Checklist regarding completion reports of 66 KV Underground Cables.
Name of work___________________ TL S/D__________________
Sr. Description Tick, if Available
No. 1 Handover/Takeover Certificate from TL organization with signature of concerned JE,SDO and ASE (TL organization and Firm) 2 Handover/Takeover Certificate from P&M organization with signature of concerned JE,SDO and ASE (TL and P&M Organization) 3 Copy of Inspection Report 4 Copy of Approved GTP for 66 KV Cable 5 Copy of Approved GTP/Drawings of cable Accessories 6 Certificate regarding the presence of any other utility in vicinity of cable along with the signatures of concerned JE,SDO and ASE. 7 Copy of Work Order along with amendments, if any 8 EMF Zone sketch/drawing for the cable laid with signature of concerned JE,SDO and ASE 9 Copy of “As Built” Drawing of cable Laid with signature of concerned JE,SDO and ASE (Mention Drum no. and length of cable of each section, tie points, route marker, HDD Laying/ Length, Jointing bay marking along the cable route on the “As Built Drawing”). 10 Joint Survey report of site. 11 Detail of payments made against the work to firm 12 Routine test results for entire cable i.e. each drum length 13 Onsite/after laying test results :- (i) Insulation resistance of each cable drum length after laying and before jointing serving insulation resistance after laying each cable length shall withstand a voltage of 10 KV DC between each re- inforcement and external conducting surface and for one minute. In addition the serving insulation resistance shall be measured and checked with values obtained in the routine factory test. (ii) On completion of the cable laying and jointing work the complete installation shall be tested with a DC DC Voltage of 10 Kv applied for 3 Minutes between each conductor and sheath. The DC test shall be carried at site if not carried out as acceptance test. (iii) Conductor resistance of each cable of each complete circuit. (iv) AC Power frequency rated voltage no load for 24 hours before putting the cable on load.