You are on page 1of 12

VALORIZACION Nº 04 CORRESPONDIENTE AL MES DE NOVIEMBRE DEL 2,012

OBRA: CENTRO COMERCIAL MACHUPICCHU AL MUNDO PRESUPUESTO EXPEDIENTE:


PROPIETARIO ASOCIACION DE ARTESANOS AL MUNDO
CONTRATISTA: GRUPO 44 SAC PRESUPUESTO APROBADO
PLAZO:
LUGAR: AV. SOL Nº 900 CUSCO
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA
Item Descripción
Und. Metrado Precio Unit S/. Parcial METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
001 OBRAS PROVISIONALES
001.001 CONSTRUCCIONES PROVISIONALES
001.001.001 CERCO CON ARPILLERA ALTURA h=3.0 mt m 14.20 29.76 422.59 14.20 422.59 100.00 0.00 0.00 0.00 14.20 422.59 100.00
001.001.002 ALMACEN, OFIC Y CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO m2 50.00 80.00 4,000.00 50.00 4,000.00 100.00 0.00 0.00 0.00 50.00 4,000.00 100.00
001.001.003 CARTEL DE IDENTIFICACION DE OBRA u 1.00 1,193.07 1,193.07 0.00 0.00 0.00 1.00 1,193.07 100.00 1.00 1,193.07 100.00
001.002 INSTALACIONES PROVISIONALES
001.002.001 INSTALACION PROVISIONAL DE AGUA Y DESAGUE glb 1.00 3,600.00 3,600.00 1.00 3,600.00 100.00 0.00 0.00 0.00 1.00 3,600.00 100.00
001.002.002 INSTALACION PROVISIONAL DE ENERGIA ELECTRICA glb 1.00 1,000.00 1,000.00 1.00 1,000.00 100.00 0.00 0.00 0.00 1.00 1,000.00 100.00
001.002.003 INSTALACION PROVISIONAL DE LETRINAS glb 1.00 1,390.00 1,390.00 1.00 1,390.00 100.00 0.00 0.00 0.00 1.00 1,390.00 100.00
002 OBRAS PRELIMINARES
002.001 LIMPIEZA DE TERRENO MANUAL m2 459.00 0.46 211.14 459.00 211.14 100.00 0.00 0.00 0.00 459.00 211.14 100.00
002.002 TRAZO, NIV Y REPLANTEO PRELIMINAR Y DURANTE LA E. DE LA O m2 459.00 2.13 977.67 459.00 977.67 100.00 0.00 0.00 0.00 459.00 977.67 100.00
002.003 TRANSPORTE DE EQUIPO Y MAQUINARIA glb 1.00 2,000.00 2,000.00 1.00 2,000.00 100.00 0.00 0.00 0.00 1.00 2,000.00 100.00
002.004 DEMOLICION DE EDIFICACIONES EXISTENTES m2 660.00 33.16 21,885.60 660.00 21,885.60 100.00 0.00 0.00 0.00 660.00 21,885.60 100.00
002.005 DESMONTAJE DE TECHOS, VENTANAS, PUERTAS Y OTROS m2 120.00 9.39 1,126.80 120.00 1,126.80 100.00 0.00 0.00 0.00 120.00 1,126.80 100.00
002.006 DEMOLICION DE PAVIMENTO DE CONCRETO 6'' m2 400.00 17.39 6,956.00 400.00 6,956.00 100.00 0.00 0.00 0.00 400.00 6,956.00 100.00
002.007 REMOCION DE CIMENTACIONES Y MUROS DE CONTENCION EXISTENTES m3 114.05 48.97 5,585.03 114.05 5,585.03 100.00 0.00 0.00 0.00 114.05 5,585.03 100.00
002.008 ELIMINACION DE MATERIAL EX. DE DEM CON E HASTA 50 km INC. AC m3 354.96 13.92 4,941.04 354.96 4,941.04 100.00 0.00 0.00 0.00 354.96 4,941.04 100.00
003 MOVIMIENTO DE TIERRAS
003.001 EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL m3 1,461.60 6.60 9,646.56 1,461.60 9,646.56 100.00 0.00 0.00 0.00 1,461.60 9,646.56 100.00
003.002 EXCAVACION MANUAL EN CIMIENTOS CORRIDOS m3 71.05 31.31 2,224.58 71.05 2,224.58 100.00 0.00 0.00 0.00 71.05 2,224.58 100.00
003.003 ACARREO INTERNO MASIVO DE MATERIAL DE EXCAVACION m3 71.05 3.03 215.28 71.05 215.28 100.00 0.00 0.00 0.00 71.05 215.28 100.00
003.004 ELIMINACION DE MATERIAL EXC CON EQUIPO HASTA 50 km INC. AC m3 1,915.81 13.92 26,668.08 1,915.81 26,668.08 100.00 0.00 0.00 0.00 1,915.81 26,668.08 100.00
003.005 REFINE Y NIVELACION EN TERRENO NORMAL m2 459.00 2.33 1,069.47 459.00 1,069.47 100.00 0.00 0.00 0.00 459.00 1,069.47 100.00
003.006 COMPACTADO APISONADO A NIVEL DE FUNDACION m2 459.00 3.91 1,794.69 459.00 1,794.69 100.00 0.00 0.00 0.00 459.00 1,794.69 100.00
004 OBRAS DE CONCRETO SIMPLE
004.001 CIMIENTOS Y SOBRECIMIENTOS
004.001.001 SOLADOS CONCRETO 1:12 CEM - HORM. m2 311.50 25.35 7,896.53 311.50 7,896.53 100.00 0.00 0.00 0.00 311.50 7,896.53 100.00
004.001.002 CONCRETO 1:10 +30% P.G. PARA CALZADURAS m3 124.00 195.13 24,196.12 124.00 24,196.12 100.00 0.00 0.00 0.00 124.00 24,196.12 100.00
004.001.003 ENCOFRADO Y DESENCOFRADO PARA CALZADURAS m2 248.00 50.07 12,417.36 248.00 12,417.36 100.00 0.00 0.00 0.00 248.00 12,417.36 100.00
005 OBRAS DE CONCRETO ARMADO
005.001 LOSAS DE CIMENTACION
005.001.001 CONCRETO EN VIGA-LOSA DE CIMENTACION f'c=210 kg/cm2 m3 126.99 391.84 49,759.76 126.99 49,759.76 100.00 0.00 0.00 0.00 126.99 49,759.76 100.00
005.001.002 ENCOFRADO Y DESENCOFRADO PARA V-LOSA DE CIMEN RECTA m2 13.75 43.14 593.18 13.75 593.18 100.00 0.00 0.00 0.00 13.75 593.18 100.00
005.001.003 ACERO ESTRUCTURAL TRABAJADO PARA VIGA-LOSA DE CIMENT kg 9,375.95 5.46 51,192.69 9,375.95 51,192.69 100.00 0.00 0.00 0.00 9,375.95 51,192.69 100.00
005.002 PLACAS
005.002.001 CONCRETO EN PLACAS f'c=210 kg/cm2 m3 71.00 415.81 29,522.51 64.59 26,857.17 90.97 0.00 0.00 0.00 64.59 26,857.17 90.97
005.002.002 ENCOFRADO Y DESENCOFRADO NORMAL EN PLACAS m2 624.33 51.35 32,059.35 593.49 30,475.71 95.06 0.00 0.00 0.00 593.49 30,475.71 95.06
005.002.003 ACERO ESTRUCTURAL TRABAJADO PARA PLACAS kg 4,330.40 5.46 23,643.98 4,189.71 22,875.82 96.75 0.00 0.00 0.00 4,189.71 22,875.82 96.75
VALORIZACION Nº 04 CORRESPONDIENTE AL MES DE NOVIEMBRE DEL 2,012
OBRA: CENTRO COMERCIAL MACHUPICCHU AL MUNDO PRESUPUESTO EXPEDIENTE:
PROPIETARIO ASOCIACION DE ARTESANOS AL MUNDO
CONTRATISTA: GRUPO 44 SAC PRESUPUESTO APROBADO
PLAZO:
LUGAR: AV. SOL Nº 900 CUSCO
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA
Item Descripción
Und. Metrado Precio Unit S/. Parcial METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
005.003 COLUMNAS
005.003.001 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 66.19 415.81 27,522.46 51.88 21,572.22 78.38 12.15 5,052.09 18.36 64.03 26,624.31 96.74
005.003.002 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 721.23 51.35 37,035.16 421.33 21,635.30 58.42 260.90 13,397.22 36.17 682.23 35,032.51 94.59
005.003.003 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 14,969.51 5.46 81,733.52 14,969.51 81,733.52 100.00 0.00 0.00 0.00 14,969.51 81,733.52 100.00
005.004 VIGAS
005.004.001 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 240.52 406.91 97,869.99 140.22 57,056.92 58.30 87.15 35,462.21 36.23 227.37 92,519.13 94.53
005.004.002 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 1,510.67 45.75 69,113.15 906.31 41,463.68 59.99 494.36 22,616.97 32.72 1,400.67 64,080.65 92.72
005.004.003 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 24,997.01 5.46 136,483.67 14,723.01 80,387.63 58.90 8,274.00 45,176.04 33.10 22,997.01 125,563.67 92.00
005.005 LOSAS ALIGERADAS
005.005.001 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 130.05 402.09 52,291.80 78.05 31,383.12 60.02 40.00 16,083.60 30.76 118.05 47,466.72 90.77
005.005.002 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 1,415.50 45.75 64,759.13 849.30 38,855.48 60.00 436.20 19,956.15 30.82 1,285.50 58,811.63 90.82
005.005.003 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg 12,012.20 5.46 65,586.61 7,207.32 39,351.97 60.00 3,604.80 19,682.21 30.01 10,812.12 59,034.18 90.01
005.005.004 BLOQUES DE TECNOPORT h=15 cm PARA LOSA ALIGERADA m 3,538.75 3.33 11,784.04 2,123.25 7,070.42 60.00 1,065.50 3,548.12 30.11 3,188.75 10,618.54 90.11
005.006 ESCALERAS Y LOZAS MACIZAS
005.006.001 CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2 m3 19.07 402.09 7,667.86 11.45 4,603.93 60.04 4.90 1,970.24 25.69 16.35 6,574.17 85.74
005.006.002 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS m2 116.96 45.75 5,350.92 70.17 3,210.28 59.99 29.79 1,362.89 25.47 99.96 4,573.17 85.47
005.006.003 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS MACIZAS kg 3,146.04 5.46 17,177.38 1,887.62 10,306.41 60.00 795.24 4,342.01 25.28 2,682.86 14,648.42 85.28
005.007 CAJA DE ASCENSOR
005.007.001 CONCRETO EN PLACAS f'c=210 kg/cm2 m3 23.80 415.81 9,896.28 14.32 5,954.40 60.17 5.94 2,469.91 24.96 20.26 8,424.31 85.13
005.007.002 ENCOFRADO Y DESENCOFRADO NORMAL EN PLACAS m2 209.44 51.35 10,754.74 125.66 6,452.64 60.00 53.78 2,761.60 25.68 179.44 9,214.24 85.68
005.007.003 ACERO ESTRUCTURAL TRABAJADO PARA PLACAS kg 2,035.29 5.46 11,112.68 2,035.29 11,112.68 100.00 0.00 0.00 0.00 2,035.29 11,112.68 100.00
005.008 PRUEBAS DE CONTROL DE CALIDAD
005.008.001 DISEÑO DE MEZCLAS PARA CONCRETO u 3.00 300.00 900.00 3.00 900.00 100.00 0.00 0.00 0.00 3.00 900.00 100.00
005.008.002 PRUEBA DE CALIDAD DEL CONCRETO (RESIST A LA COMPRESION) u 54.00 33.36 1,801.44 28.90 964.10 53.52 25.10 837.34 46.48 54.00 1,801.44 100.00
006 ESTRUCTURAS METALICAS
006.001 ARMADURA METALICA SEMICIRCULAR PARA POLICARBONATO glb 1.00 18,000.00 18,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
006.002 ARMADURA METALICA PARA TEJA ANDINA glb 1.00 41,500.00 41,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
007 MUROS Y TABIQUES
007.001 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARENA m2 214.20 110.61 23,692.66 214.20 23,692.66 100.00 0.00 0.00 0.00 214.20 23,692.66 100.00
007.002 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 1,600.78 57.37 91,836.75 847.03 48,594.11 52.91 435.50 24,984.64 27.21 1,282.53 73,578.75 80.12
008 REVOQUES ENLUCIDOS Y MOLDURAS
008.001 TARRAJEO PRIMARIO RAYADO CON MEZCLA C:A 1:5 m2 610.00 20.40 12,444.00 122.00 2,488.80 20.00 0.00 0.00 0.00 122.00 2,488.80 20.00
008.002 TARRAJEO EN INTERIORES MEZCLA C:A 1:5 m2 2,715.87 20.40 55,403.75 543.14 11,080.06 20.00 0.00 0.00 0.00 543.14 11,080.06 20.00
008.003 TARRAJEO EN EXTERIORES MEZCLA C:A 1:5 m2 201.28 27.29 5,492.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
008.004 TARRAJEO DE SUPERFICIE DE COL-COLNETAS C:A 1:5 INCLU ARISTAS m2 807.78 27.71 22,383.58 161.56 4,476.83 20.00 80.71 2,236.47 9.99 242.27 6,713.30 29.99
008.005 TARRAJEO DE SUPERFICIE VIGAS C:A 1:5, INCLUYE ARISTAS m2 996.12 27.71 27,602.49 279.22 7,737.19 28.03 99.61 2,760.19 10.00 378.83 10,497.38 38.03
008.006 FORJADO Y REVESTIMIENTO DE GRADAS Y ESCALERAS m2 72.82 32.03 2,332.42 14.60 467.64 20.05 0.00 0.00 0.00 14.60 467.64 20.05
008.007 VESTIDURA DE DERRAMES EN PTAS, VENT Y VANOS MEZCLA C:A 1:5 m 199.96 18.66 3,731.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
009 CIELORRASOS
VALORIZACION Nº 04 CORRESPONDIENTE AL MES DE NOVIEMBRE DEL 2,012
OBRA: CENTRO COMERCIAL MACHUPICCHU AL MUNDO PRESUPUESTO EXPEDIENTE:
PROPIETARIO ASOCIACION DE ARTESANOS AL MUNDO
CONTRATISTA: GRUPO 44 SAC PRESUPUESTO APROBADO
PLAZO:
LUGAR: AV. SOL Nº 900 CUSCO
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA
Item Descripción
Und. Metrado Precio Unit S/. Parcial METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
009.001 CIELORRASOS CON YESO m2 1,569.90 19.29 30,283.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
009.002 CIELORRASOS CON FIBROCEMENTO m2 302.18 76.88 23,231.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
010 PISOS Y PAVIMENTOS
010.001 FALSO PISO
010.001.001 FALSO PISO MEZCLA C:A - 1:6 e=6" (INCLUYE CAMA DE PIEDRA) m2 167.00 41.06 6,857.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
010.002 CONTRAPISO
010.002.001 CONTRAPISO DE 48 mm m2 1,366.68 23.46 32,062.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
010.003 PISOS
010.003.001 PISO DE PORCELANATO ALTO TRANSITO DE 60X60 CM m2 1,930.30 78.33 151,200.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
010.003.002 PISO DE DE CERAMICO DE 30X30 cm EN BAÑOS m2 121.18 40.83 4,947.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
010.003.003 PISO DE VITROBLOCK m2 6.48 757.74 4,910.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
011 ZOCALOS Y CONTRAZOCALOS
011.001 ZOCALOS
011.001.001 ZOCALO DE CERAMICA DE 30 X 30 cm., h=1.20 m m2 452.25 56.61 25,601.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
011.002 CONTRAZOCALOS
011.002.001 CONTRAZOCALO DE LOSETA VENECIANO COLOR OSCURO 10 X 20 cm m 765.00 14.24 10,893.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
012 ENCHAPES
012.001 ENCHAPADO CON LAJAS DE PIEDRA m2 58.00 111.93 6,491.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
013 COBERTURAS
013.001 CUBIERTA DE POLICARBONATO ALVEOLAR E= 6mm.-ACCESORIOS m2 123.86 75.71 9,377.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
013.002 CUBIERTA TEJA ANDINA m2 374.80 74.98 28,102.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
014 CARPINTERIA METALICA
014.001 ESCALERAS METALICAS
014.001.001 ESCALERA METALICA TIPO 1 glb 2.00 6,165.51 12,331.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
014.001.002 ESCALERA METALICA TIPO 2 glb 3.00 6,788.71 20,366.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
014.002 PUERTAS
014.002.001 PUERTA METALICA SEGUN DISEÑO glb 1.00 800.00 800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
014.003 VENTANAS
014.003.001 VENT DE HOJA CORREDIZA CON TUB DE ACR LAC DE 2.0mm DE 2" X 1" m2 64.45 121.36 7,821.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
014.004 BARANDAS
014.004.001 BARANDA METALICA CON PLATINA DE 1/4" X 2" m 240.00 181.94 43,665.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
014.005 DIVISIONES METALICAS
014.005.001 SEPARADOR DE BAÑO CON MELAMINA DE 15 mm. m2 13.00 138.41 1,799.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
015 CARPINTERIA DE MADERA
015.001 PUERTAS
015.001.001 PUERTA CONTRAPLACADA DE 3 mm C/MARCO DE MAD AGUANO INC. I m2 95.38 200.45 19,118.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
016 CERRAJERIA
016.001 CERRADURA PARA PUERTA DE MANIJA DE 2 GOLPES pza 25.00 70.96 1,774.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
016.002 BISAGRA CAPUCHINA ALUMINIZADA DE 4" pza 110.00 17.35 1,908.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION Nº 04 CORRESPONDIENTE AL MES DE NOVIEMBRE DEL 2,012
OBRA: CENTRO COMERCIAL MACHUPICCHU AL MUNDO PRESUPUESTO EXPEDIENTE:
PROPIETARIO ASOCIACION DE ARTESANOS AL MUNDO
CONTRATISTA: GRUPO 44 SAC PRESUPUESTO APROBADO
PLAZO:
LUGAR: AV. SOL Nº 900 CUSCO
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA
Item Descripción
Und. Metrado Precio Unit S/. Parcial METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
017 VIDRIOS, CRISTALES Y SIMILARES
017.001 VIDRIO CRUDO INCOLORO DE 6 mm m2 64.45 72.82 4,693.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
017.002 MAMPARA DE VIDRIO LAMINADO E=8MM , INC. PUERTA glb 73.00 1,975.35 144,200.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
018 PINTURA
018.001 PINTURA EN CIELORASOS 2 MANOS m2 1,510.90 9.92 14,988.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
018.002 PINTURA EN MUROS INTERIORES 2 MANOS m2 2,715.87 9.68 26,289.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
018.003 PINTURA EN MUROS EXTERIORES 2 MANOS m2 837.76 10.51 8,804.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
019 APARATOS Y ACCESORIOS SANITARIOS
019.001 INODORO RAPID JET pza 51.00 237.20 12,097.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
019.002 LAVATORIO SONNET pza 51.00 110.00 5,610.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
019.003 URINARIOS DE LOZA MODELO BAMBI pza 3.00 220.34 661.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
019.004 COLOCACION DE APARATOS SANITARIOS pza 105.00 25.77 2,705.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
019.005 PAPELERA CROMADA DE SOBREPONER pza 45.00 14.37 646.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
020 SEÑALIZACION Y SEGURIDAD
020.001 SEÑALIZACION DE AMBIENTES SEGUN DEFENSA CIVIL glb 1.00 1,073.18 1,073.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
021 SISTEMA DE AGUA FRIA
021.001 SALIDA DE AGUA FRIA
021.001.001 SALIDA DE AGUA FRIA PVC-SAP C-10 DE 1/2" pto 105.00 99.75 10,473.75 30.00 2,992.50 28.57 40.00 3,990.00 38.10 70.00 6,982.50 66.67
021.002 TUBERIA DE ADUCCION Y CONDUCCION A LA EDIFICACION
021.002.001 TUBERIA DE AGUA PVC DE 2" (50 mm) m 20.00 17.13 342.60 9.00 154.17 45.00 5.00 85.65 25.00 14.00 239.82 70.00
021.002.002 TUB DE AGUA PVC DE 11/2" C/R C-10 INST INCLUYE P HIDRAULICA m 20.00 23.04 460.80 4.00 92.16 20.00 10.00 230.40 50.00 14.00 322.56 70.00
021.002.003 TUB DE AGUA PVC DE 1" C/R C-10 INST INCLUYE P HIDRAULICA m 91.00 16.78 1,526.98 18.20 305.40 20.00 52.20 875.92 57.36 70.40 1,181.31 77.36
021.002.004 TUB DE AGUA PVC DE 3/4" C/R C-10 INST INCLUYE P HIDRAULICA m 310.00 13.71 4,250.10 0.00 0.00 0.00 218.00 2,988.78 70.32 218.00 2,988.78 70.32
021.002.005 SUMINISTRO DE ACCESORIOS TUB. DE ADUCCION Y CONDUCCION glb 1.00 1,392.80 1,392.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
021.002.006 COLOCACION DE ACCESORIOS SANITARIOS pza 350.00 22.08 7,728.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
021.003 VALVULAS
021.003.001 VALVULAS DE COMPUERTA DE 1/2" pza 55.00 63.63 3,499.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
021.003.002 VALVULAS DE COMPUERTA DE 3/4" pza 50.00 92.90 4,645.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
022 SISTEMA DE DESAGUE Y VENTILACION
022.001 RED COLECTOR DE DESAGÜE
022.001.001 TUBERIA DE PVC SAL 4" m 226.00 22.37 5,055.62 66.00 1,476.42 29.20 94.00 2,102.78 41.59 160.00 3,579.20 70.80
022.001.002 TUBERIA DE PVC SAL 6" m 54.00 45.92 2,479.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
022.001.003 SUMINISTRO DE ACCESORIOS DE COLECTOR DE DESAGUE glb 1.00 111.60 111.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
022.001.004 COLOCACION DE ACCESORIOS SANITARIOS pza 54.00 22.08 1,192.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
022.001.005 CAJA DE REGISTRO DE DESAGUE 12" X 24" CON TAPA DE Cº pza 25.00 382.26 9,556.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
022.002 SISTEMA DE DESAGUE
022.002.001 SALIDA DE DESAGUE EN PVC SAL DE 2" pto 108.00 75.06 8,106.48 30.00 2,251.80 27.78 40.56 3,044.43 37.56 70.56 5,296.23 65.33
022.002.002 SALIDAS DE DESAGUE EN PVC SAL DE 4" pto 51.00 81.65 4,164.15 30.00 2,449.50 58.82 40.40 3,298.66 79.22 70.40 5,748.16 138.04
022.003 TUBERIA DE DESAGUE
VALORIZACION Nº 04 CORRESPONDIENTE AL MES DE NOVIEMBRE DEL 2,012
OBRA: CENTRO COMERCIAL MACHUPICCHU AL MUNDO PRESUPUESTO EXPEDIENTE:
PROPIETARIO ASOCIACION DE ARTESANOS AL MUNDO
CONTRATISTA: GRUPO 44 SAC PRESUPUESTO APROBADO
PLAZO:
LUGAR: AV. SOL Nº 900 CUSCO
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA
Item Descripción
Und. Metrado Precio Unit S/. Parcial METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
022.003.001 TUBERIA DE PVC SAL 2" m 214.56 18.06 3,874.95 63.00 1,137.78 29.36 87.19 1,574.65 40.64 150.19 2,712.43 70.00
022.003.002 TUBERIA DE PVC SAL 4" m 153.25 22.37 3,428.20 32.23 720.99 21.03 0.00 0.00 0.00 32.23 720.99 21.03
022.004 ACCESORIOS DE DESAGUE
022.004.001 SUMINISTRO DE ACCESORIOS DE DESAGUE glb 1.00 445.90 445.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
022.004.002 COLOCACION DE ACCESORIOS SANITARIOS pza 350.00 22.08 7,728.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
022.005 SISTEMA DE VENTILACION
022.005.001 SALIDAS DE PVC SAL PARA VENTILACION DE 2" pto 51.00 51.31 2,616.81 20.00 1,026.20 39.22 16.00 820.96 31.37 36.00 1,847.16 70.59
022.006 TUBERIAS DE VENTILACION
022.006.001 TUBERIA DE PVC SAL 2" m 150.00 18.06 2,709.00 0.00 0.00 0.00 105.00 1,896.30 70.00 105.00 1,896.30 70.00
022.007 ACCESORIOS DE VENTILACION
022.007.001 SUMINISTRO DE ACCESORIOS DE VENTILACION glb 1.00 164.80 164.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
022.007.002 COLOCACION DE ACCESORIOS SANITARIOS pza 150.00 32.97 4,945.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
023 SISTEMA DE EVACUACION PLUVIAL
023.001 COLECTOR DE AGUAS PLUVIALES
023.001.001 TUBERIA DE PVC SAL 6" m 54.00 45.92 2,479.68 10.00 459.20 18.52 0.00 0.00 0.00 10.00 459.20 18.52
023.001.002 SUMINISTRO DE ACCESORIOS COLECTOR PLUVIAL glb 1.00 57.90 57.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
023.001.003 COLOCACION DE ACCESORIOS SANITARIOS pza 25.00 32.97 824.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
023.001.004 CAJA DE REGISTRO DE DESAGUE 12" X 24" CON TAPA DE Cº pza 5.00 382.26 1,911.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
023.002 TUBERIA DE AGUAS PLUVIALES
023.002.001 TUBERIA DE PVC SAL 2" m 1.10 18.06 19.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
023.002.002 TUBERIA DE PVC SAL 3" m 154.30 20.57 3,173.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
023.002.003 TUBERIA DE PVC SAL 4" m 30.00 22.37 671.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
023.003 ACCESORIOS DE AGUAS PLUVIALES
023.003.001 SUMINISTRO DE ACCESORIOS AGUAS PLUVIALES glb 1.00 62.40 62.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
023.003.002 COLOCACION DE ACCESORIOS SANITARIOS pza 20.00 32.97 659.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
023.003.003 SUMIDEROS DE 3" pto 10.00 47.80 478.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
024 SISTEMA CONTRA INCENDIOS
024.001 SUMINISTRO E INSTALACION DE EXTINGUIDORES u 90.00 377.11 33,939.90 0.00 0.00 0.00 45.00 16,969.95 50.00 45.00 16,969.95 50.00
024.002 TUB F GVDO PESADO C-40 2" INCLUYE ELEMENTOS DE UNION + 2% DES m 90.00 21.31 1,917.90 20.00 426.20 22.22 0.00 0.00 0.00 20.00 426.20 22.22
024.003 SUMINISTRO E INST DE GABINETE C INCENDIO CON 20 m DE MANGUERA u 4.00 1,500.00 6,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
025 TANQUE CISTERNA
025.001 TRAZO NIVELES Y REPLANTEO DURANTE LA EJECUCION m2 39.78 1.51 60.07 39.78 60.07 100.00 0.00 0.00 0.00 39.78 60.07 100.00
025.002 EXCAVACION MASIVA PARA TANQUE CISTERNA m3 127.30 9.31 1,185.16 127.30 1,185.16 100.00 0.00 0.00 0.00 127.30 1,185.16 100.00
025.003 SOLADO DE CONCRETO f'c=100 kg/cm2 h=2" m2 39.78 25.35 1,008.42 39.78 1,008.42 100.00 0.00 0.00 0.00 39.78 1,008.42 100.00
025.004 ENCOFRADO Y DESENCOFRADO NORMAL m2 156.24 36.79 5,748.07 156.24 5,748.07 100.00 0.00 0.00 0.00 156.24 5,748.07 100.00
025.005 ACERO DE REFUERZO f'y=4200 kg/cm2 kg 2,345.37 5.00 11,726.85 2,345.37 11,726.85 100.00 0.00 0.00 0.00 2,345.37 11,726.85 100.00
025.006 CONCRETO f'c=210 kg/cm2 EN TANQUE CISTERNA m3 29.71 384.30 11,417.55 29.71 11,417.55 100.00 0.00 0.00 0.00 29.71 11,417.55 100.00
025.007 CONFORMACION DE PENDIENTE DE FONDO m2 23.68 17.11 405.16 23.68 405.16 100.00 0.00 0.00 0.00 23.68 405.16 100.00
025.008 ESCALINES DE FºGº 3/4 m 5.14 127.73 656.53 5.14 656.53 100.00 0.00 0.00 0.00 5.14 656.53 100.00
VALORIZACION Nº 04 CORRESPONDIENTE AL MES DE NOVIEMBRE DEL 2,012
OBRA: CENTRO COMERCIAL MACHUPICCHU AL MUNDO PRESUPUESTO EXPEDIENTE:
PROPIETARIO ASOCIACION DE ARTESANOS AL MUNDO
CONTRATISTA: GRUPO 44 SAC PRESUPUESTO APROBADO
PLAZO:
LUGAR: AV. SOL Nº 900 CUSCO
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA
Item Descripción
Und. Metrado Precio Unit S/. Parcial METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
025.009 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 79.36 31.87 2,529.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
025.010 TARRAJEO EN EXTERIORES m2 42.10 27.29 1,148.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
025.011 TAPA METALICA DE 0.60 X 0.60 m u 2.00 180.41 360.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
025.012 SUMINISTRO DE ACCESORIOS TANQUE CISTERNA glb 1.00 1,240.26 1,240.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
025.013 COLOCACION DE ACCESORIOS SANITARIOS pza 29.00 32.97 956.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
025.014 ACARREO DE MATERIAL EXCEDENTE m3 127.30 3.03 385.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
025.015 PRUEBA HIDRAULICA Y DESINFECCION TANQUE CISTERNA glb 1.00 186.29 186.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
026 EQUIPOS
026.001 ELECTROBOMBA EQUIPO COMPLETO INC. INSTALACION glb 4.00 2,383.68 9,534.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
026.002 TANQUE HIDRONEUMATICO EQUIPO COMPLETO INC. INSTALACION glb 2.00 2,116.75 4,233.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
027 OTROS
027.001 ABRAZADERA PARA TUBERIAS u 150.00 22.59 3,388.50 0.00 0.00 0.00 30.00 677.70 20.00 30.00 677.70 20.00
028 CANALETA DE CONCRETO
028.001 TRAZO NIVELES Y REPLANTEO DURANTE LA EJECUCION m2 15.62 1.51 23.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
028.002 EXCAVACION MANUAL PARA CANALETA m3 3.05 35.26 107.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
028.003 REFINE Y PERFILADO DE ZANJA m2 12.20 3.72 45.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
028.004 EMPEDRADO CON P.M (e=0.10 m) m2 3.66 23.34 85.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
028.005 ENCOFRADO Y DESENCOFRADO NORMAL m2 26.03 36.79 957.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
028.006 CONCRETO EN CANAL f'c=175 kg/cm2 m3 2.08 308.09 640.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
028.007 REJILLA SUMIDERO PLATINA 1 1/4"X1/4" @ 1/2" Y MARCO "L" 1 1/4" m2 2.44 201.41 491.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
028.008 ACARREO DE MATERIAL EXCEDENTE m3 3.81 3.03 11.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
029 PRUEBAS DE CONTROL DE CALIDAD
029.001 PRUEBA COMPACT SUELOS (PROCTOR MODIFICADO D. DE CAMPO) u 2.00 204.79 409.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
029.002 PRUEBA DENSIDAD DE CAMPO u 4.00 34.20 136.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
029.003 PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC m 186.09 1.22 227.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
029.004 PRUEBA DE CALIDAD DEL CONCRETO (RESISTENCIA A LA COMPRESION) u 4.00 33.36 133.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
030 ASCENSOR - CAP 8 PERSONAS. glb 1.00 154,647.94 154,647.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
031 INSTALACIONES ELECTRICAS 0.00
031.001 INSTALACIONES ELECTRICAS glb 1.00 316,369.32 316,369.32 0.20 63,273.86 20.00 0.50 158,184.66 50.00 0.70 221,458.52 70.00
031.002 SUB ESTACION ELECTRICA glb 1.00 100,226.25 100,226.25 0.10 10,022.63 10.00 0.00 0.00 0.00 0.10 10,022.63 10.00
COSTO DIRECTO 2,780,545.63 1,003,527.47 36.09 422,633.80 15.20 1,426,161.27 51.29
Gastos Generales 10% 278054.56 100352.75 36.09 42263.38 15.20 142616.13 51.29
Uilidad 5.00% 139027.28 50176.37 21131.69 71308.06
Sub total 3,197,627.47 1,154,056.58 486,028.87 1,640,085.46
IGV 18 % 575572.95 207730.19 87485.20 295215.3826
TOTALVALORIZACION Nº 03 3,773,200.42 1,361,786.77 36.09 573,514.07 15.20 1,935,300.84 51.29
SALDO
METRADO PARCIAL %

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00

6.41 2,665.34 9.03


30.84 1,583.63 4.94
140.69 768.17 3.25
SALDO
METRADO PARCIAL %

2.16 898.15 3.26


39.00 2,002.65 5.41
0.00 0.00 0.00

13.15 5,350.87 5.47


110.00 5,032.50 7.28
2,000.00 10,920.00 8.00

12.00 4,825.08 9.23


130.00 5,947.50 9.18
1,200.08 6,552.44 9.99
350.00 1,165.50 9.89

2.72 1,093.68 14.26


17.00 777.75 14.53
463.18 2,528.96 14.72

3.54 1,471.97 14.87


30.00 1,540.50 14.32
0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00

1.00 18,000.00 100.00


1.00 41,500.00 100.00

0.00 0.00 0.00


318.25 18,258.00 19.88

488.00 9,955.20 80.00


2,172.73 44,323.69 80.00
201.28 5,492.93 100.00
565.51 15,670.28 70.01
617.29 17,105.11 61.97
58.22 1,864.79 79.95
199.96 3,731.25 100.00
SALDO
METRADO PARCIAL %
1,569.90 30,283.37 100.00
302.18 23,231.60 100.00

167.00 6,857.02 100.00

1,366.68 32,062.31 100.00

1,930.30 151,200.40 100.00


121.18 4,947.78 100.00
6.48 4,910.16 100.00

452.25 25,601.87 100.00

765.00 10,893.60 100.00

58.00 6,491.94 100.00

123.86 9,377.44 100.00


374.80 28,102.50 100.00

2.00 12,331.02 100.00


3.00 20,366.13 100.00

1.00 800.00 100.00

64.45 7,821.65 100.00

240.00 43,665.60 100.00

13.00 1,799.33 100.00

95.38 19,118.92 100.00

25.00 1,774.00 100.00


110.00 1,908.50 100.00
SALDO
METRADO PARCIAL %

64.45 4,693.25 100.00


73.00 144,200.55 100.00

1,510.90 14,988.13 100.00


2,715.87 26,289.62 100.00
837.76 8,804.86 100.00

51.00 12,097.20 100.00


51.00 5,610.00 100.00
3.00 661.02 100.00
105.00 2,705.85 100.00
45.00 646.65 100.00

1.00 1,073.18 100.00

35.00 3,491.25 33.33

6.00 102.78 30.00


6.00 138.24 30.00
20.60 345.67 22.64
92.00 1,261.32 29.68
1.00 1,392.80 100.00
350.00 7,728.00 100.00

55.00 3,499.65 100.00


50.00 4,645.00 100.00

66.00 1,476.42 29.20


54.00 2,479.68 100.00
1.00 111.60 100.00
54.00 1,192.32 100.00
25.00 9,556.50 100.00

37.44 2,810.25 34.67


-19.40 -1,584.01 -38.04
SALDO
METRADO PARCIAL %
64.37 1,162.52 30.00
121.02 2,707.22 78.97

1.00 445.90 100.00


350.00 7,728.00 100.00

15.00 769.65 29.41

45.00 812.70 30.00

1.00 164.80 100.00


150.00 4,945.50 100.00

44.00 2,020.48 81.48


1.00 57.90 100.00
25.00 824.25 100.00
5.00 1,911.30 100.00

1.10 19.87 100.00


154.30 3,173.95 100.00
30.00 671.10 100.00

1.00 62.40 100.00


20.00 659.40 100.00
10.00 478.00 100.00

45.00 16,969.95 50.00


70.00 1,491.70 77.78
4.00 6,000.00 100.00

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
SALDO
METRADO PARCIAL %
79.36 2,529.20 100.00
42.10 1,148.91 100.00
2.00 360.82 100.00
1.00 1,240.26 100.00
29.00 956.13 100.00
127.30 385.72 100.00
1.00 186.29 100.00

4.00 9,534.72 100.00


2.00 4,233.50 100.00

120.00 2,710.80 80.00

15.62 23.59 100.00


3.05 107.54 100.00
12.20 45.38 100.00
3.66 85.42 100.00
26.03 957.64 100.00
2.08 640.83 100.00
2.44 491.44 100.00
3.81 11.54 100.00

2.00 409.58 100.00


4.00 136.80 100.00
186.09 227.03 100.00
4.00 133.44 100.00
1.00 154,647.94 100.00

0.30 94,910.80 30.00


0.90 90,203.63 90.00
1,354,384.40 48.71
135438.44036 48.71
67719.22018
1,557,542.06
280357.571545
1,837,899.64 48.71

You might also like