
• Capital Project: Adding Project Justification
• Contract Project: Adding Project Justification
s a
• Indirect Project: Adding Project Justification
) h a
• Reviewing Project Scores o m
c l eฺc deฺ
• Requesting Funding ora Gui @ ent
r i a
z a ka Stud
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 6 - 19


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Managing Intercompany Projects

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no
Objectives

After completing this lesson, you should be able to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Describe managing intercompany projects


• Review existing projects
• Calculate project data
• Review intercompany reconciliations

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 7 - 2


Managing Intercompany Projects

Intercompany projects are transactions between two entities in


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the same organization.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a r a n
m tpartnerships
Intercompany are relationships established between two internal entities to work
h
oa project. -The project-owning organization establishes an intercompany partnership with the
Mon nonthat is acting as a service provider to the project. The intercompany partner is
organization
reimbursed for its expenses through intercompany revenue.
After you create a new project, you can request that your administrator add an intercompany
partner to that project. When administrators add an intercompany partner to a project, the
ownership status of the partner entity is set to service provider.
After setup, the service provider plans its expenses and then defines the terms for
reimbursement from the owning entity. After the service provider defines the terms for
reimbursement, the intercompany revenue can be calculated. When calculations are run, the
intercompany expenses for the project owner are calculated at the total company level, and
intercompany revenue and expenses are eliminated. Intercompany eliminations can be verified
by using the forms provided in the application.
Note: You must be provisioned to view intercompany eliminations at the total company level.

Oracle Project Financial Planning 11.1.2: Create Projects 7 - 3


Limitations of Intercompany Projects

• Intercompany partners can only be added to Cost Plus


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Contract projects.
• Intercompany partners are only allowed to budget in the
base currency of the owning entity, because currency
exchanges between the partner entity and the owning
entity are not currently supported.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 7 - 4


Tasks for Intercompany Projects

You perform the following tasks to plan financials of Cost Plus


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Contract projects for both the owning entity and the service
provider entity:
• Plan for expenses for the owning entity.
• Plan for expenses for the service provider entity.
• Plan for revenue for the service provider entity.
• Review project financials for the service provider entity. as a
• Plan for revenue for the owning entity. m )h
l e ฺco eฺ
rac
• Review project financials for the owning entity. id o tG u
r @
ia den
a
ak s Stu
ฺ z
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a are n
m tradescribed
These tasks in the following lessons:
h -4, “Planning for Project Expenses”
Mo• Lesson
non
• Lesson 5, “Planning for Contract Project Revenue”
These are the same standard project tasks, but they must be performed in both owning entity
and service provider entity projects.
Note: When planning for expenses and revenue, you must ensure that you select the correct
entity on the POV.

Oracle Project Financial Planning 11.1.2: Create Projects 7 - 5


Calculating Cost Plus Intercompany Revenue

You run the Calculate Inter Company Revenue rule to derive


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

project revenue.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranthe organization is a service provider, you must run the Calculate Inter
For projects where
o oRevenue
MCompany - rule to derive the project revenue based on a cost plus margin.
n n
To calculate Cost Plus intercompany revenue:
1. Navigate to the Manage Existing Contract Projects task list.
2. Expand Update Process, and then expand Project Revenue.
3. Click Review and Update Revenue Drivers - Cost Plus.
4. Review the Review and Update Revenue Drivers - Cost Plus form.
5. In the form, right-click and select Calculate Inter Company Revenue.
6. Click OK.

Oracle Project Financial Planning 11.1.2: Create Projects 7 - 6


Calculating Project Data

Running the business rule rolls up and reconciles intercompany


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

data at the entity level.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m tuse
Administrators
r a nthe Roll Up Project Cube task by launching the RollupTotalProjectCube
h
o orule -to consolidate and calculate project data.
Mbusiness
n n

Oracle Project Financial Planning 11.1.2: Create Projects 7 - 7


Reviewing Intercompany Reconciliations

Project Financial Planning automatically reconciles the


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

intercompany transactions at the entity level.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m tuse
Administrators
r a nthe Review Intercompany Reconciliation task to review intercompany
h
o on- between the owning entity and the service provider entity for a project at the
Mreconciliations
n
year level.

Oracle Project Financial Planning 11.1.2: Create Projects 7 - 8


Summary

In this lesson, you should have learned how to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Describe managing intercompany projects


• Review existing projects
• Calculate project data
• Review intercompany reconciliations

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 7 - 9


Practices 7-1 Through 7-9

The practice covers the following topics:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Setting Up the Intercompany Partner


• Expense Planning for the Owning Entity
• Expense Planning for the Servicing Entity
• Revenue Planning for the Servicing Entity
• Calculating Financials
s a
• Reviewing Impact on Financial Statements
) h a
• Reviewing Project KPIs and Justifications o m
c l eฺc deฺ
• Reviewing Intercompany Reconciliations ora Gui
• Requesting Funding r i a @ ent
a d ak s Stu
ฺ z
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 7 - 10


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Managing Existing Projects

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no
Objectives

After completing this lesson, you should be able to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Describe existing projects


• Describe the process for managing existing projects
• Identify the tasks for managing existing projects

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 8 - 2


Managing Existing Projects
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Project m me Planning
Financial n s fe compares actual and budgeted expenses, schedules, and
o ha n-and
performance traprovides tools to forecast project expenses and revenue. It enables you to
M no
change the base assumptions for labor, equipment, materials, and revenue, and it
recalculates the financial outlook of the project.
Existing projects are approved projects imported from transactional systems that may be
reconciled with proposed projects in Project Financial Planning. By reconciling projects, you
can compare financials between your plans, forecasts, and actuals.

Oracle Project Financial Planning 11.1.2: Create Projects 8 - 3


Process for Managing Existing Projects

1 2 3
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Import and Review project Create and update


reconcile projects performance. forecast data

s a
6 5 4
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
Submit plan for Review financialseand d thi Update assumptions,
approvals. manage m m
funding. se resources, and
o h a t o u expenses.
( m e
nsand/or its affiliates. All rights reserved.
r i a c e
aka ble li
Copyright © 2012, Oracle
Z
m ed sfera
Before m
a t r a n existing projects, your administrator must load project details and any
you can manage
h
o data - external source systems. After the project is loaded, you can review the
Mactual non
from
performance of the project with respect to key project drivers by using the Review Project
Performance task. You can then update the assumptions for the key elements of the project
(for example, realigning resources, changing equipment, updating expenses, and requesting
funds).
The process for managing Capital, Contract, and Indirect projects is similar. Notable
differences include:
• For Capital Projects, asset values are listed in the Construction in Progress (CIP) asset
list. Asset managers can use this list to provide details for assets and prepare them to
be used as normal assets for other projects.
• For Contract Projects only, you can update revenue assumptions.

Oracle Project Financial Planning 11.1.2: Create Projects 8 - 4


Managing Existing Projects Task List Tasks

• Review Project Performance Dashboard


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Review Existing Projects


• Update Process
• Review Project
• Project Funding
• Submit Plan for Approval
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Reviewm me Performance
Project n s fe
o a -tra
hReview
M nonProject Performance task opens the Financial Overview – PM form, which
The
displays a snap shot view of a project’s performance from a financial perspective. The key
financial measures included in the form are financial variance analysis, cash flow, profit and
loss impact, and project score. By reviewing these measures, you can determine areas in the
project that are efficient and areas that are lagging. You can drill down into the project details
to view the areas that may need attention or where forecasts need to be updated.
Review Existing Projects
The Review Existing Projects task enables you to review the financial and non-financial
details of the project.
You can edit project details in the Existing Project Details section of the form, including project
name, description, revenue recognition and incidence (for Contract projects only), project
manager, project customer, and project details.

Oracle Project Financial Planning 11.1.2: Create Projects 8 - 5


The project start and end date, type, status, and ownership are also viewable in this section.
You can review the project variances, impact on income statement, impact on cash flow, life
time KPIs, and funding requests in the Financial Impact section of the form.
Update Process
The Update Process task list contains several tasks that allow you to manage project
expenses and project revenue (for Contract projects only).
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

The Project Expenses task list guides you through the process of reviewing details about the
expense components of a project and contains the following tasks:
• Review and Update Labor Assignments
• Review and Update Equipment Assignments
• Review and Update Material & Other Requirements
• Review and Update Direct Expenses
• Apply Overheads a
• Review Indirect and G&A Allocated Expenses h a s
)
• Review Project Expenses
ฺ c om ฺ
The Project Revenue tasks list is available for Contract projects and a
r cle uyou
enables i dtoe review
the revenue generated by the project from various sources:
@ o t G
i a n
• Cost Plus
a k ar tude
• Time and Materials
e dฺz this S
• Fixed Price
m m se
• Direct Revenue o h a t o u
Review Project i a (m nse
ar eare l e
icentered
Z k
After all revenue andaexpenses l and calculated, you can view the updated
b
ed sforfearaproject.
financial statements
m
h am Project
The Review
- t r an task list includes the following tasks:
o

non Financial Statements
M • Calculate
Review Impact on Financial Statements
• Review Project KPIs
• Detailed Project Justification
• Review Project Score
Project Funding
You can modify project funding requests and review allocated funds using the tasks in the
Project Funding task list.
Submit Plan for Approval
After you complete the tasks for the project, review financial statements, and request funding,
you can promote your plan to another user for approval.

Oracle Project Financial Planning 11.1.2: Create Projects 8 - 6


Quiz

Before you can manage existing projects, your administrator


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

must load project details and any actual data from external
source systems.
a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: a
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 8 - 7


Quiz

You must update revenue for all project types after importing
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

projects from source systems.


a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: b
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 8 - 8


Summary

In this lesson, you should have learned how to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Describe existing projects


• Describe the process for managing existing projects
• Identify the tasks for managing existing projects

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 8 - 9


Practices 8-1 Through 8-8

The practice covers the following topics:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Reviewing Existing Project Details


• Updating Labor Expenses
• Reviewing Equipment Expenses
• Reviewing Other Expenses, Overheads, and Indirect Costs
• Reviewing Projects
s a
• Reviewing Project Justifications
) h a
• Reviewing Project Scores o m
c l eฺc deฺ
• Reviewing Other Existing Projects ora Gui @ ent
r i a
z a ka Stud
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 8 - 10


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Reviewing and Approving Projects

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no
Objectives

After completing this lesson, you should be able to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Identify financial analysis and project approval tasks


• Run business rules to calculate data
• Review project financials and perform detail analysis
• Review funding requests
• Review project proposals and scores
s a
• Review financial performance
) h a
• Submit and approve projects o m
ฺc ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 2


Lesson Agenda

This lesson covers two sets of task lists:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Reviewing Projects
• Finance Analysis

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranin this lesson is divided into two sections:
The tasks covered
- Projects tasks are, typically, performed by a project planner
Mo• Reviewing

non
Finance Analysis tasks are, typically, performed by a financial analyst or a budget
administrator

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 3


Process for Reviewing Projects

1. Calculate Project
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

2. Review Project Proposals and Existing Projects


3. Analyze Impact of Forecast Updates
4. Review Financials
5. Compare Financial and Subjective Scores
6. Review Project Justifications
s a
7. Submit Project Plan for Approval
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m for
The process
t r a n
reviewing projects begins with calculating the financial statements for the
h -
o organization.
Mentire non
After the calculation is performed, you can begin the review project details, first by focusing on
the financial impact of new project proposals, then analyzing the impact of forecast updates
for existing projects. You can review financials by accessing forms and tasks that display
income statement impact, cash flow, funding requests, and KPIs.
You can then compare project scores to help evaluate the project from both a financial and a
subjective perspective, as well as review the project justifications as another analysis point in
viewing and approving projects.
Finally, you are presented with the financial overview, which provides you with a high-level
view of the financial performance of each project and of your organization as a whole. The
overview helps you identify issues and enables you to work interactively with the financials.
You can review current year financials, net income, cash flow trends, and the project-level
project score.
When the review process is completed, you can approve or reject the plans associated with
the projects.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 4


Calculating Departmental Financial Statements

Before reviewing projects, you must run the Calculate


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Department Level Financial Statements task to update data.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
mCalculate
You runm
a the
t r a n Departmental FS_Ruleset business ruleset to calculate financial
h
o onfor- the entire organization.
Mstatements
n
To calculate department level financial statements:
1. Launch the Calculate Department Level Financial Statements task under the Review
Projects task list.
2. Click Launch.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 5


Reviewing Project Proposals
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m trReview
You launch the a n Projects task list to view new project proposals that are awaiting
h
o and -
Mreview non
approval. You can access project details, income statement impact, cash flow,
funding requests, and KPIs by launching this task.
To review project proposals:
1. Under the Review Projects task list, click the Review Project Proposals task.
2. Review the Review Project Proposals form.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 6


Reviewing Existing Projects
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
With them me Existing
Review n s fe Projects task, you can evaluate the financial and non-financial
o
details n tra projects. You can review the income statement impact, cash flow, funding
haof existing
-
M no
requests, and KPIs associated with the project.
To review existing projects:
1. Under the Review Projects task list, launch the Review Existing Projects task.
2. Review the Review Existing Projects form.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 7


Comparing Project Scores
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
You canm me allnfinancial
review s fe and subjective scores of projects within your entity. By comparing
o
project n tra based on a set of targets, you can use the scores to rank the projects for
ha performance
-
M no
approvals.
On the Compare Project Scores form, you can review financial and subjective project scoring.
To compare project scores:
1. Under the Review Projects task list, launch the Compare Project Scores task.
2. Review the Compare Project Scores form.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 8


Reviewing Project Performance
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranReview task list provides the following review tasks:
The Performance
Mo• Project-Financial Performance

non
Departmental Financial Performance
• Review Impact on Financial Statements
The Project Financial Performance task summarizes the financial performance of each project
and of your organization as a whole. The form displays variances and graphs based on
financials that help you identify project issues and efficiencies.
To review project financial performance:
1. Under the Performance Review task list, launch the Project Financial Performance task.
2. Review the Project Financial Performance form.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 9


Reviewing Departmental Financial Performance
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran financial performance:
To review departmental
Mo1. Under - Performance Review task list, launch the Departmental Financial
non
the
Performance task.
2. Review the Departmental Financial Performance form.
You can review current year financials, cash flow trends, net income trends, and headcount
trends at the departmental level by launching the Departmental Financial Performance task.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 10


Reviewing the Impact on Financial Statements
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran on Financial Statements task displays a form that includes financial data
The Review Impact
o oton-the impact on cash flow and the impact on income statement based all your
Mpertaining
n
projects or on a specific project.
To review departmental financial performance:
1. Under the Performance Review task list, launch the Review Impact on Financial
Statements task.
2. Review the Review Impact on Financial Statements form.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 11


Lesson Agenda

This lesson covers two sets of task lists:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Reviewing Projects
• Finance Analysis

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranin this lesson is divided into two sections:
The tasks covered
- Projects tasks are, typically, performed by a project planner
Mo• Reviewing

non
Finance Analysis tasks are, typically, performed by a financial analyst or a budget
administrator

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 12


Project Financials Overview
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Current Year Total Fund Requests Net Income


Financials s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
Cash Flow Trend m ed e tHead hi Count
o ham to us Trend

i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran begins the project financial analysis by reviewing an overview of several
The finance manager
o financial
Mkey -measures:
• non
Current Year Financials
• Total Fund Requests
• Net Income and Cash Flow Trend
• Head Count Trend
After the financial measures are reviewed, the finance manager can perform a detailed
analysis of the entities in the organization and the project financials. The detailed analysis
shows the net revenue, total expenses, net income or loss, project cash flow, and ROI by
organization. Then, the finance manager makes funding decisions and submits the plan for
approval.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 13


Finance Analysis Task List

The Finance Analysis task list includes the following tasks:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Run Rollups
• Finance Overview
• Detailed Analysis
• Project Funding
• Submit Plan for Approval
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 14


Running Rollups

1 2
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

3
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a
4
r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m trRun
You launch the a n Rollups task to calculate and consolidate data using a business rule. Run
h -rule before reviewing financials to ensure that your data is updated.
Mtheo business
non

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 15


Viewing the Financial Overview
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m overview
The financial
t r a n provides you with a high-level view of the financial performance of your
h
o on-You can review current year financials, total fund requests, net income and cash
Morganization.
n
flow trends, and headcount trends at the organization level.
To view the Financial Overview, launch the task under the Finance Analysis task list.
From the Financial Overview form, you can perform the following tasks:
• Allocate funds
• Change funding status
• Review project financial statements
• Review project KPIs

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 16


Financial Overview: Allocating Funds

After planning expenses for a project, the finance manager can


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

allocate funds.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran
After you request funding, the finance manager determines the funding required across
o and
Mprojects -determines how to secure the required funds. After the funding source has been
non
determined, the finance manager allocates the funds back to the projects.
The project can be assigned with the sources of funds, the project’s cost-of-capital details,
and the time line of funding. This determines the cost of-capital information and cash flow for
the project.
To allocate funds:
1. Launch the Financial Overview task.
2. In the Total Fund Request form, right-click and select Allocate Fund.
3. In the Allocate Fund runtime prompt, specify or select the values that are applicable for
your project:
- Funding Source Code: Identify the funding source.
- Funding Source Description: Describe the funding source.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 17


- Funding Instrument Type: Select form the following funding types: Internal
Funding, External Funding Short Term, External Funding Long Term,
Subordinated Debt, 7 1/2% Senior Notes, Unspecified.
Note: You can customize this Smart List to suite your needs.
- Funding Amount: Enter the funding amount allocated to the project. Allocated
funding could be the equal to or less than the funding request from the project
manager.
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

- Funding Date: Specify the date that the funding was secured.
- Term (In Months): Enter the repayment term (in months) of the funding.
- Repayment Frequency: Select from the following payment terms: Quarterly,
Semiannually, or Yearly.
- Implicit Interest Rate: Enter interest rate.
4. Click OK.
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 18


Financial Overview: Changing Funding Status

You can change the funding status for a project to one of the
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

following options:
• Approved
• Unapproved
• On-hold

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranis set to New when a request is made. Once the requests are submitted for
The funding status
o othe
Mapproval, -approving authority could change the status of individual requests before
n n
promoting the plan through the Approvals process.
Note: Allocating funds will automatically change the status to Approved.
To change project funding status:
1. Launch the Financial Overview task.
2. In the Total Fund Request form, right-click and select Change Funding Status.
3. In the Change Funding Status runtime prompt, specify or select the values that are
applicable for your project:
- Enter Project: Select the project or projects.
- Enter Project Elements: Select the funding request.
- Enter Status: Select from the following options:
- Approved: Select if the funding request has approval to move forward.
- Unapproved: Select if the funding request was rejected or not approved.
- On-hold: Select if the funding is postponed or needs to be put on hold.
4. Click OK.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 19


Financial Overview:
Reviewing the Impact on Financial Statements
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
You canm me thensproject’s
review
fe impact on cash flow and income statements by launching the
ha Project
- a
trFinancial
o
Review
M no n Statements task.
To review project financial statements:
1. Launch the Financial Overview task.
2. In the Total Fund Request form, right-click and select Review Project Financial
Statements.
3. Review the Review Impact on Financial Statements form.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 20


Financial Overview: Reviewing Project KPIs
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
You canm me thenskey
review
feperformance indicators (KPIs) for projects. Some KPIs are yearly and
o haare based
some n - traon the life of the project. Review the project-level defaults for discount rate
M no
and tax rate that were defined in the entity and make necessary changes.
To review project KPIs:
1. Launch the Financial Overview task.
2. In the Total Fund Request form, right-click and select Review Project KPIs.
3. Review the Review Project Metrics and KPIs form.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 21


Performing Detailed Analysis

You launch the Detailed Analysis task to view a high-level


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

display of the financial performance of each entity within your


organization.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m tkey
The following
r a nfinancial measures are provided to help you analyze organizational
h
Mo non-
performance:
• Net Revenue
• Total Expenses
• Net Income/(Loss)
• Cash Flow
• ROI
To view the Detailed Analysis, launch the task under the Finance Analysis task list.
Analyzing the Impact on Income Statement
To display a detailed analysis of a project’s revenue and expenses by fiscal year, right-click
the lower portion of the form and select Impact on Income Statement.
You can view the project’s financials and resources on the Impact on Income Statement form.
Analyzing the Impact on Cash Flow
To display a detailed analysis of the amount of cash flow generated and used by a project,
right-click the lower portion of the form and select Impact on Cash Flow.
You can view the flow of cash in and out of a project on the Impact on Cash Flow form.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 22


Reviewing Project Funding

You can view funding requests for a project and review the
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

funds allocated to a project.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tranfunding allocations and requests, launch the Project Funding task under the
To review project
o Analysis
MFinance - task list. The task opens the Project Funding form.
non
Funding Requests
The Funding Requests section of the form displays requests per project, the request type,
funding status, and the requested amount per year.
Allocated Funds
The Allocated Funds section displays the funding element allocated and interest expenses
per project or for all projects (total project).
Deallocating Funding
You can delete funding for a project that is no longer required or was added in error.
To deallocate a fund:
1. In the Project Funding form, right-click the Fund Allocation section and select Deallocate
Fund.
2. When prompted to delete, click OK.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 23


Approving Projects

Changing the status of a project to Approved locks the project


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

but does not submit the planning unit for approval.

Right-click a project and select


Change Project Status.

s a
) h a
ฺ c om ฺ
r a cle uide
Then, select a newoprojecttstatus.G
i a @ n
a k ar tude
e dฺz this S
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Project m me nsfecan approve projects. Once a project is approved, it is locked for
administrators
o ha . For
editing. n - tra information on changing project status, see “Changing Project Status” in
more
M no
Lesson 3.
The next topic covers submitting the project for approval through the planning unit review
cycle.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 24


Submitting Plans for Approval
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a have a n
m trcompleted
Once you all of the tasks for the project and you have reviewed the financial
h
o onand - requested funding, you can promote your plan to another user for approval.
Mstatements
n
Contracts are associated with planning units. You promote your project’s planning unit when it
is ready to be reviewed and approved.
Approval States
During the budget review process, a planning unit is always in one of the approval states
described in the following table:
• Not Started: The initial state of all planning units. The budget administrator initiates the
review process by using the Start action.
• 1st Pass: The first state for planning units. Planning units have no owner during this
state. Any user with data access can enter data and promote a planning unit.
• Under Review: The state of a promoted planning unit. A planning unit is reviewed by
someone in the organization. Only the current owner or the budget administrator can
modify data.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 25


• Frozen: The state of a locked planning unit, which is read-only. The planning unit can
be unfrozen only by the user who froze the planning unit or owners above them in the
planning unit hierarchy.
• Distributed: The state of a planning unit that is under review by multiple users. The
reviewers are filtered by those permitted to perform distribute actions.
• Under Assistance: The state of a planning unit that is on hold while its owner requests
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

help from another user. Ownership returns to the current owner when the user providing
assistance changes the planning unit status to Return.
• Signed Off: The state of a planning unit that was signed off. Only the current owner or
the budget administrator can modify data. Ownership does not change when a planning
unit is signed off.
• Not Signed Off: The state of a rejected planning unit. The current owner or the budget
administrator can modify data.
• Approved: The state of an approved planning unit. A budget administrator becomes the
s a
owner of the planning unit, and is the only person who can modify data. After all
) h a
planning units are approved, the budget review process is completed.
ฺ c om ฺ
Note the following points about approval states:
r a cle uide
• If you have read access for a planning unit, you can view the
@ o data,t the
G approval state,
and the history, and you can read and enter annotations
d n
ria foruplanning
e units in all states
k a t
except for the Not Started state.
d ฺ za is S
• A planning unit may skip approval states.
m e For eexample,
th an administrator may approve a
o h am to us
started planning unit from any state.
• You can manage the approval m process e at a higher level with parent planning units.
a ( n s
Promote Action
k a ri lice
Za rabthat
Actions are the operations
d
le are available to change the status of a planning unit and direct
its movement
m ethroughs fethe budget review process.
m n
tra the Promote action, the validation rules defined for the planning unit are run.
When
o ha younselect
-
MIf the conditions
no in all associated data validation rules are met, the planning unit is promoted
to the next owner defined in the planning unit promotional path. If the data validation rule
results in a planning unit owner assignment, the planning unit is promoted to this owner, who
may be different than the owner defined in the planning unit promotional path.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 26


Reviewing Projects

You use the Review Projects task list to review, approve, and
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

reject project proposals.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran task list includes the following tasks:
The Review Projects
- Department Level Financial Statements
Mo• Calculate

non
Review Project Proposals
• Review Existing Projects
• Compare Project Scores
• Performance Review
- Project Financial Performance
- Departmental Financial Performance
- Review Impact on Financial Statements
• Approve Projects

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 27


The following list describes reviewer actions:
• Promote: Submits the plan data to a reviewer, runs validation rules for the planning unit,
and changes the status to Under Review. For planning units with a status of Under
Review, you cannot enter data for the planning unit unless you are the owner or the
budget administrator.
• Originate: Changes the ownership of selected planning units (including its
descendants) to the first owner defined for that planning unit in the planning unit
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

hierarchy. The planning unit first owner differs between the Distribute and Bottom Up
templates.
• Reject: Returns the planning unit to the previous owner for further adjustments before
being approved, and changes the status to Not Signed Off.
• Approve: Indicates that the planning unit passed through all required levels of review,
and changes the status to Approved. The budget administrator becomes the owner.
Only the last user in the promotional path and the administrator can select this status.
• Delegate: Passes ownership to a user who is not defined in the promotional path. When s a
) h a
that user is finished with the planning unit, he or she promotes it to return it back to the
c om ฺ
user who delegated it. This action is available only with the Bottom Up template.

a cle uide
• Take Ownership: Bypasses the current owner and enables you to edit data outside the
r
o tG
promotional path. This action is available only to users who are above the planning unit
@
owner in the planning unit hierarchy. a r ia den
ฺ z ak s Stu
• Freeze: Locks all related data in descendant planning units and makes it read-only. This
m ed e thi
action does not change ownership. Only the planning unit owner or administrator can
ham to us
select the Unfreeze action to release the planning unit.
o
i a (m nse
• Distribute, Distribute Children, or Distribute Owner: Passes planning unit ownership
k a r l i ce
to multiple users. Distribute actions depend on the current location of the budget in the
Za rable
planning unit hierarchy. These actions are available only for the Distribute template.
d
e sfe
• Need Assistance: Passes ownership to a user whom you contact for help with budget
m n
o ham n-tra
tasks. When the person is finished, he or she returns ownership back to the requestor.
The person is not necessarily included in the promotional path. This action is available
M no only for the Distribute template.
• Sign Off: Allows a reviewer to sign off a planning unit without promoting it to another
user, and changes the status to Signed Off.
• Reopen: Enables the administrator to return an approved planning unit to the last owner
and change its status back to Under Review. The history and annotations are retained
for the planning unit.
The options are determined by the current status of the planning unit.

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 28


Quiz

You can only base project scoring on financial measures.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
o h amb -tran
Answer:
MFinancial n Subjective measures.
noand

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 29


Quiz

You approve a project by setting its planning unit status to


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Promote.
a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: b
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 30


Quiz

Allocating funds will automatically change the funding status to


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Approved.
a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: a
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 31


Summary

In this lesson, you should have learned how to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Identify financial analysis and project approval tasks


• Run business rules to calculate data
• Review project financials and perform detail analysis
• Review funding requests
• Review project proposals and scores
s a
• Review financial performance
) h a
• Submit and approve projects o m
ฺc ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 32


Practices 9-1 Through 9-4

The practice covers the following topics:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Running Rollups
• Reviewing the Financial Overview
• Performing Detailed Analyses
• Reviewing and Approving Project Funding

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 9 - 33


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Analyzing the Workforce

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no
Objectives

After completing this lesson, you should be able to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Describe the workforce tasks related to Project Financial


Planning
• Calculate data to update project workforce costs
• Review resources and assignments
• Review resource utilization
• Review labor requests s a
) h a
• Assign labor resources to projects o m
l e ฺc eฺ
• Request new hires c
ra Guid
o
@ ent
• Recalculate compensation costs r i a d
• Review total compensation and z a ka Stuheadcount
employee
dฺ is
e e th
m
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 2


Analyzing the Workforce

Analyzing the workforce helps you to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Review the cost and utilization of all labor resources in an


entity
• Evaluate workforce requirements for all projects in an
entity
• Allocate resources to projects based on the skill set,
availability, and competency of the resource s a
h a
• Plan to hire an outside resource, if the skill set for a m)
required job is not available internally l e ฺco eฺ
c ra Guid
@ ento
r i a
z a ka Stud
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
Through
h a m tran analysis, companies determine the employee resources needed to
workforce
o otheir - targets, assign existing employees to various positions, and plan for adding
n n
Machieve
new employees.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 3


Driver-Based Planning for Workforce Costs

Driver-based planning incorporates key business assumptions


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

into planning models. You use drivers to calculate costs, such


as:
• Healthcare
• Taxes
• Bonuses
• Merit increases s a
) h a
You can also plan for situations like: om
c l eฺc deฺ
o ra Gui
r i a @ ent
z a ka Stud
Job Transfers dฺ this
Leave of Absence
e Departures
m e
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m trangauge the various direct and indirect costs incurred by employees, such
Companies must
Mas n n- and taxes. Project Financial Planning calculates these expenses—both
ohealthocare
simple and complex—based on certain drivers.
You can model future headcount and related expenses, working with up-to-date information
about workforce expenses. By planning compensation expenses in direct correlation to
headcount, planners can effectively manage one of their largest variable expenses. You can
perform very detailed workforce planning that utilizes built-in functionality, such as planning
for transfers, leaves, departures, and so on. Or, you can plan at a higher level using
requisitions and standard rates for jobs.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 4


Required Metadata and Data Overview

You import Workforce Planning data and metadata to manage


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

labor resources and requests related to the project.


The following table lists the header records and sample data for
the EmployeeMem.csv file:

Header Record Sample Data s a


) h a
Employee Paul Kim
ฺ c om ฺ
r a cle uide
Parent Existing Employeeso G
i a @ n t
Description (optional) PaulzKim a kar Stude
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Oracle m me nsfthat
recommends
e
customers update existing employee data (dimensions and data)
h a t r a
- financial plans, either Plan or Forecast. After you update the Employee
o preparing
Mbefore non
dimension and refresh the application, you can execute employee compensation
calculations to consolidate up-to-date employee compensation plans or forecasts.
Note: For information about Workforce Administration tasks, see the “About Workforce
Administration” section of the “Administration Tasks” lesson.
The following sections describe the Workforce Planning data and metadata that you can
update.
Smart Lists
Before loading Smart Lists and Smart List values, you must identify the associated product
field names and entry names. To load a Smart List, specify its product or member name in
the Smart List Name column of the data load file. To load Smart List values, enter the
corresponding entry name in the Entry Name column of the data load file.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 5


You manage entries for the following Smart Lists:
• AssignmentLocation
• Grade
• ProjectManager
• SkillSet
Metadata
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

When you load metadata, you can add members to Employee dimension.
Consider the following when loading metadata:
• Ensure that the parent member exists in the application before loading children to it.
• All of the templates can be used for single currency Project Financial Planning
applications by removing the Currency dimension from the POV.
Under the Employee dimension, you add metadata for existing employees. The slide lists
the header records and sample data for this file. s a
) h a
After you have finished loading metadata, you can verify that the members were added by
opening the Dimension Editor in your Project Financial Planning application. ฺ c om ฺ
Data r a cle uide
@ o tG
You use the Workforce Assumptions Template to load data
a r ia detonWorkforce Planning,
related
such as Social Security tax rates, Medicare rates, and
ฺ z a kemployee
S tugrades. You load
m ed e this
Workforce Assumption data by using the ImportWFPAssumptions_1.csv data load file.
After loading the required metadata and
h a s
mdata foruWorkforce Planning, you can associate an
employee to a project. For more information
m o
o e ton data load file order, see “Data Load File
Order” in the “Administration
i a ( ns
Tasks” lesson.
r c e
Z aka ble li
m ed sfera
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 6


Analyzing Workforce: Task Overview

As a resource manager, you perform the following tasks in the


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

application to analyze your workforce:

Review
resource
requests
across
Roll up the data. Review the dashboard projects.
s a
and utilization.
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den Staff the
a k t u
dฺz this S
projects.
Review compensation, Create
e
m new-se
headcount, and FTEs. h a m
hire requests. u
o t o
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m the
You perform
t r a n
following tasks under the Workforce Analysis task list:
h n-the data.
Mo1. Roll
noup
2. Review the resource manager dashboard and resource utilization.
3. Review resource requests across projects.
4. Staff the projects.
5. Create new-hire requests.
6. Review total compensation, headcount, and full-time equivalents (FTE).

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 7


Task Lists for Workforce Analysis and Planning

The task lists for analyzing and planning your workforce are
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

designed to support standard process flows.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
a r a n
m trequisitions,
When adding employees, assets, and equipment, you can think of the process
h
o way:on-
Mthis
• n
Add: Add to the system.
• Calculate: Run a rule to update costs.
• Review: Review the calculated data.
After loading existing employees from a source system, the Employee dimension and its
account properties are prepopulated in the Project Financial Planning application, and
accurate resource expenses can be reviewed and calculated.
Typically, you review the information on existing employees in their department or cost
center, verifying their salary, employee properties such as full time or part time, and other
compensation assumptions, such as bonuses and merit increases. Then, you can make
adjustments as new events occur (for example, employees are hired, transferred, retired,
and so on).
After verifying that the existing employee information for your entity is accurate, you can
plan for new hires. To add newly hired employees to a department, you use the Add TBH
Hourly or Add TBH Salary business rule.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 8


Rolling Up Data

You roll up the workforce data to aggregate it.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Select values for the


runtime prompts.

s a
) h a
ฺ c om ฺ
Click Launch to run
the business rule. r a cle uide
@ o tG
a r ia den
z ak s StClick u Launch to

ed e thi calculate costs.
m
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
mcane sfe
Before m
a you
t r a n employee costs, you must calculate and update workforce costs by
analyze
h
o the -
non
Mrunning Rollup WFP Cube business rule.
To roll up data:
1. Under Workforce Analysis, select Roll Up Data.
2. Click Launch to open the business rule.
3. Select the values for the following runtime prompts: Entity, Project, Scenario, and
Version.
4. Click Launch calculate and aggregate workforce costs.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 9


Reviewing the Resource Manager Dashboard

The Workforce Overview form provides an at-a-glance view of the


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

utilization, hiring plan, and staffing requirements for an entity.

Click to drill-down to view details


Select an entity. of the total headcount.
Select a year.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
You use
a m Resource
the
t r a n Manager Dashboard task to help you manage resources across the
h
o on- You use this information to see how the company is performing and to identify
Morganization.
n
potential issues. The dashboard provides a quick visualization of key elements with which
you can interact: utilization, hiring plans, and project staffing.
To review resource manager dashboards:
1. Under Workforce Analysis, select Review Resource Manager Dashboard.
2. In the Entity drop-down list, select an entity.
3. In the Year drop-down list, select a year.
4. Optional: Click the chart data to drill-down to details.
Note: Be sure to calculate or recalculate the data prior to launching this task to ensure that
you are viewing up-to-date information.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 10


Utilization Trend Chart

The utilization trend is calculated by dividing total labor hours


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

by the working hours per month.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m this
The data for
t r a n is pulled from the Utilization account, which is dynamically calculated.
chart
h
o is for all- projects, for existing employees.
MData non

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 11


Hiring Plan Chart

The Hiring Plan chart information is based on project-related


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

jobs and total headcount for full-time employees.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m this
The data for
t r a n is a result of the Point of View defined in the form.
chart
h
Mo non-

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 12


Project Staffing Request – FTE

Project labor requisitions may be viewed in this section.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m this
The data for
t r a n is a result of the Point of View defined in the form.
chart
h
Mo non-

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 13


Project Staffing Request – Labor Hrs

The following chart displays project-related staffing requests.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m this
The data for
t r a n is a result of the Point of View defined in the form.
chart
h
Mo non-

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 14


Reviewing Resource Utilization

Utilization is a metric used to compare employees’ actual time


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

spent performing tasks against their total time.

Double-click to view
an employee
assignment across
projects.

s a
) h a
Wendy Resner’s
ฺ c om ฺ
monthly allocation
a c le ide
for the project
Project where Wendy o r G u
Resner is assigned @
ia den t
a r
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m trmanager,
As a resource
a a n you can periodically review the utilization of employees to ensure
h
o theyoare -working efficiently. If an employee is over- or under-allocated, you can review
Mthat n n
the assignments of the employee across all projects and take action.
To review resource utilization:
1. Under Workforce Analysis, select Review Utilization.
2. In the Entity drop-down list, select an entity.
3. Review the utilization of all employees.
4. If required, double-click an employee row.
In the Employee Assignment section of this master-detail form, review the list of projects
where the employee has been assigned.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 15


Reviewing Resource Requests Across Projects

For each job, you can review requests by project.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Select an entity to review total


job requisitions for the entity.

s a
) h a
Projects
Double-click a row to apply
ฺ c om ฺ
cle uide
context.
requesting a
project r
o tGa
incharge
r @
ia den
a
ak s Stu
ฺ z
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
As a resource
a a n you can review consolidated job requests for all projects in an
m trmanager,
h
o You - review projects in detail and identify resource requests, requested hours,
Mentity. non
can
headcount, and FTE. By performing a detailed analysis, you can plan for efficient staffing
and opportunities to combine similar jobs.
To review resource requests across projects:
1. Under Workforce Analysis, select Review Resource Requests Across Projects.
2. In the Entity drop-down list, select an entity and click Go.
3. Double-click a row to apply context.
In the Requisitions by Project section, select a job and review the list of projects requesting
that particular job.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 16


Staffing Projects

Review job requests for a project, and assign existing


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

employees to the project.


Select values for the
runtime prompts.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
Right-click and select
Assign Existing

o am to us
hEmployee.
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m trajobnrequests across all projects, you can select a project and review the job
After reviewing
o oforn-that project.
Mrequests
n
You fulfill resource requests across by assigning existing employees to project requests or
hiring additional resources. With the Staff Projects task, you can view resource requests at
the project and job level and determine whether a request can be met by an existing
employee. If an existing employee has the required skill set for the job, you can assign the
existing employee to the project.
By assigning an employee to a request, you set the request status to Approved.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 17


To staff projects:
1. Under Workforce Analysis, select Staffing Projects.
2. In the Project drop-down list, select a project and click Go.
3. Review the job requests for the project.
4. Double-click a job to confirm that the employee with the skill set for the job is available.
5. In the Assign Existing Employees section, right-click the employee and select Assign
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Existing Employee.
6. Select or enter the following runtime prompts: Project, Labor Requisition, Job, Existing
Employees, and Comments.
7. Click Launch to assign the employee to the project.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 18


Requesting New Hires

If there are no employees available with the required skill sets,


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

you can create a new-hire request.


Select values for the
runtime prompts.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
Right-click and select m ed e thi
Add To-be-hired. ha
m us
m o e to
i a ( nsand/or its affiliates. All rights reserved.
r c e
aka ble li
Copyright © 2012, Oracle
Z
m ed sfera
As the m
a t r a n you create requisitions for labor. The resource manager fulfills the
project owner,
h
o onby - assigning existing and available employees or by creating a new-hire
Mrequisitions
n
request.
To create new-hire requests:
1. Under Workforce Analysis, select Raise New Hire Requests.
2. In the Job drop-down list, select a job.
3. Review the projects that have an open requisition for the job.
4. In the Raise New Hire Requests section, right-click in the row and select Add To-be-
hired.
5. Enter values in the runtime prompts for adding a new hire and click Add.
Note the following:
• In the Number of Requisitions textbox, specify the number of resources needed for
each job.
• The Grade field generates the base salary amount. FTE must be less than or equal to 1.
• To-be-hired is often abbreviated as TBH.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 19


Recalculating Compensation Costs

After entering any new-hire requests or making any changes to


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

employee data, recalculate total compensation.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran compensation for all employees, both new and existing, in an
This task calculates
o on-
Morganization.
n
Note: This rule does not factor in merit increases in future years. You must run the
Calculate Future Years Compensation Expense rule in order to factor in merit increases.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 20


Reviewing Total Compensation

You can review total compensation costs for the entity.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Select a currency.

Select an
entity.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a total
- an
m trcompensation:
To review
o
non Workforce Analysis, select Review Total Compensation.
M 1. Under
2. Review the salary and other compensation to ensure that the costs are within the plan.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 21


Reviewing Employee Headcount and FTE

Review the regular headcount and FTE for the entity.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran headcount and FTE:
To review employee
Mo• Under -
non Workforce Analysis, select Review Employee Headcount and FTE.

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 22


Quiz

One of the tasks in Workforce Analysis is to submit equipment


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

requests:
a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: b
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 23


Quiz

Data is automatically rolled up when entered.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: b
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 24


Quiz

Compensation is automatically calculated in all future years.


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: b
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 25


Summary

In this lesson, you should have learned how to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Describe the workforce tasks related to Project Financial


Planning
• Calculate data to update project workforce costs
• Review resources and assignments
• Review resource utilization
• Review labor requests s a
) h a
• Assign labor resources to projects o m
l e ฺc eฺ
• Request new hires c
ra Guid
o
@ ent
• Recalculate compensation costs r i a d
• Review total compensation and z a ka Stuheadcount
employee
dฺ is
e e th
m
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 26


Practices 10-1 Through 10-8

The practice covers the following topics:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Rolling Up Data
• Viewing the Resource Manager Dashboard
• Reviewing Labor Requests
• Staffing Projects
• Reviewing Utilization
s a
• Creating New-Hire Requests
) h a
• Recalculating and Reviewing Total Compensationฺcom ฺ
• Reviewing Employee Headcount and FTEs r a cle uide
o G @ ent
r i a
z a ka Stud
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 10 - 27


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Analyzing and Planning for Capital Assets

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no
Objectives

After completing this lesson, you should be able to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Describe tasks that you perform in the application to analyze


and plan for capital assets
• Review equipment and utilization
• Review equipment requests and assign them to projects
• Request new equipment
• Review the impact of capital requests on financial s a
)h a
statements m
l e ฺco eฺ
• Review and update existing assets and expenses
o rac Guid
r i a @ ent
• Manage owned, leased, and construction-in-progress assets
a d
ak cost
• Calculate equipment costs andฺzreview Stu details
m ed e this
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 2


Analyzing Capital Assets

Asset Managers perform the following tasks to analyze capital


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

assets:
• Review requirements for capital assets by entity
• Review the available capital assets and their associated
expenses
• Allocate assets to approved projects based on the
availability, requirements, and expenses s a
) h a
• Decide whether to purchase new assets or lease m
o
c theฺ
equipment on operational or capital lease, based c l eฺon e
organization's requirements o ra Guid
r i a @ ent
• Calculate expenses of new leasedka
a d request
assetstuand
them as needed, based on e the z
dฺ impact S
is to Cash Flow,
m se t h
Balance Sheet, and Profit
am anduLoss
o h to
( m e
nsand/or its affiliates. All rights reserved.
r i a c e
aka ble li
Copyright © 2012, Oracle
Z
m ed sfera
Capitalm
a t r n you manage, prioritize, and plan for capital expenses. You can
Planningahelps
h n-
o oequipment
Mcalculate
ProjectnFinancial
expenses for entities and track the utilization of assets across projects in
Planning.
By tracking assets in projects, you can get a comprehensive view of equipment, machinery,
and other asset requirements across entities and then make efficient capital purchase
decisions. You can plan for new tangible or intangible expenses and check the impact on
Profit and Loss, Cash Flow, and Balance Sheets. You can also review expenses and adjust
the timing and cost of capital spending. In addition, you can manage existing assets such as
transfers, retirements, and impairments.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 3


Required Metadata and Data Overview

You import Capital Asset Planning data and metadata to


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

manage assets and requests related to the project.


The following table lists the header records and sample data for
the AssetMem.csv file:

s a
Header Record Sample Data
) h a
ฺ c om ฺ
Asset Detail Laptop 1
r a cle uide
@ o tG
Parent Total Major Assets
a r ia den
ฺ z ak 1 Laptops S tu
Description (optional)
m ed e this
Category

o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Oracle m me nsthat
recommends
fe customers update existing asset data (dimensions and data) before
o
preparing n tra plans, either Plan or Forecast. After you update the dimensions and
ha financial
-
M no
refresh the application, you can execute asset calculations and consolidate up-to-date
employee compensation plans or forecasts.
Note: The “Capital Asset Administration” section of the “Administration Tasks” lesson has
information about Capital Asset Administration tasks.
The following sections describe the Capital Asset data and metadata that you can update.
Smart Lists
Before loading Smart Lists and Smart List values, you must identify the associated product
field names and entry names. To load Smart Lists, specify their product or member name in
the Smart List Name column of the data load file. To load Smart List values, you enter the
corresponding entry name in the Entry Name column of the data load file.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 4


You manage entries for the following Smart Lists:
• AssignmentLocation
• PhysicalLocation
Metadata
When you load metadata, you can add members to Asset Class and Asset Detail dimensions.
Consider the following when loading metadata:
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Ensure that the parent member exists in the application before loading children to it.
• All of the templates can be used for single currency Project Financial Planning
applications by removing the Currency dimension from the POV.
The Asset Class dimension details the different categories of assets that a company owns,
which are typically included in your financial statements. Asset Class is broken into:
• Tangible assets: Furniture and fixtures, machinery and equipment, computers, and so
on a
• Intangible assets: Leasehold improvements, software rights, goodwill, and so on h a s
)
ฺ c om ฺ
You use the standard equipment list in the Asset Class dimension when requesting equipment

r a cle uide
for a project. At the time of the request, you specify the type of equipment required; however,
o tG
you may be unaware whether it will be fulfilled by an existing asset or by new assets.
@
a r ia den
Standard equipment provides a concise list of material assets that are requested for use on a

ฺ z ak s Stu
project, while other types of assets are not included. Under the Asset Detail dimension, you

file. m ed e thi
add metadata for existing assets. The slide lists the header records and sample data for this
m us
htoasupport
The Asset Detail dimension is used
m o e tothe request of new asset purchases, either
New Leased or New Owned. i a ( Detail
Asset ns individually details each new request. When you
r c e
Z a ka lthe
request standard equipment,
e i
lrequest supports asset requisitions in the Asset Detail
dimension (for d
e f e r ab Recdetailed
example, Equip 1, 2, 3, and so on). The Asset Detail dimension also

m m ns
contains existing major equipment out as individual assets or groups of assets, where
ha n-tra
possible.
o
MTo support
no planning for new equipment or assets, as a starting point, Project Financial
Planning provides the following line items for entering requisitions:
• 50 equipment requisitions for requesting the use of standard equipment at the project
level
• 30 line items for planning for new leased assets
• 200 line items for planning for new owned assets
Administrators can add more line items based on implementation requirements
After you have finished loading metadata, you verify that the members were added by opening
the Dimension Editor in your Project Financial Planning application.
Data
You use the Capital Assumptions and Asset Depreciation and Amortization data templates to
load data related to Capital Asset Planning. Capital assumptions include data like
depreciation, amortization methods, and so on.
After loading the required metadata and data for Capital Asset Planning, you can associate an
asset to a project. For more information on data load file order, see “Data Load File Order” in
the “Administration Tasks” lesson.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 5


Analyzing Capital Assets and Equipment

As a resource manager, you perform the following tasks to


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

analyze your capital assets and equipment:

Roll up the data. Review equipment Review equipment requests


s a
and utilization. across projects.
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
Review the impact on m
Create new equipment
ed e thi Assign equipment to projects.
financial statements.
o am to us
hrequests.
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m the
You perform
t r a n
following Capital Asset analysis tasks:
h up-the data.
Mo1. Roll
non
2. Review the resource manager dashboard.
3. Review resource utilization.
4. Review resource requests across projects.
5. Assign equipment to projects.
6. Create new equipment requests.
7. Review impact on financial statements.
Note: Oracle recommends that customers update existing asset data (dimensions and data)
before preparing financial plans, either Plan or Forecast. After you update the Asset Detail
dimension and refresh the application, you can execute the calculations and consolidate up-
to-date asset plans or forecasts.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 6


Task Lists for Capital Asset Analysis and
Planning
The task lists for analyzing and planning your capital assets are
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

designed to support standard process flows.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n works with asset managers to complete tasks in these areas.
ham n-tra
The project manager
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 7


Reviewing Equipment
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
mEquipment
You usem
a the
t r a n Overview task to see how assets are utilized, and quickly identify
h
o issues -might exist.
Mwhere
• non
The top-left area shows the utilization percentage of equipment by month. Percentages
under 100 indicate a surplus, over 100 indicates a shortage.
• The bottom-left area displays the number of open requisitions by month.
• The top-right chart shows the proportion of capital expenses for the year by category.
You can drill down into each category for detailed information.
• The bottom-right chart shows the proportion of Capital Purchases and Equipment
Operating Expenses for the year. Drill down for more detail.
To view the equipment overview:
1. Launch the Equipment Overview task under the Capital Analysis task list.
2. Review the Equipment Overview form.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 8


Reviewing Equipment Utilization
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Select an
Select an asset class.
entity.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
mReview
You usem
a the
t r a n Equipment Utilization task to review how assets and equipment are
h
o byonentity - and asset class. You use the form to review an asset and its percentage of
Mutilizedn
usage across projects. The top area displays Equipment Utilization. The bottom area displays
Asset Usage Across Projects for the Asset Class and Entity dimensions selected in the top
form.
To review equipment utilization:
1. Launch the Review Equipment Utilization task under the Capital Analysis task list.
2. Review the Equipment Utilization form.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 9


Asset Utilization Calculation Examples

Utilization = Asset Usage (or Asset Units) /


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Asset Capacity
• 200 units of laptops (UOM = Each), and 180 have been
assigned to various projects, the utilization of laptops is
180 divided by 200, which equals 90%.
• 2 cranes (UOM = Hours) are used 100 hours on various
projects. Available hours per crane is 170. Utilization of a
cranes is (2 times 100) divided by (2 times 170), which) ha
s
m
equals 58%. ฺco ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
Asset Usage
a n Units are assets used across all projects. When calculating for
m ortraAsset
h
o onnote - the following:
Mutilization,
• n
If the Capacity Units of Measure is specified as Each, utilization is calculated by dividing
the number of units used across projects by the total number of available units (Asset
Capacity).
• If the Capacity Units of Measure is specified as Hours, the utilization is calculated by
dividing the Asset Usage by the Asset Capacity.
• If Asset Units or Asset Capacity is available, but not used by any project, the asset
utilization is 0 (zero).

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 10


Reviewing Equipment Requests Across Projects
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
Double-click a
) h a
row to apply
context.
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
masset
Reviewm
a new
t r a nrequirements for all projects for an entity. The top form displays total
h -
o onrequisitions.
Mequipment
n
The bottom form displays equipment requisitions by project.
To review equipment requests across projects:
1. Launch the Review Equipment Requests Across Projects task under the Capital
Analysis task list.
2. Review the Equipment Requests Across Projects form.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 11


Assigning Equipment to Projects
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Click the tab to view


existing equipment
assigned to project.

s a
Double-click a row to
) h a
apply context.
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
mAssign
You usem
a the
t r a n Equipment to Projects task to view current equipment assignments, to
h
o their -status, and to assign equipment to projects as necessary.
Mchangenon
As an Asset Manager, you can verify equipment requests at the project level and change the
requisition status to approved, on hold, or unapproved (rejected). You fulfill the requisition by
assigning existing equipment to the project. By assigning equipment to a project request, you
change the status of that request to Approved.
To assign equipment to projects:
1. Launch the Assign Equipment to Projects task under the Capital Analysis task list.
2. Review the Assign Equipment to Projects form.
3. From the Equipment Detailed Requests by Projects tab, you can Change Requisition
Status using the shortcut menu.
4. From the Existing Equipment Availability form, you can assign existing equipment using
the shortcut menu.
Completed requisitions are not shown in the top section.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 12


Requesting New Equipment
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Select an asset class.

s a
Click the tab to create
a
) hasset.
a
m
l e ฺco eฺ
request for a new leased

o rac Guid
r i a @ ent
z a ka Stud
Right-clickmtoe
dฺ
add a newth
is
us e
o hamrequest. t o
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
m trathat
If you determine
a n an equipment request for a project cannot be fulfilled from the existing
h -
o onavailable,
Mequipment you can request a new tangible or leased asset. The equipment
n is marked to be filled by a new asset purchased in the future.
requisition
To raise a new equipment request:
1. Launch the Raise New Equipment Request task under the Capital Analysis task list.
2. Review the Equipment Requisitions and Raise New Equipment Request sections.
3. From the New Equipment Requests section, you can add a new asset, calculate an
asset, review calculated details, view the impact of the request on your financial
statements, and change the requisition status using the shortcut menu.
Note: There is a key difference in the concept of requesting new equipment versus requesting
a new hire. In planning your workforce, your new hire is not specific for a project; whereas,
with new equipment requests, it typically is for a project or will be shared across projects.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 13


Recalculating Equipment Costs
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
When you
a have n making changes or additions to equipment, run the Recalculate
m trafinished
h
o onCosts- task to recalculate and update equipment costs.
MEquipment
n
To recalculate equipment costs:
1. Launch the Recalculate Equipment Costs task under the Capital Analysis task list.
2. Launch the RollupCapexCube business rule.
3. Click the Launch button.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 14


Reviewing the Impact on Financial Statements
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Select entity.

Double-click a row to
update the data in the
bottom section of this
form.

s a
h a
Click a tab to view the
)
impact on the other

financial statements.c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
You canm me thensimpact
review
fe of capital expenses and their related costs on the Profit and Loss,
o ha Sheet,
Balance n - traand Cash Flow statements. You can review the financial impact by
M no
department or across departments, for the same asset class, all asset classes, or one asset.
To review the impact of an equipment request on the financial statements:
1. Launch the Review Impact on Financial Statements task under the Capital Analysis task
list.
2. Complete the Review Impact on Financial Statements composite form.
3. From the Cash Flow Impact form, you can view asset details by using the shortcut
menu.
To view asset details:
1. Open the Review Impact on Financial Statements composite form.
2. In the Cash Flow Impact form, right-click and select Asset Details,
3. Review the 5.05 Capital Expenditure Summary - Line Item Details form.
- You can return to the previous form by using the shortcut menu.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 15


Capital Planning

Detail Planning: Summary Planning:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Labor • Requisitions
• Equipment • Standard rates for
• Materials equipment and billing
• Indirect costs

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran Planning, you can plan, in detail or in summary, for capital assets used in
In Project Financial
o projects
Myour -by planning for the Allocated Equipment Expenses of projects. In summary form,
non
you work with equipment requisitions, standard equipment and billing rates, and do not need
to load or reconcile specific asset information. You load and manage standard equipment and
billing rates.
You perform the following tasks when planning for capital assets for your projects:
• Review and update major existing assets
• Add new assets, if required
• Review construction in process assets
• Calculate asset related expenses
• Review asset-per-unit-cost detail

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 16


Reviewing Existing Assets
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

Click a tab to view the


other asset types.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
mReview
You usem
a the
t r a n Existing Assets form to review and update assumptions for all existing
h
o You -
Massets.
• non
review assumptions by asset type:
Major Existing Tangible
• Intangible
• Leased Assets
• All Other Minor Assets
You can update asset capacity, status, insurance rate assumptions, and so on. In addition,
you can transfer, retire, and impair assets.
To review major existing assets:
1. Launch the Review Existing Assets task under Existing Assets.
2. Review the Review Existing Assets form.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 17


3. In the tabbed areas of the form, right-click for a shortcut menu to do the following:
- Calculate assets.
- Transfer assets.
- Retire assets.
- Review calculated details.
- Impair assets.
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

- Calculate intangibles.
- Calculate all leased assets.
- View the impact of an asset on your financial statements and view asset details.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 18


Reviewing and Updating Asset-Related Expenses
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
e sfe
mReview
You usem
a the
t r a n and Update Asset Related Expenses task to review and update asset-
h
o expenses- by entity, such as insurance, maintenance, and repairs. The expenses are
Mrelatednon
the calculated results from the assumptions entered by asset in the Review Existing Assets
form. Each expense line is calculated as Basic Cost multiplied by Percentage. For example,
Repairs & Maintenance is a Basic Cost, which is multiplied by Repairs & Maintenance %.
To review and update asset-related expenses:
1. Launch the “Review and Update Asset Related Expenses” task under Existing Assets.
2. Review the Manage Major Asset Expense form.
3. From the POV, select the Entity, Asset Class, and Asset Detail dimensions.
4. Review insurance, maintenance, repairs, and so on, and, if needed, update the
expenses.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 19


Adding New Assets
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
a m trAssets
Under the New a n task list, perform the following tasks:
h - reconcile new assets
Mo• Add
non
and
• Add and reconcile new leased assets
You add new tangible, intangible, or leased (equipment) assets at the entity level.
To add and reconcile new assets:
1. Launch the Add and Reconcile New Assets task under New Assets.
2. Review the Add and Reconcile New Assets form.
3. From the Add and Reconcile New Assets form, you can use the shortcut menu to add,
calculate, remove, reconcile, change the requisition status, and view the impact of
assets.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 20


Adding New Leased Assets
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
You canm meleased
add n s fe based on the following types of leases:
assets
o
• n traLease: Temporary short-term leases similar to a rental agreement. The
haOperating
-
M no lessor, who retains exposure to the risks and benefits of ownership, generally covers the
maintenance, insurance, and repair costs of the asset.
• Financed or Capitalized Lease: Long-term leases that last for almost the life of the
asset until it is considered worthless after the lease period. The lessee effectively
assumes all the risks and benefits of ownership, including maintenance, repairs,
insurance, and obsolescence. The lessor’s role is primarily to provide financing for the
asset. At termination, the asset is usually transferred to the lessee for a specified sum,
which is similar to buying an asset in installments over time.
Consider the following criteria that Project Financial Planning applies when classifying a lease
as Operating versus Financed:
• Transfer of ownership at the end of the lease term
• Purchase option at a certain date during the lease period at a bargain (much less than
the expected market value of the asset at that time)

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 21


• The lease term is for the major part of the asset’s useful life (at least 75% of the asset’s
useful life)
• The present value of the lease payments exceeds 90% of the initial value of the asset
Impact of leasing type on financial statements:
• Operating Lease: The lease payments are recorded as operating expense (rent
expense) on the Income Statement.
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Capitalized Lease:
- Records an asset and liability on the Balance Sheet to reflect the value of
equipment (the net present value of lease payments) and the obligation of the
lease payments respectively (debt)
- Depreciates the asset over its useful life, which reduces the asset on the Balance
Sheet and generates a depreciation expense on the Income Statement
- The interest associated with the lease must be listed as an expense on the Income
Statement (interest payment) s a
To add a new leased asset: ) h a
ฺ c om ฺ
1. Launch the Add and Reconcile New Leased Assets task under New Assets.
r a cle uide
2. In the New Leased Asset Request or New Leased Asset Details form, right-click and
select Add New Leased Asset . @ o tG
a r ia den
ฺ z ak s Stu
3. Complete the runtime prompt and click the Add Leased Asset button.

m ed e thi
o ham to us
i a (m nse
k a r l i ce
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 22


Reviewing Construction-In-Progress Assets
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
You canm me allnConstruction
review s fe in Progress (CIP) assets that are in progress in an entity. You
h a t r a
- these assets to existing assets after the capital project is approved. CIP assets
o reconcile
Mcan non
accumulate the costs of building an asset and are classified in the Balance Sheet as CIP until
the asset is placed in service.
To review and reconcile construction-in-progress (CIP) assets:
1. Launch the Review & Reconcile CIP Assets task under Construction In Progress Assets.
2. Review the Review Construction in Progress (CIP) Assets form.
3. You can use the shortcut menu to reconcile CIP assets.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 23


Calculating Asset-Related Expenses

You use the Calculate Asset Related Expenses rule to


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

calculate expenses for assets at the entity level.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
h a m tran
To calculate asset-related expenses:
Mo1. Launch -the Calculate Asset Related Expenses task under Capital Planning.
non
2. Click the Launch button.

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 24


Reviewing Asset Per Unit Cost Detail

The Review Asset Per Unit Cost Detail task enables you to
Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

review the Per Unit Cost for each asset.

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
Per Unitm mefor an
Cost n s fe is calculated as the Ownership Costs plus the Operating Costs.
asset
o ha n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 25


Quiz

One of the tasks in Capital Analysis is to submit equipment


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

requests (if needed).


a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: a
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 26


Quiz

You can use the Assign Equipment to Projects task to change


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

the status of the equipment.


a. True
b. False

s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: a
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 27


Quiz

Which area (tab) is not part of reviewing the impact on financial


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

statements.
a. Profit and Loss Impact
b. Balance Sheet Summary
c. Cash Flow Impact
d. Retained Earnings Impact
s a
) h a
ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
me sfe
n
ham n-tra
Answer: d
o
M no

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 28


Summary

In this lesson, you should have learned how to:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Describe tasks that you perform in the application to analyze


and plan for capital assets
• Review equipment and utilization
• Review equipment requests and assign them to projects
• Request new equipment
• Review the impact of capital requests on financial statements s a
)h a
• Review and update existing assets and expenses com
c
• Manage owned, leased, and construction-in-progress
a leฺ idassets
eฺ
@ or t Gu
• Calculate equipment costs and review en
riacostddetails
ka Stu
z a
e dฺ this
m m se
o h a t o u
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 29


Practices 11-1 Through 11-7

The practice covers the following topics:


Unauthorized reproduction or distribution prohibitedฺ Copyright© 2013, Oracle and/or its affiliatesฺ

• Rolling Up Data
• Equipment Overview
• Reviewing Equipment Utilization
• Reviewing Equipment Requests
• Assigning Equipment to Projects
s a
• Request New Equipment
) h a
• Recalculating and Reviewing Financials ฺ c om ฺ
r a cle uide
@ o tG
a r ia den
ฺ z ak s Stu
m ed e thi
o ham to us
i a (m nse
k a r © 2012,
Copyright
l i ceOracle and/or its affiliates. All rights reserved.
d Za rable
m e sfe
n
o ham n-tra
M no

Oracle Project Financial Planning 11.1.2: Create Projects 11 - 30

You might also like