Foreword
This document has been written for the use of the UIC Members staff involved in
Projects Management.
Its aim is to enable the use of the UIC Projects Database by the Members
representatives – technical experts, assistants and decision makers - on a daily basis, as
information and reporting tool. The database is also a basic communication tool
between the UIC staff involved in managing projects and the Members’ representatives
in charge of giving input or monitoring the progress of the work, as well as the financial
aspects related to this process in the ongoing projects.
The tool is currently developed for the use of all the UIC Members participating to the
UIC ongoing projects.
For ergonomics reasons, the database inventories information starting with 2010 only.
In this current version, information is updated in real time for the part called
“Deliverables” and twice a year for the parts called “Project sheets” and “Financial
report”.
The current document is subject to further updates in accordance with the Project
Database evolution at a later stage, with the aim of improving the tool efficiency.
2 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Table of contents
1. Connection to the Project Database tool .....................................................................................5
3 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
4 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
5 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
2. Select your company name in the unwinding list, clicking on the (down flash) button
3. Fill-in your e-mail address, first and last names in the appropriated fields
4. Click on Register in order to validate this information and your registration requirement
Please see the registration page overview here-below:
The application webmaster will be automatically notified that an access has been required. For safety
reasons, he is in charge to control your registration and to accept it before you are able to access the
tool.
If you have already used your e-mail address for a previous registration process into this tool, an
automatic message will be warn you stating “Your e-mail is already registered, please use Lost Password
function in order to get a new password”.
Once your registration has been validated, you will receive an automatic reply informing that your
account, including your e-mail address and password, has been duly validated.
You can now access the tool as a registered user.
6 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Should you be willing to use this option, please tick the case at the right of the question line. The Project
Database application will synchronize with Extranet. You will thus be enabled to use the same e-mail
address and password which will be associated to both your Extranet and Project Database profiles.
Should you not be willing to use this option, please let the case empty.
Once you have clicked on, you will be automatically redirected towards the registration page. You’ll
have to click on log-in again, then the page below will be displayed:
7 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Please fill-in your new password into the appropriate fields, then confirm.
If you are not sure of changing your password or you simply changed your mind, then click on Back. The
tool will keep your previous password that you may use to log-on again.
Once you have clicked on, you will be redirected on the page here-below:
Please fill-in your new e-mail into the appropriate fields, then click on “Get new password”.
The new password will be instantly generated and sent to the e-mail address you have previously filled-
in.
8 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
After having registered and logged-in the tool, this page will give you access to 2 main sections (see list
of main menu on the left side of the webpage here-above).
9 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Please note that any other type of user registered into the UIC project Database will be unable to see
and/or to access this part of the tool menu.
The button Search here-below enables you to go directly to the search module, in which you can type
titles, codes or acronym of a UIC document in order to identify and access all the available documents
related to that project.
For your reference, please find below an overview of the Search page of the tool:
10 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
In order to go chronologically back (one year before), please click on the left arrow (<-) ; if you wish to
go forward (one year after), please click on the right one (->).
Hints
Please be aware that the “YEAR” filter has an impact on your selection, as follows:
Search button: research is not affected by the year.
Projects list: the displayed projects list is the exhaustive UIC projects list for the selected year
only. If you wish to visualize the list of all the UIC projects since 2010 and up to nowadays, you
have to select them year by year.
“Company” projects: as for the projects list, the list of projects to which your company
participates will be displayed for the selected year only. If you wish to visualize all the projects
which your company has been involved in since 2010 and up to nowadays, you have to select
them year by year.
Deliverables list: the displayed list will be the list of deliverables of the selected year only. If you
wish to visualize all the deliverables for all the projects and for every year since 2010 up to
nowadays, you have to select them year by year.
Financial reports list: one to two financial reports available per year. If you wish to visualize all
the financial reports per project since 2010 and up to nowadays, you have to select them year by
year.
11 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Clicking on the Projects list button, the tool will display the full list of ongoing projects during the
selected year (please see section above called “Hints”, related to the impact of the “Year” filter on your
projects selection).
Please have an overview of a Projects list page here-below:
As you may see, besides the “Year” filter on the top right of the page, a second filter appears: the field
and/or UIC Department and/or UIC Working Body (forum, platform) to which the project is related,
either by interest or by source of funding.
Consequently, the list of projects the tool displays is the list of ongoing projects during the selected
year for the selected field.
Please have an attentive look at the image below in order to identify these two filters.
12 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Even if the project started several years ago, if it is still ongoing during the selected year, it will be
included into your displayed list.
In order to change the field / Working body of interest, please clicking on the (down flash) button to
display the unwinding list and select your field of interest, as shown below:
As a result of your selection, the new list displayed on your screen will contain all the ongoing projects
for the selected year in the working body (forum, platform) of your interest as shown below:
Hints
Please be aware that the “Select Platform / Forum” filter has an impact on your selection: the
displayed list contains the projects related to the selected working body only.
13 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
In order to view all the other projects, as exhaustive list or your company projects only, please select
the other categories proposed in the unwinding list and visualize them platform / forum by platform /
forum.
The named platforms and forums correspond, as much as possible, to the UIC internal organization
and/or names of UIC departments.
This is a quick view list on all the UIC projects in which your company is financially committed.
Clicking on the “Company Name” Projects list button, the tool will display the full list of ongoing projects
during the selected year (please see section above called “Hints”, related to the impact of the “Year” and
“Platform / Forum” filters on your projects selection) for your company only.
This means that the list displayed on your screen will contain only those projects in which your company
is involved, as financially committed.
Example:
In order to better understand the “Company Name” notion, please note that if my company is UIC, that
button will indicate “UIC” Projects list. If my company is called “XYZ”, the same button will indicate
“XYZ” Projects list. This is a user profile customized / user adjustable button enabling each user to
automatically select the list of projects concerning his company only.
Please avoid confusion with the exhaustive Projects list presented at point 3.3, which contains all the
ongoing projects at UIC per year and per working body since 2010.
Hints
Please note that the “Company Projects list” is a quick and non restrictive overview of the projects in
which your company is financially committed. In order to see all the UIC ongoing projects, please go
back to the “Projects list” section.
If you wish to visualize projects funded by the UIC headquarters being co-funded by your company,
please note that this category of projects is not available in this current version. In this case, please
contact the UIC Financial Department – Controlling, in order to ask for specific information.
14 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
As you may see in the picture above, this page contains information enabling the identification of the
project (title, acronym, related working body, budgetary reference, state of acceptance, start and end
date), as well as all the current and all previous versions of the Project Sheet and Deliverables. For these
latest documents, the year during which they have been updated is indicated on the right side of the
concerned row.
Below this main information, you will find three categories of attached documents:
all the available versions of the Project sheet, indicating the date of the latest update
all the available Deliverables, published in real time, each of them with the date of publication
in the database
all the available Financial reports, this information being updated twice a year
All these document enclosed may be downloaded, exported towards Excel list, printed into pdf.
documents or simply read on-line in summarized version.
15 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
In the picture above, you may see the on-line available summary of all the information included into a
project sheet of the database.
A thumb index bar situated on the top of the page classifies information in 6 tabs: Info (general project
information), Description, Output, Evaluation, Budget and Team.
1. Info: this information concerns the project identification, management and list of participating
companies, after validation of their opt-in decision. It corresponds to the grey module on the top
16 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
of the Project sheet. The project duration (start and end date) corresponding to item n° 8 of the
Project sheet is also included. All this information may be printed into pdf documents using the
button Export PDF shown above (see page 14).
2. Description: this thumb contains information about the project description of work, its
background, its objectives, organization etc. corresponding to questions n° 1 to 4 in the Project
sheet template. For reference, please have a look at the example of Description page here-
below.
3. Output: this thumb contains information about the project deliverables and any other output
(report, study, article etc) that may be assimilated to the list of planned deliverables. It also
contains information related to the management of the Intellectual Property Rights (IPR) related
to the project outputs. All these issues correspond to items 5 and 6 of the Project sheet.
17 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
4. Evaluation: this thumb contains information related to the evaluation of the project pertinence
and opportunity. They represent the evaluation grid which corresponds to question n° 7 in the
Project sheet. For reference, please see picture below :
5. Budget: this thumb contains information related to the project budget. It corresponds to item n°
9 of the Project sheet. For reference, please see picture below:
6. Team: this thumb displays information related to the project team and internal organization
(roles of persons involved in the project). It corresponds to question n° 10 of the Project sheet.
For reference, please see below :
18 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
19 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
In order to have an overview of the projects deliverables page, please have a look at the picture here-
below:
In case you would like to have an extraction of your selection, please note that an “Export to Excel”
button is available in the upper part of the page, just under the “Platform/Forum” filter. Please use it in
order to obtain an Excel file document including your deliverables selection, as well as complementary
explanation with regards to the deliverables status, as shown in the sample picture below:
20 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Hints
Please be aware that, the same as for the project sheets, the “Year” and “Select Platform / Forum”
filters have a significant impact on your selection: the displayed list of deliverables contains the
projects deliverables related to the selected working body only and for the selected period only.
The Project Database tool cannot enable visualizing a full list of all the projects deliverables, neither
the same list for all the years concerning one or several projects, in one time.
Please note that, in this case, using the right filters is mandatory in order to obtain a correct selection
of deliverables.
The named platforms and forums correspond, as much as possible, to the UIC internal organization
and/or names of UIC departments.
Once you have clicked on the title of a deliverable, you will be automatically redirected towards the
deliverable information page, as shown into the example here-below:
21 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
This page displays information related to the project identity and deliverables.
The page header information is similar to the Project sheet: it offers all the elements enabling the
project identification.
The deliverables part displays information related to the ongoing and finished deliverables, according to
the principle presented in page 20. If a project already has several ongoing or ended deliverables, the
available information will be displayed like in the example below:
As you may see, the project manager comments are shown for each deliverables, explaining the
deliverables status and the reasons of the incurred problems, if any.
Please be aware that this space is limited to 500 characters only. Therefore, if you wish to have further
details with regards to the progress of work or blockage reasons impacting on a project deliverables,
please contact directly the project manager whose e-mail address is indicated into the “Project
Information” header.
The date of the latest update, as well as the author of this publication, is indicated down the page.
22 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Hints
Please be aware that the “Year” and “Select Platform / Forum” filters have a significant impact on
your selection: the displayed list of financial reports contains the projects financial documents related
to the selected working body only and for the selected period only.
The Project Database tool cannot enable visualizing a full list of all the financial reports, neither the
same list for all the years concerning one or several projects, in one time.
Please note that, in this case, using the right filters is mandatory in order to obtain a correct selection
of financial reports.
The named platforms and forums correspond, as much as possible, to the UIC internal organization
and/or names of UIC departments.
Once you have clicked on the title of a financial report, you will be automatically redirected towards the
financial report information page, as shown into the example here-below:
23 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
If you wish to export this information towards a pdf. file, a “Export PDF” thumb is available in the upper
part of the page.
The page header information is similar to the Project sheet and Deliverable pages: it offers elements
enabling the project identification and, in addition, information related to the project income.
A third part in the main menu called “Administration Section” is dedicated to the Project Database
internal (UIC) and external (Member companies) Administrators only.
Therefore UIC staffs, Technical Experts and Decision Makers of the UIC member companies are not able
to visualize this part in their main menu.
UIC Administrators and Assistants representing the UIC member companies only will be enabled to see
and use this section of the Project Database. It is presented more in detail in the next chapter, within
the context of the Access Rights Management procedure (see pages 36 to 40).
Member companies not having an appointed UIC Assistant are strongly recommended to officially
design one person entitled to endorse the role of Administrator of the UIC Project Database.
24 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
3.5. Filters
Please be aware that the Project database filters called “Year” and “Select Platform / Forum” have a
significant impact on your selections: the displayed lists contain the documents related to the selected
working body only and for the selected period only.
In order to remind the filters impact on your selection at every step of your tool usage, please
consult the Hints section at the end of each related chapter.
25 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
26 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
- Check the pertinence and coherence of the publishable information in due time, enabling
thus the respect of the deadlines related to the statutory meetings, such as presented into
the UIC Statutes and Internal Regulations
27 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
- Extract and save files in Excel or pdf format for the use of the parent company, as
representative of a UIC Member company
- Use this information for any valuable reason within the framework of the parent
company and its UIC membership, as well as in relationship with the UIC staff, in
their quality of representative into the UIC Working Bodies.
- Create and manage all the users profiles related to his/her parent company
- Accept, validate, refuse and temporary or permanently delete access to the Project
Database for a user coming from or having worked into his/her parent company
28 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
DECISION MAKERS
If you are a Decision Maker of your company, please note that your Assistant is the administrator of
your company for the UIC Project Database tool.
Therefore, in order to get an access, please use the Register button in order to ask for an access. Your
demand of registration will be automatically sent to your Company UIC Assistant who will validate it
(Reminder: in order to recall the detailed registration steps, please go back to Chapter 2 – “Registration
and safe access to the Project Database tool” and check the pictures below).
Step 1:
Step 2:
As soon as your registration has been validated by your Company UIC Assistant, an e-mail message
similar to the one presented below will notify you with regards to your registered contact details (name,
first name and e-mail address). A link towards the Project Database homepage will also be provided;
please click on this link in order to connect and start using the tool as registered user.
29 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
In case you have any other special requirements, please inform your Assistant.
ASSISTANTS
If you are an Assistant representing one of the UIC Member Companies, you have an Administrator
profile for your company.
In order to get an access, please use the Register button in order to ask for an access. Your demand of
registration will be automatically sent to the UIC IT Engineer in charge with the project Database who
will validate it (Reminder: in order to recall the detailed registration steps, please go back to Chapter 2 –
“Registration and safe access to the Project Database tool” and check the pictures below).
Step 1:
Step 2:
30 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Please remember that you can also use your Extranet log-in and password that you register into the
tool, as related to your user profile.
As soon as your registration has been validated by the UIC Project Database Administrator, you will be
notified by an e-mail message confirming you the contact details registered into the tool (name, first
name and e-mail address).
If you used your Extranet log-in and password, the notification message will be similar to the sample
picture below (no password provided):
If you didn’t use your Extranet log-in and password, the notification message will be similar to the
sample picture below (password included):
TECHNICAL EXPERTS
If you are a Technical Expert, please note that your Company UIC Assistant is the administrator of your
company for the UIC Project Database tool.
In order to get an access, please use the Register button in order to ask for an access. Your demand of
registration will be automatically sent to your Company UIC Assistant who will validate it (Reminder: in
order to recall the detailed registration steps, please go back to Chapter 2 – “Registration and safe
access to the Project Database tool” and check the pictures below).
31 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Step 1:
Step 2:
As soon as your registration has been validated by your Company UIC Assistant, an e-mail message
similar to the one presented below will notify you with regards to your registered contact details (name,
first name and e-mail address). A link towards the Project Database homepage will also be provided;
please click on this link in order to connect and start using the tool as registered user.
32 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Please inform your Assistant with regards to your fields of interest with regards to the UIC projects and
activities. This will enable her/him open a personalized and secured access for your user profile to the
related documents available into the Project Database.
If you have an Extranet login and password, please remember that you can also use them as unique
access contact in order to get registered into the Project Database tool.
As soon as your registration has been validated by your Company Project Database Administrator (UIC
Assistant), you will be notified by an e-mail message confirming you the contact details registered into
the tool (name, first name and e-mail address).
If you used your Extranet log-in and password, the notification message will be similar to the sample
picture below (no password provided):
If you didn’t use your Extranet log-in and password, the notification message will be similar to the
sample picture below (password provided):
33 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
UIC ADMNISTRATOR
1. The access request will be addressed to you as an e-mail notification similar to the sample
shown in the picture below :
34 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
2. In order to accept this request, please click on the link indicated in blue into the mail body,
which will drive you towards the Project Database homepage. Once you logged-in with your
usual profile, you will be directly connected to the Administrator part – “Registration
validation” page, which will display your list of pending requests, like in the sample picture in
the next page.
You may also access to this section clicking directly on the button “Registration validation”
(second button into the Administrator list menu). If you wish to validate the access request,
please click on the “+” (Add) symbol in line with the respective request in your dashboard. If you
are not willing to validate that request, please use the “Del” (Delete) symbol in order to reject it.
3. In order to check your validation, but also to visualize the whole list of registered users into your
company, another dashboard is available for the Administrators of the tool.
In order to access this list, please go to the “Administration” part available for Administrators
only and click on the button called “Users list”
35 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
36 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Once your user registered, you may select his / her name into the list situated on the header of the page
and start customizing his access rights.
The first column of the dashboard lists all the UIC working bodies (forums and platforms) subject to
producing project sheets, deliverables and financial reports, such as presented into the Project
Database.
The three other columns propose you all the types of documents available into the Project Database.
Ticking a case situated into one of these column means that you authorize the person whose name is
selected into the Users List to access the type of document related to the UIC working body whose name
figures into the line.
Example:
Suppose you wish to authorize a technical Expert to access the project sheets and deliverables
related to the Passenger Forum. In this case, you will select, in column 1, the line corresponding
to Passenger, then tick the two cases on the same line corresponding to the “Project Sheet” and
“Deliverables” columns. If you don’t want to the Expert to access the Financial Report, just leave
the case empty.
Two buttons – “Select all” and “Unselect all” – enable you to make rapid selection in case you would like
to give full access to a user or unselect all in case you would like, on the opposite, attentively customize
a new profile.
At the end of your selection, in order to validate the customized user profile, please do not forget to
click on the “Save” button down the page in order to validate your user profile.
You may use the same dashboard in order to change your users’ profiles function of their evolution
inside your company, as well as for simply checking them.
Please check them regularly and do not forget to update them when major changes occur (internal
evolution, change of Department, the person left your company etc.).
37 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
5.2. Special requirements for the UIC staff using the Project Database
For your information, every internal user of the tool, including the UIC staff members involved in project
management or Project Database administration, is strongly recommended to use the Project Database
tool in order to provide a transparent reporting for the project he/she is in charge of.
Therefore, every internal users of the Project Database are regularly requested to:
- Ensure that the published information is updated, coherent and conform to the external users
needs ;
- Regularly check and validate the correctness, pertinence and coherence of the information
included in the published documents ;
38 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
- Correct any inconsistency noticed into the Project Database content or, if they are not technically
enabled to do so, alert and give input to the UIC Project Database Administrators so that this
inconsistency can be corrected within the best delays ;
- Inform internal and external users on every current or upcoming change in the structure, form or
way of utilization of the Project Database tool, on any temporary or permanent unavailable
functionality of the tool, except for the content and information provided by the Project Managers
who are the authors of the published information.
- Enable the UIC Financial Controlling staff to fulfill their role related to the project financial
management, as well as their reporting responsibilities, by providing them with appropriated
input in due time. This input may concern the project planning (upcoming events and expenses,
major deliverables, milestones etc.), the project coordination and management of resources (staff,
money, time), as well as the project financial reporting (interim and final reporting on the project
expenses).
39 This document is intended for the use of the UIC Members and staff only.
UIC PROJECT DATABASE – Guide of Operational Practice 2015
Should you have any requirement on these regards, please contact the UIC project database
Administrator using the following e-mail address: projectsdatabase@uic.org