Yangon - Pathein 48 Core UG Cable Link Project

List Unit Price


Estimate
No Description Unit Material in Service Total Price
Qty
Kyats Kyats
Part 1 ( Material Supply )
1 1.1 Supply 48 Core Cable USA Brand
Corning G.652D, Km
( Direct Bureial Cable)
1.2 Supply 48 Core Closure Pcs
1.3 Supply 48 Core ODF Pcs
1.4 Supply GI steel pipe
(O.D.=Φ50mm),include accessory Km
materials
1.5 Supply HDPE pipe (with silicon, Φ
40/33mm),include accessory materials Km

1.6 Supply PlasticWarning Tape Km


1.7 Supply Concrete Route marker (120mm
Pcs
x 120mm x 1000mm)
Subtotal
Part 2 ( Services )
2 Preparatory works and As-built
documents
2.1 Preliminary survey and feasibility
assessment Km

2.2 Detailed survey and design Km


2.3 ROW documation preparation,
acquisition and community negotiation Lot

2.4 Engineering measurement Km


2.5 Route cleaning Km
2.6 As built documents(3copys) Km
Subtotal
3 Breaking & Reinstatement of Road
Surface (width:0.3m)
3.1 Breaking & Reinstatement Road
Km
Surface
Subtotal
4 Excavation& Backfilling for Trench
(5'x2'x10')
4.1 Excavation for Trench Km
4.2 Backfilling for Trench Km

Subtotal
List Unit Price
Estimate
No Description Unit Material in Service Total Price
Qty
Kyats Kyats
5 Installation of O.F.Cable
5.1 Installation of 48 Core O.F.cable (by
Km
Pulling)
5.2 Installation of HDPE pipe Km
Subtotal
6 O.F. Cable Splicing, Termination &
Test
6.1 O.F.Cable single drum Test (48 fibers) Dru
m
6.2 O.F. Cable splicing & Test (48 fibers) core
6.3 O.F. Cable termination & Test (48
core
fibers)
Subtotal
7 Manholes
7.1 Construction and installation of brick
manholes with cast iron cover(inside: Pcs
LxWxD=1200x600x900mm)
7.2 Construction and installation of brick
Hanholes with cast iron cover(inside: Pcs
LxWxD=1200x600x900mm)
Subtotal
8 Laying warning tape underground
8.1 Installation of warning tape Km
Subtotal
9 Optical Fiber Cable Protection
9.1 Installation of 1×Φ50mm GI pipe for
Km
road crossing by thrust boring
9.2 Installation of Concrete Route Marker
(120mm x 120mm x 1000 mm) Post Per Pcs
200 Meter
Subtotal
10 Optional
10.1 Transportation the O.F cable with Dru
accessories to site (2 km/ drum ) m
Subtotal
Grand Total Price -

( Cost in word )