As per our revised rate details submitted to you. Flat nos are 423, 206, 306, 106, 422, 310, 409, 224,
222, 223 completed
TOILET
1 Particular Unit Quantity Rate Amount
A
1 Removing Floor tiles & clear the debris. Sft 92.85 30.00 2785.42
2 Removing wall tiles & clear the debris. Sft 92.85 30.00 0.00
3 Removing of W/C, ‘P’ trap etc. Nos 10.00 300.00 3000.00
4 Removing of waterproofing along with Sft 120.00 40.00 4800.00
PCC layer.
B
1 P/F W/C, ‘P’ trap, connector etc.(reused Nos 10.00 2900.00 29000.00
existing W/C)
2 Brickbet Ghabda filling around W/C Nos 10.00 500 5000.00
3 Laying of PCC over Brickbit around 2”. Sft 92.85 90.00 8356.25
4 Laying Waterproof mortor on the toilet Sft 260.00 72.00 18720.00
floor along with side walls waterproof
plaster upto 1ft.
5 P/F floor tile with joint filling groute Sft 92.85 100 9284.72
etc.(tile cost around Rs. 35 per Sft)
TOTAL OF TOILET WORK 80946.39
BATHROOM
2
A
1 Removing Floor tiles & clear the debris. Sft 160.00 30.00 4800.00
2 Removing wall tiles & clear the debris. Sft 15.00 30.00
3 Removing of nahni trap etc. Nos 10.00 300.00 3000.00
4 Removing of waterproofing along with Sft 160.00 40.00 6400.00
PCC layer.
B
1 P/F Nahni trap, connector etc. Nos 10.00 1000.00 10000.00
2 Brickbet Ghabda Filling around nahni Nos 10.00 500.00 5000.00
trap.
3 Laying of PCC over Brickbit around 2”. Sft 160.00 90.00 14400.00
4 Laying Waterproof mortor on the toilet Sft 320.00 72.00 23040.00
floor along with side walls waterproof
plaster upto 1ft.
5 P/F floor tile with joint filling groute Sft 160.00 100.00 16000.00
etc.(tile cost around Rs. 35 per Sft)
TOTAL OF BATHROOM WORK 82640.00
KITCHEN
3
A
1 Removing Floor tiles & clear the debris.
2 Removing wall tiles & clear the debris.
3 Removing of W/C, ‘P’ trap etc.
4 Removing of waterproofing along with
PCC layer.
B
1
2
3
4
5
TOTAL OF KITCHEN WORK