QCS 2010 Section 11 Part 2 SAMAS Page 1

2 SAFETY AND ACCIDENT PREVENTION MANAGEMENT /


ADMINISTRATION SYSTEM (SAMAS) ....................................................1

2.3 SAFETY, HEALTH AND ENVIRONMENT PROCEDURES........................... 1

2.3.1 Risk Identification and Management ............................................................... 6

2.3.1.1 Responsibilities............................................................................................... 6

2.3.1.2 Definitions ....................................................................................................... 7

2.3.1.3 Action Required To Implement This Procedure ............................................ 10

AECOM
2.3.1.4 Guidance To This Procedure ........................................................................ 12

2.3.1.5 Appendices ................................................................................................... 14

2.3.1.6 Reference Documents .................................................................................. 15

2.3.1.7 Author ........................................................................................................... 16

2.3.1.8 Approvals...................................................................................................... 16

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 2

PROCESS MAP – COMPANY DIRECT WORK

Project/Site Competent
Estimator Operative SHE Team HR
Manager Person

Review tender
information for
SHE Risk

3.1

Include SHE risk Review Risk Prepare RA in Undertake


on project Register and line with activity in line
Risk Register produce a SHE Risk RA Schedule with agreed
Assessment RA/MS
Provide advice
Schedule
3.2 and monitor
3.1 3.2
works against
RA/MS

AECOM
Allow for measures Appoint a project Where identified Stop work and 3.5
to control the competent person prepare MS inform
Identified risk to produce competent
Company Risk person if works
3.1
Assessment and significantly
Method Statement 3.2 change from the
3.2 agreed RA/MS
with agreed
RA/MS
Circulate RA/MS
for review

Review 3.
completed RAMS
prior to issue

3.2 Issue Agreed


RAMS to
relevant
supervisor/operat
ive
3.2

Monitor works Brief


against agreed supervisor/operat
RA/MS ive on content of
RA/MS
3.2 3.2

Monitor works
against issued
Maintain up to date
RA/MS
Risk
Assessment/Method
3.2
Statement records

3.2
Provide advice where
Review and revise works involve young
RA/MS if person or expectant
circumstances change mothers
3.2
3.2

Key Activity
Guidance

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 3

PROCESS MAP – SUBCONTRACT WORKS

Contractors
Project/Site Contractors
Estimator Responsible SHE Team
Manager Operatives
Person

Review tender
information
for SHE Risk Provide advice
and monitor
works against
3.1 RA/MS

Review Risk
Register and Prepare RA for 3.5
update with all activities in
changes identified the scope of
Include SHE risk by Contractors Works
on project 3.3 3.3
Risk Register

AECOM
3.1

Where identified
Review the RA/MS prepare a
using Check Sheet Method
System Statement
Allow for
measured to 3.3
control the 3.3
Identified risk
3.1

When satisfied the


RA/MS is sufficient,
return to the S/C for
issue Brief the Undertake the
Operatives of activity in line
3.3 the content and with the RA/MS
controls in the
agreed RA/MS
3.3

Monitor works Monitor the


against agreed works against
RA/MS agreed RA/MS

3.5 3.5

Stop work and inform the relevant person if works significantly change from the agreed
RA/MS

3.3

Review and revise


RA/MS if
circumstances change
Maintain up to date
Risk
Assessment/Method 3.3
Statement records
3.5

Key Activity
Guidance

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 4

PROCESS MAP – FACILITIES SERVICES AND CUSTOMER ACTIVITIES

Area Line
COMPANY
Manager/Customer Manager/Customer
Operative/Tradesman
Care Manager Care Manager

Produce a Schedule
of regular activities
undertaken in
Property Services
and Customer Care
operations

3.1
Complete a full
Method Statement
where the Risk cannot
Undertake a general
be controlled by a
Risk Assessment to
TRICS form

AECOM
determine whether
the activities require a 3.2
Method Statement

3.1

Complete task Risk Identification and Control


Statement (TRICS) for the activity

3.2

Carry out the works in


accordance with the
completed form

Complete task Risk Identification and Control


Statement (TRICS) for the activity

3.2

Produce a Schedule of
regular activities
undertaken in property
Services and Customer
Care operations

3.

Activity
Key Guidance

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 5

PURPOSE

1 The purpose of this procedure is to assign responsibilities and provide a consistent approach
to the planning, development and production of suitable and sufficient Risk Assessments and
the control of Method Statements for all activities.

SCOPE

1 This procedure covers all COMPANY Projects and locations under the control of
COMPANY. A COMPANY is defined as the organization with responsibility for management
of safety at a construction site

AECOM

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 6

2.3.1 Risk Identification and Management

2.3.1.1 Responsibilities

SHE DIRECTOR

1 Authorises and reviews this procedure.

PROJECT/SITE MANAGER

2 Ensures the procedure is established and used and that Risk Assessments are carried out
and, where appropriate, Method Statements are produced.

AECOM
3 Unless delegated to others, in writing, retain responsibility for monitoring of the works against
the relevant control documents.

COMPETENT PERSON

4 Prepare Risk Assessments taking account of the task being undertaken and the specific
layout and restrictions of the place the work is to be carried out and where identified produce
a written Method Statement incorporating a safe system of work.

SUPERVISORS

5 Either supervises the work activities or the sub/work package contractor undertaking those
work activities in line with relevant control documents required by this procedure. Provide
support to the review process for the Risk Assessment and Method Statement, to ensure
acceptability SHE-FRM-1-03.

SHE MANAGER/ADVISER

6 Provides advice and support in the application of this procedure and monitors effectiveness of
the relevant control documents.

7 If the nature of the work is deemed ‘safety critical’, the SHE Manager/Adviser may provide
appropriate support for the production of the control documents and the communication to all
relevant Operatives.

OPERATIVE/CONTRACTOR EMPLOYEE

8 Carry out the work in accordance with the relevant control documents.

SUB/WORK PACKAGE CONTRACTOR

9 Prepare Risk Assessments taking account of the work being undertaken and the specific
layout and restrictions of the place the works is to be carried out.

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 7

HUMAN RESOURCES

10 Provide assistance in cases of new or expectant mothers, young persons or children.

2.3.1.2 Definitions

CONTROL DOCUMENTS

1 Written documents used to manage the risk associated with the work activity including:

2 Risk Assessment

(a) Method Statement

(b) Permits

AECOM
(c) Plan of Work

(d) Certification

(e) Licence

(f) Skill Card

(g) or any other supporting documentation

RISK ASSESSMENT

3 The process of hazard, aspect, impact, identification, assessment of the risk, and
identification of the controls required to manage the risk to an acceptable level to ensure the
health and safety of those affected by the activity and the protection of the environment from
harm. In undertaking the Risk Assessment the Qatar Regulatory Document (Construction)
principles of prevention must be considered, which are:

(a) Eliminate

(b) Control - In controlling the hazard the following should be considered in order:

(i) Substitution – use a less risky method/material

(ii) Guarding – place guards, barriers and /or signage to isolate or warn of the
hazard

(iii) PPE – provide personal protection to individuals

(iv) Decontamination – clear/clean up after exposure

RISK ASSESSMENT GUIDES

4 COMPANY' Risk Assessment Guides have been produced for a range of common activities
undertaken by the Company and its sub-contractors. These can be used as points of
reference to produce project specific Risk Assessments. An index of Risk Assessment
Guides is on the COMPANY Intranet or available through the SHE Team.

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 8

METHOD STATEMENT

5 A hazard control measure in the form of a written safe system of work describing the
proposed working method and addressing the output from the Risk Assessment process,
providing instruction and guidance for those individuals’ carrying out the activities. The
purpose of this document is to ensure the proper planning of an element of the works and to
detail the overall methodology and associated controls SHE-FRM-1-03. The document must
be issued/briefed to management/supervision.

6 For work carried out by COMPANY Facility Services or Customer Care activities, the Method
Statement may be substituted with Task Risk Identification and Control Statement (TRICS)
SHE-FRM-1-05.

7 Sub/Work Package Contractors are to be encouraged to follow the COMPANY structure as


mentioned above. Suggestion to adopt COMPANY safe system will require an element of
instruction/training. For guidance contact the SHE Team.

AECOM
8 Alternatively Risk Assessment and Method Statements prepared by Sub/Work Package
Contractors may be prepared as a single document, providing the content is equivalent to
that of the RA/MS above.

TASK RISK IDENTIFICATION AND CONTROL STATEMENT (TRICS)

9 This document is specific to Property Services Work and Customer Care activities and
eliminates the need to produce a detailed Method Statement in the format described above. It
must only be used when the Supervisor has carried out a Risk Assessment which concludes
that a Method statement is not required. The Job/Task RA/MS is completed by the operative /
supervisor using form SHE-FRM-1-02.

HAZARD

10 Something with the potential to cause harm, this can include substances, workplaces,
machines, tools, etc and includes the potential to harm/damage the environment including the
potential of causing a statutory nuisance.

RISK

11 Is the likelihood that the potential harm from a particular hazard is realised.

Risk = consequence x probability and is classed as either


Acceptable or Unacceptable, depending on the results of the
quantifying matrix.

EXTENT OF RISK

12 The number of people or extent of the environment that may be exposed to the hazard.

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 9

COMPETENT PERSON

13 Is a person who has sufficient training, experience and knowledge to enable them to properly
undertake the task in question or carry out the Risk Assessment.

TECHNICAL ADVISER

14 Dependant on the type of work the Method Statement is being prepared for, the Technical
Adviser can be any combination of individuals (i.e. Designer, Materials Engineer, Temporary
Works Co-ordinator, etc.)

15 The Technical Adviser provides, where required, support to the review process to ensure
suitability of the content of the Risk Assessment/Method Statement. SHE-FRM-1-03.

AECOM
YOUNG PERSON

16 Any person between the age of 16-18 years old.

CHILD

17 Any person under 16 years old.

SUITABLE AND SUFFICIENT

18 An assessment required under The Management of Health and Safety at Work which:

(a) Correctly identifies a hazard

(b) Disregards negligible hazards and those associated with life in general

(c) Determines the likelihood of injury, harm or loss

(d) Quantifies the:

(i) Probability of exposure

(ii) Maximum probable loss

(iii) Number of persons at risk and/or the financial loss to the company.

(e) Identifies any specific legal duty or requirement relating to the hazard

(f) Provides sufficient information to enable appropriate control measures to be taken

(g) Enables control measures to be prioritised

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 10

2.3.1.3 Action Required To Implement This Procedure

GENERAL

1 At Tender stage the Estimator will review the Pre-Tender Safety Information provided and
instigate the production of a Project Specific Risk Register, which will identify Risk including
safety risks associated with the proposed works.

2 Details of the risks identified and any measures included on the risk register will be included
in the enquiry documents produced for contractor’s works.

3 Allowances should be made in the settled tender for arrangements to control these risks
during the Construction Phase of the project.

AECOM
4 At the start of the Construction Phase, the Project/Site Manager will review the risk register
and project program and produce a schedule of activities which will be used as a basis for
ensuring that all elements of the construction process are identified and considered for Risk
Assessment.

5 Using the schedule the Project/Site Manager will ensure a suitable Risk Assessment is
produced which will identify whether a Method Statement is required as part of the control
measures.

6 For Facility Service or Customer Care works the Area Manager or Customer Care Manager
will produce a schedule of activities undertaken on a regular basis by operatives working on
this type of work. A Risk Assessment will be undertaken and where it is identified that the
hazards can be controlled without the need of a full Method Statement he will indicate that the
operation be subject to a Risk Identification and Control Statement (TRICS) and the
procedure in 3.4 will be followed.

ACTIVITIES UNDERTAKEN BY COMPANY

7 Before carrying out any activity undertaken by direct COMPANY employees, the
Project/Area/Site Manager for the workplace/operation/ design concerned shall first
produce/review the Risks Assessment Schedule with the intention of identifying where hazard
and risk could arise. This should include discussion with the people undertaking the work, if
appropriate. It should be remembered that a risk could be seen as minimal but by further
work processes could become significant. Such as painting outside to painting in a confined
space.

8 Following this review a specific Risk Assessment using SHE-FRM-1-02 shall be undertaken
by a Competent Person appointed by the Project/Area/Site Manager.

9 Where young persons or expectant mothers are involved in the activity, additional concerns
may be required. Advice should be sought from the HR Team.

10 Where identified in the Risk Assessment the Competent Person in conjunction with any
other relevant person will:

(a) prepare a Method Statement taking account of the following:

(i) The controls identified in the Risk Assessment.

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 11

(ii) All relevant Safety, Health, Environmental (SHE) matters.

(iii) The headings, as a minimum, indicated in SHE-FRM-1-03 & 1-04.

(iv) Circulate the Method Statement utilising the tracking and content sheet SHE-
FRM-1-04.

(b) Take account of comments received from other parties and re-circulate Risk
Assessment and Method Statement to those people to ensure issues raised have been
dealt with adequately.

(c) Following agreement of the suitability of the Risk Assessment and Method Statement
by the Project/Site Manager, ensure it is issued to relevant management/supervision.

(d) Monitor performance against the Risk Assessment and Method Statement and identify
and make any necessary changes The Risk Assessments produced shall be used,
where appropriate, as the basis for COMPANY personnel checking the contents of sub
or work package contractors’ safety method statements.

AECOM
(e) The Risk Assessment and Method Statement shall be briefed to ensure that the detail
is communicated to all relevant Operatives and carry out a reality check to confirm
understanding of key aspects.

ACTIVITIES UNDERTAKEN BY CONTRACTORS

11 The Project/Site Manager must ensure contractors have been procured via COMPANY
Contractor Assessment procedure.

12 Before carrying out any activity undertaken by sub-contract employees the Contractors
Responsible Person shall first undertake a risk assessment taking into account the hazards
associated with the work this should include, if appropriate, discussion with the people
undertaking the work, and COMPANY Management.

13 The Risk Assessments produced shall be used, where appropriate, as the basis for
COMPANY personnel checking the contents of sub or work package contractors’ safety
method statements.

14 Where identified in the Risk Assessment the Contractors Responsible Person will prepare a
Method Statement taking account of the following:

(a) The controls identified in the Risk Assessment.

(b) All relevant Safety, Health, Environmental (SHE) matters.

(c) The headings, as a minimum, indicated in SHE-FRM-1-03 & 1-04

(Note: the use of the COMPANY format Risk Assessment and Method Statement
templates may be suggested to the Sub-Work Package Contractor for work carried
out on projects and locations under COMPANY control).

15 The Project/Site Manager will review the Risk Assessment and Method Statement produced
using the tracking and content sheet SHE-FRM-1-04. Circulating to relevant parties as
required. Following the review he will take account of comments received from other parties
and re-circulate Risk Assessment and Method Statement to those people to ensure issues
raised have been dealt with adequately.

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 12

16 Following agreement of the suitability of the Risk Assessment and Method Statement, the
Project/Site Manager will issue it to relevant COMPANY Management/Supervisor who will
then ensure that the contractor’s supervisor gives a briefing of the Risk Assessment and
Method Statement so that the detail is communicated to all relevant operatives.

17 The Project/Site Manager or Supervisor will monitor performance against the Risk
Assessment and Method Statement and identify and communicate any suggested changes.
In cases where any significant changes to the system of work are necessary, activities must
be stopped so that the changes to be made are re-assessed and approved. Where
appropriate, following any revision, the checking process should be repeated.

TASK RISK IDENTIFICATION AND CONTROL STATEMENT (TRICS)

18 The TRICS SHE-FRM-1-05 should be completed prior to commencement of works by the


Appropriate Line Manager. Where this is not possible or practicable, the individual
tradesman undertaking the task should complete the task assessment. The TRICS format is

AECOM
only to be used after an assessment has been made by the relevant Manager and the need
to produce a Method Statement for the works has been eliminated.

19 Should the initial TRICS being completed by the tradesman reveal that other assessments
(e.g. Manual Handling/Noise) are required the risk assessment guides should be used to
develop a safe system of work. Should the safety requirements of the job still not be met then
the individual Line Manager shall be contacted immediately.

RECORDS AND MONITORING OF THE RISK ASSESSMENT

20 The Project/Site Manager should maintain up to date current Risk Assessment records so
that any significant change to a activity requiring the Risk Assessment to be re-evaluated can
be controlled. The need for review will depend upon the level of risk and the significance of
the change.

21 Where appropriate to the activity the SHE Advisor for the project will monitor performance
and identify any necessary changes by inspection and/or audit.

2.3.1.4 Guidance To This Procedure

RISK ASSESSMENTS

1 All Contractors and self-employed persons are required to make suitable and sufficient Risk
Assessment of work activities to be undertaken. A record of the significant findings of Risk
Assessments must be kept. This record shall state the hazards and risks and the controls
needed to reduce the risks to an acceptable level. The controls shall then be implemented by
management to protect health and safety and the environment.

2 Where Risk Assessments are required to be carried out under particular sections of the Qatar
Regulatory Document (Construction), COSHH, Noise, Asbestos and Lead etc. a repeat
assessment is not required unless other elements of the work demand assessment in their
own right (e.g. painting at height may require a COSHH Assessment for the paint as well as
an assessment of the risk of working at height or damage to a watercourse due to spillage).

3 Where an assessment identifies the likelihood of an adverse health condition or identifiable


disease being contracted, then health surveillance may be required. In all such cases the
advice of the SHE Team shall be sought.

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 13

4 On completion of a Risk Assessment the record shall then be used to supply the following
information to the relevant persons at risk:

(a) Hazard/risk/impacts

(b) Preventative and protective measures

(c) Emergency procedures

(d) Name of emergency wardens or incident controllers

(e) Instruction and training to carry out the work safely

5 All activities undertaken under the Risk Assessment (and controls therein) shall be monitored
to ensure that the assessment is both suitable and sufficient and is being worked to.

6 Any changes in work must be notified to the competent person who has developed the Risk

AECOM
Assessment and must result in a review of the assessment and if necessary a revised
assessment produced.

METHOD STATEMENTS

7 Method Statements serve the important function of detailing the controls for activities where
risks have been identified by a specific Risk Assessment. It needs to demonstrate the thought
process and logic that has been developed to arrive at the controls. Method Statements shall
be explained by the appropriate Supervisor to the workforce prior to the execution of the
work. Method Statements are required for all high or significant risk activities that have been
identified by a Risk Assessment. Method Statements are not normally required for low risk
activities. A sample format has been included in SHE-FRM-1-03

USE OF RISK ASSESSMENT GUIDES

8 It is a legal requirement to carry out and record Risk Assessments where significant risk is
identified. Therefore, to assist management in collecting the necessary information, a
number of Risk Assessment Guides have been produced. These Guides cover the main
hazards and risks associated with COMPANY’s most commonly encountered activities
together with details of possible control methods for consideration. It shall be understood
that the Risk Assessment Guides cover common and general issues not the specific issues
applicable to any particular work activity or location. They are an aid only and shall not be
used unmodified as an activity specific Risk Assessment.

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 14

2.3.1.5 Appendices

Appendix 1 – Risk Assessment Methodology

Fatality building loss, catastrophic environment


Major injury, damage or environment impact
Minor injury, damage or environment impact
No injury, damage or environment impact

impact
Risk Factor

AECOM
0 1 2 3

Almost no probability 1 A A A U

A small probability 2 A A U U

A high probability 3 A U U U

Almost Certain 4 A U U U
Acceptable Unacceptable
Consequence X Probability = Risk
0–3 4 - 12

Risk Level Action

No further preventative action. Consideration shall be given to


more cost-effective solutions or improvements that impose no
Acceptable additional cost burden. Monitoring required to ensure that
controls in place are properly maintained.

Work shall not be started or continued until the risk level has
been reduced to an acceptable risk level. While the control
measures selected shall be cost-effective, legally there is an
Unacceptable absolute duty to reduce the risk, this means that if it is not
possible to reduce the risk even with unlimited resources, then
the work shall not be started or shall remain prohibited.

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 15

Appendix 2 – Risk Assessment Process

AECOM
2.3.1.6 Reference Documents

FORMS

1 S,H&E Risk Assessment Form (SHE-FRM-1-01)

2 Job/Task Risk Assessment/Method Statement (SHE-FRM-1-02)

3 Method Statement Layout (SHE-FRM-1-03)

4 Tracking and Content Sheet (SHE-FRM-1-04)

5 Task Risk Identification and Control Statement (TRICS) (SHE-FRM-1-05)

REFERENCE DOCUMENTS

6 Qatar Regulatory Document (Construction) RD1.1.7

7 Appendix 1 – Risk Assessment Methodology

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 16

2.3.1.7 Author

SECTION NAME POSITION IN CONTACT


COMPANY DETAILS

SHE Manager

2.3.1.8 Approvals

AECOM
NAME POSITION SIGNATURE &
IN DATE
COMPANY
Approved by: SHEQ Director

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 17

AECOM
SHE-FRM-1-01 - SAFETY, HEALTH & ENVIRONMENTAL RISK ASSESSMENT RISK FACTOR

Major injury, damage or


Minor injury, damage or
Site & Contract No : Risk Assessment No :

Fatality, building loss,


No injury, damage or

environment impact
environment impact

environment impact

environment impact
catastrophic
Activity : Location :
Risk Quantifying

Person Conducting Assessment : Date :

Person Supervising Work : Date :


Almost no probability
A small probability
PERSONS EXPOSED
A high probability
Almost Certain

EMPLOYEES : OTHER WORKERS : PUBLIC/VISITORS : YOUNG PERSONS : Acceptable Unacceptable

Risk Level Action


New or Expectant Mothers : Disabled : Others :
Insignificant No action required and no documentary records need to be kept

Estimated Total No. of Persons at Risk : No further preventative action. Consideration shall be given to more cost-
effective solutions or improvements that impose no additional cost
Acceptable
burden. Monitoring required to ensure that controls in place are properly
maintained.
Work shall not be started or continued until the risk level has been
reduced to an acceptable risk level. While the control measures selected
HAZARDS (WHAT MIGHT Unacceptable shall be cost-effective, legally there is an absolute duty to reduce the risk,
CAUSE HARM?) S H E S H E this means that if it is not possible to reduce the risk even with unlimited
resources, then the work shall not be started or shall remain prohibited.
NOTES
1 Adverse Weather Conditions 17 Loading/Unloading
2 Cold\Hot 18 Materials 1. Physical Hazards are the nature of issues that may cause harm. Tick box for
hazard.
3 Electricity 19 Moving Parts of Machinery
4 Excavation 20 New or Expectant Mothers 2. Preventative / Control Measures are the actions that will stop it going wrong.

5 Fire/Flammable Atmosphere 21 Proximity to Water 3. Control measures are to ensure that residual risks are reduced to a minimum.
Where controls fail to reduce the risk to a acceptable level then refer assessment to
6 Floor/Ground Conditions 22 Scaffold
your line manager.
7 Flying Particle/Dust 23 Sharp Objects
4. If the operations are likely to affect the public or the safe operation of a public
8 Hand or Power Tool 24 Stairs/Steps infrastructure or transport system, the control measures must reduce the likelihood
9 Hazardous Substance 25 Static Equipment/Machinery of significant harm to the level that existed before our work commenced.

10 Heat/Hot Work 26 Structure 5. Where young persons or expectant mothers are involved in the activity, ensure that
11 Lack of Experience 27 Temporary Works any additional controls are put in place in accordance with local procedures.

12 Lack of Training 28 Vehicle/Mobile Equipment 6. In addition to the above, consideration must be given to other individuals’
susceptibility due to pre-existing health conditions, e.g. bad back, poor hearing.
13 Lack of/too much Oxygen 29 Working Hours/Fatigue
Additional ‘human factors’ such as ergonomics, workplace design, etc. should also
14 Ladder 30 Workstation Design be considered.

15 Lifting Equipment Appliances 31 Young Persons 7. Where a hazard is identified that is not listed in the Physical Hazards list, enter the
16 Lighting 32 Other hazard description followed by Other in brackets i.e. (Other).

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 18

AECOM
Risk Control Measures Risk
Perceptive /Control Measures
HAZARD Nature of Risk What Might Go Wrong? Before Implemented By After
How do you Stop it Going Wrong?
No. Controls (Name) Controls
U/A U/A

Name Signature Date


Person Completing the Assessment
Person Reviewing the Assessment

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 19

Section 1 - Job / Task Allocation


To be completed by person taking works order/organising task:
o
Job / Contract N .:
Client: Contact Name: Date:
Job / Task Location:

Description of work:

Proposed work method:

AECOM
(additional sheets if required)
Completed By (Name): Signature:

Section 2 - Risk Assessment


To be completed by operative / person undertaking the work/task
Upon arrival at the work location complete this Risk Assessment before starting work. If the
responses mean you cannot complete the job/task safely, discuss your concerns with your
Manager.
*Delete as required
Is the proposed work method (above) acceptable? (If No following this risk Yes / No
assessment a method statement must be produced)
SAFE Are there any client controls e.g. Permits / clearances certificates etc? Yes / No
SYSTEM
Are barriers and signs needed to separate the work area? Yes / No
SAFETY & Do you know the location emergency procedures / fire exits / muster points / First Yes / No
SECURITY Aid etc? Yes / No
Do power supplies / fire detection systems need isolating
What personal protective equipment is needed (tick relevant boxes)?
SAFETY Safety Footwear Safety Helmet Hi-Visibility Vests
EQUIPMENT Gloves Eye Protection Hearing Protection
Dust Masks Other(state): …………………………………………….
List any items of plant / tools required:
(Include drills, saws, compactors, breakers
PLANT & etc…)
EQUIPMENT Are you competent and have you received the training to use them? Yes / No
Are all the plant / tools suitable for use, tested and inspected? Yes / No
Confirm plant / tools will be visibly inspected by the user prior to use? Yes / No
HEALTH Check labels on materials and substances. If hazardous, has a COSHH Yes / No / NA
HAZARDS Assessment been carried out?
Have all underground services been located and clearly marked? Yes / No / NA
EXCAVATION Are shoring materials on site before starting work? Yes / No / NA
Which is the most appropriate for access (circle as appropriate)
Ladder Access Tower MEWP
WORK AT Scaffolding Yes / No / NA
HEIGHT Yes / No / NA
If Mobile Elevated Work Platform are you trained and competent to operate?
Yes / No / NA
If scaffold / access tower has this been erected by competent person?
Will this be inspected by the user prior to use?

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 20

Can heavy/awkward items be moved and stacked securely? Yes / No / NA


MANUAL
Is lifting apparatus required? Yes / No
HANDLING
Is a separate Manual Handling assessment required? Yes / No
Are materials in safe area and stacked securely? Yes / No
SITE TIDINESS Are all materials segregated from building users and members of the public? Yes / No
ENVIRONMEN Are there facilities for the disposal of spent materials or packaging? Yes / No / NA
T Do any consents to discharge trade effluent apply or are any required? Yes / No / NA
Are there any risks to trees or other ecology – contact SHE adviser for advise Yes / No / NA
where required
Has consideration been given to prevention of nuisance from dust/noise to Yes / No / NA
neighbours

Completed by
Signature: Date:
(Name):
Section 3 – Task Statement

AECOM
To be completed by operative / person undertaking the work/task if the ‘proposed work method’
does not accurately describe the method of work required, complete the following to explain the
safe method of working that will be adopted:

(Explain how the work is going to be done, include things such as plant, materials, access to the work
area, manual handling, sequence of work, any limitations, protection to building users, members of
public etc.)

Insert names of all members of the work gang and confirm the work method has been explained.
Name and position: Signature

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 21

METHOD STATEMENT
Contract Title:

Contractor:

THIS METHOD STATEMENT HAS BEEN DEVELOPED FURTHER TO THE COMPLETION OF THE
FOLLOWING REFERENCED RISK ASSESSMENTS:

Risk Assessment Number Title

AECOM
SECTION 1 – GENERAL DETAILS

SCOPE OF WORKS:

LOCATION OF THE WORKS (USE SKETCH BOXES IF REQUIRED):

PREPARED BY:

POSITION HELD:

SIGNED: DATE:

REVIEW DATE (IF REQUIRED):

WORK SUPERVISOR(S):

Refer to Method Statement Tracking & Content Sheet

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 22

SECTION 2 - PROGRAMME OF OPERATIONS

Start Date/Time:

Preceding Works to be Completed:

Duration:

Permit Required:

Permit to Work(General) Permit to Enter (Confined Space)

AECOM
Permit to Dig Hot Work Permit Out of Hours Work Permit

Other (please note type of permit)

SECTION 3 – PERSONNEL

Include details of all personnel involved in the task and any special training, skills or qualifications
required

Name Role Competence Details

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 23

SECTION 4 - SAFE SYSTEM OF WORK TO BE ADOPTED

Refer to prompt list on the tracker sheet

AECOM

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 24

SECTION 5 - PLANT, EQUIPMENT

Match plant and equipment to qualified personnel and include any specific PPE details.

Plant & Equipment

Test Certificates In Date


Equipment Description Operator Details
(matched to equipment)

AECOM
Personal Protective Equipment

Specification
Equipment Description Training Required
(e.g. type, grade)

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 25

Sketch Box 1

AECOM
Sketch Box 2

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 26

Receipt Acknowledgements

SUPERVISOR IN CHARGE OF THE WORK

I confirm that I have read and understand the requirements of this method statement and
associated risk assessments and will ensure their communication to operatives under my control
and to those who may be affected by its requirements

Signed ………………………………... Date………………….

Print name ……………………………….. Supervisor

AECOM
COMMUNICATION

Communicate the contents of the Method Statement to all those involved or affected by the works
and record their details below.

Name Signature

NOTE:

1. If you have any doubt about any information given or contained in this Method Statement –
ASK FOR CLARIFICATION

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 27

Risk Assessment/ Method Statement – Tracking and Content Sheet


Project : Contractor :

METHOD STATEMENT TITLE : DATE :

Review
1st review Status* Name (print) 2nd review Status* Name (print)
date date
Project/Site Manager

1st review Status* Name (print) 2nd review Status* Name (print)
SHE Function date date
As Required
1st review 2ndreview

AECOM
Technical Advisor date Status* Name (print) date Status* Name (print)

As Required
Status
NB: Use the ‘Prompt List’ below to give a status code, as follows: *Status A – Work can proceed as described
B – Work can proceed when comments are incorporated
C – Re-submit and review before work can proceed

Signed off by COMPANY as current Name: Signature and date:


working document
In
Prompt List Yes No Part N/A
Fully describes the works/individual tasks/the sequence, method and
1 process in place to identify change requirements?

2 Names and titles of key personnel/supervisors responsible?

3 Details resources required eg equipment, plant, men and materials?

4 Programme of works and working hours identified?

5 Interfaces/security of the client/public/other contractors identified?


Specific Risk Assessment / attached and satisfactory?
 Are all the hazards identified?
6  Have all the risks been evaluated? (See item 7)
 Are there arrangements in place for reviewing control measures due to
changing circumstances?

7 High risk or safety critical activities identified/controls specified?


Access/scaffolding requirements (including ancillary arrangements such as
8 anchor points) fully detailed and described?

9 Certificates of competence or qualification of operatives provided?

10 Certificates for plant/equipment inspection/examination provided?

11 COSHH, noise, manual-handling issues dealt with?

12 Personal protective equipment specified?

13 Permit requirements identified?

14 Monitoring (checks and inspections) identified?

15 Any builder’s work in connection identified/adequate notice given?

16 Temporary protection/support identified (eg fire, traffic, services)?

17 Environmental controls/waste disposal identified?

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 28

18 Cranage/lifting equipment - certificates/checklist/lifting plan in place?

19 Emergency arrangements/first aid/special welfare/?

In
Prompt List Yes No Part N/A

20 Details of toolbox talks to be provided?


Details of temporary works schemes identified, including drawings,
21 calculations and checks?
Workplace environment, design, layout and specific limitations identified,
22 have human factors been taken into consideration, ie experience, fatigue,
communication, methods, etc?

AECOM
23 Conformation of briefing of method statement to operatives.

24 Any other (specify)?

Comment/Observation (if appropriate)

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 29

Section 1 - Task Allocation


To be completed by person organising task:
o
Job / Contract N .: Date:
Client: Contact Name:
Location:

Description of work:

AECOM
Are there any client controls e.g. Permits / clearances certificates etc required? Yes / No
Is there a requirement to isolate fixed plant or equipment? Yes / No
Will there be a requirement for Lone Working? Yes / No
LOCATION Will there be a need to enter a confined space? Yes / No
Are there materials / substances used by the client which could be hazardous to the
INFORMATION person carrying out the work Yes / No
Do any consents to discharge trade effluent apply or are any required? Yes / No

If the answer to any of the above is YES, consideration should be given to producing a detailed Method Statement

The need for a Method Statement has been considered and the issue of this TRICS is acceptable for this work Yes / No

Completed By (Name): Signature:


Contact Details
Review Date

Section 2 - Risk Assessment


To be completed by the person undertaking the work/task
Upon arrival at the work location complete this Risk Assessment before starting work. If the responses
mean you cannot complete the job/task safely, discuss your concerns with the person signing above.

Completed By (Name): Signature:

Contact Details

Are barriers and signs needed to separate the work area? Yes / No
EMERGENCY &
Do you know the location emergency procedures / fire exits / muster points / First Aid etc? Yes / No
SECURITY
Do power supplies / fire detection systems need isolating Yes / No

The following PPE is mandatory for COMPANY Employees.


SAFETY Safety Footwear Safety Helmet Gloves Eye Protection
EQUIPMENT
Indicate if it is available for use

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 30

What additional personal protective equipment is needed (tick relevant boxes)?


Dust Masks Hi-Visibility Vests Hearing Protection

Other (state): …………………………………………….

Check labels on materials and substances. If hazardous, has a COSHH Assessment Yes / No / NA
HEALTH
been carried out?
HAZARDS
If yes attached to this TRICS

List any items of plant / tools required:


(Include drills, saws, compactors, breakers etc…)

AECOM
PLANT &
EQUIPMENT
Are you experienced in their use or received the training to use them? Yes / No
Are all the plant / tools suitable for use, tested and inspected? Yes / No
Plant / tools have been visibly inspected by the user prior to use and no defects Yes / No
apparent

Have all underground services been located and clearly marked? Yes / No / NA
EXCAVATION Is there a drawing available for the support work? Yes / No / NA
Are sufficient shoring materials, as identified on the drawing, on site before starting Yes / No / NA
work?

Which is the most appropriate means of access (circle as appropriate)


Access Tower MEWP Scaffolding
Yes / No / NA
If Mobile Elevated Work Platform are you trained and competent to operate?
Yes / No / NA
If scaffold / access tower has this been erected by competent person?
WORK AT Yes / No / NA
Confirm this has been inspected by the user prior to use?
HEIGHT
Yes / No / NA
If non of the above is practical is a ladder the proposed means of access
Type…………
Specify the type of ladder

Indicate the height / no of rungs needed to provide safe access
Rungs……

Are there any heavy or awkward items be moved or stacked? Yes / No / NA


MANUAL
If lifting equipment is required is it available? Yes / No
HANDLING
Is a separate Manual Handling assessment required? Yes / No

Is there space in the work area to stack / store materials safely and allow access? Yes / No
Are all materials segregated from building users and members of the public? Yes / No
SITE TIDINESS
Are there any object / vehicles materials belonging to the client which may be a hazard? Yes / No
WORK AREA
Is the area suitably lit to carry out the task safely? Yes / No
Are the ground / floor conditions suitable for the work to be carried out? Yes / No

Are there facilities for the disposal of spent materials or packaging? Yes / No / NA
Are there any risks to trees or other ecology – contact SHE adviser for advise where
ENVIRONMENT
required Yes / No / NA
Has consideration been given to prevention of nuisance from dust/noise to neighbours Yes / No / NA

QCS 2010
QCS 2010 Section 11 Part 2 SAMAS Page 31

Section 3 – Task Statement


To be completed by the person undertaking the task.
Accurately describe the safe method of working that will be adopted:

(Explain how the work is going to be done, include things such as plant, materials, access to the work area, manual
handling, sequence of work, any limitations, protection to building users, members of public etc.)

AECOM
I confirm that the above statement identifies the hazards and risks associated with the works to be carried out
and the control measures identified are in place.

Completed by Signature: Date:


(Name):

Insert names of all members of the work gang and confirm the work method has been explained.
Name and position: Signature