Construction Estimates
Electrical and Plumbing Works
Bill of Quantities and Labor Cost

 Electrical Works for a 53m² house/lot

Unit Cost Total Cost


Grand
Unit Qty
Materials Total
Material Labor Material Labor

Roughing-ins
pc 20 58.00 17.40 1,160.00 348.00 1,508.00
Electrical Conduit uPVC, 15mmØ
pc 1 400.00 120.00 400.00 120.00 520.00
RSC 20mmØ
pc 1 25.00 7.50 25.00 7.50 32.50
Entrance Cap 20mm dia.
pc 6 20.00 6.00 120.00 36.00 156.00
Junction Box , 4" x 4" G.I
pc 4 20.00 6.00 80.00 24.00 104.00
Utility Box, 2" x 4" x G.I
Grounding Rod, 2.4m x 16mm pc 1 200.00 60.00 200.00 60.00 260.00
dia.
Wires and Fixtures
m 180 25.00 7.50 4,500.00 1,350.00 5,850.00
3.5 mm2 THW wire , Stranded
pc 2 108.00 32.40 216.00 64.80 280.80
Duplex C.O. with Plate
pc 1 148.00 44.40 148.00 44.40 192.40
3- Gang Switch with Plate
pc 1 68.00 20.40 68.00 20.40 88.40
Single Switch with Plate
set 5 550.00 165.00 2,750.00 825.00 3,575.00
FL 1x 40W industrial Type
set 1 620.00 186.00 620.00 186.00 806.00
ESL 1 x 12W 2U Type
set 1 410.00 123.00 410.00 123.00 533.00
Safety Switch 30A 2P
TOTAL 8,737.00 2,621.10 11,358.10
Material and Labor Cost

Total Material Cost Php8,737.00


Total Labor Cost
= Total Material Cost*.30 Php2,621.10
Total Cost
= Total Material Cost+ Total Labor Cost Php11,358.10 or Php214.30/m²

Labor Cost

Labor Cost
Installation of lights, receptacle, switch and
Php300/pc
wirings
Installation of electrical sockets and
Php200/pc
wirings

No. of lights, receptacle, switch and wirings 6


No. of electrical sockets and wirings 2
Total Labor Cost Php2200.00 or Php41.51/m²
 Plumbing Works for a 53m² house/lot

Unit Cost Total Cost Grand


Materials Unit Qty Material Labor Material Labor
Total
Water Closet 1.6gpf with
set 1 4,500.00 1,350.00 4,500.00 1,350.00 5,850.00
Accessories
Lavatory, Pedestral Type with
set 1 2,500.00 750.00 2,500.00 750.00 3,250.00
Accessories
Faucet , Hose Bibb , Brass 3/4"Ø pc 4 220.00 66.00 880.00 264.00 1,144.00
G.I Coupling, 3/4"Ø pc 8 17.00 5.10 136.00 40.80 176.80
G.I Tee, 3/4"Ø
G.I. Pipe 3/4" Sch.40 pc 10 370.00 111.00 3,700.00 1,110.00 4,810.00
G.I. Elbow 90° x 3/4"Ø pc 20 17.00 5.10 340.00 102.00 442.00
Gate Valve , 3/4"dia. pc 1 215.00 64.50 215.00 64.50 279.50
Gate Valve , 3/4'"dia. pc 2 215.00 64.50 430.00 129.00 559.00
Check Valve , 3/4"dia. pc 1 215.00 64.50 215.00 64.50 279.50
Tissue Holder pc 2 250.00 75.00 500.00 150.00 650.00
S.S. Floor Drain 4' x 4" pc 3 200.00 60.00 600.00 180.00 780.00
TOTAL 14,016.00 4,204.80 18,220.80

Material and Labor Cost

Total Material Cost Php14,016.00


Total Labor Cost
= Total Material Cost*.30 Php4,204.80
Total Cost
= Total Material Cost+ Total Labor Cost Php18,220.80 or Php343.79/m²

Labor Cost

Labor Cost
Installation of all Plumbing Works Php500/day

No. of laborers No. of days to finish Total Cost


2 3 Php3000.00 or Php56.60/m²