Subject: Rehabilitation/Reconstruction

3rd draft and justification is provided where required.

Sr # Page # Description Remarks

1 Title Page Correction dcbfin Monwhich was Pointed out Corrected.


but stdhgill not
corrected

2 1 a. Sr # 2: or persons. Envcxxrolled with the a. Deleted


PE’s
Department/Authority. and para and Sr #
3 need deletion b. Changed to Bidding ]:00
b. Sr # 2 last para: \ hours
[] Technical envelope instead of financial
envelope. which need correction. d. Changed to technical
envelope.

3 9 (a) tsdcvhe additional text ivcsfncluded Deleted.


needs deletion

4 11 IB 1xvcx9.1 (b): needs insertion of missing Reswewtored to original


text Clause.
5 17 IB.3cxvcx5: needs deletion of “Federal Restored tfgso original Clause.
Government procurement”

6 18

7 19

8 21

9 22

Page 1 of 2
Comments & Replies

Sr # Page # Description Remarks

10 25 to 32 The application Forms A-1 to A-7 needs These forms are mandatory to
deletion as these are the prequalification be filled in by the Bidders,
forms. otherwise Post-Qualification will
not be possible.
11 42 & page Duplication of Bill No.1fdb which needs Page deleted.
after 82 Review
12 65 a. Appdgfendix-D shall be replaced by a. replaced,
Appendertdfbix-Edb
b. No oyetf days are missing b. 16 months added.
13 PC-1 PES Lahore needs deletion Deleted

14 PC-12 60.11 (b) needs deletion & (c) be changed Changed


to (b)
15 PCfn-13 68.2 (b) PES Lahore needs deletion Deleted.

16 T-S-nvb 3- 3.9.1 & 3.9.2 needs correction Deleted.


79
17 T-Svnbe-3- Items pointed out needs deletion Deleted.
80
18 T-Se-3-81 Items pointed out needs deletion Deleted.

19 T-Sey-3-85 Items pointed out needs deletion Deleted.

20 T-Serhe-5- Items pointed out needs deletion Deleted.


4
21 Tdb-S-6-20 Items pointed out needs deletion Deleted.

22 TdfbS-7-23 Items pointed out needs deletion Deleted.

Page 2 of 2