You are on page 1of 26

Doc.

No: Revision: Date: Page:


ELE/TSS/AT 300 X 1 1999 138

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : STATIC EXCITER TEST SHEET NO. AT351AX


sh. 1 of 1

Description :

Item :

SINGLE LINE : FCD :

Test : Pre-operational Checks


_____________________________________________________________________________

PRE-COMMISSIONING TEST METHOD

The test shall be carried out according to Manufacturer’s instruction, and with reference to logic &
schematic diagrams.

TEST RESULTS

Test done according to the following documents :

- dwg.:
_________________________________________________________________________

- diagrams. :
_________________________________________________________________________

- specs. :
_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 139

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : STATIC EXCITER TEST SHEET NO. AT351BX


sh. 1 of 1

Description :

Item :

SINGLE LINE : FCD :

Test : Insulation Resistance Measurement


_______________________________________________________________________________

TEST METHOD

- The test shall be carried out applying the voltage of ___ 1000 V d.c.

- Insulation resistance : _______________________ Mohm


(Minimum value : 10 Mohm)

PRE- COMMISSIONING TEST PROCEDURE

The insulation resistance measurement shall be done applying a d.c. voltage between
AC/DC power circuits & all other circuits connected together and to ground. Static Exciter
must be completely erected, all the parts electrically connected to the main busbars in
normal operation must be connected also during the test, except for :

- Auxiliary, Current transformers & Capacitors

- All regulation cards & indicating instruments

- In general all the devices which absorb reactive power

- All electronic components or circuits involved in the test such as thyristors, diodes,
electronic
transducer, reaction circuits, etc. must be short-circuited or disconnected.

Note : Thyristor bridges must be checked and tested separately.

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 140

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : STATIC EXCITER TEST SHEET NO. AT351CX


sh. 1 of 1

Description :

Item :

SINGLE LINE : FCD :

Test : Manual voltage regulation check


_______________________________________________________________________________

COMMISSIONING TEST PROCEDURE

With the generator running at rated speed, the alternator voltage is increased gradually by manual
regulation. The correct variation of alternator voltage is verified.

TEST RESULTS

Excitation voltage range shall be 0 + 110% Vn.

Test Results

GENERATOR GENERATOR EXCITATION RHEOSTAT


VOLTAGE (%) VOLTAGE (V) VOLTAGE (V) POSITION (%)

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 141

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : STATIC EXCITER TEST SHEET NO. AT351DX


sh. 1 of 1

Description :

Item :

SINGLE LINE : FCD :

Test : Static Characteristic


_______________________________________________________________________________

Note : This test applies to brushless exciter only.

COMMISSIONING TEST METHOD

Placing a resistive load at the outlet of the exciter it is possible to obtain :

the right operation of the thyristor bridges at the different sectioning angles with reading of the max
voltage value (ceiling voltage) at the outlet of the rectifier bridges.

TEST RESULTS

- ceiling values

Vin Bridge = ___________ V A.C.


Vout Bridge = __________ V d.c.

- wave form as well impulse sequence checked ______________

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 142

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : STATIC EXCITER TEST SHEET NO. AT351EX


sh. 1 of 1

Description :

Item :

SINGLE LINE : FCD :

Test : Automatic Voltage Regulation Check


_______________________________________________________________________________

COMMISSIONING TEST METHOD

The alternator running at rated speed and exciter through the automatic regulator.
The excitation wave form shall be controlled and power thyristor ignition impulse as well.
Alternator voltage setting range shall be checked.

TEST RESULTS

Excitation voltage shall show six peaks per cycle and generator voltage shall vary from _15% to +
10% of rated voltage.

GENERATOR GENERATOR EXCITATION RHEOSTAT


VOLTAGE (%) VOLTAGE (V) VOLTAGE (V) POSITION (%)

AVR setting : Vmin = ____ % = _____ kV


: Vmax = ____ % = ______ kV

Generator rated voltage : VN = ____ kV

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 143

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : STATIC EXCITER TEST SHEET NO. AT351FX


sh. 1 of 1

Description :

Item :

SINGLE LINE : FCD :

Test : Initial Response Test


_______________________________________________________________________________

COMMISIONING TEST METHOD

Having the machine operating on no-load condition and the Automatic Voltage Regulator of the
exciter on, cause a reference voltage sudden variation of + - 2% of the rated value. Check that the
exciting system reaches the positive or negative ceiling. Also verify that the response time to reach
the new voltage value is less than ____ sec.

TEST RESULTS

Record, at step of : _____ _____ _____ %;

generator voltage _____ _____ _____ kV;

excitation voltage/current _____ _____ _____ V/A;

initial sudden variation _____ _____ _____ %.

response time _____ _____ _____ sec.

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 144

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : STATIC EXCITER TEST SHEET NO. AT351GX


sh. 1 of 1

Description :

Item :

SINGLE LINE : FCD :

Test : Operation limits under excitation and over excitation


_______________________________________________________________________________

COMMISSIONING TEST PROCEDURE

With reference to the capability curves __________ enclosed the correct exciter stability is verified
in the limiting points.

A) Under-Excitation
With the generator running in parallel with the network, supplying the minimum obtainable
active power, calibrate the maximum value of the reactive network demand.
With the generator running at rated active power, calibrate the maximum value of reactive
power supplied by the network.
In these conditions the two calibrations must be made with the generator voltage value as
constant as possible and near to the nominal value.

B) Over-Excitation
With the generator running in parallel with the network, supplying the minimum obtainable
active power, calibrate the maximum deliverable reactive power to the network.
With the generator running at rated active power, calibrate the maximum value of deliverable
reactive power to the net.
In these conditions the two calibrations must be made with the generator voltage value as
constant as possible and near to the nominal value.

TEST RESULTS

The values verified shall be in accordance with the limits of the curves, as indicated on enclosed
capability curves.

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 145

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : STATIC EXCITER TEST SHEET NO. AT351HX


sh. 1 of 1

Description :

Item :

SINGLE LINE : FCD :

Test : Stability on load


_______________________________________________________________________________

COMMISSIONING TEST METHOD

With the unit running at rated speed and loaded, at variations of 1 to 5% voltage step respect of
nominal voltage, the following shall be measured :
 excitation current;
 generator voltage;
 response time.

TEST RESULTS

The results is positive if the transient of generator damps-out within 1 to 2 sec.

VOLTAGE EXCIT. CURR. GEN. VOLTAGE (V) RESPONSE TIME


STEP (%) (__A) (sec)

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 146

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : STATIC EXCITER TEST SHEET NO. AT351IX


sh. 1 of 1

Description :

Item :

SINGLE LINE : FCD :

Test : Stability on load rejection


_______________________________________________________________________________

COMMISSIONING TEST METHOD & RESULTS

Scope of the test is to verify excitation response when the unit is suddenly disconnected from the
grid. With the unit running in parallel with network and as much reactive power as possible, trip the
unit main breaker.

The following values shall be measured :

a) Before Load Rejection :

- Excitation Current _____ A; - Excitation Voltage : _____ V;

- Generator Voltage _____ kV; - Power Factor : ____ cosfi;

- Active Power : _______ MW; - Reactive Power : ____ MVA.

b) At Load Rejection

Enclose high speed recorder strip showing the shape of :

- Active power - Generator Voltage

- Excitation Current (if required)

- Generator Voltage oscillation damps out within ____ sec.

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 147

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : EARTHING NETWORK TEST SHEET NO. AT362AX


sh. 1 of 5

Description :

Item :

SINGLE LINE : FCD :

Test : Earth Net & Earth Specific


Resistance Measurement
_______________________________________________________________________________

(A) VISUAL INSPECTION/PRE-COMMISSIONING

Visual Inspection shall be carried out to check the correct installation of the equipment
and that it is complete and connected in any parts.

(B) TEST CIRCUIT & PROCEDURES FOR PRE-COMMISSIONING

The tests shall be performed according to the scheme:

B.1) EARTH NET RESISTANCE MEASUREMENT

as short as poss 1 1
<-- ---------------> <---------------------------------> <------>
= or < 3m (*)

E A/B C probe D auxiliary earth


A
R --
T E E U/ HE A. . . . . . . . . . . . . . . . . .
. . . . .
H 1 2 S D
. . . . . . . . .
. . . . . ... .
meter . . .. . . . .. . . . . .
. . . . . .. . . .
. . . . . .
V V V. . . . . .
. . . . . . . . . .
(*) Only one connection instead of two wires.

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 148

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : EARTHING NETWORK TEST SHEET NO. AT362AX


sh. 2 of 5

B.1.1) Test Procedure


Suggested Rod location :
A/B 1 C
A/B C D A/B + --------------------+
1 1
1 1
D +----------+ C
v 1 v 1 v b) c) D
+-----------------+ +

1= normally ~ 20 mt.

generally 3 - 5 times the electrodes extension, where extension is :

. length when pipes etc.

. diagonal when plate or net

. diameter when circular

In any case 1 shall be so greater that moving the auxiliary rod, the reading of the
instrument shall not vary.

d = depth of rods from 40 to 90 cm.

. the rods shall have 1 to 1,5 cm. diameter

. the auxiliary earth (D) can be any existing earth connection like earthed lattice, water pipe
etc.

. the probe (C) and the auxiliary earth rod can be buried into wet clay bags, laid on the
ground.

. to improve contact use of salted water is suggested.

. readings shall be made, moving the rods location of 180 0 to minimize the disturbing voltage
effects.

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 149

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : EARTHING NETWORK TEST SHEET NO. AT362AX


sh. 3 of 5

B. 2) EARTH SPECIFIC RESISTANCE MEASUREMENT


(Wanner method - 4 rods)

A
B probes
C
E E
U/ HE
12 S
meter D auxiliary
< -------- a -------- > < ------------------ a ------------- > < --- a --- > earth

. . .. . . . . .
. . . . . . . . . . . . A
. . . . . . . . . . . . . . . .. .. . . . . . . . . . d
. . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . .

B. 2.1) Test Procedure

Same procedure as per B. 1.1) shall apply, except for the following :
. earth rods location :
A B C D
--------------------------------------------------------------------------------------- in line

. a = normally 20 mt.
. d > or = a
-------
20 mt.
. the rods normally have 1 mt. length and 0 1, 5 to 2, 5 cm.

Earth specific resistance calculation (rho) :

rho = R x 2 x 3, 14 x a
- where :
rho = earth specific resistance (ohm.m)
R = earth resistance (ohm)
a = distance between B & C probes (m)

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 150

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : EARTHING NETWORK TEST SHEET NO. AT362AX


sh. 4 of 5

TEST RESULTS

C. 1) Visual Inspection :

- Installation according to drawing _______________


- Earthing leads _______________________________
- Cross-section of protective conductors & according to earthing system spec.
______________________

- Network completion ________________________________ ( See attachment)

C. 2) Ambient Condition :

- General soil condition _______________________________________


- Ambient temperature _________________________________________
- Humidity __________________________________________________

C. 3) Instrumentation :

- Type of meter _______________________________________________


- Model of meter _____________________________________________
- Dimension of probes :

A: 1 = _____ m 0 = ________ mm
B: 1 = _____ m 0 = ________ mm
C: 1 = _____ m 0 = ________ mm
D: 1= _____ m 0 = ________ mm

- depth of probes:
A : ______ m C : ________ m
B : ______ m D : ________ m

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 151

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : EARTHING NETWORK TEST SHEET NO. AT362AX


sh. 5 of 5

C. 4) Earth Net & Earth Specific Resistance Measurement

Distance Between Probes B. 1) B. 2)


A- B B-C C-D EARTH NET EARTH NET SPECIFIC RESIST.
(m) (m) (m) RESISTANCE instrument spec. resist.
(ohm) reading (ohm. m)

Earth Resistance Value Obtained : _________________________________________

Design Earth Resistance Value : __________________________________________

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 152

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : TELEPHONE, INTERCOM, SOUND TEST SHEET NO. AT365X


REINFORCEMENT, RADIO SYSTEMS
sh. 1 of 2

Description :

Item :

SINGLE LINE : FCD :

Test : 1) Visual Inspection


2) Operating Instructions
_______________________________________________________________________________
_

Delete equipment not tested on this form :

- Intercommunication System

- Sound Reinforcement System

- Telephone System

- Radio System

TEST METHOD

1) Visual Inspection/Pre-commissioning

Visual Inspection shall be carried out to verify :


- completeness of plant according to relevant drawings;
- the equipment free of damages.

2) Operating Test/Commissioning
- following the manufacturer instruction, verify that equipment works properly.

TEST RESULTS

1) Visual Inspection : resume data in the table :


2) Operating Test :

2.1) Power Supply : _____ V

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 153

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : TELEPHONE, INTERCOM, SOUND TEST SHEET NO. AT365X


REINFORCEMENT, RADIO SYSTEMS
sh. 2 of 2

2.2) Grounding

2.3) Proper operation of apparatus as listed

Pos Ambient Reference Type Visual Inspection Operating


.
Zone Drawing of Design Instal Status Test NOTE
Nr. Equipm. Qty. Qty.

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 154

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : LIGHTING CIRCUITS TEST SHEET NO. AT367 X


sh. 1 of 2

Description :

Item :

SINGLE LINE : FCD :

Test : 1) Visual Inspection


2) Insulation Resistance Measurement
3) Operational Test
_______________________________________________________________________________
_

TEST PROCEDURE

This test covers all electrical tests and verifications foreseen by C.E.I. standards for lighting systems.

1) Visual Inspection/Pre-Commissioning
Visual Inspection shall include :
- a check for correct installation
- a check for nameplate data
- check number of self powered emergency lighting devices

2) Insulation resistance measurement (if required) Pre-Commissioning


Insulation resistance measurement is done applying 500 V D.C. for one minute to lighting
system circuits.

3) Operational test/Commissioning

Scope of operational test is to verify the satisfactory operation of circuits, design data,
balanced load and illumination level.

Sub administration panels are checked under separate forms where load balancing are
recorded.

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 155

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : LIGHTING CIRCUITS TEST SHEET NO. AT367 X


sh. 2 of 2

TEST RESULT

Illumination level check

Shall be done at : ______ m height from ground

ZONE / AREA Quantity of self Measured lux Equipment


powered
Description Emerg. Light Minimum Maximum Average according to
drawings

NOTES :

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 156

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : CLOCK SYSTEM TEST SHEET NO. AT368 X


sh. 1 of 2

Description :

Item :

SINGLE LINE : FCD :

Test : 1) Visual Inspection


2) Operating Test
_______________________________________________________________________________
_

TEST METHOD

1) Visual InspectionPre-Commissioning

Visual Inspection shall be carried out to verify :

- completeness of plant according to relevant drawings


- the equipment free of damages

2) Operating test/Commissioning

- following the manufacturer instruction, verify that equipment works properly.

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 157

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : CLOCK SYSTEM TEST SHEET NO. AT368 X


sh. 2 of 2

TEST RESULTS

1) Visual Inspection : resume data in the table

2) Operating Test :
2.1) Power supply : _____ V

2.2) Master clock correct


. operation & impulses
. time deviation

2.3) Driven clocks synchronism

2.4) Proper operation of apparatus as listed

Pos. Ambient Reference Type of Quantity Operation


Zone Drawing Equipm. Design Instal checks Note
Nr. Nr. Nr.

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 158

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : ELECTRICAL HEATER ELEMENT TEST SHEET NO. AT369 X


sh. 1 of 2

Description :

Item :

SINGLE LINE : FCD :

Test : 1) Visual Inspection


2) Operating Test
Note : Test Procedure from sheet 2
_______________________________________________________________________________

TEST RESULTS

1) Visual Inspection/Pre-Commissioning

1.1 Completeness of installation

1.2) Equipment free from damages

1.3) Data plate :


. maker : _________________________ ; type __________________________ ;

. supply : ______ V ; power : ______ __ W ; rated current : ________ A

2) Operating test/Commissioning

2.1) Insulation _______________ Mohm

2.2) resistance _______________ ohm

at ambient temperature ________ 0 C

2.3) absorbed current _____________ A

2.4) thermostat (if applicable) :


. range ______________ 0 C

. setting ______________ 0 C

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 159

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : ELECTRICAL HEATER ELEMENT TEST SHEET NO. AT369 X


sh. 2 of 2

TEST METHOD

1) Visual InspectionPre-Commissioning

Visual Inspection shall be carried out to verify :


- completeness of installation according to relevant drawings;
- the equipment free of damages

2) Operating test/Commissioning

- check insulation (*)


- check continuity and resistance value at ambient temperature
- put heater into operation
- check the absorbed current and verify with plate power data
- check thermostat range & setting (if applicable)

(*) by applying 1000 V D.C. for 60 seconds between heating wire and metallic envelope.

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 160

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : PROTECTION RELAY TEST SHEET NO. AT373 X


sh. 1 of 1

Description :

Item :

SINGLE LINE : FCD :

Test : Relay Verifications/Pre-Commissioning


_______________________________________________________________________________

Due to a great quantity of different kind of Protection Relays, checks shall be made
on the Manufacturer Test Log Sheet, according to Manufacturer Instruction.

The relays below listed have been checked as for attached Test Reports :

Pos. Relay Type Item Description Location Manufact. Test Report


N.

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 161

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : LOGIC & A.C. CIRCUITS TEST SHEET NO. AT374 X
sh. 1 of 1

Description :

Item :

SINGLE LINE : FCD :

Test : Logic Diagram & A.C. circuits acceptance


_______________________________________________________________________________

SECTION OF PLANT :

COMMISSIONING TEST PROCEDURE

Functional test shall be carried to prove the correct and satisfactory operation of plant systems
according to logic diagrams.
Protection & Measuring Circuits shall be primary injected to prove correct wiring connections and, for
differential & power circuits only, currents proper direction.

RESULTS

Plant operation with regard to interlocks, logical connections, controls, alarms and trip circuits as
well as voltage and current measuring and protection circuits has been tested according to :
- logic diagram : _______________________________________________

- schematic diagram : ___________________________________________

- three-wiring diagram : _________________________________________

- specification : ________________________________________________

- _________________________ : _________________________________

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 162

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : DIFFERENTIAL PROTECTION C.T. TEST SHEET NO. AT375 X


CIRCUITS
sh. 1 of 2

Description :

Item :

SINGLE LINE : FCD :

Test : Secondary Currents Verification


_______________________________________________________________________________

COMMISSIONING TEST METHOD

- Primary injection current shall circulate in the busbar i.e. during “Generator short circuit test”
when at least 5 to 10 % of the Generator rated current is circulating.

- Short circuit shall be applied at agreed points, with the scope to verify each branch of the
differential protection with reference to the three line diagram.

- During the test, secondary currents shall be measured at Relay terminals (if possible) and
compared with primary current (through C.T. ratio) and special care shall be taken for the “spill
current” (secondary current as a difference between homonymous) at Relay terminal.

- Test results shall be filled in the attached table (pag. 2).

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :
Doc.No: Revision: Date: Page:
ELE/TSS/AT 300 X 1 1999 163

Dept.:
COMMISSIONING
ELECTRICAL TEST SHEET Language:
E
Project: STANDARD FOR COMBINED CYCLE POWER PLANT

Equipment Description : DIFFERENTIAL PROTECTION C.T. CIRCUITS TEST SHEET NO. AT375 X
sh. 2 of 2

TEST RESULTS Note : fill 1st field for 2 branch diff. prot.
1st-2nd field for 3 branch diff. prot.
1st-2nd-3rd field for 4 branch diff. prot.

Relay
Drawing
Phase r y b r y b r y b
Primary Current
(kA)
C. T. Block
1st T. I (___A)
C. T.Block Nr
F T. I (___ A)
i S
e p T.Block Nr
l i I (___ A)
d ll
C. T. Block Nr
2nd T. I (____ A)
C. T. Block Nr
F T. I (___ A)
i S
e p T.Block Nr
l i I (___ A)
d ll
C. T. Block Nr
3rd T. I (____ A)
C. T. Block Nr
F T. I (___ A)
i S
e p T.Block Nr
l i I (___ A)
d ll

Company Name Signature Date


Performed By :

Witnessed By :

Witnessed By :