COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
FOREWORD
This procedure contains the following Pre-commissioning checks, test and specification:
Leakage test
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 165
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Description :
Item :
Visual Inspection shall be carried out to check the correct installation of the equipment and that it is
complete and connected in any parts.
as short as poss 1 1
<--------------------> <--------------------------------------------> <--------->
= or < 3m (*)
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 166
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
In any case 1 shall be so greater that moving the auxiliary rod, the reading of the instrument shall not
vary.
. the auxiliary earth (D) can be any existing earth connection like earthed lattice, water pipe etc.
. the probe (C) and the auxiliary earth rod can be buried into wet clay bags, laid on the ground.
. readings shall be made, moving the rods location of 1800 to minimize the disturbing voltage effects.
A
B probes
C
E E U/ HE
1 2 S
meter D auxiliary
< ----------- a ------------ > < ------------------- a ----------------- > < ---- a ----- > earth
. . .. . . . . . . . . . . . . . . . . . A
. . . . . . . . . . . . . . . .. .. . . . . . . . . . d
. . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Same procedure as per B. 1.1) shall apply, except for the following :
. earth rods location :
A B C D
--------------------------------------------------------------------------------------- in line
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 167
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
. a = normally 20 mt.
a
. d > or = -------
20
rho = R x 2 x 3, 14 x a
- where :
rho = earth specific resistance (ohm.m)
R = earth resistance (ohm)
a = distance between B & C probes (m)
C) TEST RESULTS
C.3) Instrumentation :
- Type of meter
- Model of meter
- Dimensions of probes :
A : 1 = _______ m 0 = ________ mm
B : 1 = ________ m 0 = ________ mm
C : 1 = _______ m 0 = ________ mm
D : 1 = _______ m 0 = ________ mm
- depth of probes :
A : _______ m C : ________ m
B : ________ m D : ________ m
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 168
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 169
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
1) GENERAL
For all the joints realized at site during the erection must be checked if there are
gas leakages.
The inspection should be carried out BT a 24 hours shift in order to reduce at
minimum the time required taking into consideration the high number of joints.
Jointly could be agreed to check joints with a random mode in order to reduce the
time required according to the vendor’s practice experience.
2) INSTRUMENT REQUIRED
- Vacuum pump
- Test equipment (probe and gauge).
3) ACCEPTANCE CRITERIA
- remove the set screw locking the ball seal from the hole for leak test.
- connect the test equipment
- open the connecting valve
- let the vacuum pump run for 15 minutes
- close the connecting valve, wait 15 minutes to allow the vacuum gauge to stabilize
and make a note of the vacuum degree existing in the chamber between the O-
rings.
- after 15 minutes take a new reading of the vacuum gauge.
5) CONCLUSIONS
The forms RV04 must be filled up for each bay. See form attached.
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 170
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 171
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
1 GENERAL
On all the compartment the moisture content must be measured by the moisture monitor.
The test should be done BT a team. Number of test will be ................ . This test must be
done as close as possible of H.V. test.
2 INSTRUMENT REQUIRED
3 ACCEPTANCE CRITERIA
4 TEST PROCEDURE
Connect the instrument to the SF6 sample as shown on the sketch enclosed.
Select the power switch on AC or DC position according to the supply available.
(A.C. 230 V 50 Hz or D.C. 67. 5V. with battery).
Select the knob on the highest range (x 100) and wait for the stabilization before doing the
final reading on the correct scale.
CONCLUSIONS :
The forms RV05 must be filled for each BAY. See forms attached.
Note: In order to prevent the cell saturation shut off the gas inlet always before switching off
the instrument.
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 172
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Type of instrument :
Dupoint 303 Moisture Monitor or equivalent device.
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 173
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
1 GENERAL
During this test the D.C. voltage drop or resistance of each pole of the main circuit
shall be measured under condition as near as possible similar with a regard to
ambient air temperature, and point of measurement must be the same of those used
during factory test. Measurements will be ......................
2 INSTRUMENT REQUIRED
3 ACCEPTANCE CRITERIA
The measured value on site shall not exceed 1.2 of the sum of the corresponding
values measured during the factory test.
4 TEST PROCEDURE
Two power clamps will be connected at the terminal bushings lug A-B on the same
phase. As per sketches enclosed, from the clamps by a suitable cables will be
connected to a DC generator.
From the same clamps will be connected two wires to a digital multimeter.
5 CONCLUSIONS
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 174
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 175
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
1 GENERAL
Scope of the test is to ascertain the closing time, opening time discrepancy of poles during closing
and opening operation.
2 INSTRUMENT REQUIRED
- Milligraph recorder supplied BT 220 V. 50 Hz. Track time will be 10 ms. (or equivalent).
3 ACCEPTANCE CRITERIA
Push the closing push button and pull the paper by a constant movement. During this action the
breaker will close and the paper will be recorded.
Read the poles discrepancy after closing if any.
Push the opening push button and pull the paper by a constant movement. During this action the
breaker will open and the paper will be recorded.
Read the zero time.
From this mark to the blank line read the aveage of breaker opening time.
Read the poles discrepancy after opening if any.
5 CONCLUSIONS
The forms RV06 must be filled up along with the proper annex containing the recorded diagram.
See forms attached.
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 176
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 177
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 178
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
1 GENERAL
Auxiliary and control circuits of switchgear and control gear shall be subjected to 1
minute power frequency voltage with stand test.
This test will involve only wirings and multi-plug connectors handled at site. For the
remaining equipment (motors, electro-valves, mano-densostat boards) the test will be
carried out by D.C. megger 500 V D.C.
For convenience of testing, the duration may generally be reduced to 1 second.
2 INSTRUMENT REQUIRED
3 ACCEPTANCE CRITERIA
Auxiliary and control circuits of the switching devices shall be considered to have
passed the test if no disruptive discharge occurs during each test.
4 TEST PROCEDURE
As per convenience (from terminal strip or connectors) all the wires involved on the
test will be connected as follow :
- all the wires will be connected one by one to one end of the testing equipment.
The other end will be grounded.
- if practicable one end of the testing device will be connected one by one to all
remaining wires.
5 CONCLUSIONS
The forms RV03 must be filled up mentioning the list of the connectors related to
each bay.
With this test will be checked the insulation between the all wires and ground and
between wire and wires.
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 179
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 180
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
1 GENERAL
This test will be carried out after the dielectric test of the aux. circuit.
The following procedure will describe the logic sequences of the component pertaining each
typical bay that are as follows :
1.1 Outgoing lines from line ......... to line ........ composed of the following
equipment :
2 INSTRUMENT REQUIRED
- Multimeters
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 181
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
3 ACCEPTANCE CRITERIA
The test will be accepted if all the contacts of the logic chain will carry out two commutation
while closing and while opening for ascertaining the action of the final relay. Two different
color marks on each contact of the chain will confirm the correct sequence. Test record RV 11.
4 PRECAUTION
During the test if possible the overhead lines (incoming & outgoing) to the bushings must be
disconnected.
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 182
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
1 GENERAL
Each compartment is provided with a manodensostat (if any). This manodensostat with the
related gauge will measure the pressure of SF6 gas.
These manodensostats are compensated in temperature. In this way the reading pressure is
proportional directly to the gas among each manodensostat is provided with three contacts :
2 INSTRUMENT REQUIRED
3 ACCEPTANCE CRITERIA
4 SETTING
4.2 DISCONNECTING & EARTHING SWITCHES VOLTAGES & CURRENT TRANSFORMERS BUSHING & DUCTS
- rated pressure ...................... bar
- alarm 1st stage ...................... bar
- alarm 2nd stage ...................... bar
5 TEST PROCEDURE
6 CONCLUSIONS
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 183
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 184
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
1 GENERAL
Each breaker is provided with independent motor compressor with all the control aux. device
for all the three poles by a set of copper tubes.
2 INSTRUMENT REQUIRED
3 ACCEPTANCE CRITERIA
- Correct actuation of the relay interlocks and alarm by adjusting the air pressure at
the design value and tuning the position of the switches if necessary.
4 SETTING
5 PROCEDURE
- Before starting with the air pressure test, must be checked the correct rotation of
the motor compressor.
- Check the correct setting of the motor relay.
- Start with the compressor and arrive to the rated pressure; adjust it if required.
Check and remove circuit leakages if any.
- Vent the air for achieving the air compressor starting pressure.
- Stop the compressor and vent air to reach the pressure valve causing the inhibition
of reclosing breaker circuit.
- Continue to vent air up to alarm actuation and check local alarm on and remote
alarm window (control room).
- Continue to vent air to reach the pressure value causing the two opening breaker
circuits and the lock-out of closing breaker circuit.
- Start again motor compressor and check the reset of lock out of closing breaker
circuit and the two opening circuits.
- Continue to raise the air pressure up to the reset of alarm.
- Continue to raise the air pressure up to the reset of the reclosing breaker circuit.
- Continue to raise the air pressure up to the automatic stop of compressor at the
rated pressure.
6 CONCLUSIONS
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 185
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 186
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
1 GENERAL
2 INSTRUMENT REQUIRED
- Chronometer
- Testing pressure gauge
3 REFERENCE CRITERIA
- The filling of air compressor tank should be about ........... minutes from 0 bar
to .............. bar and about ................... minutes from ................... bar
to ................ bar
4 ACCEPTANCE CRITERIA
5 TEST PROCEDURE
5.1 Install testing pressure gauge and take a chronometer. Start the compressor and
read the time, After 10 20 30 minutes read air pressure and fill up the form.
5.2 As soon as the air compressor has reached the rated pressure switch-off power of
compressor and take the time. Wait for 24 hours and take the second reading of air
pressure.
5.3 Start again the air compressor and maintain it in running condition until the rated
pressure will be reached. At that moment switch on the reclosing circuit of breaker.
Set first reclosing with a delay of .......... second.
Arrange a second reclosing with a delay of .......... minutes. Simulate at the relay
board one fault and verify the correct sequence of breaker. At the completion of the
sequence take the reading of air pressure at the testing gauge for reference only.
6 CONCLUSIONS
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 187
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 188
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
1 GENERAL
All disconnectors have been delivered to site in single phase sub system. At site it is
required to carry out adjustment of the related strokes. This test must be carried out at the
presence of the vendor’s specialist.
2 INSTRUMENT REQUIRED
3 ACCEPTANCE CRITERIA
4 REFERENCE CRITERIA
Line and bus bar disconnectors opening and closing time about ................... sec.
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 189
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
D. Check the correspondence between the aux. contacts and the aux. contacts and the
status of the disconnectors in open and close condition / See Sh. ............
E. In order to avoid damages to the equipment due to connection mistakes, before
starting any operation of the procedure will be as follows : -
E1. By manual operation set the actuator at 50% of stroke
E2. Press the close push bottom and then switch off DC supply (See Sh. ......)
Check the correct rotation of the motor.
E3. Press the open push button and then switch off DC supply (See Sh. .....) Check
the correct rotation of motor.
E4. Set again at 50% of stroke and than during closing and opening, operator the
related limit switches for checking the stop of the motor (See Sh. .............. )
IMPORTANT NOTE
During the above operation do not switch off ............... V.D.C. supply in order to avoid damages of
the mechanical pin due to the loss of breaking system of DC motor (if any).
C. Increase DC supply at ........... V.D.C. and repeat the operation described at point B2.
Decrease DC supply at .......... V.D.C. and repeat the operation described at point
B2.
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 190
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
5.4 QUICK EARTHING DISCONNECTORS (IF ANY ACTUATOR TYPE..... INSTRUC. BOOK ....................... )
A. Check of linkages and needles of single phase disconnectors and strokes by
manual operation.
B. Check break system of D.C. motor while closing and opening as follows : -
B1. Check the mechanical acting of limit switchers LS .......... - LS ............ and
LS .............. about .................
Turns of hand wheel before the mechanical stop of driving device.
B2. Open and close the quick earthing disconnectors in order to ascertain after
motor stopping about ........... turn of gap between the driving device and
mechanical stop.
C. As soon as the above adjustment will be over carry out some closing and
opening operation in order to verify the correct operation of actuators.
D. Tuning of closing speed (rated .......... m/sec + ..................... ;
- ................... m/sec)
D1. Install on aux. contacts dev .... a disc with angle marks that can show the
stroke position of main moving contracts.
D2. Connect the digital chronometer with the contacts mounted on the disc with
angle marks.
D3. Close the quick disconnector and check the speed. If the speed is incorrect
adjust the closing spring to reach the rated value.
6 CONCLUSIONS
The form RV09 must be filled up for each BAY. See form attached.
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 191
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
189
189
189
189
189 T
189
189
189T
189T
189T
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 192
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
1 GENERAL
Scope of the test is to ascertain the good condition of insulation of all the phases
and the related ducts. Each test will be carried out for each phase and ground. It
is often convenient to divide the whole installation of GIS in sections for the
following reasons:
- for limiting the load capacitive of the testing equipment
- to limit the discharge energy if disruptive discharge occurs
- in case of disruptive discharge the location of the fault will be facilitated
The sections not involved in the test must be disconnected shorted and grounded.
IMPORTANT NOTE :
If one section will be dismantled during high voltage test the test must be repeated only
for the section involved. For potential transformers the above test will change as per the
test procedure that will be described hereafter being the P.T. disconnected.
2 INSTRUMENT REQUIRED
3 ACCEPTANCE CRITERIA
The switchgear shall be passed successfully the test if each section has withstood
the specified test voltage without any disruptive discharge for 1 minute.
4 PRECAUTIONS
Substation area during the test must be completely segregate by a boundary. All
the gates must be closed. Warning posts must be installed along the boundary.
Only the personnel involved in the test can enter the substation. The safety
distance must be more than ............ meter. The over head lines connection to the
bushing must be removed. All the grounding nets must be checked as per
drawing before the H.V. Test.
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 193
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
7 CONCLUSIONS
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 194
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 195
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
1 Check that the wiring is done as per drawing (terminal boards and connector amphenol).
2 Check of the correspondence with drawings of the tags to be fixed on the cables.
3 Check that the pins (male and female) are properly locked into the amphenols plug. The
check will be performed by pushing with fingers the pins to ascertain that they are well
fixed.
4 Check that the amperometric and voltmetric circuits are properly tight (pulling the wire) and
inspect visually core by core the C/T and P/T grounding connections.
5 Install on all the plugs the mechanical code (if any) to avoid mismatch of plugs during
maintenance.
6 Carry out with plug disconnected (see procedure N.6 GIS) the insulation strength of wires of
connectors, all other equipment, as C/T and P/T cables, motor, limit switches, etc.; will
be checked with 500 VDC.
P.S. All the item which have mentioned follow the international standard IEC 517 7.107.2
a) c).
A good method to check the C/T ratios, the polarity (P1 P2 ------ > S1 S2) and the groups
of the interposing C/Ts differential protections is to inject a suitable three phase and
symmetrical 3 pH system into bus bar.
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 196
COMMISSIONING
Dept.:
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
The primary current of transformer feeding with 3PH 380 [V] the primary 11 kV with the
secondary (0,4 kV) shorted, will be :
Witnessed By :
Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 197
Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD COMMISSIONING PROCEDURES
Witnessed By :
Witnessed By :