I.

Introduction

Today, many of as do not fully understand swine raising industry. Swine raising is not only feeding
and cleaning of swine house and raising the swine until they reach it marketable weight. Swine raiser
have to deal with a lot of aspects of swine production to ensure efficiency of their business. We should
also understand the importance of the business in our community. We get the supply of pork which we
used in our meal from the swine raisers.

This study aims to know, to identify the methods, problems encountered by swine raiser and find
the possible solution to these problems. Swine raising has various advantages. Some of these are the
following: by product utilization, efficient converter of low quality feeds, small space requirements,
quick breed improvement and adaptability to other system of management.

II. Statement of the Problems

This study aims to find the problems encountered by swine raisers:

1. What are the problems of swine raiser in relation to :]


A. Diseases
a. How these diseases are acquired?
b. How these diseases are prevented?
B. Supply of feeds
C. Adequacy of facilities
D. Occurrence of calamities that affect the swine industry

Assumption:

Hopefully it is further desired that whatever finding and conclusions that might arrived in this
study will serve as a meaningful guide to swine producers who have interest in this feasibility study who
would like to make a research regarding/r3elated to this study.

III. Presentation of Data/ Project Description

A. Project Summary – A feasibility study of swine production and marketing project.

B. Proponent –

C. Location – The project will be the 3rd and 4th district of Quezon, who labor is primarily
engage in farming activities and plenty of agricultural waste products are generated.

D. Funds – In able to start and support this project the initial amount needed is __________.
This will be used to purchased, prepare the stocks and supplies needed for the production
and operation of this proposed project.
E. Source of Funds – The proposed source of funds will be the _________

F. Beneficiaries – The beneficiaries of this project will be the citizen of 3rd and 4th District of
Quezon Province, the farmers in the area will also benefited since their agricultural waste
product can be converted into money by using its as feeds for the livestock especially in
swine.

Government/ Municipality will also benefited in this project, because of the additional
income for them and add to this is the less importance of pork and most of all Filipino
community will be satisfied for it will help them meet the demand for high protein product
in the Filipino diet.

G. Estimated Capital – Our estimated Capital is ________ it will going to cost this big because
instead of renting a lot and building it is better to buy the lot then build the facilities for we
will need a big space for the office and warehouse for feeds that we will need to deliver
product when they buy large volume of feeds, we will need a truck for delivery and pick-up
for the monitoring of the project.

IV. Management and Manpower

Salary Yearly salary


1 Manager 28,500/month 342,000
4 Technician 450/day 561,600
2 Veterinarian 10,000/month 240,000
1 Secretary 400/day 124,800
1 Cashier 400/day 124,800
1 Bookkeeper 450/day 140,400
1 Supply officer 400/day 124,800
4 Laborer 350/day 109,200
3 Driver 600/day 374,400
4 Security Guard 380/day 474,240

Allowance per month 1,500/each x 22 396,000


Total of P 3,012,240

Land and Building (Office and Warehouse)


Land 3,600,000
Earth fill 300,000
Building 3,200,000
Total P 7,100,000
Furniture/Fixture/Office Equipment
Telephone Computer
Air conditioner Computer table
Cabinet Office table
Monoblock chair/ Swivel chair And others

Total P 800,000

1 Pick-Up P1,900,000
2 Elf Truck P3,600,000
Total P6,300,000

Construction of Pigpens w/ Biogas, water pump


3rd District – 11 town/municipality
4th District – 10 town/municipality
Total of 21 municipalities

60 pigpens/ municipality in average


X 21 municipality
1,260 pigpens with water pump and installed biogas
X P 15,000 – construction of pigpens and labor
P 18,900,000 – total cost for construction of pigpens
P 18,900,000

Purchasing of Piglets:

60 piglets X 1,260 pigpens = 75,600 piglets


X 3,000/head
Total P 226,800,000

Manpower P 3,012,240
Land P 7,100,000
Equipment and Vehicle P 6,300,000
Pigpens P 18,900,000
Piglets P 226,800,000
Total P 262,112,240

Purchasing of Feeds

1. Pre- Starter 12.5 kilos for 15 days


2. Starter 50 kilos for 45 days
3. Grower 100 kilos for 50 days
4. Finisher 25 kilos for 10 days
12.5 kilos X 50.00 625
50 kilos X 29.00 1,450
100 kilos X 27.00 2,700
25 kilos X 26.00 650
Total P 5,425.00/ piglet
X 75,600 piglets
Total P410,130,000.00

Medicines and Vitamins, Vaccine – to follow Data

Utilities:

1. The electricity will be supplied by QUEZELCO


2. The water will be supplied LWD.
3. The telephone will be provided by Globe or Smart
(To follow computation of monthly bill)

Size of Pigpens – to follow the specification, lay-out

Freight In = 0.5% of total amount of piglets

= 75,600 piglets X 3000 = 226,800,000 X 0.5% = P 1,134,000

Seminar and Training for Proper Handling of Swine Raising – to follow details

You might also like