VALORIZACION DE OBRA N° 01 (REAJUSTADA)

OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 01 - ARQUITECTURA

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.

06.00 COBERTURAS
06.01 TIJERAL T-1 L=9.00 m MODULOS TIPO u 2.00 1,203.75 2,407.50 0.00 0.00 0.00 0.00
06.02 CORREAS DE MADERA DE 3"x4" m 207.00 11.75 2,432.25 0.00 0.00 0.00 0.00
06.03 FRISOS DE MADERA DE 1"x12" FRONTIS POSTERIOR m 36.90 14.69 542.06 0.00 0.00 0.00 0.00
06.04 FRISOS DE MADERA DE 1"x14" LATERAL IZQUIERDO Y DERECHO m 19.00 12.36 234.84 0.00 0.00 0.00 0.00
06.05 COBERTURA DE TEJA ANDINA m2 186.88 47.30 8,839.42 0.00 0.00 0.00 0.00
06.06 CUMBRERA DE TEJA ANDINA m 18.25 30.49 556.44 0.00 0.00 0.00 0.00
07.00 MUROS Y TABIQUES DE ALBAÑILERIA
07.01 MUROS DE CABEZA LADRILLO KK 18 HUECOS C:A 1:5 m2 67.29 111.43 7,498.12 0.00 0.00 67.29 7,498.12
07.02 MUROS DE SOGA LADRILLO KK 18 HUECOS C:A 1:5 m2 34.92 67.06 2,341.74 0.00 0.00 34.92 2,341.74
07.03 ACERO CORRUGADO fy=4200 kg/cm2 ALBAÑILERIA kg 17.60 5.14 90.46 0.00 0.00 17.60 90.46
08.00 REVOQUES Y ENLUCIDOS
08.01 TARRAJEO EN INTERIORES Y EXTERIORES C:A 1:4 m2 204.42 19.17 3,918.73 0.00 0.00 0.00 0.00
08.02 TARRAJEO EN SUPERFICIE DE VIGAS C:A 1:4 m2 69.32 28.21 1,955.52 0.00 0.00 0.00 0.00
08.03 TARRAJEO DE SUPERFICIE DE COLUMNAS C:A 1:4 m2 35.47 23.63 838.16 0.00 0.00 0.00 0.00
08.04 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 86.88 10.15 881.83 0.00 0.00 0.00 0.00
08.05 BRUÑAS DE 1.00 CM. m 59.54 4.82 286.98 0.00 0.00 0.00 0.00
08.06 JUNTAS DE DILATACION EN MUROS CON TECKNOPORT m 16.20 7.30 118.26 0.00 0.00 16.20 118.26
09.00 CIELORRASOS
09.01 CIELO RASO CON PLANCHAS DE TRIPLAY DE 1.2x2.4 M, E = 6 mm Y ALEROS m2 158.88 57.42 9,122.89 0.00 0.00 0.00 0.00
10.00 PISOS Y PAVIMENTOS
10.01 FALSO PISO DE 4" DE CONCRETO 1:10 m2 102.30 29.76 3,044.45 0.00 0.00 0.00 0.00
10.02 PISO DE MADERA TRATADA TORNILLO MACHIHEMBRADO m2 102.30 123.22 12,605.41 0.00 0.00 0.00 0.00
10.03 VEREDA DE 4" DE CONCRETO f'c= 175 kg/cm2 + PULIDO 1:2 x 1cm. BRUÑADO m2 63.15 66.06 4,171.69 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 01 - ARQUITECTURA

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.
10.04 ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDAS m2 63.15 36.69 2,316.97 0.00 0.00 0.00 0.00
10.05 JUNTAS ASFALTICAS m 11.40 2.21 25.19 0.00 0.00 0.00 0.00
11.00 ZOCALOS Y CONTRAZOCALOS
11.01 CONTRAZOCALO DE CEMENTO PULIDO H=20 cm Y BRUÑADO m 47.50 7.03 333.93 0.00 0.00 0.00 0.00
11.02 CONTRAZOCALO DE MADERA TRATADA H=10 cm. m 59.30 38.77 2,299.06 0.00 0.00 0.00 0.00
12.00 CARPINTERIA DE MADERA
12.01 PUERTA APANELADAS INCLUIDO INSTALACIONES Y ACCCESORIOS u 2.00 857.55 1,715.10 0.00 0.00 0.00 0.00
12.02 VENTANA DE MADERA INCLUIDO INSTALACIONES Y ACCESORIOS u 8.00 499.31 3,994.48 0.00 0.00 0.00 0.00
13.00 VIDRIOS, CRISTALES Y SIMILARES
13.01 VIDRIOS SEMIDOBLES p2 437.23 7.54 3,296.71 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 01 - ARQUITECTURA

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.
14.00 PINTURA
14.01 PINTURA LATEX DOS MANOS EN CIELO RASO, FRISOS Y DERRAMES m2 245.76 7.19 1,767.01 0.00 0.00 0.00 0.00
14.02 PINTURA LATEX DOS MANOS EN MUROS INTERIORES Y EXTERIORES m2 309.21 3.88 1,199.73 0.00 0.00 0.00 0.00
14.03 PINTURA ESMALTE EN CONTRAZOCALOS H=20 cm. m 106.80 7.52 803.14 0.00 0.00 0.00 0.00
15.00 PIZARRAS
15.01 PIZARRA ACRILICA DE 5.00 x 1.20 m. u 2.00 603.98 1,207.96 0.00 0.00 0.00 0.00
16.00 OTROS
16.01 CANALETA METALICA FLUVIAL PERFIL EN U ML 36.50 18.81 686.63 0.00 0.00 0.00 0.00
16.02 CAJA DE REGISTRO DE 40 X40 PZA 1.00 76.47 76.47 0.00 0.00 0.00 0.00
16.03 SUMIDERO DE BRONCE 3" PZA 4.00 20.31 81.24 0.00 0.00 0.00 0.00
16.04 REJILLA ANTIROEDORES DE 3" PZA 4.00 15.21 60.84 0.00 0.00 0.00 0.00
16.05 TUBERIA DE BAJADA Y DISTRIBUCION DE PVC SAL 3" M 19.20 12.27 235.58 0.00 0.00 0.00 0.00
16.07 SALIDA PLUVIAL DE 3" PTO 4.00 19.29 77.16 0.00 0.00 0.00 0.00

COSTO DIRECTO 82,063.97 0.00 10,048.58


GASTOS GENERALES 11.6813% 9,586.14 0.00 1,173.81
UTILIDAD 8.00% 6,565.12 0.00 803.89
SUB-TOTAL 98,215.23 0.00 12,026.28
IGV 19.00% 18,660.89 0.00 2,284.99
TOTAL VALORIZADO S/. 116,876.12 0.00% 0.00 12.24% 14,311.28
OBRA N° 01 (REAJUSTADA)
OLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.

0.00 0.00 2.00 2,407.50 0.00%


0.00 0.00 207.00 2,432.25 0.00%
0.00 0.00 36.90 542.06 0.00%
0.00 0.00 19.00 234.84 0.00%
0.00 0.00 186.88 8,839.42 0.00%
0.00 0.00 18.25 556.44 0.00%

67.29 7,498.12 0.00 0.00 100.00%


34.92 2,341.74 0.00 0.00 100.00%
17.60 90.46 0.00 0.00 100.00%

0.00 0.00 204.42 3,918.73 0.00%


0.00 0.00 69.32 1,955.52 0.00%
0.00 0.00 35.47 838.16 0.00%
0.00 0.00 86.88 881.83 0.00%
0.00 0.00 59.54 286.98 0.00%
16.20 118.26 0.00 0.00 100.00%

0.00 0.00 158.88 9,122.89 0.00%

0.00 0.00 102.30 3,044.45 0.00%


0.00 0.00 102.30 12,605.41 0.00%
0.00 0.00 63.15 4,171.69 0.00%
OBRA N° 01 (REAJUSTADA)
OLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.
0.00 0.00 63.15 2,316.97 0.00%
0.00 0.00 11.40 25.19 0.00%

0.00 0.00 47.50 333.93 0.00%


0.00 0.00 59.30 2,299.06 0.00%

0.00 0.00 2.00 1,715.10 0.00%


0.00 0.00 8.00 3,994.48 0.00%

0.00 0.00 437.23 3,296.71 0.00%


OBRA N° 01 (REAJUSTADA)
OLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.

0.00 0.00 245.76 1,767.01 0.00%


0.00 0.00 309.21 1,199.73 0.00%
0.00 0.00 106.80 803.14 0.00%

0.00 0.00 2.00 1,207.96 0.00%

0.00 0.00 36.50 686.63 0.00%


0.00 0.00 1.00 76.47 0.00%
0.00 0.00 4.00 81.24 0.00%
0.00 0.00 4.00 60.84 0.00%
0.00 0.00 19.20 235.58 0.00%
0.00 0.00 4.00 77.16 0.00%

10,048.58 72,015.38
1,173.81 8,412.33
803.89 5,761.23
12,026.28 86,188.94
2,284.99 16,375.90
12.24% 14,311.28 87.76% 102,564.84
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEP
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 02 - ESTRUCTURAS

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.
01.01 TRABAJOS PROVISIONALES
01.01 CAMPAMENTO PROVISIONAL DE LA OBRA m2 36.00 28.89 1,040.04 0.00 0.00 36.00 1,040.04
01.02 CARTEL DE OBRA glb 1.00 645.74 645.74 0.00 0.00 1.00 645.74
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 2.00 1,412.79 2,825.58 0.00 0.00 2.00 2,825.58
02.00 TRABAJOS PRELIMINARES
02.01 DESMONTAJE DE TECHO m2 142.50 3.64 518.70 0.00 0.00 142.50 518.70
02.02 RETIRO DE PUERTAS Y VENTANAS EN INTERIORES Y EXTERIORES u 9.00 5.58 50.22 0.00 0.00 9.00 50.22
02.03 DEMOLICION DE CONSTRUCCION EXISTENTE m3 186.33 6.96 1,296.86 0.00 0.00 186.33 1,296.86
02.04 ELIMINACION DE MATERIAL DE DEMOLICION m3 186.33 6.51 1,213.01 0.00 0.00 186.33 1,213.01
02.05 LIMPIEZA DE TERRENO m2 175.28 1.40 245.39 0.00 0.00 175.28 245.39
02.06 TRAZO Y REPLANTEO m2 175.28 4.56 799.28 0.00 0.00 175.28 799.28
03.00 MOVIMIENTO DE TIERRAS
03.01 CORTE SUPERFICIAL MANUAL HASTA 0.50 M m3 122.69 55.72 6,836.29 0.00 0.00 122.69 6,836.29
03.02 EXCAVACION MANUAL DE ZANJAS m3 41.74 27.86 1,162.88 0.00 0.00 41.74 1,162.88
03.03 RELLENO CON MATERIAL PROPIO m3 7.14 16.72 119.38 0.00 0.00 7.14 119.38
03.04 ELIMINACION DE MATERIAL EXCEDENTE m3 111.26 27.86 3,099.70 0.00 0.00 111.26 3,099.70
03.05 NIVELACION INTERIOR APISONADO MANUAL m2 153.45 0.84 128.90 0.00 0.00 0.00 0.00
03.06 AFIRMADO INTERIOR DE 4" PARA INTERIORES Y VEREDAS m2 165.45 16.35 2,705.11 0.00 0.00 0.00 0.00
04.00 CONCRETO SIMPLE
04.01 SOLADO e = 3" CON C:H 1:12 m2 29.50 34.13 1,006.84 0.00 0.00 29.50 1,006.84
04.02 CIMIENTOS CORRIDOS MEZCLA 1:10 + 30% PIEDRA m3 17.04 236.16 4,024.17 0.00 0.00 17.04 4,024.17
04.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 36.06 32.27 1,163.66 0.00 0.00 36.06 1,163.66
04.04 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS m3 3.35 328.05 1,098.97 0.00 0.00 3.35 1,098.97
05.00 CONCRETO ARMADO
05.01 ZAPATAS
05.01.01 CONCRETO f'c= 210 kg/cm2 EN ZAPATAS m3 5.82 349.01 2,031.24 0.00 0.00 5.82 2,031.24
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEP
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 02 - ESTRUCTURAS

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.
05.01.02 ACERO CORRUGADO fy=4200 kg/cm2 ZAPATAS kg 146.06 4.83 705.47 0.00 0.00 146.06 705.47
05.02 COLUMNAS
05.02.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 6.39 401.75 2,567.18 0.00 0.00 6.39 2,567.18
05.02.02 CONCRETO f'c=140 kg/cm2 PARA COLUMNAS m3 0.67 399.04 267.36 0.00 0.00 0.67 267.36
05.02.03 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 90.01 44.86 4,037.85 0.00 0.00 90.01 4,037.85
05.02.04 ACERO CORRUGADO fy=4200 kg/cm2 COLUMNAS kg 657.05 4.99 3,278.68 0.00 0.00 657.05 3,278.68
05.03 VIGAS
05.03.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 7.09 417.51 2,960.14 0.00 0.00 7.00 2,922.56
05.03.02 CONCRETO f'c=175 kg/cm2 PARA VIGAS m3 0.33 426.18 140.64 0.00 0.00 0.30 127.85
05.03.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 55.44 39.06 2,165.49 0.00 0.00 50.00 1,953.00
05.03.04 ACERO CORRUGADO fy=4200 kg/cm2 VIGAS kg 838.93 5.21 4,370.83 0.00 0.00 835.00 4,350.35

COSTO DIRECTO 52,505.55 0.00 49,388.23


GASTOS GENERALES 11.6813% 6,133.33 0.00 5,769.19
UTILIDAD 8.00% 4,200.44 0.00 3,951.06
SUB-TOTAL 62,839.32 0.00 59,108.48
IGV 19.00% 11,939.47 0.00 11,230.61
TOTAL VALORIZADO S/. 74,778.80 0.00% 0.00 94.06% 70,339.09
OBRA N° 01 (REAJUSTADA)
E SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.

36.00 1,040.04 0.00 0.00 100.00%


1.00 645.74 0.00 0.00 100.00%
2.00 2,825.58 0.00 0.00 100.00%

142.50 518.70 0.00 0.00 100.00%


9.00 50.22 0.00 0.00 100.00%
186.33 1,296.86 0.00 0.00 100.00%
186.33 1,213.01 0.00 0.00 100.00%
175.28 245.39 0.00 0.00 100.00%
175.28 799.28 0.00 0.00 100.00%

122.69 6,836.29 0.00 0.00 100.00%


41.74 1,162.88 0.00 0.00 100.00%
7.14 119.38 0.00 0.00 100.00%
111.26 3,099.70 0.00 0.00 100.00%
0.00 0.00 153.45 128.90 0.00%
0.00 0.00 165.45 2,705.11 0.00%

29.50 1,006.84 0.00 0.00 100.00%


17.04 4,024.17 0.00 0.00 100.00%
36.06 1,163.66 0.00 0.00 100.00%
3.35 1,098.97 0.00 0.00 100.00%

5.82 2,031.24 0.00 0.00 100.00%


OBRA N° 01 (REAJUSTADA)
E SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.
146.06 705.47 0.00 0.00 100.00%

6.39 2,567.18 0.00 0.00 100.00%


0.67 267.36 0.00 0.00 100.00%
90.01 4,037.85 0.00 0.00 100.00%
657.05 3,278.68 0.00 0.00 100.00%

7.00 2,922.56 0.09 37.58 98.73%


0.30 127.85 0.03 12.79 90.91%
50.00 1,953.00 5.44 212.49 90.19%
835.00 4,350.35 3.93 20.48 99.53%

49,388.23 3,117.33
5,769.19 364.14
3,951.06 249.39
59,108.48 3,730.86
11,230.61 708.86
94.06% 70,339.09 5.94% 4,439.72
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPART
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 03 - INSTALACIONES ELECTRICAS

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.

17.00 TUBERIAS Y ACCESORIOS


17.01 SALIDA PARA CENTROS DE LUZ CON INTERRUPTOR pto 12.00 56.66 679.92 0.00 0.00 0.00 0.00
17.02 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC pto 4.00 71.51 286.04 0.00 0.00 2.00 143.02
18.00 TABLERO DE DISTRIBUCION Y ACCESORIOS
18.01 TABLERO DE DISTRIBUCION ELECTRICO GALVANIZADO PARA 4 DISTRIBUCIONES u 1.00 176.44 176.44 0.00 0.00 0.00 0.00
18.02 INTERRUPTOR THERMOMAGNETICO 2 X 20 AMPERIOS u 2.00 57.19 114.38 0.00 0.00 0.00 0.00
18.03 INTERRUPTOR THERMOMAGNETICO 2 X 15 AMPERIOS u 1.00 40.87 40.87 0.00 0.00 0.00 0.00
18.04 CAJA DE PASE u 1.00 45.16 45.16 0.00 0.00 1.00 45.16
19.00 CONDUCTORES Y/O CABLES
19.01 CABLE ELECTRICO TW 2x6 mm2 ALIMENTADOR m 40.00 6.07 242.80 0.00 0.00 0.00 0.00
19.02 CABLE ELECTRICO TW 2x4 mm2 m 68.92 3.78 260.52 0.00 0.00 0.00 0.00
19.03 CABLE ELECTRICO TW 2x2.5 mm2 m 158.75 1.51 239.71 0.00 0.00 0.00 0.00
20.00 ARTEFACTOS
20.01 ARTEFACTO PARA FLUORESCENTE 2 X 40 W + LAMPARA u 8.00 149.03 1,192.24 0.00 0.00 0.00 0.00
20.02 ARTEFACTO PARA FLUORESCENTE 2 X 20 W + LAMPARA u 4.00 121.30 485.20 0.00 0.00 0.00 0.00
21.00 POZO CONEXION A TIERRA
21.00 POZO CONEXION A TIERRA u 1.00 516.25 516.25 0.00 0.00 1.00 516.25
COSTO DIRECTO 4,279.53 0.00 704.43
GASTOS GENERALES 11.6813% 499.90 0.00 82.29
UTILIDAD 8.00% 342.36 0.00 56.35
SUB-TOTAL 5,121.79 0.00 843.07
IGV 19.00% 973.14 0.00 160.18
TOTAL VALORIZADO S/. 6,094.93 0.00% 0.00 16.46% 1,003.25
BRA N° 01 (REAJUSTADA)
AD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.

0.00 0.00 12.00 679.92 0.00%


2.00 143.02 2.00 143.02 50.00%

0.00 0.00 1.00 176.44 0.00%


0.00 0.00 2.00 114.38 0.00%
0.00 0.00 1.00 40.87 0.00%
1.00 45.16 0.00 0.00 100.00%

0.00 0.00 40.00 242.80 0.00%


0.00 0.00 68.92 260.52 0.00%
0.00 0.00 158.75 239.71 0.00%

0.00 0.00 8.00 1,192.24 0.00%


0.00 0.00 4.00 485.20 0.00%

1.00 516.25 0.00 0.00 100.00%


704.43 3,575.10
82.29 417.62
56.35 286.01
843.07 4,278.73
160.18 812.96
16.46% 1,003.25 83.54% 5,091.69
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPAR
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 04 - SERVICIOS HIGIENICOS

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.
1.00 TRABAJOS PRELIMINARES
1.01 DESMONTAJE DE TECHO m2 18.00 3.64 65.52 0.00 0.00 18.00 65.52
1.02 RETIRO DE PUERTAS Y VENTANAS EN INTERIORES Y EXTERIORES u 4.00 5.58 22.32 0.00 0.00 4.00 22.32
1.03 DEMOLICION DE CONSTRUCCION EXISTENTE m3 31.23 6.96 217.36 0.00 0.00 31.23 217.36
1.04 ELIMINACION DE MATERIAL DE DEMOLICION m3 31.23 6.51 203.31 0.00 0.00 31.23 203.31
1.05 LIMPIEZA DE TERRENO m2 20.34 1.40 28.48 0.00 0.00 20.34 28.48
1.06 TRAZO Y REPLANTEO m2 20.34 4.56 92.75 0.00 0.00 20.34 92.75
2.00 MOVIMIENTO DE TIERRAS
2.01 CORTE SUPERFICIAL MANUAL HASTA 0.50 M m3 14.24 55.72 793.45 0.00 0.00 10.00 557.20
2.02 EXCAVACION MANUAL DE ZANJA PARA CIMIENTO m3 4.65 27.86 129.55 0.00 0.00 3.00 83.58
2.03 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO m3 18.89 27.86 526.28 0.00 0.00 18.00 501.48
2.04 NIVELACION INTERIOR APISONADO MANUAL m2 20.34 0.84 17.09 0.00 0.00 0.00 0.00
2.05 AFIRMADO INTERIOR DE 4" PARA INTERIORES Y VEREDAS m2 20.34 16.35 332.56 0.00 0.00 0.00 0.00
3.00 CONCRETO SIMPLE
3.01 CIMIENTOS CORRIDOS MEZCLA 1:10 + 30% PIEDRA m3 3.32 236.16 784.05 0.00 0.00 0.00 0.00
3.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 13.58 32.27 438.23 0.00 0.00 0.00 0.00
3.03 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS m3 1.41 328.05 462.55 0.00 0.00 0.00 0.00
4.00 CONCRETO ARMADO
4.01 COLUMNAS
4.01.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 2.89 401.74 1,161.03 0.00 0.00 0.00 0.00
4.01.02 CONCRETO f'c=140 kg/cm2 PARA COLUMNAS m3 0.32 399.04 127.69 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPAR
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 04 - SERVICIOS HIGIENICOS

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.
4.01.03 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 38.07 44.86 1,707.82 0.00 0.00 0.00 0.00
4.01.04 ACERO CORRUGADO fy=4200 kg/cm2 COLUMNAS kg 264.27 4.99 1,318.71 0.00 0.00 200.00 998.00
4.02 VIGAS
4.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 0.82 417.50 342.35 0.00 0.00 0.00 0.00
4.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 10.94 39.06 427.32 0.00 0.00 0.00 0.00
4.02.03 ACERO CORRUGADO fy=4200 kg/cm2 VIGAS kg 104.67 5.21 545.33 0.00 0.00 0.00 0.00
5.00 ESTRUCTURA DE TECHO Y COBERTURA
5.01 CORREAS DE MADERA DE 3"x4" m 5.35 11.75 62.86 0.00 0.00 0.00 0.00
5.02 COBERTURA DE TECHALIT m2 25.58 28.60 731.59 0.00 0.00 0.00 0.00
6.00 MUROS Y TABIQUES DE ALBAÑILERIA
6.01 MUROS DE CABEZA LADRILLO KK 18 HUECOS C:A 1:5 m2 29.42 111.43 3,278.27 0.00 0.00 0.00 0.00
6.02 MUROS DE SOGA LADRILLO KK 18 HUECOS C:A 1:5 m2 16.55 67.06 1,109.84 0.00 0.00 0.00 0.00
6.03 MUROS DE CANTO LADRILLO KK 18 HUECOS C:A 1:5 m2 11.28 56.56 638.00 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPAR
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 04 - SERVICIOS HIGIENICOS

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.
7.00 REVOQUES Y ENLUCIDOS
7.01 TARRAJEO EN INTERIORES Y EXTERIORES C:A 1:4 m2 114.47 19.17 2,194.39 0.00 0.00 0.00 0.00
7.02 TARRAJEO DE SUPERFICIE DE COLUMNAS C:A 1:4 m2 36.30 23.63 857.77 0.00 0.00 0.00 0.00
7.03 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m2 28.05 10.19 285.83 0.00 0.00 0.00 0.00
8.00 PISOS Y PAVIMENTOS
8.01 FALSO PISO DE 4" DE CONCRETO 1:8 m2 4.83 29.76 143.74 0.00 0.00 0.00 0.00
8.02 PISO DE CCERAMICA 0.30X0.30 M m2 10.00 41.14 411.40 0.00 0.00 0.00 0.00
8.03 VEREDA DE 4" DE CONCRETO f'c= 175 kg/cm2 + PULIDO 1:2 x 1cm. BRUÑIDO m2 18.05 66.06 1,192.38 0.00 0.00 0.00 0.00
8.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 2.71 36.69 99.43 0.00 0.00 0.00 0.00
8.05 JUNTAS ASFALTICAS m 6.00 2.21 13.26 0.00 0.00 0.00 0.00
9.00 ZOCALOS Y CONTRAZOCALOS
9.01 CONTRAZOCALO DE CERAMICA H=20 cm. m 18.64 49.76 927.53 0.00 0.00 0.00 0.00
9.02 CONTRAZOCALO DE CEMENTO PULIDO CON MORTERO 1:5 DE E=2 cm H=20 cm m 18.05 6.09 109.92 0.00 0.00 0.00 0.00
10.00 CARPINTERIA METALICA Y DE MADERA
10.01 PUERTA APANELADAS INCLUIDO INSTALACIONES Y ACCCESORIOS P-03 (2.05 x 1.10 u 2.00 949.46 1,898.92 0.00 0.00 0.00 0.00
10.02 PUERTA TRIPLAY INCLUIDO INSTALACIONES Y ACCCESORIOS P-04 (0.60 x 1.40 m.) u 4.00 992.07 3,968.28 0.00 0.00 0.00 0.00
10.03 VENTANAS INCLUIDO INSTALACIONES Y ACCESORIOS V-05 (3.125x0.30 m) u 2.00 115.90 231.80 0.00 0.00 0.00 0.00
10.04 VENTANAS INCLUIDO INSTALACIONES Y ACCESORIOS V-06 (1.00 x 0.30 m) u 2.00 66.53 133.06 0.00 0.00 0.00 0.00
11.00 VIDRIOS, CRISTALES Y SIMILARES
11.01 VIDRIOS SEMIDOBLES p2 26.48 7.54 199.66 0.00 0.00 0.00 0.00
12.00 PINTURA
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPAR
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 04 - SERVICIOS HIGIENICOS

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.
12.01 PINTURA LATEX DOS MANOS EN FRISOS Y DERRAMES m2 2.81 7.19 20.20 0.00 0.00 0.00 0.00
12.02 PINTURA LATEX DOS MANOS EN MUROS INTERIORES Y EXTERIORES, COLUMNAS m2 128.21 3.01 385.91 0.00 0.00 0.00 0.00
13.00 APARATOS SANITARIOS
13.01 INODORO SIFON JET u 2.00 119.14 238.28 0.00 0.00 0.00 0.00
13.02 URINARIOS CORRIDO h=0.40 m m 0.80 123.87 99.10 0.00 0.00 0.00 0.00
13.03 BEBEDERO CORRIDO m 2.05 187.95 385.30 0.00 0.00 0.00 0.00
13.04 PAPELERA LOSA BLANCA u 2.00 13.43 26.86 0.00 0.00 0.00 0.00
13.05 COLOCACION DE APARATOS SANITARIOS u 2.00 48.92 97.84 0.00 0.00 0.00 0.00
13.06 COLOCACION DE ACCESORIOS u 2.00 12.23 24.46 0.00 0.00 0.00 0.00
13.07 GRIFERIA PARA DUCHA u 2.00 43.23 86.46 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPAR
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 04 - SERVICIOS HIGIENICOS

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.
14.00 INSTALACIONES SANITARIAS
14.01 SALIDA DE DESAGUE DE 2" pto 6.00 45.13 270.78 0.00 0.00 0.00 0.00
14.02 SALIDA DE DESAGUE DE 4" pto 4.00 20.20 80.80 0.00 0.00 0.00 0.00
14.03 SALIDA DE VENTILACION DE 2" pto 2.00 9.33 18.66 0.00 0.00 0.00 0.00
14.04 RED DE DISTRIBUCION TUBERIA DE PVC SAL DE 2" m 6.96 3.83 26.66 0.00 0.00 0.00 0.00
14.05 RED DE DISTRIBUCION TUBERIA DE PVC SAL DE 4" m 14.07 7.92 111.43 0.00 0.00 0.00 0.00
14.06 REGISTRO DE BRONCE ROSCADO DE 2" pza 1.00 20.79 20.79 0.00 0.00 0.00 0.00
15.00 INSTALACIONES DE AGUA FRIA
15.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" C/TAPA DE Cº pza 1.00 125.59 125.59 0.00 0.00 0.00 0.00
15.02 SALIDA DE AGUA FRIA pto 8.00 28.58 228.64 0.00 0.00 0.00 0.00
15.03 RED DE DISTRIBUCION TUBERIA PVC DE 1/2" m 20.27 11.55 234.12 0.00 0.00 0.00 0.00
15.04 CONEXION DE AGUA A LA RED 1" u 1.00 276.34 276.34 0.00 0.00 0.00 0.00
15.05 CAJA DE VALVULA DE CONTROL u 1.00 83.99 83.99 0.00 0.00 0.00 0.00
15.06 VALVULA ESFERICA DE 1/2" EN PARED pza 1.00 73.94 73.94 0.00 0.00 0.00 0.00
15.07 PRUEBA HIDRAULICA Y DESINFECCION glb 1.00 13.36 13.36 0.00 0.00 0.00 0.00
16.00 SISTEMA DE DESAGUE PLUVIAL
16.01 SALIDA PLUVIAL DE 3" pto 2.00 19.29 38.58 0.00 0.00 0.00 0.00
16.02 TUBERIA DE BAJADA Y DISTRIBUCION DE PVC SAL 3" m 3.40 12.27 41.72 0.00 0.00 0.00 0.00
16.03 SUMIDERO DE BRONCE 3" pza 4.00 20.31 81.24 0.00 0.00 0.00 0.00
16.04 REJILLA ANTIRROEDORES DE 3" pza 4.00 15.21 60.84 0.00 0.00 0.00 0.00
16.05 CAJA DE REGISTRO DE 40 x 40 pza 1.00 76.47 76.47 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPAR
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 04 - SERVICIOS HIGIENICOS

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.
16.06 CANALETA METALICA LUVIAL PERFIL EN U m 9.30 18.81 174.93 0.00 0.00 0.00 0.00
17.00 INSTALACIONES ELECTRICAS
17.01 TUBERIAS Y ACCESORIOS
17.01.01 SALIDA PARA CENTROS DE LUZ CON INTERRUPTOR pto 3.00 56.66 169.98 0.00 0.00 0.00 0.00
17.01.02 SALIDA PARA TOMACORRIENTES UNIPOLAR SIMPLE CON PVC pto 2.00 52.64 105.28 0.00 0.00 0.00 0.00
17.02 CONDUCTORES Y/O CABLES
17.02.01 CABLE ELECTRICO TW 2x2.5 mm2 m 19.70 1.51 29.75 0.00 0.00 0.00 0.00
17.03 ARTEFACTOS
17.03.01 ARTEFACTO WALL SOCKET ESTÁNDAR/LAMPARA u 3.00 52.94 158.82 0.00 0.00 0.00 0.00
COSTO DIRECTO 32,098.78 0.00 2,769.99
GASTOS GENERALES 11.6813% 3,749.55 0.00 323.57
UTILIDAD 8.00% 2,567.90 0.00 221.60
SUB-TOTAL 38,416.23 0.00 3,315.16
IGV 19.00% 7,299.08 0.00 629.88
TOTAL VALORIZADO S/. 45,715.31 0.00% 0.00 8.63% 3,945.05
OBRA N° 01 (REAJUSTADA)
EDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.

18.00 65.52 0.00 0.00 100.00%


4.00 22.32 0.00 0.00 100.00%
31.23 217.36 0.00 0.00 100.00%
31.23 203.31 0.00 0.00 100.00%
20.34 28.48 0.00 0.00 100.00%
20.34 92.75 0.00 0.00 100.00%

10.00 557.20 4.24 236.25 70.22%


3.00 83.58 1.65 45.97 64.52%
18.00 501.48 0.89 24.80 95.29%
0.00 0.00 20.34 17.09 0.00%
0.00 0.00 20.34 332.56 0.00%

0.00 0.00 3.32 784.05 0.00%


0.00 0.00 13.58 438.23 0.00%
0.00 0.00 1.41 462.55 0.00%

0.00 0.00 2.89 1,161.03 0.00%


0.00 0.00 0.32 127.69 0.00%
OBRA N° 01 (REAJUSTADA)
EDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.
0.00 0.00 38.07 1,707.82 0.00%
200.00 998.00 64.27 320.71 75.68%

0.00 0.00 0.82 342.35 0.00%


0.00 0.00 10.94 427.32 0.00%
0.00 0.00 104.67 545.33 0.00%

0.00 0.00 5.35 62.86 0.00%


0.00 0.00 25.58 731.59 0.00%

0.00 0.00 29.42 3,278.27 0.00%


0.00 0.00 16.55 1,109.84 0.00%
0.00 0.00 11.28 638.00 0.00%
OBRA N° 01 (REAJUSTADA)
EDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.

0.00 0.00 114.47 2,194.39 0.00%


0.00 0.00 36.30 857.77 0.00%
0.00 0.00 28.05 285.83 0.00%

0.00 0.00 4.83 143.74 0.00%


0.00 0.00 10.00 411.40 0.00%
0.00 0.00 18.05 1,192.38 0.00%
0.00 0.00 2.71 99.43 0.00%
0.00 0.00 6.00 13.26 0.00%

0.00 0.00 18.64 927.53 0.00%


0.00 0.00 18.05 109.92 0.00%

0.00 0.00 2.00 1,898.92 0.00%


0.00 0.00 4.00 3,968.28 0.00%
0.00 0.00 2.00 231.80 0.00%
0.00 0.00 2.00 133.06 0.00%

0.00 0.00 26.48 199.66 0.00%


OBRA N° 01 (REAJUSTADA)
EDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.
0.00 0.00 2.81 20.20 0.00%
0.00 0.00 128.21 385.91 0.00%

0.00 0.00 2.00 238.28 0.00%


0.00 0.00 0.80 99.10 0.00%
0.00 0.00 2.05 385.30 0.00%
0.00 0.00 2.00 26.86 0.00%
0.00 0.00 2.00 97.84 0.00%
0.00 0.00 2.00 24.46 0.00%
0.00 0.00 2.00 86.46 0.00%
OBRA N° 01 (REAJUSTADA)
EDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.

0.00 0.00 6.00 270.78 0.00%


0.00 0.00 4.00 80.80 0.00%
0.00 0.00 2.00 18.66 0.00%
0.00 0.00 6.96 26.66 0.00%
0.00 0.00 14.07 111.43 0.00%
0.00 0.00 1.00 20.79 0.00%

0.00 0.00 1.00 125.59 0.00%


0.00 0.00 8.00 228.64 0.00%
0.00 0.00 20.27 234.12 0.00%
0.00 0.00 1.00 276.34 0.00%
0.00 0.00 1.00 83.99 0.00%
0.00 0.00 1.00 73.94 0.00%
0.00 0.00 1.00 13.36 0.00%

0.00 0.00 2.00 38.58 0.00%


0.00 0.00 3.40 41.72 0.00%
0.00 0.00 4.00 81.24 0.00%
0.00 0.00 4.00 60.84 0.00%
0.00 0.00 1.00 76.47 0.00%
OBRA N° 01 (REAJUSTADA)
EDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.
0.00 0.00 9.30 174.93 0.00%

0.00 0.00 3.00 169.98 0.00%


0.00 0.00 2.00 105.28 0.00%

0.00 0.00 19.70 29.75 0.00%

0.00 0.00 3.00 158.82 0.00%


2,769.99 29,328.79
323.57 3,425.98
221.60 2,346.30
3,315.16 35,101.07
629.88 6,669.20
8.63% 3,945.05 91.37% 41,770.27
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPAR
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 05 - CERCO PERIMETRICO

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.

1.00 TRABAJOS PROVISIONALES


1.01 DEMOLICION DE CERCO PERIMETRICO m3 236.39 6.83 1,614.54 0.00 0.00 236.39 1,614.54
1.02 RETIRO DE PUERTAS u 2.00 34.83 69.66 0.00 0.00 2.00 69.66
1.03 ELIMINACION DE MATERIAL DE DEMOLICION m3 236.39 6.51 1,538.90 0.00 0.00 236.39 1,538.90
1.04 TRAZO Y REPLANTEO m2 67.54 4.56 307.98 0.00 0.00 67.54 307.98
1.05 LIMPIEZA DE TERRENO MANUAL m2 67.54 1.37 92.53 0.00 0.00 67.54 92.53
2.00 MOVIMIENTO DE TIERRAS
2.01 EXCAVACION PARA CIMIENTACION m3 101.28 55.72 5,643.32 0.00 0.00 101.28 5,643.32
2.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 19.00 54.67 1,038.73 0.00 0.00 19.00 1,038.73
2.03 ELIMINACION DE MATERIAL EXCEDENTE m3 82.29 13.93 1,146.30 0.00 0.00 82.29 1,146.30
3.00 CIMIENTOS Y SOBRECIMIENTOS
3.01 CIMIENTOS CORRIDOS MEZCLA 1:10 + 30% PG m3 72.34 236.16 17,083.81 0.00 0.00 65.00 15,350.40
3.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTO m2 67.54 32.27 2,179.52 0.00 0.00 65.00 2,097.55
3.03 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS m3 16.46 328.05 5,399.70 0.00 0.00 12.00 3,936.60
3.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 245.79 32.27 7,931.64 0.00 0.00 230.00 7,422.10
4.00 CONCRETO ARMADO
4.01 COLUMNAS
4.01.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 11.57 401.74 4,648.13 0.00 0.00 7.00 2,812.18
4.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 151.30 44.86 6,787.32 0.00 0.00 110.00 4,934.60
4.01.03 ACERO CORRUGADO fy=4200 kg/cm2 COLUMNAS kg 1,084.32 4.99 5,410.76 0.00 0.00 800.00 3,992.00
4.02 VIGAS
4.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 4.76 417.50 1,987.30 0.00 0.00 2.00 835.00
4.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 46.46 39.06 1,814.73 0.00 0.00 25.00 976.50
4.02.03 ACERO CORRUGADO fy=4200 kg/cm2 VIGAS kg 442.13 5.21 2,303.50 0.00 0.00 220.00 1,146.20
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPAR
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 05 - CERCO PERIMETRICO

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.
5.00 ALBAÑILERIA
5.01 MUROS DE SOGA LADRILLO KK 18 HUECOS C:H 1:5 m2 300.97 67.06 20,183.05 0.00 0.00 125.56 8,420.31
5.02 ACERO CORRUGADO fy=4200 kg/cm2 ALBAÑILERIA kg 195.36 5.14 1,004.15 0.00 0.00 150.00 771.00
6.00 COBERTURA EN LAS PUERTAS
6.01 PLANCHA DE TEJA ANDINA EN PORTADA PRINCIPAL m2 12.18 87.20 1,062.10 0.00 0.00 0.00 0.00
6.02 COBERTURA DE TEJA ANDINA EN PORTADA PRINCIPAL m 5.80 47.30 274.34 0.00 0.00 0.00 0.00
6.03 TIJERAL DE MADERA EUCALIPTO L=2.00 S/DISEÑO u 5.00 257.38 1,286.90 0.00 0.00 0.00 0.00
6.04 VIGA CORRIDA DE MADERA m 5.80 78.15 453.27 0.00 0.00 0.00 0.00
6.05 CORREAS DE MADERA DE EUCALIPTO LABRADA m 23.20 31.45 729.64 0.00 0.00 0.00 0.00
7.00 PUERTA DE INGRESO
7.01 PUERTA METALICA DE INGRESO u 1.00 1,775.87 1,775.87 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 01 (REAJUSTADA)
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPAR
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009
FORMULA : N° 05 - CERCO PERIMETRICO

PROPUESTA CONTRACTUAL AVANCE


ITEM PARTIDA COSTO COSTO ACUMULADO ANTERIOR AVANCE DEL MES
Und. METRADO
UNITARIO PARCIAL METRADO S/. METRADO S/.
8.00 OTROS
8.01 MOBILIARIO ESCOLAR Y DOCENTES
8.01.01 MESAS DE MADERA PARA NIÑOS u 20.00 117.65 2,353.00 0.00 0.00 0.00 0.00
8.01.02 SILLAS DE MADERA PARA NIÑOS u 20.00 75.63 1,512.60 0.00 0.00 0.00 0.00
8.01.03 ESCRITORIO DE MADERA PARA PROFESORES u 2.00 420.17 840.34 0.00 0.00 0.00 0.00
8.01.04 SILLAS DE MADERA PARA PROFESORES u 2.00 126.05 252.10 0.00 0.00 0.00 0.00
8.02 ENSAYOS DE CALIDAD
10.01 ENSAYOS DE CALIDAD DE CONCRETO u 27.00 37.82 1,021.14 0.00 0.00 5.00 189.10
9.00 FLETE
9.01 FLETE TERRESTRE glb 1.00 12,026.53 12,026.53 0.00 0.00 0.50 6,013.27
9.02 FLETE RURAL glb 1.00 41,936.06 41,936.06 0.00 0.00 0.45 18,871.23
COSTO DIRECTO 153,709.46 0.00 89,220.00
GASTOS GENERALES 11.6813% 17,955.26 0.00 10,422.06
UTILIDAD 8.00% 12,296.76 0.00 7,137.60
SUB-TOTAL 183,961.48 0.00 106,779.66
IGV 19.00% 34,952.68 0.00 20,288.14
TOTAL VALORIZADO S/. 218,914.16 0.00% 0.00 58.04% 127,067.80
OBRA N° 01 (REAJUSTADA)
EDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.

236.39 1,614.54 0.00 0.00 100.00%


2.00 69.66 0.00 0.00 100.00%
236.39 1,538.90 0.00 0.00 100.00%
67.54 307.98 0.00 0.00 100.00%
67.54 92.53 0.00 0.00 100.00%

101.28 5,643.32 0.00 0.00 100.00%


19.00 1,038.73 0.00 0.00 100.00%
82.29 1,146.30 0.00 0.00 100.00%

65.00 15,350.40 7.34 1,733.41 89.85%


65.00 2,097.55 2.54 81.97 96.24%
12.00 3,936.60 4.46 1,463.10 72.90%
230.00 7,422.10 15.79 509.54 93.58%

7.00 2,812.18 4.57 1,835.95 60.50%


110.00 4,934.60 41.30 1,852.72 72.70%
800.00 3,992.00 284.32 1,418.76 73.78%

2.00 835.00 2.76 1,152.30 42.02%


25.00 976.50 21.46 838.23 53.81%
220.00 1,146.20 222.13 1,157.30 49.76%
OBRA N° 01 (REAJUSTADA)
EDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.

125.56 8,420.31 175.41 11,762.74 41.72%


150.00 771.00 45.36 233.15 76.78%

0.00 0.00 12.18 1,062.10 0.00%


0.00 0.00 5.80 274.34 0.00%
0.00 0.00 5.00 1,286.90 0.00%
0.00 0.00 5.80 453.27 0.00%
0.00 0.00 23.20 729.64 0.00%

0.00 0.00 1.00 1,775.87 0.00%


OBRA N° 01 (REAJUSTADA)
EDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

AVANCE SALDO POR EJECUTAR


ACUMULADO ACTUAL COSTO
METRADO %
METRADO S/. PARCIAL S/.

0.00 0.00 20.00 2,353.00 0.00%


0.00 0.00 20.00 1,512.60 0.00%
0.00 0.00 2.00 840.34 0.00%
0.00 0.00 2.00 252.10 0.00%

5.00 189.10 22.00 832.04 18.52%

0.50 6,013.27 0.50 6,013.27 50.00%


0.45 18,871.23 0.55 23,064.83 45.00%
89,220.00 64,489.46
10,422.06 7,533.21
7,137.60 5,159.16
106,779.66 77,181.83
20,288.14 14,664.55
58.04% 127,067.80 41.96% 91,846.37
CALCULO DEL FACTOR DE REAJUSTE (K) REALES
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

Presupuesto ESTRUCTURAS K = 0.298*(Ir / Io) + 0.057*(Cr / Co) + 0.300*(Mr / Mo) + 0.135*(Ar / Ao) + 0.142*(Hr / Ho) + 0.068*(Mr / Mo)

Monomio Factor (%) Símbolo Indice Descripción


1 0.298 100.000 I 39 INDICE DE PRECIOS AL CONSUMIDOR
2 0.057 100.000 C 21 CEMENTO PORTLAND TIPO I
3 0.300 100.000 M 47 MANO DE OBRA
4 0.135 100.000 A 3 ACERO DE CONSTRUCCION CORRUGADO
5 0.142 100.000 H 38 HORMIGON
6 0.068 100.000 M 45 MADERA TERCIADA DE MADERA NACIONAL

Indice % COEF. P.BASE Jan-09 Mar-09 Apr-09 May-09


DESCRIPCION Simbolo
INEI INC. INCID. Dec-08 Indice Ka Indice Kr Indice Kr Indice

39 INDICE DE PRECIOS AL CONSUMIDOR I 100.00% 0.298 346.60 346.97 0.298 347.96 0.299 0.00 0.000 0.00

21 CEMENTO PORTLAND TIPO I C 100.00% 0.057 323.41 323.41 0.057 323.41 0.057 0.00 0.000 0.00

47 MANO DE OBRA M 100.00% 0.300 396.82 397.23 0.300 397.23 0.300 0.00 0.000 0.00

3 ACERO DE CONSTRUCCION CORRUGADO A 100.00% 0.135 644.53 631.96 0.132 552.14 0.116 0.00 0.000 0.00

38 HORMIGON H 100.00% 0.142 641.92 647.12 0.143 632.54 0.140 0.00 0.000 0.00

45 MADERA TERCIADA DE MADERA NACIONAL M 100.00% 0.068 325.63 326.35 0.068 327.07 0.068 0.00 0.000 0.00

1.000 K= 0.999 0.980 0.000


CALCULO DEL FACTOR DE REAJUSTE (K) REALES
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

Presupuesto ARQUITECTURA
K = 0.297*(Ir / Io) + 0.070*(Cr / Co) + 0.231*(Mr / Mo) + 0.066*(Hr / Ho) + 0.157*(Mr / Mo) + 0.069*(Pr / Po) + 0.057*(Ar / Ao) + 0.053*(Br / Bo)

Monomio Factor (%) Símbolo Indice Descripción

1 0.297 100.000 I 39 INDICE DE PRECIOS AL CONSUMIDOR

2 0.070 100.000 C 21 CEMENTO PORTLAND TIPO I

3 0.231 100.000 M 47 MANO DE OBRA

4 0.066 100.000 H 38 HORMIGON

5 0.157 100.000 M 45 MADERA TERCIADA DE MADERA NACIONAL

6 0.069 100.000 P 54 PINTURA

7 0.057 100.000 A 3 ACERO DE CONSTRUCCION

8 0.053 100.000 B 17 BLOQUE Y LADRILLO

Indice % COEF. P.BASE Jan-09 Mar-09 Apr-09 May-09


DESCRIPCION Simbolo
INEI INC. INCID. Dec-08 Indice Ka Indice Kr Indice Kr Indice

39 INDICE DE PRECIOS AL CONSUMIDOR I 100.000% 0.297 346.60 346.97 0.297 347.96 0.298 0.00 0 0.00

CEMENTO PORTLAND TIPO I 323.41 323.41 0.070 323.41 0.00 0.00


21 C 100.000% 0.070 0.070 0

47 MANO DE OBRA M 100.000% 0.231 396.82 397.23 0.231 397.23 0.231 0.00 0 0.00

38 HORMIGON H 100.000% 0.066 641.93 647.12 0.067 632.54 0.065 0.00 0 0.00

MADERA TERCIADA DE MADERA NACIONAL 0.157


45 M 100.000% 0.157 325.63 326.35 327.07 0.158 0.00 0 0.00
CALCULO DEL FACTOR DE REAJUSTE (K) REALES
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

PINTURA 0.069
54 P 100.000% 0.069 331.90 331.93 330.57 0.069 0.00 0 0.00

3 ACERO DE CONSTRUCCION A 100.000% 0.057 644.53 631.96 0.056 552.14 0.049 0.00 0 0.00

17 BLOQUE Y LADRILLO B 100.000% 0.053 684.17 679.31 0.053 679.96 0.053 0.00 0 0.00
1.000 K= 1.000 0.993 0.000
CALCULO DEL FACTOR DE REAJUSTE (K) REALES
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

Presupuesto INSTALACIONES ELECTRICAS


K = 0.297*(Ir / Io) + 0.058*(Tr / To) + 0.257*(Mr / Mo) + 0.057*(Ar / Ao) + 0.124*(Ar / Ao) + 0.207*(Ar / Ao)

Monomio Factor (%) Símbolo Indice Descripción

1 0.297 100.000 I 39 INDICE DE PRECIOS AL CONSUMIDOR

2 0.058 100.000 T 72 TUBERIA DE PVC

3 0.257 100.000 M 47 MANO DE OBRA

4 0.057 100.000 A 12 ARTEFACTO DE ALUMBRADO INTERIOR

5 0.124 100.000 A 7 ALAMBRE Y CABLE TIPO TW Y THW

6 0.207 100.000 A 11 ARTEFACTO DE ALUMBRADO EXTERIOR

Indice % COEF. P.BASE Jan-09 Mar-09 Apr-09 May-09


DESCRIPCION Simbolo
INEI INC. INCID. Dec-08 Indice Ka Indice Kr Indice Kr Indice
INDICE DE PRECIOS AL CONSUMIDOR 346.60 346.97 0.297 347.96 0.00 0.00
39 I 100.000% 0.297 0.298 0

72 TUBERIA DE PVC T 100.000% 0.058 381.67 374.72 0.057 350.04 0.053 0.00 0 0.00

47 MANO DE OBRA M 100.000% 0.257 396.82 397.23 0.257 397.23 0.257 0.00 0 0.00

ARTEFACTO DE ALUMBRADO INTERIOR 307.85 291.73 0.054 300.68 0.00 0.00


12 A 100.000% 0.057 0.056 0

7 ALAMBRE Y CABLE TIPO TW Y THW A 100.000% 0.124 516.10 496.05 0.119 467.77 0.112 0.00 0 0.00
ARTEFACTO DE ALUMBRADO EXTERIOR 0.195
11 A 100.000% 0.207 279.68 264.06 267.12 0.198 0.00 0 0.00
CALCULO DEL FACTOR DE REAJUSTE (K) REALES
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

1.000 K= 0.980 0.974 0.000


CALCULO DEL FACTOR DE REAJUSTE (K) REALES
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

Presupuesto SERVICIOS HIGIENICOS


K = 0.297*(Ir / Io) + 0.059*(Cr / Co) + 0.268*(Mr / Mo) + 0.064*(Ar / Ao) + 0.061*(Br / Bo) + 0.065*(Hr / Ho) + 0.052*(Tr / To) + 0134*(Mr / Mo)

Monomio Factor (%) Símbolo Indice Descripción

1 0.297 100.000 I 39 INDICE DE PRECIOS AL CONSUMIDOR

2 0.059 100.000 C 21 CEMENTO PORTLAND

3 0.268 100.000 M 47 MANO DE OBRA

4 0.064 100.000 A 3 ACERO

5 0.061 100.000 B 17 BLOQUE DE LADRILLO

6 0.065 100.000 H 38 HORMIGON

7 0.052 T 72 TUBERIA PVC

8 0.134 M 45 MADERA TERCIADA

Indice % COEF. P.BASE Jan-09 Mar-09 Apr-09 May-09


DESCRIPCION Simbolo
INEI INC. INCID. Dec-08 Indice Ka Indice Kr Indice Kr Indice
INDICE DE PRECIOS AL CONSUMIDOR 346.60 346.97 0.297 347.96 0.00 0.00
39 I 100.000% 0.297 0.298 0

21 CEMENTO PORTLAND C 100.000% 0.059 323.41 323.41 0.059 323.41 0.059 0.00 0 0.00

47 MANO DE OBRA M 100.000% 0.268 396.82 397.23 0.268 397.23 0.268 0.00 0 0.00

ACERO 644.53 631.96 0.063 552.14 0.00 0.00


3 A 100.000% 0.064 0.055 0

17 BLOQUE DE LADRILLO B 100.000% 0.061 684.17 679.31 0.061 679.96 0.061 0.00 0 0.00

38 HORMIGON H 100.000% 0.065 641.93 647.12 0.066 632.54 0.064 0.00 0 0.00
CALCULO DEL FACTOR DE REAJUSTE (K) REALES
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

TUBERIA PVC 0.051


72 T 100.000% 0.052 381.67 374.72 350.04 0.048 0.00 0 0.00

45 MADERA TERCIADA M 100.000% 0.134 325.63 326.35 0.134 327.07 0.135 0.00 0 0.00
1.000 K= 0.999 0.988 0.000
CALCULO DEL FACTOR DE REAJUSTE (K) REALES
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

Presupuesto CERCO PERIMETRICO


K = 0.326*(Ir / Io) + 0.090*(Cr / Co) + 0.145*(Mr / Mo) + 0.067*(Hr / Ho) + 0.242*(Fr / Fo) + 0.072*(Ar / Ao) + 0.058*(Mr / Mo)

Monomio Factor (%) Símbolo Indice Descripción

1 0.326 100.000 I 39 INDICE DE PRECIOS AL CONSUMIDOR

2 0.090 100.000 C 21 CEMENTO PORTLAND

3 0.145 100.000 M 47 MANO DE OBRA

4 0.067 100.000 H 38 HORMIGON

5 0.242 100.000 F 32 FLETE TERRESTRE

6 0.072 100.000 A 3 ACERO DE CONSTRUCCION

7 0.058 100.000 M 45 MADERA NACIONAL

Indice % COEF. P.BASE Jan-09 Mar-09 Apr-09 May-09


DESCRIPCION Simbolo
INEI INC. INCID. Dec-08 Indice Ka Indice Kr Indice Kr Indice
INDICE DE PRECIOS AL CONSUMIDOR 346.60 346.97 0.326 347.96 0.00 0.00
39 I 100.000% 0.326 0.327 0

21 CEMENTO PORTLAND C 100.000% 0.090 323.41 323.41 0.090 323.41 0.090 0.00 0 0.00

47 MANO DE OBRA M 100.000% 0.145 396.82 397.23 0.145 397.23 0.145 0.00 0 0.00

HORMIGON 641.93 647.12 0.068 632.54 0.00 0.00


38 H 100.000% 0.067 0.066 0

32 FLETE TERRESTRE F 100.000% 0.242 428.68 428.68 0.242 425.75 0.24 0.00 0 0.00

3 ACERO DE CONSTRUCCION A 100.000% 0.072 644.53 631.96 0.071 552.14 0.062 0.00 0 0.00
MADERA NACIONAL 0.058
45 M 100.000% 0.058 325.63 326.35 327.07 0.058 0.00 0 0.00
CALCULO DEL FACTOR DE REAJUSTE (K) REALES
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCA
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

1.000 K= 1.000 0.988 0.000


TOR DE REAJUSTE (K) REALES
DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

May-09 Jun-09
Kr Indice Kr

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000
TOR DE REAJUSTE (K) REALES
DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

May-09 Jun-09
Kr Indice Kr

0 0

0 0

0 0

0 0

0 0
TOR DE REAJUSTE (K) REALES
DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

0 0

0 0

0 0
0.000 0.000
TOR DE REAJUSTE (K) REALES
DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

May-09 Jun-09
Kr Indice Kr

0 0

0 0

0 0

0 0

0 0

0 0
TOR DE REAJUSTE (K) REALES
DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

0.000 0.000
TOR DE REAJUSTE (K) REALES
DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

May-09 Jun-09
Kr Indice Kr

0 0

0 0

0 0

0 0

0 0

0 0
TOR DE REAJUSTE (K) REALES
DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

0 0

0 0
0.000 0.000
TOR DE REAJUSTE (K) REALES
DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

May-09 Jun-09
Kr Indice Kr

0 0

0 0

0 0

0 0

0 0

0 0

0 0
TOR DE REAJUSTE (K) REALES
DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

0.000 0.000
CÁLCULO DEL REAJUSTE
: CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE
OBRA: SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE
ANCASH
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

Fecha Monto Valorizado Reajuste


Val. N° K-1
Valorización (V) (R=V*(K-1))

ARQUITECTURA
1 Marzo 2009 12,026.28 -0.007 -84.18
2 Abril 2009 - -1.000 -
3 Mayo 2009 - -1.000 -
4 Junio 2009 - -1.000 -
SUB-TOTAL 12,026.28 -84.18

ESTRUCTURAS
1 Marzo 2009 59,108.48 -0.020 -1,182.17
2 Abril 2009 - -1.000 -
3 Mayo 2009 - -1.000 -
4 Junio 2009 - -1.000 -
SUB-TOTAL 59,108.48 -1,182.17

ELECTRICAS
1 Marzo 2009 843.07 -0.026 -21.92
2 Abril 2009 - -1.000 -
3 Mayo 2009 - -1.000 -
4 Junio 2009 - -1.000 -
SUB-TOTAL 843.07 -21.92

SS.HH
1 Marzo 2009 3,315.16 -0.012 -39.78
2 Abril 2009 - -1.000 -
3 Mayo 2009 - -1.000 -
4 Junio 2009 - -1.000 -
SUB-TOTAL 3,315.16 -39.78

CERCO PERIMETRICO
1 Marzo 2009 106,779.66 -0.012 -1,281.36
2 Abril 2009 - -1.000 -
3 Mayo 2009 - -1.000 -
4 Junio 2009 - -1.000 -
SUB-TOTAL 106,779.66 -1,281.36
TOTAL REAJUSTE VALORIZACION N° 01 -2,609.41
CÁLCULO DEL REAJUSTE
ION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE
TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE

A - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008


CALCULO DEL DEDUCTIVO POR ADELANTO DIRECTO
VALORIZACION N° 01 - MARZO 2009

OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO -
DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

MONTO DEL CONTRATO S/ 462,379.32 INCLUIDO IGV


ADELANTO DIRECTO 10% (A) S/ 38,855.41 NO INCLUYE IGV 77,710.81
MONTO DEL CONTRATO ( C ) S/ 388,554.05 NO INCLUYE IGV

VALORIZACION INDICES UNIFICADOS


MONTO Mes de pago del DEDUCCION
Mes de Reajuste
Nº Mes VALORIZADO Adelanto Directo
V K Ka D = V*A/C (K / Ka - 1)
ARQUITECTURA
1 Marzo 2009 12,026.28 0.988 1.000 -14.38
2 Abril 2009 - 0.000 1.000 -
3 Mayo 2009 - 0.000 1.000 -
4 Junio 2009 - 0.000 1.000 -
SUB-TOTAL 12,026.28 -14.38

ESTRUCTURAS
1 Marzo 2009 59,108.48 0.980 0.999 -114.14
2 Abril 2009 - 0.000 0.999 -
3 Mayo 2009 - 0.000 0.999 -
4 Junio 2009 - 0.000 0.999 -
SUB-TOTAL 59,108.48 -114.14
ELECTRICAS
1 Marzo 2009 843.07 0.974 0.980 -0.53
2 Abril 2009 - 0.000 0.980 -
3 Mayo 2009 - 0.000 0.980 -
4 Junio 2009 - 0.000 0.980 -
SUB-TOTAL 843.07 -0.53
SS.HH
1 Marzo 2009 3,315.16 0.988 0.999 -3.58
2 Abril 2009 - 0.000 0.999 -
3 Mayo 2009 - 0.000 0.999 -
4 Junio 2009 - 0.000 0.999 -
SUB-TOTAL 3,315.16 -3.58
CERCO PERIMETRICO
1 Marzo 2009 106,779.66 0.988 1.000 -125.64
2 Abril 2009 - 0.000 1.000 -
3 Mayo 2009 - 0.000 1.000 -
4 Junio 2009 - 0.000 1.000 -
SUB-TOTAL 106,779.66 -125.64
CALCULO DEL DEDUCTIVO POR ADELANTO DIRECTO
VALORIZACION N° 01 - MARZO 2009

OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO -
DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

MONTO DEL CONTRATO S/ 462,379.32 INCLUIDO IGV


ADELANTO DIRECTO 10% (A) S/ 38,855.41 NO INCLUYE IGV 77,710.81
MONTO DEL CONTRATO ( C ) S/ 388,554.05 NO INCLUYE IGV

VALORIZACION INDICES UNIFICADOS


MONTO Mes de pago del DEDUCCION
Mes de Reajuste
Nº Mes VALORIZADO Adelanto Directo
V K Ka D = V*A/C (K / Ka - 1)

TOTAL DEL DEDUCTIVO POR ADELANTO


TOTAL S/. 182,072.65
DIRECTO S/.
-258.26
CALCULO DEL DEDUCTIVO POR ADELANTO DE MATERIALES
VALORIZACION N° 01 - MARZO 2009

OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAM
DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

MONTO DEL CONTRATO S/ 462,379.32 INCLUIDO IGV


ADELANTO DE MATERIALES 20% (A) S/ 77,710.81 NO INCLUYE IGV
MONTO DEL CONTRATO ( C ) S/ 388,554.05 NO INCLUYE IGV

VALORIZACION INDICES UNIFICADOS


MONTO Mes de pago del
Mes de Reajuste
Nº Mes VALORIZADO Adelanto Directo
V K Ka
ARQUITECTURA
1 Marzo 2009 12,026.28 0.988 1.000
2 Abril 2009 - 0.000 1.000
3 Mayo 2009 - 0.000 1.000
4 Junio 2009 - 0.000 1.000
SUB-TOTAL 12,026.28

ESTRUCTURAS
1 Marzo 2009 59,108.48 0.980 0.999
2 Abril 2009 - 0.000 0.999
3 Mayo 2009 - 0.000 0.999
4 Junio 2009 - 0.000 0.999
SUB-TOTAL 59,108.48
ELECTRICAS
1 Marzo 2009 843.07 0.974 0.980
2 Abril 2009 - 0.000 0.980
3 Mayo 2009 - 0.000 0.980
4 Junio 2009 - 0.000 0.980
SUB-TOTAL 843.07
SS.HH
1 Marzo 2009 3,315.16 0.988 0.999
2 Abril 2009 - 0.000 0.999
3 Mayo 2009 - 0.000 0.999
4 Junio 2009 - 0.000 0.999
SUB-TOTAL 3,315.16
CERCO PERIMETRICO
1 Marzo 2009 106,779.66 0.988 1.000
2 Abril 2009 - 0.000 1.000
3 Mayo 2009 - 0.000 1.000
4 Junio 2009 - 0.000 1.000
SUB-TOTAL 106,779.66
TOTAL DEL DEDUCTIVO POR ADELANTO
TOTAL S/. 182,072.65
DE MATERIALES S/.
DEDUCTIVO POR ADELANTO DE MATERIALES
LORIZACION N° 01 - MARZO 2009

STITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO -


OVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008

DEDUCCION

D = V*A/C (K / Ka - 1)

-28.76
-
-
-
-28.76

-228.27
-
-
-
-228.27

-1.06
-
-
-
-1.06

-7.16
-
-
-
-7.16

-251.28
-
-
-
-251.28
-516.53
CALCULO DE LAS AMORTIZACIONES POR ADELANTOS EFECTUADOS

OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAM
- DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANC
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

A.- AMORTIZACION POR ADELANTO DIRECTO

MONTO DEL ADELANTO DIRECTO (S/IGV) S/.38,855.41

VALORIZACION AMORTIZACION (10%*V)


MONTO Acumulado Amortización
Nº MES Acumulado Actual
VALORIZADO (V) Anterior Actual

1 Marzo 2009 182,072.65 0.00 18,207.27 18,207.27


2 Abril 2009 0.00 - - -
3 Mayo 2009 0.00 - - -
4 Junio 2009 0.00 - - -

B.- AMORTIZACION POR ADELANTO DE MATERIALES

MONTO DEL ADELANTO DIRECTO (S/IGV) S/.77,710.81

VALORIZACION AMORTIZACION (20%*V)


MONTO Acumulado Amortización
Nº MES Acumulado Actual
VALORIZADO (V) Anterior Actual

1 Marzo 2009 182,072.65 0.00 36,414.53 36,414.53


2 Abril 2009 0.00 #VALUE! - #VALUE!
3 Mayo 2009 0.00 #VALUE! - #VALUE!
4 Junio 2009 0.00 #VALUE! - #VALUE!
RTIZACIONES POR ADELANTOS EFECTUADOS

A INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO


HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

ESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008

SALDO POR
AMORTIZAR

20,648.14
-
-
-

SALDO POR
AMORTIZAR

41,296.28
-
-
-
RESUMEN DE LA VALORIZACION MENSUAL Nº 01 (RECALCULADA
MARZO 2009

OBRA : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD


PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA PRESUPUESTO BASE DICIEMBRE 2008
PRESUPUESTO BASE S/.462,379.32
GARANTIA FIEL CUMPLIMIENTO S/.46,237.93

VALORIZACION
MONTO ACUMULADA VALORIZACION
DESCRIPCION
CONTRACTUAL ANTERIOR ACTUAL
MONTOS CONTRACTUALES (V)
ARQUITECTURA 98,215.23 - 12,026.28
ESTRUCTURAS 62,839.32 - 59,108.48
ELECTRICAS 5,121.79 - 843.07
A
SS.HH 38,416.23 - 3,315.16
CERCO PERIMETRICO 183,961.48 - 106,779.66
TOTAL CONTRACTUAL 388,554.05 0.00 182,072.65
% DE AVANCE DE OBRA A LA FECHA 0.00% 46.86%
REAJUSTES (S)
ARQUITECTURA -84.18
ESTRUCTURAS -1,182.17
B ELECTRICAS -21.92
SS.HH -39.78
CERCO PERIMETRICO -1,281.36
TOTAL REAJUSTE -2,609.41
DEDUCTIVOS QUE NO CORRESPONDEN (D)
DEL ADELANTO DE MATERIALES -516.53
C
DEL ADELANTO DIRECTO -258.26
TOTAL DEDUCTIVOS -774.79

D VALORIZACION BRUTA (VB=V+R-D) 180,238.04

AMORTIZACIONES (A)
AMORTIZACION ADELANTO DIRECTO 38,855.41 0.00 18,207.27
E
AMORTIZACION ADELANTO MATERIALES 77,710.81 0.00 36,414.53
TOTAL AMORTIZACIONES 116,566.22 0.00 54,621.80
MONTOS A PAGAR AL CONTRATISTA
F VALORIZACION NETA (VN=VB-A) 180,238.04 125,616.24
IGV = VNx(19%) 23,867.09
G MONTO TOTAL DE VALORIZACION CON IGV S/. 149,483.33
H GARANTIA DE FIEL CUMPLIMIENTO (10%) 46,237.93 0.00 23,118.97

I VALORIZACION A SOLICITAR 126,364.36


ORIZACION MENSUAL Nº 01 (RECALCULADA)
MARZO 2009

N EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS -


O DE ANCASH

CION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008

ACUMULADO % SALDO POR


ACTUAL AVANCE VALORIZAR

12,026.28 12.24% 86,188.94


59,108.48 94.06% 3,730.85
843.07 16.46% 4,278.72
3,315.16 8.63% 35,101.07
106,779.66 58.04% 77,181.82
182,072.66 206,481.40
46.86% 53.14%

18,207.27 20,648.14
36,414.53 41,296.28
54,621.80 61,944.42

23,118.97 23,118.97
CUADRO COMPARATIVO DE AVANCE DE OBRA
OBRA: : CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCAS
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

PROGRAMADO EJECUTADO
N° DE % AVANCE
MES VALORIZACION % AVANCE % AVANCE VALORIZACION ACUMULADA % AVANCE
VALORIZACION ACUMULADA MENSUAL
PROGRAMADA MENSUAL ACUMULADO EJECUTADA EJECUTADA ACUMULADO
EJECUTADO
1 MARZO 2009 134,582.73 134,582.73 34.64% 34.64% 182,072.66 182,072.66 46.86% 46.86%
2 ABRIL 2009 106,193.00 240,775.74 27.33% 61.97% 0.00 182,072.66 0.00% 0.00%
3 MAYO 2009 93,107.92 333,883.65 23.96% 85.93% 0.00 182,072.66 0.00% 0.00%
4 JUNIO 2009 54,670.38 388,554.03 14.07% 100.00% 0.00 182,072.66 0.00% 0.00%
182,072.66
388,554.03
P O R C E N T A JE A V A N C E A C U M U LA D O

CURVAS DE AVANCE
120.0%

100.00%
100.0%

85.93%
80.0%

60.0% 61.97%

40.0%
34.64% PROGRAMADO

20.0% EJECUTADO
P O R C E N T A JE A V A N C E A C U M U LA D
CURVAS DE AVANCE
120.0%

100.00%
100.0%

85.93%
80.0%

60.0% 61.97%

40.0%
34.64% PROGRAMADO

20.0% EJECUTADO

0.0%
0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
N ° DE VALORIZ AC ION

NOTA: LA OBRA SE ENCUENTRA EN 12.22% ADELANTADA


IO DE SOLEDAD DE TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH
CUADRO COMPARATIVO DE AVANCE DE OBRA
: CONSTRUCCION DE LA INSTITUCION EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD
OBRA:
TAMBO - DISTRITO DE HUACHIS - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE HUACHIS
CONTRATISTA : CONSTRUCTORA Y SERVICIOS SAN ANTONIO DE PADUA E.I.R.L
MODALIDAD : SUMA ALZADA - PROCESO DE SELECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008
FECHA : MARZO 2009

MES 1 MES 2 MES 3


Nº VALORIZACION
1 2 3
MES DE VALORIZACION MARZO ABRIL MAYO
VALORIZACION PROGRAMADA 0.00 34.64% 27.33% 23.96%
ACUMULADA 0.00 34.64% 61.97% 85.93%
VALORIZACION EJECUTADA 0.00 46.86% 0.00% 0.00%
ACUMULADA 0.00 46.86% 46.86% 46.86%
P O R C E N TAJ E AVAN C E A C U M U LA D O

CURVA S DE AVANCE DE OBRA REPROGRAMADO


100.00%
100.00
90.00%

80.00% 85.93%

70.00%

60.00%
61.97%
50.00% 46.86%

40.00%

30.00% 34.64%

20.00%

10.00%

0.00%
1 2 3 4 5

N° DE VALORIZACI ON
AVANCE PROGRAMADO AVANCE EJECUTADO

LA OBRA SE ENCUENTRA: 12.22% ADELANTADA


RATIVO DE AVANCE DE OBRA
ON EDUCATIVA PRIMARIA Nº 86861 DEL CASERIO DE SOLEDAD DE
ROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH

ECCION EXONERADO Nº12 - 2008 MDH/A.C. Nº 175 - 2008

MES 4
4
JUNIO
14.07%
100.00%
0.00%
46.86%

VANCE DE OBRA REPROGRAMADO


100.00%

85.93%

61.97%
6%

4%

3 4 5

N° DE VALORI ZA CI ON
AVANCE PROGRAMADO AVANCE EJECUTADO

You might also like