Professional Documents
Culture Documents
CURRICULAM VITAE
Email ID : sanjib_civ2003@yahoo.co.uk
Qualification:
Bachelor of Engineering (Civil)
Trainings:
Fundamentals of FIDIC Contracts, 2015
Reviewing PCI Standards, Dubai, UAE, 2004
Quality Management Training of JAM CPP, Dubai, UAE, 2003
Safety Training of JAM CPP, Dubai, UAE, 2003
Quality Management policies of NTPC Rihand, India, 2002
Safety Training of IOCL, Haldia, India, 2001
From June 2018 – till Date : M/s. Kuber Dutt Construction Pvt. Ltd.
POSITION : Head (Projects)
RESPONSIBILITIES:
Project Structuring, budget monitoring, project control & project planning
including resource planning.
Project Management, Project Delivery and its approach, Financials &
Benefits realisation.
Ensuring proper Cash Flow, Fund allocation and utilisation.
Contracts Administration & Management.
Page 1 of 6
CV Format.
From Feb 2016 - May 2018 : M/s. Galfar Al Misnad Engg. & Contg. W.L.L.
POSITION : Project Manager
RESPONSIBILITIES:
Project Structuring, budget monitoring, project control & project planning
including resource planning.
Supervising and overseeing the direction of the project, ensuring that the
client’s specifications and requirements are met, reviewing progress and
liaising with quantity surveyors to monitor costs
Coordinating and supervising construction team, providing monthly targets
to each team and monitoring them daily basis.
Expertise in selecting proper tools, equipments & materials, reviewing
method of statements/procedures and job-safety analysis.
Checking and approving the site reports, field designs and drawings.
Ensure proper safety inspections and maintaining construction site safety
at high priority. Ensure maintaining of quality control procedures as per
the standard.
Ability in assessing and minimising risk
Finding ways to prevent problems and to solve any that crop up
Page 2 of 6
CV Format.
RESPONSIBILITIES:
Responsible for handling Project Management of 2x600 MW Mega Power
Plant at Raghunathpur, West Bengal
Construction supervision of all Civil structures which includes main plant
excavation, piling, heavy and equipment foundation, composite structure,
equipment platform, area grading, roads & drains, ash dyke, chimney,
NDCT, non plant buildings by proper planning, scheduling, budgeting and
implementing of work as per specification, drawings. Leaded the Civil
Construction team by managing 50 crew members and completed the
project with safety & high-quality, on time & within the budget.
Page 3 of 6
CV Format.
From Jan 2008 - Sept 2008 : Petron Civil Engineering Pvt. Ltd,
India
POSITION : Deputy Manager
PROJECT : 2X250 MW Thermal Power Plant –
Kasimpur, Aligarh
CLIENT : Uttar Pradesh Rajya Vidyut Nigam Limited
RESPONSIBILITIES:
Prepared and implemented Project Quality Plan and involved in the Mix
Design
Functioned as Management representative and conducted internal Audit and
Management review Meeting
Responsible for setting and analyzing Quality Objectives
Monitored Progress on Quality Management System, System implementation,
Orientation on Quality Matters, ISO regards and Training on Quality matters.
Involved in the Quality Assurance, Preparation of Inspection Tests Plan and
implementation of the same, Preparation of method statement for critical
activities.
Ensured Customer satisfaction and analyzed Customer feedback and managed
Site Execution related activities
From Aug 2005 - Jan 2007 : Larsen & Toubro (Oman) LLC
Page 4 of 6
CV Format.
Page 6 of 6