FILE: G:\OTT-00204430-A0_PANGNIRTUNG\CONT01\P401-03 P&ID.DWG No.

Issue Date
WASTE SLUDGE FROM WASTE SLUDGE PUMP AND POLYMER DOSING SKID
RECYCLE PUMPS 1 60% REVIEW SUBMISSION 2013-MAR-08
93
SEE DWG. P401-2 DEFOAMER 93-V-04 SC 2 ISSUED FOR TENDER 2013-APR-10
CHEMICAL FEED 01
70 SEE DWG. P401-2 93-V-05 93-BPV-01
LIT
01
93-V-03
OUTDOOR 70 POLYMER
VENT LE FEED PUMP 93-CFP-01
01 70-PFP-01 93-PRV-01
70
PT
01
NEAT 93
POLYMER 70 70 LS
PG PE 01
OVERFLOW TO TOTE 03 01
EOF
FINAL EFFLUENT
NEAT
SEE DWG. P401-2
POLMER
ACTIVATION
70-V-19 70-V-18 70-V-17
70-V-16 DEVICE
MIXER
70 70-MIX-01
SLUDGE LS
01 PULSATION
STORAGE
TANK DAMPER
DECANT TO 70-V-03 70-TK-01 70-PD-01
SCREENED SEWAGE SUMP (REPURPOSED
SEE DWG. P401-2 EXISTING SLUDGE 93-V-01
75 DIGESTER)
PG 70
01 SC
01 70-V-15
70 70 DEFOAMER DRUM
PG PG 70
01 02 FIT 93-TK-01
75-V-05 01
70-V-06 70-V-08 70-V-09
70
75-V-06 FE
70-V-07 70-V-10 01 70-V-14 70
LS TO PROCESS
70-V-11 70-V-12
MIXER 04 PIPING
70-WSP-01
ST 70-MIX-02
SLUDGE PUMP 70-V-13

DEWATERING DEWATERED SLUDGE


ST 70-TR-01 TO DISPOSAL

70
FILTRATE RETURN TO PG TRENCH
SCREENED SEWAGE SUMP 04 DRAIN
SEE DWG. P401-2 80
PS
01

70-V-20
75-V-04 TO DEWATERING
81-V-06
SCREEN SPRAY WASH
75-V-02 SEE DWG. P401-2

70-V-22
70 81-V-05 81-V-04
LS

70-V-21
75-V-01 75-V-03 03
VENT
70
75-AB-01 75-AB-02 LS
02 81-V-03
EXISTING AERATION BLOWERS FROM UV DISINFECTION
SEE DWG. P401-2 81-V-02 81-NWP-01
IN MECHANICAL ROOM 70 80-V-01
LS No. Revision Ckd. By Date
01 NON-POTABLE
70-FRP-01 WATER HOLDING
TANK (81-TK-01)

FILTRATE SUMP

CITRIC ACID TO
MEMBRANE TANK # 1 CITRIC ACID PANEL
PERMEATE PIPING
SEE DWG. P401-2
91
PG SODIUM HYPOCHLORITE
01 TO BACK PULSE TANK
SEE DWG. P401-2
SODIUM HYPOCHLORITE PANEL
91-BPV-01 91-V-09

CITRIC ACID TO
92
PG
FOR INFORMATION ONLY
MEMBRANE TANK # 2 01
SODIUM HYPOCHLORITE
91-V-07 91-PRV-02 91-V-01 92-V-11 Const. North
PERMEATE PIPING TO MEMBRANE TANK #1
SEE DWG. P401-2 PERMEATE PIPING 92-PRV-03
91-PRV-01 SEE DWG. P401-2 S
92-V-16

92-V-15 92-V-18 92-V-09 92-PRV-02


SODIUM HYPOCHLORITE
92-BPV-01
91-CC-01 TO MEMBRANE TANK #2
PERMEATE PIPING 92-V-10 92-V-08
Drawn By:
SEE DWG. P401-2
ARL/MCO
92-PRV-01
91-V-05 Dwg. Standards
91-CFP-01 Ckd. By: PD
COMPRESSED AIR 92-V-17 92-CC-01
91-V-06 Designed By:
91-V-04 P
91-V-07 DFB
92-V-06 92-V-03 Date Printed Dwg. Design
91 92-CFP-02 92-CFP-01 Ckd. By:
SAO
LS
01
92-V-07 92-V-04
91-MIX-01 exp Services Inc.
92-V-05 92-V-08 92-V-02
t: +1.613.688.1899 | f: +1.613.225.7330
2650 Queensview Drive, Unit 100
Ottawa, ON K2B 8H6
CANADA

www.exp.com

92
LS
01
91-V-03

61-V-11
MAINTENANCE SHOP

91-V-02 BUILDINGS EARTH & ENVIRONMENT ENERGY


INDUSTRIAL INFRASTRUCTURE SUSTAINABILITY
61 CITRIC ACID TANK
PS 91-TK-01
01 Project Title

AIR SUPPLY ASSEMPLY # 1


61-V-02 61-V-08
92-V-01
TO MBR SYSTEM
61-PRV-01
EJECTOR ASSEMBLY #1 WASTE WATER
61-V-12 S TREATMENT PLANT
SODIUM HYPOCHLORITE DRUM
56-V-01 56-V-03
92-TK-01 UPGRADE
61-AF-01 61-AF-02 DRAIN 56-F-01 PANGNIRTUNG, NU
61-V-09 56-V-05 56-VE-01
56-V-07
61-V-04
FILTER FILTER
61-V-03 61-V-05
61-AC-01 61-AC-02 Dwg. Title
61 AIR VACUUM FROM
PG 61-V-06 61-AD-01 61-V-07
01 PERMEATE HEADER
DRYER TRAIN 1. SEE DWG P401-2
PLOTTED BY: PATRICK DAIGLE

61-TK-03
AIR SUPPLY ASSEMPLY # 2 DRAIN PROCESS AND
61-V-01 EJECTOR ASSEMBLY #2 INSTRUMENTATION
61-V-10
S DIAGRAM (P&ID)
AIR COMPRESSOR
56-V-02 56-V-04
TO DRAIN 56-F-02
TO DRAIN
DATE: 2013/Apr/10 2:00:28 PM

56-V-06 56-VE-02
56-V-08 Project No.
OTT-00204430-A0
Dwg. No. Rev. No.
AIR VACUUM FROM
PERMEATE HEADER
P401-3 0
TRAIN 2. SEE DWG P401-2 Scale
DRAIN NOT TO SCALE
This drawing is not to be scaled
exp Services Inc. c 2013