MONTOS
12 C U RV A S DE C O N TR O L DE AV AN C E DE O B RA
10
A V AN C E
P R OG R A MA
8 DO
6
A V AN C E
E J EC U T AD
4 O
2
1
SE M A N A S 1
0
DATOS DE OBRA
IU PRES. Ka
Incidencia
Mono. factor Símb. Indice Descripcion Base ABRIL. IU SET.
(%) REAJUSTE
2015 2015
1 0.104 100.000% A 05 AGREGADO GRUESO 216.50 219.77 0.10557
2 0.06 100.000% C 21 CEMENTO PORTLAND TIPO I 367.31 367.31 0.06000
3 0.106 100.000% D 30 DÓLAR MAS INFLACIÓN DEL MERCADO USA 429.32 447.20 0.11041
4 0.055 100.000% F 32 FLETE TERRESTRE 469.08 467.08 0.05477
5 0.379 100.000% I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 411.50 418.76 0.38569
6 0.052 100.000% M 43 MADERA NACIONAL PARA ENCOFRADO Y CARP. 599.60 612.75 0.05314
7 0.098 100.000% M 47 MANO DE OBRA 523.15 544.59 0.10202
8 0.146 100.000% M 49 MAQUINARIA Y EQUIPO IMPORTADO 279.73 288.48 0.15057
k -SETIEMBRE 2015 1.02217
Ka-1 Err:502
NOTA.-
(*) EL REAJUSTE "K" SE CALCULARA CON LOS INDICES REALES EN LA LIQUIDACION FINAL DE OBRA.
(*) HASTA LA ELABORACION DEL PRESENTE CUADRO LOS INDICES UNIFICADOS PUBLICADOS SON SOLO HASTA EL MES DE
JULIO del 2015, LO QUE INDICA SE CALCULARA EL COEFICIENTE "K" CON LOS IU DE SETIEMBRE, LO QUE SERA CORREGIDO
EN LA LIQUIUDACION (concordante con el RLCE)
NUMERO Y FECHA DE CONTRATO DE OBR: CONTRATO DE LA ADJUDICACION DE LICITACION PUBLICA Nº 001-2016-MDP/CS
ENTIDAD CONTRATANTE : MUNICIPALIDAD DISTRITAL DE SAN MARCOS
NOMBRE DE LA OBRA : "CONSTRUCCIÓN DE AMBIENTE U OFICINA PARA PRESTACIÓN DE SERVICIOS AL PÚBLICO EN LA I.E. PACHACUTEC EN LA LOCALIDAD DE SAN MARCOS,
FECHA DE APROBACION DEL EXPEDIENTE: #REF!
AREA GEOGRAFICA : 2
PLAZO EJECUCION APROBADO : 90 D.C.
: 816,361.51 CD
MONTO CONTRATADO : 146,945.07 IGV
: 963,306.58 TOTAL
CONTRATISTA : CONTRUCTORA Y SERVICI
EMPRESA PRIVADA : CONVENIO MVCS
INICIO DE OBRA : 23 DE OCTUBRE DEL 201
MES DE PRESUPUESTO BASE : MAYO DEL 2016
TIPO DE OBRA : EDIFICACIÓN
D E L C O S T O D IR E C T O D E L P R O Y E C T O
PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPICION ANTERIOR ACTUAL ACUMULADO
UND METRADO P.U. S/. SUB TOTAL
Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %
PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPICION ANTERIOR ACTUAL ACUMULADO
UND METRADO P.U. S/. SUB TOTAL
Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %
03.02.02.0 EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom=2.50 m, m 51.80 34.67 1,795.91 - 0.00 - 0.00 0.00 0.00 0.00 51.80 1795.91 100.00
03.02.02.0 REFINE Y NIVELACIÓN DE ZANJA, a=0.80 m m 291.50 3.02 880.33 - 0.00 - 0.00 0.00 0.00 0.00 291.50 880.33 100.00
03.02.02.0 CAMA DE APOYO PARA TUBERÍA , e=0.10m, a=0.80m, m 291.50 11.92 3,474.68 - 0.00 - 0.00 0.00 0.00 0.00 291.50 3474.68 100.00
03.02.02.0 PRIMER RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL m 239.70 10.27 2,461.72 - 0.00 - 0.00 0.00 0.00 0.00 239.70 2461.72 100.00
03.02.02.0 PRIMER RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL m 51.80 10.92 565.66 - 0.00 - 0.00 0.00 0.00 0.00 51.80 565.66 100.00
03.02.02.0 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO H m 239.70 22.51 5,395.65 - 0.00 - 0.00 0.00 0.00 0.00 239.70 5395.65 100.00
03.02.02.0 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO H m 51.80 48.24 2,498.83 - 0.00 - 0.00 0.00 0.00 0.00 51.80 2498.83 100.00
03.02.02.0 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 11.82 16.84 199.05 - 0.00 - 0.00 0.00 0.00 0.00 11.82 199.05 100.00
03.02.03 SUMINISTRO E INSTALACIÓN DE TUBERÍAS 13,983.26
03.02.03.0 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC UF NTP-ISO 4435, m 291.50 47.97 13,983.26 - 0.00 - 0.00 0.00 0.00 0.00 291.50 13983.26 100.00
03.02.04 PRUEBAS HIDRAULICA 262.35
03.02.04.0 PRUEBA HIDRAULICA DE DESAGUE m 291.50 0.90 262.35 - 0.00 - 0.00 0.00 0.00 0.00 291.50 262.35 100.00
03.03 CAMARA DE INSPECCION (64 UNIDADES) 125,745.59
03.03.01 CONCRETO SIMPLE 1,380.64
03.03.01.0 CONCRETO f'c=140 kg/cm2 EN DADOS DE ANCLAJE DE TUBERIA m3 3.46 399.03 1,380.64 - 0.00 1.73 690.32 50.00 1.73 690.32 50.00 1.73 690.32 50.00
03.03.02 BUZONES DE CONCRETO 124,364.95
03.03.02.0 BUZON DE CONCRETO H prom=1.00 - 1.50 m und 52.00 1,778.20 92,466.40 - 0.00 35.00 62,237.00 67.31 35.00 62237.00 67.31 17.00 30229.40 32.69
03.03.02.0 BUZON DE CONCRETO H prom= 1.51 - 2.00 m und 3.00 2,142.22 6,426.66 - 0.00 2.00 4,284.44 66.67 2.00 4284.44 66.67 1.00 2142.22 33.33
03.03.02.0 BUZON DE CONCRETO H prom=2.01 - 2.50 m und 4.00 2,501.58 10,006.32 - 0.00 2.00 5,003.16 50.00 2.00 5003.16 50.00 2.00 5003.16 50.00
03.03.02.0 BUZON DE CONCRETO H prom=2.51 - 3.00 m und 4.00 2,850.97 11,403.88 - 0.00 - 0.00 0.00 0.00 0.00 4.00 11403.88 100.00
03.03.02.0 BUZON DE CONCRETO H prom=3.01 - 3.50 m und 1.00 4,061.69 4,061.69 - 0.00 - 0.00 0.00 0.00 0.00 1.00 4061.69 100.00
03.04 CONEXIONES DOMICILIARIAS (79 UNIDADES) 38,436.35
03.04.01 TRABAJOS PRELIMINARES 666.44
03.04.01.0 LIMPIEZA DE TERRENO MANUAL m2 189.60 0.99 187.70 - 0.00 - 0.00 0.00 0.00 0.00 189.60 187.70 100.00
03.04.01.0 TRAZO, NIVELACION Y REPLANTEO m 474.00 1.01 478.74 - 0.00 - 0.00 0.00 0.00 0.00 474.00 478.74 100.00
03.04.02 MOVIMIENTO DE TIERRAS 14,253.19
03.04.02.0 EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom=0.80 m, a m 474.00 7.87 3,730.38 - 0.00 - 0.00 0.00 0.00 0.00 474.00 3730.38 100.00
03.04.02.0 REFINE Y NIVELACIÓN DE ZANJA, a=0.40 m m 474.00 2.51 1,189.74 - 0.00 - 0.00 0.00 0.00 0.00 474.00 1189.74 100.00
03.04.02.0 CAMA DE APOYO PARA TUBERÍA CON MATERIAL SELECCIONAD m 474.00 7.48 3,545.52 - 0.00 - 0.00 0.00 0.00 0.00 474.00 3545.52 100.00
03.04.02.0 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO m 474.00 2.89 1,369.86 - 0.00 - 0.00 0.00 0.00 0.00 474.00 1369.86 100.00
03.04.02.0 RELLENO Y COMPACTADO CON MATERIAL PROPIO;a=0.40 m, h= m 474.00 9.12 4,322.88 - 0.00 - 0.00 0.00 0.00 0.00 474.00 4322.88 100.00
03.04.02.0 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 5.63 16.84 94.81 - 0.00 - 0.00 0.00 0.00 0.00 5.63 94.81 100.00
03.04.03 CAJA DE REGISTRO 8,807.71
03.04.03.0 CAJA DE REGISTRO DE DESAGUE 12" x 24" und 79.00 111.49 8,807.71 - 0.00 - 0.00 0.00 0.00 0.00 79.00 8807.71 100.00
03.04.04 SUMINISTRO E INSTALACIÓN DE CONEXION DOMICILIARIA 14,709.01
03.04.04.0 SUMINISTRO E INSTALACION DE CONEXION DOMICILIARIA, TUB. und 79.00 186.19 14,709.01 - 0.00 - 0.00 0.00 0.00 0.00 79.00 14709.01 100.00
04 UNIDAD BÁSICA DE SANEAMIENTO CON ARRASTRE HIDRÁULICO 1,067,512.62
04.01 CASETA UBS (160 UNIDADES) 590,370.10
04.01.01 TRABAJOS PRELIMINARES 1,540.08
04.01.01.0 LIMPIEZA DEL TERRENO MANUAL m2 570.40 0.99 564.70 570.40 564.70 100.00 - 0.00 570.40 564.70 100.00 0.00 0.00 0.00
04.01.01.0 TRAZO, REPLANTEO Y CONTROL DE NIVELES m2 570.40 1.71 975.38 570.40 975.38 100.00 - 0.00 570.40 975.38 100.00 0.00 0.00 0.00
04.01.02 MOVIMIENTO DE TIERRAS 10,427.35
04.01.02.0 EXCAVACION MANUAL EN TERRENO NORMAL m3 185.60 33.73 6,260.29 185.60 6,260.29 100.00 - 0.00 185.60 6260.29 100.00 0.00 0.00 0.00
VALORIZACION DE OBRA N°02
PERIODO: 01/10/2017 AL 31/10/2017
PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPICION ANTERIOR ACTUAL ACUMULADO
UND METRADO P.U. S/. SUB TOTAL
Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %
04.01.02.0 RELLENO CON MATERIAL PROPIO ZARANDEADO m3 55.77 18.23 1,016.69 55.77 1,016.69 100.00 - 0.00 55.77 1016.69 100.00 0.00 0.00 0.00
04.01.02.0 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE DIST. PROM m3 213.44 14.76 3,150.37 85.38 1,260.15 40.00 42.69 630.07 20.00 128.06 1890.22 60.00 85.38 1260.15 40.00
04.01.03 CONCRETO SIMPLE 70,285.52
04.01.03.0 ENCOFRADO Y DESENCOFRADO m2 583.04 24.84 14,482.71 116.61 2,896.54 20.00 116.61 2,896.54 20.00 233.22 5793.09 40.00 349.82 8689.63 60.00
04.01.03.0 FALSO PISO e=4" CON ACABADO CEMENTO PULIDO m2 410.46 28.82 11,829.46 - 0.00 - - 0.00 0.00 0.00 0.00 410.46 11829.46 100.00
04.01.03.0 CONCRETO EN CIMIENTOS CORRIDOS C:H 1:10 +30% PG Max. 6" m3 89.42 246.97 22,084.06 17.88 4,416.81 20.00 17.88 4,416.81 20.00 35.77 8833.62 40.00 53.65 13250.43 60.00
04.01.03.0 CONCRETO EN SOBRECIMIENTO f'c=175 kg/cm2 m3 35.51 362.36 12,867.40 7.10 2,573.48 20.00 7.10 2,573.48 20.00 14.20 5146.96 40.00 21.31 7720.44 60.00
04.01.03.0 CONCRETO EN VEREDAS f'c=140 kg/cm2 E=0.15 m m2 147.20 61.29 9,021.89 - 0.00 - 0.00 0.00 0.00 0.00 147.20 9021.89 100.00
04.01.04 CONCRETO ARMADO 49,024.00
04.01.04.0 ACERO CORRUGADO fy=4,200 kg/cm2 GRADO 60 kg 2,650.37 4.64 12,297.72 - 0.00 795.11 3,689.32 30.00 795.11 3689.32 30.00 1855.26 8608.40 70.00
04.01.04.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 610.21 35.25 21,509.90 - 0.00 183.06 6,452.97 30.00 183.06 6452.97 30.00 427.15 15056.93 70.00
04.01.04.0 CONCRETO F'C=175 KG/CM2 m3 34.08 446.49 15,216.38 - 0.00 10.22 4,564.91 30.00 10.22 4564.91 30.00 23.86 10651.47 70.00
04.01.05 ALBAÑILERIA 128,726.79
04.01.05.0 MURO DE LADRILLO K.K.MACIZO 9x13x24 cm. m2 1,778.24 72.39 128,726.79 177.82 12,872.68 10.00 711.30 51,490.72 40.00 889.12 64363.40 50.00 889.12 64363.40 50.00
04.01.06 CARPINTERIA DE MADERA 48,435.20
04.01.06.0 PUERTA CONTRAPLACADA DE MADERA DE 0.75x1.70 m und 160.00 256.41 41,025.60 - 0.00 - 0.00 0.00 0.00 0.00 160.00 41025.60 100.00
04.01.06.0 VENTANA DE MADERA PARA UBS und 160.00 46.31 7,409.60 - 0.00 - 0.00 0.00 0.00 0.00 160.00 7409.60 100.00
04.01.07 COBERTURA 91,900.44
04.01.07.0 VIGA DE MADERA DE 2"x3"x10´ und 160.00 114.14 18,262.40 - 0.00 - 0.00 0.00 0.00 0.00 160.00 18262.40 100.00
04.01.07.0 CORREA DE 2"x2"x8´ und 160.00 44.89 7,182.40 - 0.00 - 0.00 0.00 0.00 0.00 160.00 7182.40 100.00
04.01.07.0 COBERTURA CON TEJA ANDINA m2 928.80 71.55 66,455.64 - 0.00 - 0.00 0.00 0.00 0.00 928.80 66455.64 100.00
04.01.08 REVOQUES Y ENLUCIDOS 13,766.76
04.01.08.0 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE CON ACABA m2 596.48 23.08 13,766.76 - 0.00 - 0.00 0.00 0.00 0.00 596.48 13766.76 100.00
04.01.09 PINTURAS 17,580.76
04.01.09.0 PINTADO LATEX EN EXTERIORES (DOS MANOS) m2 1,585.28 11.09 17,580.76 - 0.00 - 0.00 0.00 0.00 0.00 1585.28 17580.76 100.00
04.01.10 INSTALACIONES SANITARIAS 158,683.20
04.01.10. SISTEMA DE AGUA FRIA 51,198.40
04.01.10.0 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" PARA INODO pto 160.00 12.80 2,048.00 - 0.00 - 0.00 0.00 0.00 0.00 160.00 2048.00 100.00
04.01.10.0 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" PARA LAVATO pto 160.00 15.11 2,417.60 - 0.00 - 0.00 0.00 0.00 0.00 160.00 2417.60 100.00
04.01.10.0 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" PARA DUCHA pto 160.00 50.28 8,044.80 - 0.00 - 0.00 0.00 0.00 0.00 160.00 8044.80 100.00
04.01.10.0 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" PARA LAVAD pto 160.00 37.24 5,958.40 - 0.00 - 0.00 0.00 0.00 0.00 160.00 5958.40 100.00
04.01.10.0 SUMINISTRO E INSTALACION DE CONEXION INTERNA DE RED und 160.00 54.45 8,712.00 - 0.00 - 0.00 0.00 0.00 0.00 160.00 8712.00 100.00
04.01.10.0 VALVULA COMPUERTA 1/2" und 160.00 105.27 16,843.20 - 0.00 - 0.00 0.00 0.00 0.00 160.00 16843.20 100.00
04.01.10.0 ACCESORIOS DE INGRESO - GRIFO DE LAVADERO und 160.00 44.84 7,174.40 - 0.00 - 0.00 0.00 0.00 0.00 160.00 7174.40 100.00
04.01.10. SISTEMA DE DESAGUE 44,304.00
04.01.10.0 SALIDA PVC-SAL 2" PARA DESAGUE pto 160.00 46.29 7,406.40 - 0.00 - 0.00 0.00 0.00 0.00 160.00 7406.40 100.00
04.01.10.0 SALIDA PVC-SAL 4" PARA DESAGUE pto 160.00 49.76 7,961.60 - 0.00 - 0.00 0.00 0.00 0.00 160.00 7961.60 100.00
04.01.10.0 SALIDA PVC-SAL 2" PARA VENTILACION pto 160.00 34.33 5,492.80 - 0.00 - 0.00 0.00 0.00 0.00 160.00 5492.80 100.00
04.01.10.0 SUMIDERO DE BRONCE 2" und 160.00 34.64 5,542.40 - 0.00 - 0.00 0.00 0.00 0.00 160.00 5542.40 100.00
04.01.10.0 RED DE DERIVACION PVC SAL PARA DESAGUE DE 4" m 160.00 46.02 7,363.20 - 0.00 - 0.00 0.00 0.00 0.00 160.00 7363.20 100.00
04.01.10.0 RED DE DERIVACION PVC SAL PARA DESAGUE DE 2" m 160.00 24.82 3,971.20 - 0.00 - 0.00 0.00 0.00 0.00 160.00 3971.20 100.00
04.01.10.0 ACCESORIOS DE SALIDA - DESAGUE DE LAVADERO und 160.00 41.04 6,566.40 - 0.00 - 0.00 0.00 0.00 0.00 160.00 6566.40 100.00
04.01.10.0 APARATOS Y ACCESORIOS SANITARIOS 50,001.60
VALORIZACION DE OBRA N°02
PERIODO: 01/10/2017 AL 31/10/2017
PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPICION ANTERIOR ACTUAL ACUMULADO
UND METRADO P.U. S/. SUB TOTAL
Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %
04.01.10.0 SUMINISTRO E INSTALACION DE INODORO BLANCO INCL. ACC und 160.00 182.12 29,139.20 - 0.00 - 0.00 0.00 0.00 0.00 160.00 29139.20 100.00
04.01.10.0 SUMINISTRO E INSTALACION DE LAVATORIO INCL. ACCESORIOS und 160.00 130.39 20,862.40 - 0.00 - 0.00 0.00 0.00 0.00 160.00 20862.40 100.00
04.01.10. INSTALACIONES ELECTRICAS 13,179.20
04.01.10.0 SALIDA PARA CENTRO DE LUZ pto 160.00 63.10 10,096.00 - 0.00 - 0.00 0.00 0.00 0.00 160.00 10096.00 100.00
04.01.10.0 SALIDA DE INTERRUPTOR SIMPLE pto 160.00 19.27 3,083.20 - 0.00 - 0.00 0.00 0.00 0.00 160.00 3083.20 100.00
04.02 BIODIGESTOR (160 UNIDADES) 214,207.64
04.02.01 TRABAJOS PRELIMINARES 1,411.99
04.02.01.0 LIMPIEZA DEL TERRENO MANUAL m2 522.96 0.99 517.73 - 0.00 - 0.00 0.00 0.00 0.00 522.96 517.73 100.00
04.02.01.0 TRAZO, REPLANTEO Y CONTROL DE NIVELES m2 522.96 1.71 894.26 - 0.00 - 0.00 0.00 0.00 0.00 522.96 894.26 100.00
04.02.02 MOVIMIENTO DE TIERRAS 26,889.99
04.02.02.0 EXCAVACION MANUAL EN TERRENO NORMAL m3 518.63 33.73 17,493.39 - 0.00 - 0.00 0.00 0.00 0.00 518.63 17493.39 100.00
04.02.02.0 RELLENO CON MATERIAL PROPIO ZARANDEADO m3 406.63 18.23 7,412.86 - 0.00 - 0.00 0.00 0.00 0.00 406.63 7412.86 100.00
04.02.02.0 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE DIST. PROM m3 134.40 14.76 1,983.74 - 0.00 - 0.00 0.00 0.00 0.00 134.40 1983.74 100.00
04.02.03 CONCRETO SIMPLE 4,462.46
04.02.03.0 CONCRETO f'c=140 kg/cm2 m3 15.21 293.39 4,462.46 - 0.00 - 0.00 0.00 0.00 0.00 15.21 4462.46 100.00
04.02.04 SUMINISTRO E INSTALACIÓN DE BIODIGESTOR 181,443.20
04.02.04.0 SUMINISTRO E INSTALACION DE BIODIGESTOR und 160.00 1,134.02 181,443.20 - 0.00 - 0.00 0.00 0.00 0.00 160.00 181443.20 100.00
04.03 POZO DE ABSORCIÓN (160 UNIDADES) 98,655.73
04.03.01 TRABAJOS PRELIMINARES 868.59
04.03.01.0 LIMPIEZA DEL TERRENO MANUAL m2 321.70 0.99 318.48 - 0.00 - 0.00 0.00 0.00 0.00 321.70 318.48 100.00
04.03.01.0 TRAZO, REPLANTEO Y CONTROL DE NIVELES m2 321.70 1.71 550.11 - 0.00 - 0.00 0.00 0.00 0.00 321.70 550.11 100.00
04.03.02 MOVIMIENTO DE TIERRAS 28,133.15
04.03.02.0 EXCAVACION MANUAL EN TERRENO NORMAL m3 546.89 33.73 18,446.60 - 0.00 - 0.00 0.00 0.00 0.00 546.89 18446.60 100.00
04.03.02.0 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE DIST. PROM m3 656.27 14.76 9,686.55 - 0.00 - 0.00 0.00 0.00 0.00 656.27 9686.55 100.00
04.03.03 CONCRETO SIMPLE 8,965.61
04.03.03.0 ENCOFRADO Y DESENCOFRADO m2 201.06 24.84 4,994.33 - 0.00 - 0.00 0.00 0.00 0.00 201.06 4994.33 100.00
04.03.03.0 CONCRETO EN CIMIENTOS CORRIDOS C:H 1:10 +30% PG Max. 6" m3 16.08 246.97 3,971.28 - 0.00 - 0.00 0.00 0.00 0.00 16.08 3971.28 100.00
04.03.04 CONCRETO ARMADO 20,331.97
04.03.04.0 ACERO CORRUGADO fy=4,200 kg/cm2 GRADO 60 kg 1,016.71 4.64 4,717.53 - 0.00 - 0.00 0.00 0.00 0.00 1016.71 4717.53 100.00
04.03.04.0 ENCOFRADO Y DESENCOFRADO m2 180.96 31.36 5,674.91 - - 0.00 - 0.00 0.00 0.00 0.00 180.96 5674.91 100.00
04.03.04.0 CONCRETO F'C=175 KG/CM2 m3 27.43 362.36 9,939.53 - - 0.00 - 0.00 0.00 0.00 0.00 27.43 9939.53 100.00
04.03.05 ALBAÑILERIA 35,889.21
04.03.05.0 MAMPOSTERIA DE LADRILLO KK, SABEZA, C/ JUNTAS VERTICALES m2 502.65 71.40 35,889.21 - - 0.00 - 0.00 0.00 0.00 0.00 502.65 35889.21 100.00
04.03.06 ACCESORIOS 4,467.20
04.03.06.0 ACCESORIOS EN POZO DE ABSORCION und 160.00 27.92 4,467.20 - - 0.00 - 0.00 0.00 0.00 0.00 160.00 4467.20 100.00
04.04 CAJA DE REGISTRO H=0.30m (320 UNIDADES) 54,684.44
04.04.01 TRABAJOS PRELIMINARES 345.60
04.04.01.0 LIMPIEZA DEL TERRENO MANUAL m2 128.00 0.99 126.72 - - 0.00 - 0.00 0.00 0.00 0.00 128.00 126.72 100.00
04.04.01.0 TRAZO, REPLANTEO Y CONTROL DE NIVELES m2 128.00 1.71 218.88 - - 0.00 - 0.00 0.00 0.00 0.00 128.00 218.88 100.00
04.04.02 MOVIMIENTO DE TIERRAS 2,633.83
04.04.02.0 EXCAVACION MANUAL EN TERRENO NORMAL m3 51.20 33.73 1,726.98 - - 0.00 - 0.00 0.00 0.00 0.00 51.20 1726.98 100.00
04.04.02.0 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE DIST. PROM m3 61.44 14.76 906.85 - - 0.00 - 0.00 0.00 0.00 0.00 61.44 906.85 100.00
04.04.03 CONCRETO SIMPLE 25,807.41
VALORIZACION DE OBRA N°02
PERIODO: 01/10/2017 AL 31/10/2017
PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPICION ANTERIOR ACTUAL ACUMULADO
UND METRADO P.U. S/. SUB TOTAL
Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %
04.04.03.0 ENCOFRADO Y DESENCOFRADO m2 505.60 31.36 15,855.62 - - 0.00 - 0.00 0.00 0.00 0.00 505.60 15855.62 100.00
04.04.03.0 CONCRETO f'c=140 kg/cm2 m3 33.92 293.39 9,951.79 - - 0.00 - 0.00 0.00 0.00 0.00 33.92 9951.79 100.00
04.04.04 CARPINTERIA METALICA 25,897.60
04.04.04.0 TAPA METALICA DE 0.30X0.60M und 320.00 80.93 25,897.60 - - 0.00 - 0.00 0.00 0.00 0.00 320.00 25897.60 100.00
04.05 REGISTRO DE LODOS (160 UNIDADES) 52,752.39
04.05.01 TRABAJOS PRELIMINARES 276.48
04.05.01.0 LIMPIEZA DEL TERRENO MANUAL m2 102.40 0.99 101.38 - 0.00 - 0.00 0.00 0.00 0.00 102.40 101.38 100.00
04.05.01.0 TRAZO, REPLANTEO Y CONTROL DE NIVELES m2 102.40 1.71 175.10 - 0.00 - 0.00 0.00 0.00 0.00 102.40 175.10 100.00
04.05.02 MOVIMIENTO DE TIERRAS 3,423.95
04.05.02.0 EXCAVACION MANUAL EN TERRENO NORMAL m3 66.56 33.73 2,245.07 - 0.00 - 0.00 0.00 0.00 0.00 66.56 2245.07 100.00
04.05.02.0 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE DIST. PROM m3 79.87 14.76 1,178.88 - 0.00 - 0.00 0.00 0.00 0.00 79.87 1178.88 100.00
04.05.03 CONCRETO SIMPLE 25,231.16
04.05.03.0 ENCOFRADO Y DESENCOFRADO m2 499.20 31.36 15,654.91 - 0.00 - 0.00 0.00 0.00 0.00 499.20 15654.91 100.00
04.05.03.0 CONCRETO f'c=140 kg/cm2 m3 32.64 293.39 9,576.25 - 0.00 - 0.00 0.00 0.00 0.00 32.64 9576.25 100.00
04.05.04 CARPINTERIA METALICA 17,699.20
04.05.04.0 TAPA METALICA DE 0.60X0.60M und 160.00 110.62 17,699.20 - 0.00 - 0.00 0.00 0.00 0.00 160.00 17699.20 100.00
04.05.05 ACCESORIOS 6,121.60
04.05.05.0 SUMINISTRO E INSTALACION DE VALVULA Ø = 2" und 160.00 38.26 6,121.60 - 0.00 - 0.00 0.00 0.00 0.00 160.00 6121.60 100.00
04.06 LAVADERO DOMICILIARIO (160 UNIDADES) 56,842.32
04.06.01 MOVIMIENTO DE TIERRAS 411.54
04.06.01.0 EXCAVACION MANUAL EN TERRENO NORMAL m3 8.00 33.73 269.84 - 0.00 - 0.00 0.00 0.00 0.00 8.00 269.84 100.00
04.06.01.0 ACARREO DE MATERIAL EXEDENTE DIST. PROM 30 M m3 9.60 14.76 141.70 - 0.00 - 0.00 0.00 0.00 0.00 9.60 141.70 100.00
04.06.02 CONCRETO SIMPLE 1,862.80
04.06.02.0 CONCRETO CICLÓPEO f'c=140 kg/cm2 + 30% P.M. m3 8.00 232.85 1,862.80 - 0.00 - 0.00 0.00 0.00 0.00 8.00 1862.80 100.00
04.06.03 CONCRETO ARMADO 13,460.04
04.06.03.0 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 600.00 4.64 2,784.00 - 0.00 - 0.00 0.00 0.00 0.00 600.00 2784.00 100.00
04.06.03.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 160.00 35.25 5,640.00 - 0.00 - 0.00 0.00 0.00 0.00 160.00 5640.00 100.00
04.06.03.0 CONCRETO f'c=175 kg/cm2 m3 12.00 419.67 5,036.04 - 0.00 - 0.00 0.00 0.00 0.00 12.00 5036.04 100.00
04.06.04 ALBAÑILERIA 27,541.99
04.06.04.0 MURO DE LADRILLO K.K. 9x13x24 cm., m2 393.12 70.06 27,541.99 - 0.00 - 0.00 0.00 0.00 0.00 393.12 27541.99 100.00
04.06.05 REVOQUES Y ENLUCIDOS 13,565.95
04.06.05.0 TARRAJEO C/MORTERO MEZCLA 1:3 e=1/2" m2 529.92 25.60 13,565.95 - 0.00 - 0.00 0.00 0.00 0.00 529.92 13565.95 100.00
05 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 311,145.50
05.01 CAMARA DE REJAS (01 UNIDADES) 2,610.52
05.01.01 TRABAJOS PRELIMINARES 0.95
05.01.01.0 LIMPIEZA DE TERRENO MANUAL m2 0.48 0.99 0.48 - 0.00 - 0.00 0.00 0.00 0.00 0.48 0.48 99.00
05.01.01.0 TRAZO, NIVELACION Y REPLANTEO m2 0.48 0.97 0.47 - 0.00 - 0.00 0.00 0.00 0.00 0.48 0.47 99.06
05.01.02 MOVIMIENTO DE TIERRAS 59.42
05.01.02.0 EXCAVACION MANUAL DE MATERIAL CONGLOMERADO m3 1.03 33.73 34.74 - 0.00 - 0.00 0.00 0.00 0.00 1.03 34.74 100.01
05.01.02.0 PERFILADO Y NIVELADO CON EQUIPO LIVIANO m2 0.78 3.80 2.96 - 0.00 - 0.00 0.00 0.00 0.00 0.78 2.96 100.14
05.01.02.0 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 1.29 16.84 21.72 - 0.00 - 0.00 0.00 0.00 0.00 1.29 21.72 100.02
05.01.03 CONCRETO SIMPLE 17.52
05.01.03.0 SOLADO DE e=3" MEZCLA 1:12 CEMENTO-HORMIGON m2 0.48 36.50 17.52 - 0.00 - 0.00 0.00 0.00 0.00 0.48 17.52 100.00
VALORIZACION DE OBRA N°02
PERIODO: 01/10/2017 AL 31/10/2017
PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPICION ANTERIOR ACTUAL ACUMULADO
UND METRADO P.U. S/. SUB TOTAL
Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %
05.01.04 CONCRETO ARMADO 1,590.48
05.01.04.0 CONCRETO F'C=175 KG/CM2 m3 0.97 446.49 433.10 - 0.00 - 0.00 0.00 0.00 0.00 0.97 433.10 100.00
05.01.04.0 ENCOFRADO Y DESENCOFRADO m2 15.36 45.52 699.19 - 0.00 - 0.00 0.00 0.00 0.00 15.36 699.19 100.00
05.01.04.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 100.26 4.57 458.19 - 0.00 - 0.00 0.00 0.00 0.00 100.26 458.19 100.00
05.01.05 REVOQUES Y ENLUCIDOS 322.59
05.01.05.0 TARRAJEO C/MORTERO MEZCLA 1:3 e=1.5 cm, EN EXTERIORES m2 5.95 27.88 165.89 - 0.00 - 0.00 0.00 0.00 0.00 5.95 165.89 100.00
05.01.05.0 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 6.47 24.22 156.70 - 0.00 - 0.00 0.00 0.00 0.00 6.47 156.70 100.00
05.01.06 CARPINTERIA METALICA 338.26
05.01.06.0 REJA DE PLATINA DE 1"x1/4" und 2.00 169.13 338.26 - 0.00 - 0.00 0.00 0.00 0.00 2.00 338.26 100.00
05.01.07 SUMINISTRO E INSTALACIÓN DE TUBERÍAS 281.30
05.01.07.0 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC S-25, Ø 200 mm m 6.30 44.65 281.30 - 0.00 - 0.00 0.00 0.00 0.00 6.30 281.30 100.00
05.02 DESARENADOR (01 UNIDAD) 2,526.18
05.02.01 TRABAJOS PRELIMINARES 2.02
05.02.01.0 LIMPIEZA DE TERRENO MANUAL m2 0.90 0.99 0.89 - 0.00 - 0.00 0.00 0.00 0.00 0.90 0.89 100.11
05.02.01.0 TRAZO, NIVELACION Y REPLANTEO. m2 0.90 1.25 1.13 - 0.00 - 0.00 0.00 0.00 0.00 0.90 1.13 99.56
05.02.02 MOVIMIENTO DE TIERRAS 72.53
05.02.02.0 EXCAVACION MANUAL DE MATERIAL CONGLOMERADO m3 1.40 33.73 47.22 - 0.00 - 0.00 0.00 0.00 0.00 1.40 47.22 100.00
05.02.02.0 PERFILADO Y NIVELADO CON EQUIPO LIVIANO m2 0.90 3.80 3.42 - 0.00 - 0.00 0.00 0.00 0.00 0.90 3.42 100.00
05.02.02.0 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 1.30 16.84 21.89 - 0.00 - 0.00 0.00 0.00 0.00 1.30 21.89 100.01
05.02.03 CONCRETO SIMPLE 16.43
05.02.03.0 SOLADO DE e=3" MEZCLA 1:12 CEMENTO-HORMIGON m2 0.45 36.50 16.43 - 0.00 - 0.00 0.00 0.00 0.00 0.45 16.43 99.97
05.02.04 CONCRETO ARMADO 1,472.70
05.02.04.0 CONCRETO F'C=175 KG/CM2 m3 1.11 446.49 495.60 - 0.00 - 0.00 0.00 0.00 0.00 1.11 495.60 100.00
05.02.04.0 ENCOFRADO Y DESENCOFRADO m2 12.78 45.52 581.75 - 0.00 - 0.00 0.00 0.00 0.00 12.78 581.75 100.00
05.02.04.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 86.51 4.57 395.35 - 0.00 - 0.00 0.00 0.00 0.00 86.51 395.35 100.00
05.02.05 REVOQUES Y ENLUCIDOS 312.26
05.02.05.0 TARRAJEO C/MORTERO MEZCLA 1:3 e=1.5 cm, EN EXTERIORES m2 4.45 27.88 124.07 - 0.00 - 0.00 0.00 0.00 0.00 4.45 124.07 100.00
05.02.05.0 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 7.77 24.22 188.19 - 0.00 - 0.00 0.00 0.00 0.00 7.77 188.19 100.00
05.02.06 ACCESORIOS 650.24
05.02.06.0 COMPUERTA CON PLANCHA METALICA CON ACERO LAC 1/4", 0.8 und 2.00 147.78 295.56 - 0.00 - 0.00 0.00 0.00 0.00 2.00 295.56 100.00
05.02.06.0 COMPUERTA CON PLANCHA METALICA CON ACERO LAC 1/4", 0.3 und 1.00 131.54 131.54 - 0.00 - 0.00 0.00 0.00 0.00 1.00 131.54 100.00
05.02.06.0 PLANCHA PARA VERTEDERO CON ACERO LAC 1/8", 0.30x0.60 m und 2.00 111.57 223.14 - 0.00 - 0.00 0.00 0.00 0.00 2.00 223.14 100.00
05.03 TANQUE INHOFF (01 UNIDADES) 134,369.36
05.03.01 TRABAJOS PRELIMINARES 107.57
05.03.01.0 LIMPIEZA DE TERRENO MANUAL m2 48.02 0.99 47.54 - 0.00 - 0.00 0.00 0.00 0.00 48.02 47.54 100.00
05.03.01.0 TRAZO, NIVELACION Y REPLANTEO. m2 48.02 1.25 60.03 - 0.00 - 0.00 0.00 0.00 0.00 48.02 60.03 99.99
05.03.02 MOVIMIENTO DE TIERRAS 7,271.13
05.03.02.0 EXCAVACION A MAQUINA EN TERRENO NORMAL m3 288.24 5.12 1,475.79 - 0.00 - 0.00 0.00 0.00 0.00 288.24 1475.79 100.00
05.03.02.0 PERFILADO Y NIVELADO CON EQUIPO LIVIANO m2 48.02 3.80 182.48 - 0.00 - 0.00 0.00 0.00 0.00 48.02 182.48 100.00
05.03.02.0 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3 18.30 30.39 556.14 - 0.00 - 0.00 0.00 0.00 0.00 18.30 556.14 100.00
05.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 300.28 16.84 5,056.72 - 0.00 - 0.00 0.00 0.00 0.00 300.28 5056.72 100.00
05.03.03 CONCRETO SIMPLE 2,208.62
05.03.03.0 SOLADO DE e=3" MEZCLA 1:12 CEMENTO-HORMIGON m2 60.51 36.50 2,208.62 - 0.00 - 0.00 0.00 0.00 0.00 60.51 2208.62 100.00
VALORIZACION DE OBRA N°02
PERIODO: 01/10/2017 AL 31/10/2017
PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPICION ANTERIOR ACTUAL ACUMULADO
UND METRADO P.U. S/. SUB TOTAL
Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %
05.03.04 CONCRETO ARMADO 100,110.01
05.03.04.0 CONCRETO f'c=210 kg/cm2 m3 107.58 533.89 57,435.89 - 0.00 - 0.00 0.00 0.00 0.00 107.58 57435.89 100.00
05.03.04.0 ENCOFRADO Y DESENCOFRADO m2 511.02 45.52 23,261.63 - 0.00 - 0.00 0.00 0.00 0.00 511.02 23261.63 100.00
05.03.04.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4,247.81 4.57 19,412.49 - 0.00 - 0.00 0.00 0.00 0.00 4247.81 19412.49 100.00
05.03.05 REVOQUES Y ENLUCIDOS 11,640.55
05.03.05.0 TARRAJEO C/MORTERO MEZCLA 1:3 e=1.5 cm, EN EXTERIORES m2 51.40 27.88 1,433.03 - 0.00 - 0.00 0.00 0.00 0.00 51.40 1433.03 100.00
05.03.05.0 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 421.45 24.22 10,207.52 - 0.00 - 0.00 0.00 0.00 0.00 421.45 10207.52 100.00
05.03.06 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCSESORIOS 9,608.01
05.03.06.0 SUMINISTRO E INSTALACIÓN DE TUBERIA SCH 40 DN 200 MM m 15.00 270.87 4,063.05 - 0.00 - 0.00 0.00 0.00 0.00 15.00 4063.05 100.00
05.03.06.0 SUMINISTRO E INSTALACION DE VALVULA COMP. H°D° BB DN 2 und 1.00 3,781.35 3,781.35 - 0.00 - 0.00 0.00 0.00 0.00 1.00 3781.35 100.00
05.03.06.0 SUMINISTRO E INSTALACION DE ACCESORIOS EN TANQUE INHOF glb 1.00 1,763.61 1,763.61 - 0.00 - 0.00 0.00 0.00 0.00 1.00 1763.61 100.00
05.03.07 VARIOS 3,423.47
05.03.07.0 BARANDA DE PROTECCION S/DISEÑO m 16.80 150.54 2,529.07 - 0.00 - 0.00 0.00 0.00 0.00 16.80 2529.07 100.00
05.03.07.0 JUNTA WATER STOP DE PVC DE 6" m 29.20 30.63 894.40 - 0.00 - 0.00 0.00 0.00 0.00 29.20 894.40 100.00
05.04 FILTRO BIOLOGICO (01 UNIDADES) 37,425.35
05.04.01 TRABAJOS PRELIMINARES 37.45
05.04.01.0 LIMPIEZA DE TERRENO MANUAL m2 16.72 0.99 16.55 - 0.00 - 0.00 0.00 0.00 0.00 16.72 16.55 100.02
05.04.01.0 TRAZO, NIVELACION Y REPLANTEO. m2 16.72 1.25 20.90 - 0.00 - 0.00 0.00 0.00 0.00 16.72 20.90 100.00
05.04.02 MOVIMIENTO DE TIERRAS 1,923.27
05.04.02.0 EXCAVACION A MAQUINA EN TERRENO NORMAL m3 71.06 5.12 363.83 - 0.00 - 0.00 0.00 0.00 0.00 71.06 363.83 100.00
05.04.02.0 PERFILADO Y NIVELADO CON EQUIPO LIVIANO m2 16.72 3.80 63.54 - 0.00 - 0.00 0.00 0.00 0.00 16.72 63.54 99.99
05.04.02.0 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 88.83 16.84 1,495.90 - 0.00 - 0.00 0.00 0.00 0.00 88.83 1495.90 100.00
05.04.03 CONCRETO SIMPLE 610.28
05.04.03.0 SOLADO DE e=3" MEZCLA 1:12 CEMENTO-HORMIGON m2 16.72 36.50 610.28 - 0.00 - 0.00 0.00 0.00 0.00 16.72 610.28 100.00
05.04.04 CONCRETO ARMADO 20,232.72
05.04.04.0 CONCRETO f'c=210 kg/cm2 m3 17.68 533.89 9,439.18 - 0.00 - 0.00 0.00 0.00 0.00 17.68 9439.18 100.00
05.04.04.0 ENCOFRADO Y DESENCOFRADO m2 130.13 45.52 5,923.52 - 0.00 - 0.00 0.00 0.00 0.00 130.13 5923.52 100.00
05.04.04.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,065.65 4.57 4,870.02 - 0.00 - 0.00 0.00 0.00 0.00 1065.65 4870.02 100.00
05.04.05 REVOQUES Y ENLUCIDOS 1,803.18
05.04.05.0 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 74.45 24.22 1,803.18 - 0.00 - 0.00 0.00 0.00 0.00 74.45 1803.18 100.00
05.04.06 FILTROS 2,759.23
05.04.06.0 GRAVA ZARANDEADA 1/8"-1/4" m3 9.52 108.47 1,032.63 - 0.00 - 0.00 0.00 0.00 0.00 9.52 1032.63 100.00
05.04.06.0 GRAVA ZARANDEADA 1/2"-3/4" m3 8.16 94.72 772.92 - 0.00 - 0.00 0.00 0.00 0.00 8.16 772.92 100.00
05.04.06.0 GRAVA ZARANDEADA 1"- 1 1/2" m3 6.80 83.47 567.60 - 0.00 - 0.00 0.00 0.00 0.00 6.80 567.60 100.00
05.04.06.0 GRAVA ZARANDEADA 2"- 2 1/2" m3 5.44 70.97 386.08 - 0.00 - 0.00 0.00 0.00 0.00 5.44 386.08 100.00
05.04.07 VARIOS 10,059.22
05.04.07.0 CANALETA DE REPARTICION und 28.00 293.73 8,224.44 - 0.00 - 0.00 0.00 0.00 0.00 28.00 8224.44 100.00
05.04.07.0 VIGUETA DE SOPORTE F'C=210 kg/cm2, EN FILTRO BIOLOGICO m2 13.60 134.91 1,834.78 - 0.00 - 0.00 0.00 0.00 0.00 13.60 1834.78 100.00
05.05 ESTRUCTURA DE DISTRIBUCION DE CAUDALES (01 UNIDADES) 1,483.24
05.05.01 TRABAJOS PRELIMINARES 7.22
05.05.01.0 LIMPIEZA DE TERRENO MANUAL m2 3.45 0.99 3.42 - 0.00 - 0.00 0.00 0.00 0.00 3.45 3.42 99.87
05.05.01.0 TRAZO Y REPLANTEO m2 3.45 1.10 3.80 - 0.00 - 0.00 0.00 0.00 0.00 3.45 3.80 99.87
05.05.02 MOVIMIENTO DE TIERRAS 175.77
VALORIZACION DE OBRA N°02
PERIODO: 01/10/2017 AL 31/10/2017
PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPICION ANTERIOR ACTUAL ACUMULADO
UND METRADO P.U. S/. SUB TOTAL
Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %
05.05.02.0 EXCAVACION MANUAL EN TERRENO NORMAL m3 2.97 33.73 100.18 - 0.00 - 0.00 0.00 0.00 0.00 2.97 100.18 100.00
05.05.02.0 PERFILADO Y NIVELADO CON EQUIPO LIVIANO m2 3.45 3.80 13.11 - 0.00 - 0.00 0.00 0.00 0.00 3.45 13.11 100.00
05.05.02.0 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 3.71 16.84 62.48 - 0.00 - 0.00 0.00 0.00 0.00 3.71 62.48 99.99
05.05.03 CONCRETO SIMPLE 52.93
05.05.03.0 SOLADO DE e=3" MEZCLA 1:12 CEMENTO-HORMIGON m2 1.45 36.50 52.93 - 0.00 - 0.00 0.00 0.00 0.00 1.45 52.93 99.99
05.05.04 CONCRETO ARMADO 810.09
05.05.04.0 CONCRETO f'c=210 kg/cm2 m3 0.73 533.89 389.74 - 0.00 - 0.00 0.00 0.00 0.00 0.73 389.74 100.00
05.05.04.0 ENCOFRADO Y DESENCOFRADO m2 5.07 45.52 230.79 - 0.00 - 0.00 0.00 0.00 0.00 5.07 230.79 100.00
05.05.04.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 41.48 4.57 189.56 - 0.00 - 0.00 0.00 0.00 0.00 41.48 189.56 100.00
05.05.05 REVOQUES Y ENLUCIDOS 47.96
05.05.05.0 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 1.98 24.22 47.96 - 0.00 - 0.00 0.00 0.00 0.00 1.98 47.96 99.99
05.05.06 EMBOQUILLADO 389.27
05.05.06.0 EMBOQUILLADO DE PROTECCION F'C=140 KG/CM2 + 40% PM m2 2.21 176.14 389.27 - 0.00 - 0.00 0.00 0.00 0.00 2.21 389.27 100.00
05.06 LECHO DE SECADO (01 UNIDADES) 27,798.06
05.06.01 TRABAJOS PRELIMINARES 48.83
05.06.01.0 TRAZO, NIVELACION Y REPLANTEO. m2 39.06 1.25 48.83 - 0.00 - 0.00 0.00 0.00 0.00 39.06 48.83 99.99
05.06.02 MOVIMIENTO DE TIERRAS 2,071.92
05.06.02.0 EXCAVACION MANUAL DE MATERIAL CONGLOMERADO m3 19.53 33.73 658.75 - 0.00 - 0.00 0.00 0.00 0.00 19.53 658.75 100.00
05.06.02.0 REFINE Y NIVELACION m2 39.06 2.96 115.62 - 0.00 - 0.00 0.00 0.00 0.00 39.06 115.62 100.00
05.06.02.0 COMPACTADO CON PLANCHA VIBRATORIA m2 39.06 5.16 201.55 - 0.00 - 0.00 0.00 0.00 0.00 39.06 201.55 100.00
05.06.02.0 ACARREO DE MATERIAL EXCEDENTE HASTA Dprom.=30 M. m3 24.41 23.62 576.56 - 0.00 - 0.00 0.00 0.00 0.00 24.41 576.56 100.00
05.06.02.0 ELIMINACION DE MATERIAL EXCEDENTE m3 24.41 21.28 519.44 - 0.00 - 0.00 0.00 0.00 0.00 24.41 519.44 100.00
05.06.03 CONCRETO SIMPLE 1,397.18
05.06.03.0 SOLADO CONCRETO F´C=100 kg/cm2 H=10 cm m2 39.06 35.77 1,397.18 - 0.00 - 0.00 0.00 0.00 0.00 39.06 1397.18 100.00
05.06.04 OBRAS DE CONCRETO ARMADO 9,992.10
05.06.04.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 453.34 4.57 2,071.76 - 0.00 - 0.00 0.00 0.00 0.00 453.34 2071.76 100.00
05.06.04.0 ENCOFRADO Y DESENCOFRADO m2 68.75 45.52 3,129.50 - 0.00 - 0.00 0.00 0.00 0.00 68.75 3129.50 100.00
05.06.04.0 CONCRETO F'C=175 KG/CM2 m3 10.73 446.49 4,790.84 - 0.00 - 0.00 0.00 0.00 0.00 10.73 4790.84 100.00
05.06.05 REVOQUES Y ENLUCIDOS 1,381.15
05.06.05.0 TARRAJEO C/MORTERO MEZCLA 1:3 e=1/2", EN EXTERIORES m2 38.70 25.60 990.72 - 0.00 - 0.00 0.00 0.00 0.00 38.70 990.72 100.00
05.06.05.0 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 16.12 24.22 390.43 - 0.00 - 0.00 0.00 0.00 0.00 16.12 390.43 100.00
05.06.06 SUMINISTRO E INSTALACIÓN DE TUBERÍAS 375.48
05.06.06.0 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC UF NTP-ISO 4435, m 12.00 31.29 375.48 - 0.00 - 0.00 0.00 0.00 0.00 12.00 375.48 100.00
05.06.07 SUMINISTRO E INSTALACION DE MATERIAL FILTRANTE 6,758.50
05.06.07.0 MATERIAL FILTRANTE DE 3/4" - 2" m3 9.57 147.22 1,408.90 - 0.00 - 0.00 0.00 0.00 0.00 9.57 1408.90 100.00
05.06.07.0 MATERIAL FILTRANTE DE 1/4" - 3/4" m3 1.95 147.22 287.08 - 0.00 - 0.00 0.00 0.00 0.00 1.95 287.08 100.00
05.06.07.0 MATERIAL FILTRANTE DE 1/16" - 1/4" m3 29.30 147.22 4,313.55 - 0.00 - 0.00 0.00 0.00 0.00 29.30 4313.55 100.00
05.06.07.0 MATERIAL FILTRANTE - ARENA GRUESA m3 5.27 142.12 748.97 - 0.00 - 0.00 0.00 0.00 0.00 5.27 748.97 100.00
05.06.08 VARIOS 1,190.94
05.06.08.0 SUMINITRO E INSTALACION DE LADRILLO PASTELERO 0.25x0.25 m2 39.06 30.49 1,190.94 - 0.00 - 0.00 0.00 0.00 0.00 39.06 1190.94 100.00
VALORIZACION DE OBRA N°02
PERIODO: 01/10/2017 AL 31/10/2017
PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPICION ANTERIOR ACTUAL ACUMULADO
UND METRADO P.U. S/. SUB TOTAL
Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %
05.06.09 CAJA DE REUNION 396.40
05.06.09.0 CAJA DE 3.0 X 0.8 X 0.7 m C/TAPA und 1.00 396.40 396.40 - 0.00 - 0.00 0.00 0.00 0.00 1.00 396.40 100.00
05.06.10 COBERTURA 4,185.56
05.06.10.0 SOPORTE PARA TECHO DE COBERTURA und 12.00 45.00 540.00 - 0.00 - 0.00 0.00 0.00 0.00 12.00 540.00 100.00
05.06.10.0 COBERTURA CON PLANCHA Y SOPORTES DE MADERA ROLLIZA m2 52.56 69.36 3,645.56 - 0.00 - 0.00 0.00 0.00 0.00 52.56 3645.56 100.00
05.07 CAMARA DE CLORACION (01 UNIDADES) 5,253.90
05.07.01 TRABAJOS PRELIMINARES 2.93
05.07.01.0 LIMPIEZA DE TERRENO MANUAL m2 1.40 0.99 1.39 - 0.00 - 0.00 0.00 0.00 0.00 1.40 1.39 99.71
05.07.01.0 TRAZO Y REPLANTEO m2 1.40 1.10 1.54 - 0.00 - 0.00 0.00 0.00 0.00 1.40 1.54 100.00
05.07.02 MOVIMIENTO DE TIERRAS 736.32
05.07.02.0 EXCAVACION MANUAL EN TERRENO NORMAL m3 13.20 33.73 445.24 - 0.00 - 0.00 0.00 0.00 0.00 13.20 445.24 100.00
05.07.02.0 PERFILADO Y NIVELADO CON EQUIPO LIVIANO m2 3.48 3.80 13.22 - 0.00 - 0.00 0.00 0.00 0.00 3.48 13.22 100.03
05.07.02.0 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 16.50 16.84 277.86 - 0.00 - 0.00 0.00 0.00 0.00 16.50 277.86 100.00
05.07.03 CONCRETO SIMPLE 51.10
05.07.03.0 SOLADO DE e=3" MEZCLA 1:12 CEMENTO-HORMIGON m2 1.40 36.50 51.10 - 0.00 - 0.00 0.00 0.00 0.00 1.40 51.10 100.00
05.07.04 CONCRETO ARMADO 1,887.60
05.07.04.0 CONCRETO f'c=210 kg/cm2 m3 1.52 533.89 811.51 - 0.00 - 0.00 0.00 0.00 0.00 1.52 811.51 100.00
05.07.04.0 ENCOFRADO Y DESENCOFRADO m2 14.79 45.52 673.24 - 0.00 - 0.00 0.00 0.00 0.00 14.79 673.24 100.00
05.07.04.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 88.15 4.57 402.85 - 0.00 - 0.00 0.00 0.00 0.00 88.15 402.85 100.00
05.07.05 REVOQUES Y ENLUCIDOS 334.27
05.07.05.0 TARRAJEO C/MORTERO MEZCLA 1:3 e=1.5 cm, EN EXTERIORES m2 3.78 27.88 105.39 - 0.00 - 0.00 0.00 0.00 0.00 3.78 105.39 100.00
05.07.05.0 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 9.45 24.22 228.88 - 0.00 - 0.00 0.00 0.00 0.00 9.45 228.88 100.00
05.07.06 ACCESORIOS Y OTROS 2,241.68
05.07.06.0 TANQUE DE 600 Lt. DE POLIETILENO INC. ACCESORIOS und 1.00 857.96 857.96 - 0.00 - 0.00 0.00 0.00 0.00 1.00 857.96 100.00
05.07.06.0 PANTALLA DE PLANCHA DE POLIETILENO DE ALTA DENSIDAD e= und 6.00 230.62 1,383.72 - 0.00 - 0.00 0.00 0.00 0.00 6.00 1383.72 100.00
05.08 RED DE EVACUACION (L=300.00 ML) 41,543.23
05.08.01 TRABAJOS PRELIMINARES 540.60
05.08.01.0 LIMPIEZA DE TERRENO MANUAL m2 240.00 0.99 237.60 - 0.00 - 0.00 0.00 0.00 0.00 240.00 237.60 100.00
05.08.01.0 TRAZO, NIVELACION Y REPLANTEO m 300.00 1.01 303.00 - 0.00 - 0.00 0.00 0.00 0.00 300.00 303.00 100.00
05.08.02 MOVIMIENTO DE TIERRAS 17,394.77
05.08.02.0 EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom=1.50 m, a m 300.00 14.76 4,428.00 - 0.00 - 0.00 0.00 0.00 0.00 300.00 4428.00 100.00
05.08.02.0 REFINE Y NIVELACIÓN DE ZANJA, a=0.60 m m 300.00 0.95 285.00 - 0.00 - 0.00 0.00 0.00 0.00 300.00 285.00 100.00
VALORIZACION DE OBRA N°02
PERIODO: 01/10/2017 AL 31/10/2017
PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPICION ANTERIOR ACTUAL ACUMULADO
UND METRADO P.U. S/. SUB TOTAL
Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %
05.08.02.0 CAMA DE APOYO PARA TUBERÍA , e=0.10m, a=0.60m, m 300.00 8.81 2,643.00 - 0.00 - 0.00 0.00 0.00 0.00 300.00 2643.00 100.00
05.08.02.0 PRIMER RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL m 300.00 10.27 3,081.00 - 0.00 - 0.00 0.00 0.00 0.00 300.00 3081.00 100.00
05.08.02.0 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO H m 300.00 22.51 6,753.00 - 0.00 - 0.00 0.00 0.00 0.00 300.00 6753.00 100.00
05.08.02.0 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 12.16 16.84 204.77 - 0.00 - 0.00 0.00 0.00 0.00 12.16 204.77 100.00
05.08.03 SUMINISTRO E INSTALACIÓN DE TUBERÍAS 14,391.00
05.08.03.0 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC UF NTP-ISO 4435, m 300.00 47.97 14,391.00 - 0.00 - 0.00 0.00 0.00 0.00 300.00 14391.00 100.00
05.08.04 PRUEBAS HIDRAULICA 270.00
05.08.04.0 PRUEBA HIDRAULICA DE DESAGUE m 300.00 0.90 270.00 - 0.00 - 0.00 0.00 0.00 0.00 300.00 270.00 100.00
05.08.05 CAMARA DE INSPECCION (02 UNIDADES) 8,946.86
05.08.05. CONCRETO SIMPLE 55.86
05.08.05.0 CONCRETO f'c=140 kg/cm2 EN DADOS DE ANCLAJE DE TUBERI m3 0.14 399.03 55.86 - 0.00 - 0.00 0.00 0.00 0.00 0.14 55.86 100.01
05.08.05. BUZONES DE CONCRETO 8,891.00
05.08.05.0 BUZON DE CONCRETO H prom=1.20 - 1.50 m und 5.00 1,778.20 8,891.00 - 0.00 - 0.00 0.00 0.00 0.00 5.00 8891.00 100.00
05.09 CERCO PERIMÉTRICO CON MALLA OLIMPICA (L= 160.00 ml) 58,135.66
05.09.01 TRABAJOS PRELIMINARES 161.60
05.09.01.0 TRAZO, NIVELACION Y REPLANTEO m 160.00 1.01 161.60 - 0.00 - 0.00 0.00 0.00 0.00 160.00 161.60 100.00
05.09.02 CONCRETO SIMPLE 4,165.98
05.09.02.0 CONCRETO CICLÓPEO f'c=140 kg/cm2 + 30% P.M. m3 7.04 232.85 1,639.26 - 0.00 - 0.00 0.00 0.00 0.00 7.04 1639.26 100.00
05.09.02.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 71.68 35.25 2,526.72 - 0.00 - 0.00 0.00 0.00 0.00 71.68 2526.72 100.00
05.09.03 ESTRUCTURA METALICA 52,828.70
05.09.03.0 POSTE DE TUBO DE F° G° Ø=2" m 176.00 47.35 8,333.60 - 0.00 - 0.00 0.00 0.00 0.00 176.00 8333.60 100.00
05.09.03.0 MARCO DE FIERRO GALVANIZADO D=1 1/2" m 505.60 47.62 24,076.67 - 0.00 - 0.00 0.00 0.00 0.00 505.60 24076.67 100.00
05.09.03.0 MALLA OLIMPICA GALVANIZADA C/ALAMBRE N°12 m2 248.64 80.41 19,993.14 - 0.00 - 0.00 0.00 0.00 0.00 248.64 19993.14 100.00
05.09.03.0 PUERTA METALICA (0.85x2.10M) MARCO F°G° D=1 1/2" und 1.00 425.29 425.29 - 0.00 - 0.00 0.00 0.00 0.00 1.00 425.29 100.00
05.09.04 PINTURAS 979.38
05.09.04.0 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 91.19 10.74 979.38 - 0.00 - 0.00 0.00 0.00 0.00 91.19 979.38 100.00
06 MITIGACIÓN AMBIENTAL 21,409.52
06.01 MONITOREO AMBIENTAL glb 1.00 6,000.00 6,000.00 1.00 6,000.00 100.00 - 0.00 1.00 6000.00 100.00 0.00 0.00 0.00
06.02 BAÑO PORTATILES EN OBRA und 2.00 3,954.76 7,909.52 2.00 7,909.52 100.00 - 0.00 2.00 7909.52 100.00 0.00 0.00 0.00
06.03 CONTENEDOR DE RESIDUOS SOLIDOS und 3.00 2,500.00 7,500.00 1.00 2,500.00 33.33 2.00 5,000.00 66.67 3.00 7500.00 100.00 0.00 0.00 0.00
07 CAPACITACIÓN Y EDUCACION SANITARIA 20,349.90
07.01 IMPLEMENTACION Y CAPACITACION TECNICA DE LA JASS tller 1.00 4,584.90 4,584.90 - 0.00 - 0.00 0.00 0.00 0.00 1.00 4584.90 100.00
07.02 EDUCACION SANITARIA tller 1.00 15,765.00 15,765.00 - 0.00 - 0.00 0.00 0.00 0.00 1.00 15765.00 100.00
08 PROGRAMA DE MONITOREO ARQUEOLOGICO 104,132.80
08.01 ELABORACION DEL PLAN DE MONITOREO ARQUEOLOGICO mes 2.00 9,100.00 18,200.00 2.00 18,200.00 100.00 - 0.00 2.00 18200.00 100.00 0.00 0.00 0.00
08.02 IMPLEMENTACION DEL PLAN DE MONITOREO ARQUEOLOGICO mes 8.00 10,350.00 82,800.00 3.00 31,050.00 37.50 3.00 31,050.00 37.50 6.00 62100.00 75.00 2.00 20700.00 25.00
08.03 PRESENTACION DEL PLAN DE MONITOREO ARQUEOLOGICO mes 1.00 3,132.80 3,132.80 1.00 3,132.80 100.00 - 0.00 1.00 3132.80 100.00 0.00 0.00 0.00
09 FLETE 206,050.04
09.01 FLETE TERRESTRE glb 1.00 62,623.20 62,623.20 0.20 12,524.64 20.00 0.20 12,524.64 20.00 0.40 25049.28 40.00 0.60 37573.92 60.00
09.02 FLETE RURAL glb 1.00 ### 143,426.84 0.20 28,685.37 20.00 0.20 28,685.37 20.00 0.40 57370.74 40.00 0.60 86056.10 60.00
PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPICION ANTERIOR ACTUAL ACUMULADO
UND METRADO P.U. S/. SUB TOTAL
11.30%
Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %Metrado Valoriz. Avance %
12.65% 23.94% 76.06%
SUB TOTAL 2,415,770.89 ### 305,547.16 578,440.82 1,837,330.07
IGV 18% 434,838.76 49,120.86 54,998.49 104,119.35 330,719.41
PRESUPUESTO TOTAL 2,850,609.65 ### 360,545.65 682,560.17 2,168,049.48
FICHA DE IDENTIFICACIÓN DE LA OBRA
OBRA:
"CONSTRUCCIÓN DE AMBIENTE U OFICINA PARA PRESTACIÓN DE SERVICIOS AL PÚBLICO EN LA I.E. PACHACUTEC
EN LA LOCALIDAD DE SAN MARCOS, DISTRITO DE SAN MARCOS - HUARI - ANCASH"
I. GENERALIDADES:
UBICACIÓN:
1 REGION : ANCASH
2 DISTRITO : SAN MARCOS
3 PROVINCIA : HUARI
4 CASERIO : SAN MARCOS
B. ASPECTOS ECONÓMICOS:
Numero de Valorizaciones Tramitadas
Valorización N° 05 (sin reajuste) : S/. 10,000.55
: S/. 0.00
1
: S/. 0.00
val. Acumulado = S/. 10,000.55
21
NUMERO Y FECHA DE CONTRATO DE OBRA : CONTRATO DE LA ADJUDICACION DE LICITACION PUBLICA Nº 001-2016-MDP/CS CONTRATISTA : CONTRUCTORA Y SERVICIOS MULTIPLES CYSMA S.R.L
ENTIDAD CONTRATANTE : MUNICIPALIDAD DISTRITAL DE SAN MARCOS EMPRESA PRIVADA : CONVENIO MVCS
NOMBRE DE LA OBRA ; "CONSTRUCCIÓN DE AMBIENTE U OFICINA PARA PRESTACIÓN DE SERVICIOS AL PÚBLICO EN LA I.E. PACHACUTE INICIO DE OBRA : 23 DE OCTUBRE DEL 2018
FECHA DE APROBACION DEL EXPEDIENTE TECNICO : ### MES DE PRESUPUESTO BAS : MAYO DEL 2016
AREA GEOGRAFICA : 2 TIPO DE OBRA : EDIFICACIÓN
PLAZO EJECUCION APROBADO : 90 D.C. SUPERVISOR DE OBRA : ING. FRANKLIN BRONCANO CASTILLO
: 816,361.51 CD RESIDENTE DE OBRA : ING. JESUS ERNESTO MONTES SALAZAR
MONTO CONTRATADO : 146,945.07 IGV MES DE VALORIZACION : AGOSTO DEL 2017 (01 AL 31)
: 963,306.58 TOTAL SISTEMA DE CONTRATACION: A SUMA ALZADA
22
NUMERO Y FECHA DE CONTRATO DE OBRA : CONTRATO DE LA ADJUDICACION DE LICITACION PUBLICA Nº 001-2016-MDP/CS CONTRATISTA : CONTRUCTORA Y SERVICIOS MULTIPLES CYSMA S.R.L
ENTIDAD CONTRATANTE : MUNICIPALIDAD DISTRITAL DE SAN MARCOS EMPRESA PRIVADA : CONVENIO MVCS
NOMBRE DE LA OBRA ; "CONSTRUCCIÓN DE AMBIENTE U OFICINA PARA PRESTACIÓN DE SERVICIOS AL PÚBLICO EN LA I.E. PACHACUTE INICIO DE OBRA : 23 DE OCTUBRE DEL 2018
FECHA DE APROBACION DEL EXPEDIENTE TECNICO : ### MES DE PRESUPUESTO BAS : MAYO DEL 2016
AREA GEOGRAFICA : 2 TIPO DE OBRA : EDIFICACIÓN
PLAZO EJECUCION APROBADO : 90 D.C. SUPERVISOR DE OBRA : ING. FRANKLIN BRONCANO CASTILLO
: 816,361.51 CD RESIDENTE DE OBRA : ING. JESUS ERNESTO MONTES SALAZAR
MONTO CONTRATADO : 146,945.07 IGV MES DE VALORIZACION : AGOSTO DEL 2017 (01 AL 31)
: 963,306.58 TOTAL SISTEMA DE CONTRATACION: A SUMA ALZADA
23
NUMERO Y FECHA DE CONTRATO DE OBRA : CONTRATO DE LA ADJUDICACION DE LICITACION PUBLICA Nº 001-2016-MDP/CS CONTRATISTA : CONTRUCTORA Y SERVICIOS MULTIPLES CYSMA S.R.L
ENTIDAD CONTRATANTE : MUNICIPALIDAD DISTRITAL DE SAN MARCOS EMPRESA PRIVADA : CONVENIO MVCS
NOMBRE DE LA OBRA ; "CONSTRUCCIÓN DE AMBIENTE U OFICINA PARA PRESTACIÓN DE SERVICIOS AL PÚBLICO EN LA I.E. PACHACUTE INICIO DE OBRA : 23 DE OCTUBRE DEL 2018
FECHA DE APROBACION DEL EXPEDIENTE TECNICO : ### MES DE PRESUPUESTO BAS : MAYO DEL 2016
AREA GEOGRAFICA : 2 TIPO DE OBRA : EDIFICACIÓN
PLAZO EJECUCION APROBADO : 90 D.C. SUPERVISOR DE OBRA : ING. FRANKLIN BRONCANO CASTILLO
: 816,361.51 CD RESIDENTE DE OBRA : ING. JESUS ERNESTO MONTES SALAZAR
MONTO CONTRATADO : 146,945.07 IGV MES DE VALORIZACION : AGOSTO DEL 2017 (01 AL 31)
: 963,306.58 TOTAL SISTEMA DE CONTRATACION: A SUMA ALZADA
24
RESUMEN DE VALORIZACION DE OBRA 02 (Adicional N° 01)
PERIODO: 01/02/2018 AL 04/02/2018
PRESUPUESTO
SALDO
DESCRIPICION ANTERIOR ACTUAL ACUMULADO
SUB TOTAL
Valoriz. Avance % Valoriz. Avance % Valoriz. Avance % Valoriz. Avance %
Costo Directo 49,737.52 42,367.92 85.18 7,369.60 14.82 49,737.52 100.00 0.00 0.00
GASTOS GENERALES(10%) 4,973.75 4,236.79 736.96 4,973.75 0.00
UTILIDAD (5%) 2,486.88 2,118.40 368.48 2,486.88 0.00
SUB TOTAL 57,198.15 48,723.11 85.18 8,475.04 14.82 57,198.15 100.00 0.00 0.00
SUB TOTAL * FACTOR DE RELACIÓN 67,493.81 57,493.27 10,000.55 67,493.81 0.00
VALORIZACIÓN CONTRACTUAL (V) - SIN IGV 67,493.81 57,493.27 10,000.55 67,493.81 0.00
REAJUSTE (R) R = V(K-1) - SIN IGV 0.00 0.00 0.00 0.00 0.00
VALORIZACIÓN BRUTA (VB=V+R) 67,493.81 57,493.27 10,000.55 67,493.81 0.00
AMORTIZACIÓN ADELANTO DIRECTO (AD) 0.00 0.00 0.00 0.00 0.00
AMORTIZACIÓN ADELANTO MATERIALES (AM 0.00 0.00 0.00 0.00 0.00
VALORIZACIÓN NETA (VN=VB -AD -AM) 67,493.81 57,493.27 10,000.55 67,493.81 0.00
MONTO DEL 18% DE IGV 12,148.89 8,770.16 1,800.10 10,570.26 1,578.63
TOTAL VALORIZADO 79,642.70 66,263.43 11,800.65 78,064.07 1,578.63
METRADO METRADO
ITEM DESCRIPCION UNIDAD
EXPEDIENTE ACTUAL %
01 UNIDAD BÁSICA DE SANEAMIENTO CON ARRASTRE HIDRÁULICO
01.01 CASETA UBS (156 UNIDADES)
01.01.01 CONCRETO SIMPLE
01.01.01.01 ENCOFRADO Y DESENCOFRADO m2 27.60 0.00 0.00
01.01.01.02 CONCRETO f'c=140 kg/cm2 EN VEREDA m3 19.32 0.00 0.00
01.01.02 REVOQUES Y ENLUCIDOS
01.01.02.01 TARRAJEO DE VIGAS INT. Y EXT. MEZC. 1:2, e=1.5 cm. m2 401.60 0.00 0.00
01.01.02.02 TARRAJEO DE CONTRAZOCALOS INT. Y EXT. MEZC. 1:2, e=1.5 cm. m2 502.00 0.00 0.00
02 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
02.01 RED DE EVACUACION (L=300 ML.)
02.01.01 CAMARA DE INSPECCION (04 UNIDADES)
02.01.01.01 CONCRETO SIMPLE
02.01.01.01.01 CONCRETO f'c=140 kg/cm2 EN DADOS DE ANCLAJE DE TUBERIA m3 0.22 0.00 0.00
02.01.01.02 BUZONES DE CONCRETO
02.01.01.02.01 BUZON DE CONCRETO H prom=1.20 - 1.50 m und 4.00 0.00 0.00
03 INSTALACIONES DE SUMINISTRO DE AGUA EN CASETAS UBS
03.01 CAMARA ROMPE PRESION TIPO CRP-7 (01 UND.)
03.01.01 OBRAS PRELIMINARES
03.01.01.01 TRAZO NIVELACION Y REPLANTEO m2 1.65 0.00 0.00
03.01.02 MOVIMIENTO DE TIERRAS
03.01.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 1.98 0.00 0.00
03.01.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50m.) m3 2.38 0.00 0.00
03.01.03 OBRAS DE CONCRETO SIMPLE
03.01.03.01 CONCRETO F'C=140 KG/CM2 PARA SOLADOS m3 0.01 0.00 0.00
03.01.04 OBRAS DE CONCRETO ARMADO
03.01.04.01 CONCRETO f'c=210 kg/cm2 m3 1.10 0.00 0.00
03.01.04.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 91.06 0.00 0.00
03.01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 11.42 0.00 0.00
03.01.05 REVOQUES ENLUCIDOS Y MOLDURAS
03.01.05.01 TARRAJEO INTERIOR m2 1.84 0.00 0.00
03.01.05.02 TARRAJEO EN EXTERIORES m2 7.85 0.00 0.00
03.01.05.03 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES 1:2 + SIKA, e=1.5 cm m2 3.48 0.00 0.00
03.01.06 PISOS
03.01.06.01 REVESTIMIENTO DE PIEDRA ASENTADA EN CONCRETO F'C=100 Kg/cm2. m2 0.50 0.00 0.00
03.01.07 PINTURA
03.01.07.01 PINTURA DE MURO EXTERIOR C/LATEX VINILICO m2 7.13 0.00 0.00
03.01.08 CARPINTERIA METALICA
03.01.08.01 TAPA METALICA DE 0.40X0.40M SEGUN DISEÑO und 1.00 0.00
03.01.08.02 TAPA METALICA DE 0.60X0.60M SEGUN DISEÑO und 1.00 0.00 0.00
03.01.08.03 VENTILACION C/TUBRIA DE Fo Go S/DISEÑO DE 2" und 1.00 0.00 0.00
03.01.09 SUMINISTRO E INSTALACIÓN DE TUBERÍAS
03.01.09.01 SUM. E INST. TUBERIA PVC C-10 3/4"INC. PRUEBA m 10.00 0.00 0.00
03.01.10 SUMINISTRO E INSTALACION DE ACCSESORIOS PARA CRP-7.
03.01.10.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC PARA CRP-7. glb 1.00 0.00 0.00
03.01.11 SUMINISTRO E INSTALACION DE VALVULAS
03.01.11.01 SUMINISTRO E INSTALACION VALVULA COMPUERTA DE 3/4" und 1.00 0.00 0.00
03.01.11.02 SUMINISTRO E INSTALACION VALVULA FLOTADOR 3/4" und 1.00 0.00 0.00
03.02 CONEXIONES DOMICILIARIAS DE AGUA POTABLE
03.02.01 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CONEXIONES DOMICILIARIAS
03.02.01.01 SUMINISTRO E INSTALACION DE CONEXION DOMICILIARIA, DE D= 1/2" und 80.00 80.00 100.00
RESUMEN DE PAGO AL CONTRATISTA (Adicional N° 02)
PERIODO: 01/02/2018 AL 04/02/2018
III. DEDUCCIONES
III.1 Deducción del reajuste por adelanto en efectivo
V. AMORTIZACIONES
V.1 Amortización por adelanto en efectivo 0.00 0.00
V.2 Amortización por adelanto de materiales 0.00 0.00
V.3 Amortización por adelanto de materiales 0.00 0.00
NOTA:
(*) EN LAS VALORIZACIONES NO SE REALIZARAN LA RETENCION DEL 10% DEL MONTO TOTAL DEL CONTRATO, DADO QUE EL CONTRATISTA TIENE
LA CARTA FIANZA COMO PARTE DEL FONDO DE GARANTIA
SITUACIÓN DE LA OBRA (Adicional N° 01)
PERIODO: 01/02/2018 AL 04/02/2018
"CONSTRUCCIÓN DE AMBIENTE U OFICINA PARA PRESTACIÓN DE SERVICIOS AL PÚBLICO EN LA I.E. PACHACUTEC EN LA LOCALIDAD DE SAN MARCOS,
OBRA
DISTRITO DE SAN MARCOS - HUARI - ANCASH"
67,493.82 67,493.82
MUNICIPALIDAD DISTRITAL DE PIRA
CALENDARIO DE AVANCE DE OBRA PROGRAMADO VS EJECUTADO (Adicional N° 01 )
CONTRATO : CONTRATO DE LA ADJUDICACION DE LICITACION PUBLICA Nº 001-2016-MDP/CS
O B R A : MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DE SANEAMIENTO BÁSICO DE SHINAN, LLANCA, DISTRITO DE PIRA - PROVINCIA HUARAZ - ANCASH
CONTRATISTA : CONSORCIO SHINAN LLANCA
SUPERVISION : MULTISERVICIOS SAN JERONIMO DPG S.R.L.
RESIDENTE DE OBRA : ING. YUDE OLAVE CLAVERI
FECHA : FEBRERO 2018
OBRA : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO DE SHINAN, LLANCA, DISTRITO DE PIRA - PROVINCIA HUARAZ - ANCASH
CONTRATISTA : CONSORCIO SHINAN LLANCA
RESIDENTE DE OBRA : ING. YUDE OLAVE CLAVERI
PLAZO EJECUCION : 240 DIAS CALENDARIO
Jan-18 Feb-18
UN
ITEM DESCRIPCION METRADO P. UNITARIO P. PARCIAL 06/01/18 AL 01/02/18 AL
D
31/05/18 04/02/18
01 UNIDAD BÁSICA DE SANEAMIENTO CON ARRASTRE HIDRÁULICO 30,654.57
01.01 CASETA UBS (156 UNIDADES) 30,654.57
01.01.01 CONCRETO SIMPLE 8,769.38
01.01.01.01 ENCOFRADO Y DESENCOFRADO m2 27.60 38.41 1,060.12 1,060.12
01.01.01.02 CONCRETO f'c=140 kg/cm2 EN VEREDA m3 19.32 399.03 7,709.26 7,709.26
01.01.02 REVOQUES Y ENLUCIDOS 21,885.19
01.01.02.01 TARRAJEO DE VIGAS INT. Y EXT. MEZC. 1:2, e=1.5 cm. m2 401.60 24.22 9,726.75 9,726.75
01.01.02.02 TARRAJEO DE CONTRAZOCALOS INT. Y EXT. MEZC. 1:2, e=1.5 cm. m2 502.00 24.22 12,158.44 12,158.44
02 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 7,091.79
02.01 RED DE EVACUACION (L=300 ML.) 7,091.79
02.01.01 CAMARA DE INSPECCION (04 UNIDADES) 7,091.79
02.01.01.01 CONCRETO SIMPLE 87.79
02.01.01.01. CONCRETO f'c=140 kg/cm2 EN DADOS DE ANCLAJE DE TUBERIA m3 0.22 399.03 87.79 87.79
02.01.01.02 BUZONES DE CONCRETO 7,004.00
02.01.01.02. BUZON DE CONCRETO H prom=1.20 - 1.50 m und 4.00 1,751.00 7,004.00 7,004.00
03 INSTALACIONES DE SUMINISTRO DE AGUA EN CASETAS UBS 11,991.16
03.01 CAMARA ROMPE PRESION TIPO CRP-7 (01 UND.) 4,621.56
03.01.01 OBRAS PRELIMINARES 2.36
03.01.01.01 TRAZO NIVELACION Y REPLANTEO m2 1.65 1.43 2.36 2.36
03.01.02 MOVIMIENTO DE TIERRAS 130.34
03.01.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 1.98 42.17 83.50 83.50
03.01.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50m.) m3 2.38 19.68 46.84 46.84
03.01.03 OBRAS DE CONCRETO SIMPLE 3.44
03.01.03.01 CONCRETO F'C=140 KG/CM2 PARA SOLADOS m3 0.01 344.36 3.44 3.44
03.01.04 OBRAS DE CONCRETO ARMADO 1,620.00
03.01.04.01 CONCRETO f'c=210 kg/cm2 m3 1.10 538.95 592.85 592.85
03.01.04.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 91.06 4.84 440.73 440.73
03.01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 11.42 51.35 586.42 586.42
03.01.05 REVOQUES ENLUCIDOS Y MOLDURAS 344.76
03.01.05.01 TARRAJEO INTERIOR m2 1.84 21.44 39.45 39.45
03.01.05.02 TARRAJEO EN EXTERIORES m2 7.85 25.07 196.80 196.80
03.01.05.03 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES 1:2 + SIKA, e=1.5 m2 3.48 31.18 108.51 108.51
03.01.06 PISOS 40.13
03.01.06.01 REVESTIMIENTO DE PIEDRA ASENTADA EN CONCRETO F'C=100 Kg/cm2. m2 0.50 80.25 40.13 40.13
03.01.07 PINTURA 106.52
03.01.07.01 PINTURA DE MURO EXTERIOR C/LATEX VINILICO m2 7.13 14.94 106.52 106.52
03.01.08 CARPINTERIA METALICA 299.00
03.01.08.01 TAPA METALICA DE 0.40X0.40M SEGUN DISEÑO und 1.00 89.81 89.81 89.81
03.01.08.02 TAPA METALICA DE 0.60X0.60M SEGUN DISEÑO und 1.00 166.69 166.69 166.69
03.01.08.03 VENTILACION C/TUBRIA DE Fo Go S/DISEÑO DE 2" und 1.00 42.50 42.50 42.50
03.01.09 SUMINISTRO E INSTALACIÓN DE TUBERÍAS 32.50
03.01.09.01 SUM. E INST. TUBERIA PVC C-10 3/4"INC. PRUEBA m 10.00 3.25 32.50 32.50
03.01.10 SUMINISTRO E INSTALACION DE ACCSESORIOS PARA CRP-7. 1,933.28
03.01.10.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC PARA CRP-7. glb 1.00 1,933.28 1,933.28 1,933.28
03.01.11 SUMINISTRO E INSTALACION DE VALVULAS 109.23
03.01.11.01 SUMINISTRO E INSTALACION VALVULA COMPUERTA DE 3/4" und 1.00 26.55 26.55 26.55
03.01.11.02 SUMINISTRO E INSTALACION VALVULA FLOTADOR 3/4" und 1.00 82.68 82.68 82.68
03.02 CONEXIONES DOMICILIARIAS DE AGUA POTABLE 7,369.60
03.02.01 SUMINISTRO E INSTALACION DE VALVULAS Y ACCSESORIOS EN CONEXIONES DOMICILIARIAS 7,369.60
03.02.01.01 SUMINISTRO E INSTALACION DE CONEXION DOMICILIARIA, DE D= 1/2" und 80.00 92.12 7,369.60 7,369.60
OBRA : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO DE SHINAN, LLANCA, DISTRITO DE PIRA - PROVINCIA HUARAZ - ANCASH
CONTRATISTA : CONSORCIO SHINAN LLANCA
RESIDENTE DE OBRA : ING. YUDE OLAVE CLAVERI
PLAZO EJECUCION : 240 DIAS CALENDARIO
Jan-18 Feb-18
UN
ITEM DESCRIPCION METRADO P. UNITARIO P. PARCIAL 06/01/18 AL 01/02/18 AL
D
31/05/18 04/02/18
OBRA : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO DE SHINAN, LLANCA, DISTRITO DE PIRA - PROVINCIA HUARAZ - ANCASH
CONTRATISTA : CONSORCIO SHINAN LLANCA
RESIDENTE DE OBRA : ING. YUDE OLAVE CLAVERI
PLAZO EJECUCION : 240 DIAS CALENDARIO
MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO
UN
ITEM DESCRIPCION METRADO P. UNITARIO P. PARCIAL 11/05/17 AL 01/06/17 AL 01/07/17 AL 01/08/17 AL 01/09/17 AL 01/10/17 AL 01/11/17 AL 01/12/17 AL 01/01/18 AL
D
31/05/17 30/06/17 31/07/17 31/08/17 30/09/17 31/10/17 30/11/17 31/12/17 05/01/18
01 TRABAJOS PROVISIONALES 19,345.87
01.01 OFICINAS, ALMACEN Y GUARDIANIA m2 120.00 118.70 14,244.00 14,244.00
01.02 CARTEL DE IDENTIFICACION DE OBRA glb 1.00 1,141.87 1,141.87 1,141.87
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 1.00 3,960.00 3,960.00 3,960.00
02 SEGURIDAD Y SALUD OCUPACIONAL 46,990.00
02.01 IMPLEMENTOS DE SEGURIDAD 46,990.00
02.01.01 IMPLEMENTOS DE SEGURIDAD INDIVIDUAL und 300.00 149.05 44,715.00 44,715.00
02.01.02 IMPLEMENTOS DE SEGURIDAD COLECTIVO glb 1.00 2,275.00 2,275.00 2,275.00
03 ALCANTARILLADO SANITARIO 303,734.09
03.01 RED COLECTORA (L=1042.00 ML) 105,881.86
03.01.01 TRABAJOS PRELIMINARES 1,671.37
03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 625.20 0.99 618.95 618.95
03.01.01.02 TRAZO, NIVELACION Y REPLANTEO m 1,042.00 1.01 1,052.42 1,052.42
03.01.02 MOVIMIENTO DE TIERRAS 70,668.51
03.01.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom=1.50 m, a=0.60 m 658.60 6.79 4,471.89 4,471.89
03.01.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom=2.00 m, a=0.60 m 234.40 30.20 7,078.88 7,078.88
03.01.02.03 EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom=2.50 m, a=0.60 m 42.70 34.67 1,480.41 1,480.41
03.01.02.04 EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom=3.00 m, a=0.60 m 72.90 38.40 2,799.36 2,799.36
03.01.02.05 EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom=3.50 m, a=0.60 m 33.40 41.02 1,370.07 1,370.07
03.01.02.06 REFINE Y NIVELACIÓN DE ZANJA, a=0.60 m m 1,042.00 0.95 989.90 989.90
03.01.02.07 CAMA DE APOYO PARA TUBERÍA , e=0.10m, a=0.60m, m 1,042.00 8.81 9,180.02 8,389.60 790.42
03.01.02.08 PRIMER RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO m 658.60 10.89 7,172.15 7,127.33 44.82
03.01.02.09 PRIMER RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO m 234.40 11.67 2,735.45 2,735.45
03.01.02.10 PRIMER RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO m 42.70 11.67 498.31 498.31
03.01.02.11 PRIMER RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO m 72.90 12.55 914.90 914.90
03.01.02.12 PRIMER RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPI m 33.40 12.55 419.17 401.71 17.46
03.01.02.13 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO Hprom=1. m 658.60 22.51 14,825.09 11,768.23 3,056.86
03.01.02.14 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO Hprom=2. m 234.40 33.77 7,915.69 7,915.69
03.01.02.15 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO Hprom=2. m 42.70 48.24 2,059.85 2,059.85
03.01.02.16 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO Hprom=3. m 72.90 56.27 4,102.08 4,102.08
03.01.02.17 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO Hprom=3. m 33.40 67.52 2,255.17 1,057.22 1,197.95
03.01.02.18 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 23.76 16.84 400.12 400.12
03.01.03 SUMINISTRO E INSTALACIÓN DE TUBERÍAS 32,604.18
03.01.03.01 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC UF NTP-ISO 4435, S-25, m 1,042.00 31.29 32,604.18 32,604.18
03.01.04 PRUEBAS HIDRAULICA 937.80
03.01.04.01 PRUEBA HIDRAULICA DE DESAGUE m 1,042.00 0.90 937.80 937.80
03.02 RED EMISORA (L=291.50 ML) 33,670.29
03.02.01 TRABAJOS PRELIMINARES 525.29
03.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 233.20 0.99 230.87 230.87
03.02.01.02 TRAZO, NIVELACION Y REPLANTEO m 291.50 1.01 294.42 294.42
03.02.02 MOVIMIENTO DE TIERRAS 18,899.39
03.02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom=1.50 m, a=0.80 m 239.70 6.79 1,627.56 1,627.56
03.02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom=2.50 m, a=0.80 m 51.80 34.67 1,795.91 1,795.91
03.02.02.03 REFINE Y NIVELACIÓN DE ZANJA, a=0.80 m m 291.50 3.02 880.33 880.33
03.02.02.04 CAMA DE APOYO PARA TUBERÍA , e=0.10m, a=0.80m, m 291.50 11.92 3,474.68 3,474.68
03.02.02.05 PRIMER RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO m 239.70 10.27 2,461.72 2,461.72
03.02.02.06 PRIMER RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO m 51.80 10.92 565.66 123.82 441.84
03.02.02.07 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO Hprom=1. m 239.70 22.51 5,395.65 1,982.13 3,413.52
03.02.02.08 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO Hprom=2. m 51.80 48.24 2,498.83 2,498.83
03.02.02.09 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 11.82 16.84 199.05 199.05
03.02.03 SUMINISTRO E INSTALACIÓN DE TUBERÍAS 13,983.26
03.02.03.01 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC UF NTP-ISO 4435, S-25, m 291.50 47.97 13,983.26 13,983.26
03.02.04 PRUEBAS HIDRAULICA 262.35
03.02.04.01 PRUEBA HIDRAULICA DE DESAGUE m 291.50 0.90 262.35 262.35
03.03 CAMARA DE INSPECCION (64 UNIDADES) 125,745.59
03.03.01 CONCRETO SIMPLE 1,380.64
03.03.01.01 CONCRETO f'c=140 kg/cm2 EN DADOS DE ANCLAJE DE TUBERIA m3 3.46 399.03 1,380.64 1,380.64
03.03.02 BUZONES DE CONCRETO 124,364.95
03.03.02.01 BUZON DE CONCRETO H prom=1.00 - 1.50 m und 52.00 1,778.20 92,466.40 30,822.00 61,644.40
03.03.02.02 BUZON DE CONCRETO H prom= 1.51 - 2.00 m und 3.00 2,142.22 6,426.66 6,426.66
03.03.02.03 BUZON DE CONCRETO H prom=2.01 - 2.50 m und 4.00 2,501.58 10,006.32 10,006.32
03.03.02.04 BUZON DE CONCRETO H prom=2.51 - 3.00 m und 4.00 2,850.97 11,403.88 11,403.88
03.03.02.05 BUZON DE CONCRETO H prom=3.01 - 3.50 m und 1.00 4,061.69 4,061.69 4,061.69
03.04 CONEXIONES DOMICILIARIAS (79 UNIDADES) 38,436.35
CALENDARIO VALORIZADO DE EJECUCION DE OBRA PROGRAMADO, A LA FECHA DE INICIO, DE OBRA (Adicional N° 01)
OBRA : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO DE SHINAN, LLANCA, DISTRITO DE PIRA - PROVINCIA HUARAZ - ANCASH
CONTRATISTA : CONSORCIO SHINAN LLANCA
RESIDENTE DE OBRA : ING. YUDE OLAVE CLAVERI
PLAZO EJECUCION : 240 DIAS CALENDARIO
MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO
UN
ITEM DESCRIPCION METRADO P. UNITARIO P. PARCIAL 11/05/17 AL 01/06/17 AL 01/07/17 AL 01/08/17 AL 01/09/17 AL 01/10/17 AL 01/11/17 AL 01/12/17 AL 01/01/18 AL
D
31/05/17 30/06/17 31/07/17 31/08/17 30/09/17 31/10/17 30/11/17 31/12/17 05/01/18
03.04.01 TRABAJOS PRELIMINARES 666.44
03.04.01.01 LIMPIEZA DE TERRENO MANUAL m2 189.60 0.99 187.70 187.70
03.04.01.02 TRAZO, NIVELACION Y REPLANTEO m 474.00 1.01 478.74 478.74
03.04.02 MOVIMIENTO DE TIERRAS 14,253.19
03.04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom=0.80 m, a=0.40 m m 474.00 7.87 3,730.38 1,958.45 1,771.93
03.04.02.02 REFINE Y NIVELACIÓN DE ZANJA, a=0.40 m m 474.00 2.51 1,189.74 1,189.74
03.04.02.03 CAMA DE APOYO PARA TUBERÍA CON MATERIAL SELECCIONADO/ZARAN m 474.00 7.48 3,545.52 3,545.52
03.04.02.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO; a=0. m 474.00 2.89 1,369.86 1,369.86
03.04.02.05 RELLENO Y COMPACTADO CON MATERIAL PROPIO;a=0.40 m, h=0.50 m m 474.00 9.12 4,322.88 2,393.02 1,929.86
03.04.02.06 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 5.63 16.84 94.81 94.81
03.04.03 CAJA DE REGISTRO 8,807.71
03.04.03.01 CAJA DE REGISTRO DE DESAGUE 12" x 24" und 79.00 111.49 8,807.71 8,807.71
03.04.04 SUMINISTRO E INSTALACIÓN DE CONEXION DOMICILIARIA 14,709.01
03.04.04.01 SUMINISTRO E INSTALACION DE CONEXION DOMICILIARIA, TUB. PVC IS und 79.00 186.19 14,709.01 14,709.01
04 UNIDAD BÁSICA DE SANEAMIENTO CON ARRASTRE HIDRÁULICO 1,067,512.62
04.01 CASETA UBS (160 UNIDADES) 590,370.10
04.01.01 TRABAJOS PRELIMINARES 1,540.08
04.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 570.40 0.99 564.70 564.70
04.01.01.02 TRAZO, REPLANTEO Y CONTROL DE NIVELES m2 570.40 1.71 975.38 975.38
04.01.02 MOVIMIENTO DE TIERRAS 10,427.35
04.01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 185.60 33.73 6,260.29 6,260.29
04.01.02.02 RELLENO CON MATERIAL PROPIO ZARANDEADO m3 55.77 18.23 1,016.69 1,016.69
04.01.02.03 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE DIST. PROM 30 M m3 213.44 14.76 3,150.37 1,240.46 1,909.91
04.01.03 CONCRETO SIMPLE 70,285.52
04.01.03.01 ENCOFRADO Y DESENCOFRADO m2 583.04 24.84 14,482.71 3,803.78 10,678.93
04.01.03.02 FALSO PISO e=4" CON ACABADO CEMENTO PULIDO m2 410.46 28.82 11,829.46 11,829.46
04.01.03.03 CONCRETO EN CIMIENTOS CORRIDOS C:H 1:10 +30% PG Max. 6" m3 89.42 246.97 22,084.06 22,084.06
04.01.03.04 CONCRETO EN SOBRECIMIENTO f'c=175 kg/cm2 m3 35.51 362.36 12,867.40 12,867.40
04.01.03.05 CONCRETO EN VEREDAS f'c=140 kg/cm2 E=0.15 m m2 147.20 61.29 9,021.89 9,021.89
04.01.04 CONCRETO ARMADO 49,024.00
04.01.04.01 ACERO CORRUGADO fy=4,200 kg/cm2 GRADO 60 kg 2,650.37 4.64 12,297.72 12,297.72
04.01.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 610.21 35.25 21,509.90 17,581.81 3,928.09
04.01.04.03 CONCRETO F'C=175 KG/CM2 m3 34.08 446.49 15,216.38 15,216.38
04.01.05 ALBAÑILERIA 128,726.79
04.01.05.01 MURO DE LADRILLO K.K.MACIZO 9x13x24 cm. m2 1,778.24 72.39 128,726.79 64,363.40 21,500.00 5,000.00 37,863.39
04.01.06 CARPINTERIA DE MADERA 48,435.20
04.01.06.01 PUERTA CONTRAPLACADA DE MADERA DE 0.75x1.70 m und 160.00 256.41 41,025.60 41,025.60
04.01.06.02 VENTANA DE MADERA PARA UBS und 160.00 46.31 7,409.60 7,409.60
04.01.07 COBERTURA 91,900.44
04.01.07.01 VIGA DE MADERA DE 2"x3"x10´ und 160.00 114.14 18,262.40 17,783.08 479.32
04.01.07.02 CORREA DE 2"x2"x8´ und 160.00 44.89 7,182.40 3,838.14 3,344.26
04.01.07.03 COBERTURA CON TEJA ANDINA m2 928.80 71.55 66,455.64 66,455.64
04.01.08 REVOQUES Y ENLUCIDOS 13,766.76
04.01.08.01 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE CON ACABADO PUm2 596.48 23.08 13,766.76 13,311.59 455.17
04.01.09 PINTURAS 17,580.76
04.01.09.01 PINTADO LATEX EN EXTERIORES (DOS MANOS) m2 1,585.28 11.09 17,580.76 11,662.45 5,918.31
04.01.10 INSTALACIONES SANITARIAS 158,683.20
04.01.10.01 SISTEMA DE AGUA FRIA 51,198.40
04.01.10.01. SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" PARA INODORO pto 160.00 12.80 2,048.00 1,451.20 596.80
04.01.10.01. SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" PARA LAVATORIO pto 160.00 15.11 2,417.60 2,417.60
04.01.10.01. SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" PARA DUCHA pto 160.00 50.28 8,044.80 8,044.80
04.01.10.01. SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" PARA LAVADERO pto 160.00 37.24 5,958.40 5,958.40
04.01.10.01. SUMINISTRO E INSTALACION DE CONEXION INTERNA DE RED DE A und 160.00 54.45 8,712.00 8,007.53 704.47
04.01.10.01. VALVULA COMPUERTA 1/2" und 160.00 105.27 16,843.20 16,031.40 811.80
04.01.10.01. ACCESORIOS DE INGRESO - GRIFO DE LAVADERO und 160.00 44.84 7,174.40 7,174.40
04.01.10.02 SISTEMA DE DESAGUE 44,304.00
04.01.10.02. SALIDA PVC-SAL 2" PARA DESAGUE pto 160.00 46.29 7,406.40 7,406.40
04.01.10.02. SALIDA PVC-SAL 4" PARA DESAGUE pto 160.00 49.76 7,961.60 7,961.60
04.01.10.02. SALIDA PVC-SAL 2" PARA VENTILACION pto 160.00 34.33 5,492.80 5,492.80
04.01.10.02. SUMIDERO DE BRONCE 2" und 160.00 34.64 5,542.40 5,542.40
04.01.10.02. RED DE DERIVACION PVC SAL PARA DESAGUE DE 4" m 160.00 46.02 7,363.20 7,341.72 21.48
04.01.10.02. RED DE DERIVACION PVC SAL PARA DESAGUE DE 2" m 160.00 24.82 3,971.20 3,549.30 421.90
04.01.10.02. ACCESORIOS DE SALIDA - DESAGUE DE LAVADERO und 160.00 41.04 6,566.40 4,626.00 1,940.40
04.01.10.03 APARATOS Y ACCESORIOS SANITARIOS 50,001.60
CALENDARIO VALORIZADO DE EJECUCION DE OBRA PROGRAMADO, A LA FECHA DE INICIO, DE OBRA (Adicional N° 01)
OBRA : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO DE SHINAN, LLANCA, DISTRITO DE PIRA - PROVINCIA HUARAZ - ANCASH
CONTRATISTA : CONSORCIO SHINAN LLANCA
RESIDENTE DE OBRA : ING. YUDE OLAVE CLAVERI
PLAZO EJECUCION : 240 DIAS CALENDARIO
MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO
UN
ITEM DESCRIPCION METRADO P. UNITARIO P. PARCIAL 11/05/17 AL 01/06/17 AL 01/07/17 AL 01/08/17 AL 01/09/17 AL 01/10/17 AL 01/11/17 AL 01/12/17 AL 01/01/18 AL
D
31/05/17 30/06/17 31/07/17 31/08/17 30/09/17 31/10/17 30/11/17 31/12/17 05/01/18
04.01.10.03. SUMINISTRO E INSTALACION DE INODORO BLANCO INCL. ACCESORI und 160.00 182.12 29,139.20 29,139.20
04.01.10.03. SUMINISTRO E INSTALACION DE LAVATORIO INCL. ACCESORIOS und 160.00 130.39 20,862.40 20,862.40
04.01.10.04 INSTALACIONES ELECTRICAS 13,179.20
04.01.10.04. SALIDA PARA CENTRO DE LUZ pto 160.00 63.10 10,096.00 10,096.00
04.01.10.04. SALIDA DE INTERRUPTOR SIMPLE pto 160.00 19.27 3,083.20 3,056.78 26.43
04.02 BIODIGESTOR (160 UNIDADES) 214,207.64
04.02.01 TRABAJOS PRELIMINARES 1,411.99
04.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 522.96 0.99 517.73 517.73
04.02.01.02 TRAZO, REPLANTEO Y CONTROL DE NIVELES m2 522.96 1.71 894.26 894.26
04.02.02 MOVIMIENTO DE TIERRAS 26,889.99
04.02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 518.63 33.73 17,493.39 6,888.02 10,605.37
04.02.02.02 RELLENO CON MATERIAL PROPIO ZARANDEADO m3 406.63 18.23 7,412.86 2,179.27 5,233.59
04.02.02.03 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE DIST. PROM 30 M m3 134.40 14.76 1,983.74 1,983.74
04.02.03 CONCRETO SIMPLE 4,462.46
04.02.03.01 CONCRETO f'c=140 kg/cm2 m3 15.21 293.39 4,462.46 4,462.46
04.02.04 SUMINISTRO E INSTALACIÓN DE BIODIGESTOR 181,443.20
04.02.04.01 SUMINISTRO E INSTALACION DE BIODIGESTOR und 160.00 1,134.02 181,443.20 90,721.60 60,481.00 30,240.60
04.03 POZO DE ABSORCIÓN (160 UNIDADES) 98,655.73
04.03.01 TRABAJOS PRELIMINARES 868.59
04.03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 321.70 0.99 318.48 318.48
04.03.01.02 TRAZO, REPLANTEO Y CONTROL DE NIVELES m2 321.70 1.71 550.11 492.34 57.77
04.03.02 MOVIMIENTO DE TIERRAS 28,133.15
04.03.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 546.89 33.73 18,446.60 18,446.60
04.03.02.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE DIST. PROM 30 M m3 656.27 14.76 9,686.55 9,686.55
04.03.03 CONCRETO SIMPLE 8,965.61
04.03.03.01 ENCOFRADO Y DESENCOFRADO m2 201.06 24.84 4,994.33 4,994.33
04.03.03.02 CONCRETO EN CIMIENTOS CORRIDOS C:H 1:10 +30% PG Max. 6" m3 16.08 246.97 3,971.28 3,971.28
04.03.04 CONCRETO ARMADO 20,331.97
04.03.04.01 ACERO CORRUGADO fy=4,200 kg/cm2 GRADO 60 kg 1,016.71 4.64 4,717.53 4,717.53
04.03.04.02 ENCOFRADO Y DESENCOFRADO m2 180.96 31.36 5,674.91 4,650.45 1,024.46
04.03.04.03 CONCRETO F'C=175 KG/CM2 m3 27.43 362.36 9,939.53 9,939.53
04.03.05 ALBAÑILERIA 35,889.21
04.03.05.01 MAMPOSTERIA DE LADRILLO KK, SABEZA, C/ JUNTAS VERTICALES ABI m2 502.65 71.40 35,889.21 35,889.21
04.03.06 ACCESORIOS 4,467.20
04.03.06.01 ACCESORIOS EN POZO DE ABSORCION und 160.00 27.92 4,467.20 4,467.20
04.04 CAJA DE REGISTRO H=0.30m (320 UNIDADES) 54,684.44
04.04.01 TRABAJOS PRELIMINARES 345.60
04.04.01.01 LIMPIEZA DEL TERRENO MANUAL m2 128.00 0.99 126.72 126.72
04.04.01.02 TRAZO, REPLANTEO Y CONTROL DE NIVELES m2 128.00 1.71 218.88 218.88
04.04.02 MOVIMIENTO DE TIERRAS 2,633.83
04.04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 51.20 33.73 1,726.98 1,449.43 277.55
04.04.02.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE DIST. PROM 30 M m3 61.44 14.76 906.85 906.85
04.04.03 CONCRETO SIMPLE 25,807.41
04.04.03.01 ENCOFRADO Y DESENCOFRADO m2 505.60 31.36 15,855.62 15,855.62
04.04.03.02 CONCRETO f'c=140 kg/cm2 m3 33.92 293.39 9,951.79 9,951.79
04.04.04 CARPINTERIA METALICA 25,897.60
04.04.04.01 TAPA METALICA DE 0.30X0.60M und 320.00 80.93 25,897.60 25,897.60
04.05 REGISTRO DE LODOS (160 UNIDADES) 52,752.39
04.05.01 TRABAJOS PRELIMINARES 276.48
04.05.01.01 LIMPIEZA DEL TERRENO MANUAL m2 102.40 0.99 101.38 101.38
04.05.01.02 TRAZO, REPLANTEO Y CONTROL DE NIVELES m2 102.40 1.71 175.10 175.10
04.05.02 MOVIMIENTO DE TIERRAS 3,423.95
04.05.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 66.56 33.73 2,245.07 2,217.01 28.06
04.05.02.02 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE DIST. PROM 30 M m3 79.87 14.76 1,178.88 564.88 614.00
04.05.03 CONCRETO SIMPLE 25,231.16
04.05.03.01 ENCOFRADO Y DESENCOFRADO m2 499.20 31.36 15,654.91 7,270.83 8,384.08
04.05.03.02 CONCRETO f'c=140 kg/cm2 m3 32.64 293.39 9,576.25 9,576.25
04.05.04 CARPINTERIA METALICA 17,699.20
04.05.04.01 TAPA METALICA DE 0.60X0.60M und 160.00 110.62 17,699.20 17,699.20
04.05.05 ACCESORIOS 6,121.60
04.05.05.01 SUMINISTRO E INSTALACION DE VALVULA Ø = 2" und 160.00 38.26 6,121.60 6,121.60
04.06 LAVADERO DOMICILIARIO (160 UNIDADES) 56,842.32
04.06.01 MOVIMIENTO DE TIERRAS 411.54
04.06.01.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 8.00 33.73 269.84 269.84
CALENDARIO VALORIZADO DE EJECUCION DE OBRA PROGRAMADO, A LA FECHA DE INICIO, DE OBRA (Adicional N° 01)
OBRA : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO DE SHINAN, LLANCA, DISTRITO DE PIRA - PROVINCIA HUARAZ - ANCASH
CONTRATISTA : CONSORCIO SHINAN LLANCA
RESIDENTE DE OBRA : ING. YUDE OLAVE CLAVERI
PLAZO EJECUCION : 240 DIAS CALENDARIO
MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO
UN
ITEM DESCRIPCION METRADO P. UNITARIO P. PARCIAL 11/05/17 AL 01/06/17 AL 01/07/17 AL 01/08/17 AL 01/09/17 AL 01/10/17 AL 01/11/17 AL 01/12/17 AL 01/01/18 AL
D
31/05/17 30/06/17 31/07/17 31/08/17 30/09/17 31/10/17 30/11/17 31/12/17 05/01/18
04.06.01.02 ACARREO DE MATERIAL EXEDENTE DIST. PROM 30 M m3 9.60 14.76 141.70 141.70
04.06.02 CONCRETO SIMPLE 1,862.80
04.06.02.01 CONCRETO CICLÓPEO f'c=140 kg/cm2 + 30% P.M. m3 8.00 232.85 1,862.80 1,862.80
04.06.03 CONCRETO ARMADO 13,460.04
04.06.03.01 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 600.00 4.64 2,784.00 2,784.00
04.06.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 160.00 35.25 5,640.00 5,052.79 587.21
04.06.03.03 CONCRETO f'c=175 kg/cm2 m3 12.00 419.67 5,036.04 5,036.04
04.06.04 ALBAÑILERIA 27,541.99
04.06.04.01 MURO DE LADRILLO K.K. 9x13x24 cm., m2 393.12 70.06 27,541.99 27,541.99
04.06.05 REVOQUES Y ENLUCIDOS 13,565.95
04.06.05.01 TARRAJEO C/MORTERO MEZCLA 1:3 e=1/2" m2 529.92 25.60 13,565.95 13,565.95
05 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 311,145.50
05.01 CAMARA DE REJAS (01 UNIDADES) 2,610.52
05.01.01 TRABAJOS PRELIMINARES 0.95
05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 0.48 0.99 0.48 0.48
05.01.01.02 TRAZO, NIVELACION Y REPLANTEO m2 0.48 0.97 0.47 0.48
05.01.02 MOVIMIENTO DE TIERRAS 59.42
05.01.02.01 EXCAVACION MANUAL DE MATERIAL CONGLOMERADO m3 1.03 33.73 34.74 34.74
05.01.02.02 PERFILADO Y NIVELADO CON EQUIPO LIVIANO m2 0.78 3.80 2.96 2.96
05.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 1.29 16.84 21.72 21.72
05.01.03 CONCRETO SIMPLE 17.52
05.01.03.01 SOLADO DE e=3" MEZCLA 1:12 CEMENTO-HORMIGON m2 0.48 36.50 17.52 17.52
05.01.04 CONCRETO ARMADO 1,590.48
05.01.04.01 CONCRETO F'C=175 KG/CM2 m3 0.97 446.49 433.10 433.10
05.01.04.02 ENCOFRADO Y DESENCOFRADO m2 15.36 45.52 699.19 699.19
05.01.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 100.26 4.57 458.19 458.19
05.01.05 REVOQUES Y ENLUCIDOS 322.59
05.01.05.01 TARRAJEO C/MORTERO MEZCLA 1:3 e=1.5 cm, EN EXTERIORES m2 5.95 27.88 165.89 165.89
05.01.05.02 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 6.47 24.22 156.70 156.70
05.01.06 CARPINTERIA METALICA 338.26
05.01.06.01 REJA DE PLATINA DE 1"x1/4" und 2.00 169.13 338.26 338.26
05.01.07 SUMINISTRO E INSTALACIÓN DE TUBERÍAS 281.30
05.01.07.01 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC S-25, Ø 200 mm m 6.30 44.65 281.30 281.30
05.02 DESARENADOR (01 UNIDAD) 2,526.18
05.02.01 TRABAJOS PRELIMINARES 2.02
05.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 0.90 0.99 0.89 0.89
05.02.01.02 TRAZO, NIVELACION Y REPLANTEO. m2 0.90 1.25 1.13 1.13
05.02.02 MOVIMIENTO DE TIERRAS 72.53
05.02.02.01 EXCAVACION MANUAL DE MATERIAL CONGLOMERADO m3 1.40 33.73 47.22 47.22
05.02.02.02 PERFILADO Y NIVELADO CON EQUIPO LIVIANO m2 0.90 3.80 3.42 3.42
05.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 1.30 16.84 21.89 21.89
05.02.03 CONCRETO SIMPLE 16.43
05.02.03.01 SOLADO DE e=3" MEZCLA 1:12 CEMENTO-HORMIGON m2 0.45 36.50 16.43 16.43
05.02.04 CONCRETO ARMADO 1,472.70
05.02.04.01 CONCRETO F'C=175 KG/CM2 m3 1.11 446.49 495.60 495.60
05.02.04.02 ENCOFRADO Y DESENCOFRADO m2 12.78 45.52 581.75 581.75
05.02.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 86.51 4.57 395.35 383.11 12.24
05.02.05 REVOQUES Y ENLUCIDOS 312.26
05.02.05.01 TARRAJEO C/MORTERO MEZCLA 1:3 e=1.5 cm, EN EXTERIORES m2 4.45 27.88 124.07 124.07
05.02.05.02 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 7.77 24.22 188.19 188.19
05.02.06 ACCESORIOS 650.24
05.02.06.01 COMPUERTA CON PLANCHA METALICA CON ACERO LAC 1/4", 0.85x0.40 und 2.00 147.78 295.56 295.56
05.02.06.02 COMPUERTA CON PLANCHA METALICA CON ACERO LAC 1/4", 0.33x0.40 und 1.00 131.54 131.54 131.54
05.02.06.03 PLANCHA PARA VERTEDERO CON ACERO LAC 1/8", 0.30x0.60 m und 2.00 111.57 223.14 223.14
05.03 TANQUE INHOFF (01 UNIDADES) 134,369.36
05.03.01 TRABAJOS PRELIMINARES 107.57
05.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 48.02 0.99 47.54 47.54
05.03.01.02 TRAZO, NIVELACION Y REPLANTEO. m2 48.02 1.25 60.03 60.03
05.03.02 MOVIMIENTO DE TIERRAS 7,271.13
05.03.02.01 EXCAVACION A MAQUINA EN TERRENO NORMAL m3 288.24 5.12 1,475.79 1,475.79
05.03.02.02 PERFILADO Y NIVELADO CON EQUIPO LIVIANO m2 48.02 3.80 182.48 182.48
05.03.02.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3 18.30 30.39 556.14 556.14
05.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 300.28 16.84 5,056.72 5,056.72
05.03.03 CONCRETO SIMPLE 2,208.62
CALENDARIO VALORIZADO DE EJECUCION DE OBRA PROGRAMADO, A LA FECHA DE INICIO, DE OBRA (Adicional N° 01)
OBRA : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO DE SHINAN, LLANCA, DISTRITO DE PIRA - PROVINCIA HUARAZ - ANCASH
CONTRATISTA : CONSORCIO SHINAN LLANCA
RESIDENTE DE OBRA : ING. YUDE OLAVE CLAVERI
PLAZO EJECUCION : 240 DIAS CALENDARIO
MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO
UN
ITEM DESCRIPCION METRADO P. UNITARIO P. PARCIAL 11/05/17 AL 01/06/17 AL 01/07/17 AL 01/08/17 AL 01/09/17 AL 01/10/17 AL 01/11/17 AL 01/12/17 AL 01/01/18 AL
D
31/05/17 30/06/17 31/07/17 31/08/17 30/09/17 31/10/17 30/11/17 31/12/17 05/01/18
05.03.03.01 SOLADO DE e=3" MEZCLA 1:12 CEMENTO-HORMIGON m2 60.51 36.50 2,208.62 2,208.62
05.03.04 CONCRETO ARMADO 100,110.01
05.03.04.01 CONCRETO f'c=210 kg/cm2 m3 107.58 533.89 57,435.89 57,435.89
05.03.04.02 ENCOFRADO Y DESENCOFRADO m2 511.02 45.52 23,261.63 14,610.72 8,650.91
05.03.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4,247.81 4.57 19,412.49 18,811.43 601.06
05.03.05 REVOQUES Y ENLUCIDOS 11,640.55
05.03.05.01 TARRAJEO C/MORTERO MEZCLA 1:3 e=1.5 cm, EN EXTERIORES m2 51.40 27.88 1,433.03 1,433.03
05.03.05.02 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 421.45 24.22 10,207.52 10,111.98 95.54
05.03.06 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCSESORIOS 9,608.01
05.03.06.01 SUMINISTRO E INSTALACIÓN DE TUBERIA SCH 40 DN 200 MM m 15.00 270.87 4,063.05 4,063.05
05.03.06.02 SUMINISTRO E INSTALACION DE VALVULA COMP. H°D° BB DN 200mm und 1.00 3,781.35 3,781.35 3,781.35
05.03.06.03 SUMINISTRO E INSTALACION DE ACCESORIOS EN TANQUE INHOFF glb 1.00 1,763.61 1,763.61 1,763.61
05.03.07 VARIOS 3,423.47
05.03.07.01 BARANDA DE PROTECCION S/DISEÑO m 16.80 150.54 2,529.07 2,529.07
05.03.07.02 JUNTA WATER STOP DE PVC DE 6" m 29.20 30.63 894.40 894.40
05.04 FILTRO BIOLOGICO (01 UNIDADES) 37,425.35
05.04.01 TRABAJOS PRELIMINARES 37.45
05.04.01.01 LIMPIEZA DE TERRENO MANUAL m2 16.72 0.99 16.55 16.55
05.04.01.02 TRAZO, NIVELACION Y REPLANTEO. m2 16.72 1.25 20.90 20.90
05.04.02 MOVIMIENTO DE TIERRAS 1,923.27
05.04.02.01 EXCAVACION A MAQUINA EN TERRENO NORMAL m3 71.06 5.12 363.83 363.83
05.04.02.02 PERFILADO Y NIVELADO CON EQUIPO LIVIANO m2 16.72 3.80 63.54 63.54
05.04.02.03 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 88.83 16.84 1,495.90 1,495.90
05.04.03 CONCRETO SIMPLE 610.28
05.04.03.01 SOLADO DE e=3" MEZCLA 1:12 CEMENTO-HORMIGON m2 16.72 36.50 610.28 610.28
05.04.04 CONCRETO ARMADO 20,232.72
05.04.04.01 CONCRETO f'c=210 kg/cm2 m3 17.68 533.89 9,439.18 9,439.18
05.04.04.02 ENCOFRADO Y DESENCOFRADO m2 130.13 45.52 5,923.52 5,923.52
05.04.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,065.65 4.57 4,870.02 4,870.02
05.04.05 REVOQUES Y ENLUCIDOS 1,803.18
05.04.05.01 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 74.45 24.22 1,803.18 814.65 988.53
05.04.06 FILTROS 2,759.23
05.04.06.01 GRAVA ZARANDEADA 1/8"-1/4" m3 9.52 108.47 1,032.63 1,032.63
05.04.06.02 GRAVA ZARANDEADA 1/2"-3/4" m3 8.16 94.72 772.92 772.92
05.04.06.03 GRAVA ZARANDEADA 1"- 1 1/2" m3 6.80 83.47 567.60 567.60
05.04.06.04 GRAVA ZARANDEADA 2"- 2 1/2" m3 5.44 70.97 386.08 386.08
05.04.07 VARIOS 10,059.22
05.04.07.01 CANALETA DE REPARTICION und 28.00 293.73 8,224.44 8,224.44
05.04.07.02 VIGUETA DE SOPORTE F'C=210 kg/cm2, EN FILTRO BIOLOGICO m2 13.60 134.91 1,834.78 1,834.78
05.05 ESTRUCTURA DE DISTRIBUCION DE CAUDALES (01 UNIDADES) 1,483.24
05.05.01 TRABAJOS PRELIMINARES 7.22
05.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.45 0.99 3.42 3.42
05.05.01.02 TRAZO Y REPLANTEO m2 3.45 1.10 3.80 3.80
05.05.02 MOVIMIENTO DE TIERRAS 175.77
05.05.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 2.97 33.73 100.18 100.18
05.05.02.02 PERFILADO Y NIVELADO CON EQUIPO LIVIANO m2 3.45 3.80 13.11 13.11
05.05.02.03 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 3.71 16.84 62.48 62.48
05.05.03 CONCRETO SIMPLE 52.93
05.05.03.01 SOLADO DE e=3" MEZCLA 1:12 CEMENTO-HORMIGON m2 1.45 36.50 52.93 52.93
05.05.04 CONCRETO ARMADO 810.09
05.05.04.01 CONCRETO f'c=210 kg/cm2 m3 0.73 533.89 389.74 389.74
05.05.04.02 ENCOFRADO Y DESENCOFRADO m2 5.07 45.52 230.79 230.79
05.05.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 41.48 4.57 189.56 189.56
05.05.05 REVOQUES Y ENLUCIDOS 47.96
05.05.05.01 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 1.98 24.22 47.96 47.96
05.05.06 EMBOQUILLADO 389.27
05.05.06.01 EMBOQUILLADO DE PROTECCION F'C=140 KG/CM2 + 40% PM m2 2.21 176.14 389.27 389.27
05.06 LECHO DE SECADO (01 UNIDADES) 27,798.06
05.06.01 TRABAJOS PRELIMINARES 48.83
05.06.01.01 TRAZO, NIVELACION Y REPLANTEO. m2 39.06 1.25 48.83 48.83
05.06.02 MOVIMIENTO DE TIERRAS 2,071.92
05.06.02.01 EXCAVACION MANUAL DE MATERIAL CONGLOMERADO m3 19.53 33.73 658.75 658.75
05.06.02.02 REFINE Y NIVELACION m2 39.06 2.96 115.62 115.62
05.06.02.03 COMPACTADO CON PLANCHA VIBRATORIA m2 39.06 5.16 201.55 201.55
CALENDARIO VALORIZADO DE EJECUCION DE OBRA PROGRAMADO, A LA FECHA DE INICIO, DE OBRA (Adicional N° 01)
OBRA : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO DE SHINAN, LLANCA, DISTRITO DE PIRA - PROVINCIA HUARAZ - ANCASH
CONTRATISTA : CONSORCIO SHINAN LLANCA
RESIDENTE DE OBRA : ING. YUDE OLAVE CLAVERI
PLAZO EJECUCION : 240 DIAS CALENDARIO
MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO
UN
ITEM DESCRIPCION METRADO P. UNITARIO P. PARCIAL 11/05/17 AL 01/06/17 AL 01/07/17 AL 01/08/17 AL 01/09/17 AL 01/10/17 AL 01/11/17 AL 01/12/17 AL 01/01/18 AL
D
31/05/17 30/06/17 31/07/17 31/08/17 30/09/17 31/10/17 30/11/17 31/12/17 05/01/18
05.06.02.04 ACARREO DE MATERIAL EXCEDENTE HASTA Dprom.=30 M. m3 24.41 23.62 576.56 576.56
05.06.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 24.41 21.28 519.44 519.44
05.06.03 CONCRETO SIMPLE 1,397.18
05.06.03.01 SOLADO CONCRETO F´C=100 kg/cm2 H=10 cm m2 39.06 35.77 1,397.18 1,397.18
05.06.04 OBRAS DE CONCRETO ARMADO 9,992.10
05.06.04.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 453.34 4.57 2,071.76 2,071.76
05.06.04.02 ENCOFRADO Y DESENCOFRADO m2 68.75 45.52 3,129.50 1,583.42 1,546.08
05.06.04.03 CONCRETO F'C=175 KG/CM2 m3 10.73 446.49 4,790.84 4,790.84
05.06.05 REVOQUES Y ENLUCIDOS 1,381.15
05.06.05.01 TARRAJEO C/MORTERO MEZCLA 1:3 e=1/2", EN EXTERIORES m2 38.70 25.60 990.72 990.72
05.06.05.02 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 16.12 24.22 390.43 390.43
05.06.06 SUMINISTRO E INSTALACIÓN DE TUBERÍAS 375.48
05.06.06.01 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC UF NTP-ISO 4435, S-25, m 12.00 31.29 375.48 375.48
05.06.07 SUMINISTRO E INSTALACION DE MATERIAL FILTRANTE 6,758.50
05.06.07.01 MATERIAL FILTRANTE DE 3/4" - 2" m3 9.57 147.22 1,408.90 1,408.90
05.06.07.02 MATERIAL FILTRANTE DE 1/4" - 3/4" m3 1.95 147.22 287.08 287.08
05.06.07.03 MATERIAL FILTRANTE DE 1/16" - 1/4" m3 29.30 147.22 4,313.55 4,313.55
05.06.07.04 MATERIAL FILTRANTE - ARENA GRUESA m3 5.27 142.12 748.97 748.97
05.06.08 VARIOS 1,190.94
05.06.08.01 SUMINITRO E INSTALACION DE LADRILLO PASTELERO 0.25x0.25x0.03 m m2 39.06 30.49 1,190.94 1,190.94
05.06.09 CAJA DE REUNION 396.40
05.06.09.01 CAJA DE 3.0 X 0.8 X 0.7 m C/TAPA und 1.00 396.40 396.40 396.40
05.06.10 COBERTURA 4,185.56
05.06.10.01 SOPORTE PARA TECHO DE COBERTURA und 12.00 45.00 540.00 540.00
05.06.10.02 COBERTURA CON PLANCHA Y SOPORTES DE MADERA ROLLIZA m2 52.56 69.36 3,645.56 3,645.56
05.07 CAMARA DE CLORACION (01 UNIDADES) 5,253.90
05.07.01 TRABAJOS PRELIMINARES 2.93
05.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 1.40 0.99 1.39 1.39
05.07.01.02 TRAZO Y REPLANTEO m2 1.40 1.10 1.54 1.54
05.07.02 MOVIMIENTO DE TIERRAS 736.32
05.07.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 13.20 33.73 445.24 445.24
05.07.02.02 PERFILADO Y NIVELADO CON EQUIPO LIVIANO m2 3.48 3.80 13.22 13.22
05.07.02.03 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 16.50 16.84 277.86 277.86
05.07.03 CONCRETO SIMPLE 51.10
05.07.03.01 SOLADO DE e=3" MEZCLA 1:12 CEMENTO-HORMIGON m2 1.40 36.50 51.10 51.10
05.07.04 CONCRETO ARMADO 1,887.60
05.07.04.01 CONCRETO f'c=210 kg/cm2 m3 1.52 533.89 811.51 811.51
05.07.04.02 ENCOFRADO Y DESENCOFRADO m2 14.79 45.52 673.24 673.24
05.07.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 88.15 4.57 402.85 402.85
05.07.05 REVOQUES Y ENLUCIDOS 334.27
05.07.05.01 TARRAJEO C/MORTERO MEZCLA 1:3 e=1.5 cm, EN EXTERIORES m2 3.78 27.88 105.39 105.39
05.07.05.02 TARRAJEO INT. Y EXT. MEZC. 1:2, e=1.5 cm m2 9.45 24.22 228.88 228.88
05.07.06 ACCESORIOS Y OTROS 2,241.68
05.07.06.01 TANQUE DE 600 Lt. DE POLIETILENO INC. ACCESORIOS und 1.00 857.96 857.96 857.96
05.07.06.02 PANTALLA DE PLANCHA DE POLIETILENO DE ALTA DENSIDAD e=25mm, Dund 6.00 230.62 1,383.72 1,383.72
05.08 RED DE EVACUACION (L=300.00 ML) 41,543.23
05.08.01 TRABAJOS PRELIMINARES 540.60
05.08.01.01 LIMPIEZA DE TERRENO MANUAL m2 240.00 0.99 237.60 237.60
05.08.01.02 TRAZO, NIVELACION Y REPLANTEO m 300.00 1.01 303.00 303.00
05.08.02 MOVIMIENTO DE TIERRAS 17,394.77
05.08.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom=1.50 m, a=0.60 m m 300.00 14.76 4,428.00 4,372.65 55.35
05.08.02.02 REFINE Y NIVELACIÓN DE ZANJA, a=0.60 m m 300.00 0.95 285.00 285.00
05.08.02.03 CAMA DE APOYO PARA TUBERÍA , e=0.10m, a=0.60m, m 300.00 8.81 2,643.00 2,643.00
05.08.02.04 PRIMER RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO m 300.00 10.27 3,081.00 3,081.00
05.08.02.05 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO Hprom=1. m 300.00 22.51 6,753.00 6,753.00
05.08.02.06 ELIMINACION DE MATERIAL EXCEDENTE Dmax=1.0 Km m3 12.16 16.84 204.77 204.77
05.08.03 SUMINISTRO E INSTALACIÓN DE TUBERÍAS 14,391.00
05.08.03.01 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC UF NTP-ISO 4435, S-25, m 300.00 47.97 14,391.00 14,391.00
05.08.04 PRUEBAS HIDRAULICA 270.00
05.08.04.01 PRUEBA HIDRAULICA DE DESAGUE m 300.00 0.90 270.00 270.00
05.08.05 CAMARA DE INSPECCION (02 UNIDADES) 8,946.86
05.08.05.01 CONCRETO SIMPLE 55.86
05.08.05.01. CONCRETO f'c=140 kg/cm2 EN DADOS DE ANCLAJE DE TUBERIA m3 0.14 399.03 55.86 55.86
05.08.05.02 BUZONES DE CONCRETO 8,891.00
CALENDARIO VALORIZADO DE EJECUCION DE OBRA PROGRAMADO, A LA FECHA DE INICIO, DE OBRA (Adicional N° 01)
OBRA : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO DE SHINAN, LLANCA, DISTRITO DE PIRA - PROVINCIA HUARAZ - ANCASH
CONTRATISTA : CONSORCIO SHINAN LLANCA
RESIDENTE DE OBRA : ING. YUDE OLAVE CLAVERI
PLAZO EJECUCION : 240 DIAS CALENDARIO
MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO
UN
ITEM DESCRIPCION METRADO P. UNITARIO P. PARCIAL 11/05/17 AL 01/06/17 AL 01/07/17 AL 01/08/17 AL 01/09/17 AL 01/10/17 AL 01/11/17 AL 01/12/17 AL 01/01/18 AL
D
31/05/17 30/06/17 31/07/17 31/08/17 30/09/17 31/10/17 30/11/17 31/12/17 05/01/18
05.08.05.02. BUZON DE CONCRETO H prom=1.20 - 1.50 m und 5.00 1,778.20 8,891.00 8,891.00
05.09 CERCO PERIMÉTRICO CON MALLA OLIMPICA (L= 160.00 ml) 58,135.66
05.09.01 TRABAJOS PRELIMINARES 161.60
05.09.01.01 TRAZO, NIVELACION Y REPLANTEO m 160.00 1.01 161.60 161.60
05.09.02 CONCRETO SIMPLE 4,165.98
05.09.02.01 CONCRETO CICLÓPEO f'c=140 kg/cm2 + 30% P.M. m3 7.04 232.85 1,639.26 1,639.26
05.09.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 71.68 35.25 2,526.72 2,526.72
05.09.03 ESTRUCTURA METALICA 52,828.70
05.09.03.01 POSTE DE TUBO DE F° G° Ø=2" m 176.00 47.35 8,333.60 7,593.77 739.83
05.09.03.02 MARCO DE FIERRO GALVANIZADO D=1 1/2" m 505.60 47.62 24,076.67 13,447.17 10,629.50
05.09.03.03 MALLA OLIMPICA GALVANIZADA C/ALAMBRE N°12 m2 248.64 80.41 19,993.14 19,993.14
05.09.03.04 PUERTA METALICA (0.85x2.10M) MARCO F°G° D=1 1/2" und 1.00 425.29 425.29 425.29
05.09.04 PINTURAS 979.38
05.09.04.01 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 91.19 10.74 979.38 979.38
06 MITIGACIÓN AMBIENTAL 21,409.52
06.01 MONITOREO AMBIENTAL glb 1.00 6,000.00 6,000.00 6,000.00
06.02 BAÑO PORTATILES EN OBRA und 2.00 3,954.76 7,909.52 7,909.52
06.03 CONTENEDOR DE RESIDUOS SOLIDOS und 3.00 2,500.00 7,500.00 7,500.00
07 CAPACITACIÓN Y EDUCACION SANITARIA 20,349.90
07.01 IMPLEMENTACION Y CAPACITACION TECNICA DE LA JASS tller 1.00 4,584.90 4,584.90 4,584.90
07.02 EDUCACION SANITARIA tller 1.00 15,765.00 15,765.00 7,882.50 7,882.50
08 PROGRAMA DE MONITOREO ARQUEOLOGICO 104,132.80
08.01 ELABORACION DEL PLAN DE MONITOREO ARQUEOLOGICO mes 2.00 9,100.00 18,200.00 18,200.00
08.02 IMPLEMENTACION DEL PLAN DE MONITOREO ARQUEOLOGICO mes 8.00 10,350.00 82,800.00 27,600.00 27,600.00 27,600.00
08.03 PRESENTACION DEL PLAN DE MONITOREO ARQUEOLOGICO mes 1.00 3,132.80 3,132.80 3,132.80
09 FLETE 206,050.04
09.01 FLETE TERRESTRE glb 1.00 62,623.20 62,623.20 12,524.64 12,524.64 12,524.64 12,524.64 12,524.64
09.02 FLETE RURAL glb 1.00 143,426.84 143,426.84 28,685.37 14,342.68 57,370.74 28,685.37 14,342.68
COSTO DIRECTO S/. 2,100,670.34 220,000.98 262,274.71 355,795.21 415,295.08 358,085.26 123,846.46 200,344.88 157,145.28 7,882.50
Gastos Generales 10.00 % 210,067.03 22,000.10 26,227.47 35,579.52 41,529.51 35,808.53 12,384.65 20,034.49 15,714.53 788.25
UTILIDAD 5.00 % 105,033.52 11,000.05 13,113.74 17,789.76 20,764.75 17,904.26 6,192.32 10,017.24 7,857.26 394.13
PARCIAL S/. 2,415,770.89 253,001.12 301,615.92 409,164.49 477,589.34 411,798.05 142,423.43 230,396.61 180,717.07 9,064.88
IGV 18 % 434,838.76 45,540.20 54,290.87 73,649.61 85,966.08 74,123.65 25,636.22 41,471.39 32,529.07 1,631.68
PRESUPUESTO BASE S/. 2,850,609.65 298,541.33 355,906.79 482,814.09 563,555.42 485,921.70 168,059.65 271,868.00 213,246.14 10,696.55
PRESUPUESTO DE CONTRATO S/. 2,850,609.65 S/. 298,541.33 S/. 355,906.79 S/. 482,814.09 S/. 563,555.42 S/. 485,921.70 S/. 168,059.65 S/. 271,868.00 S/. 213,246.14 S/. 10,696.55
PROCENTAJE DE AVANCE FISICO FINANCIERO MENSUAL 10.47% 12.49% 16.94% 19.77% 17.05% 5.90% 9.54% 7.48% 0.38%
PROCENTAJE DE AVANCE FISICO FINANCIERO ACUMULADO 10.47% 22.96% 39.90% 59.67% 76.71% 82.61% 92.14% 99.62% 100.00%
CALENDARIO DE AVANCE DE OBRA PROGRAMADO VS EJECUTADO
PERIODO: 01/10/2017 AL 31/10/2017
MONTO % SALDO
PAGOS SEGÚN AVANCE DE OBRA
DESCRIPCION CONTRATADO AVANCE POR
TOTAL ANTERIOR ACTUAL ACUMULADA PAGO PAGAR
A MONTO DEL CONTRATO
25,000.00 0.00 6,664.01 6,664.01 26.66% 18,335.99
B AVANCES DE OBRA
AVANCE FISICO DE OBRA SEGÚN
VALORIZACION DEL CONTRATISTA DE OBRA 26.66% 26.66%
SON : Cinco Mil Novescientos Noventa y Siete con 61/100 Nuevo Soles