You are on page 1of 2

Copyright 2002 and 2005 AIA MASTERSPEC Outline 11/02 (R 05/05)

SECTION 024119 - SELECTIVE STRUCTURE DEMOLITION

0.1 SUMMARY

A. Demolition and removal of [portions of a building or structure] [selected site elements].

B. Historic items removed and salvaged for Owner.

0.2 PROJECT CONDITIONS

A. Owner will[ not] occupy portions of building immediately adjacent to selective demolition area.

B. Hazardous Materials: [Not expected] [Expected] to be encountered.

1. Remediation: By [Owner before start of Work] [Contractor as part of this Project].


2. Landfill records for hazardous wastes.

C. Hazardous Materials: Unknown whether hazardous materials will be encountered. If


encountered, Owner will remove hazardous materials under a separate contract.

0.3 WARRANTY

A. Existing Warranties: <Insert list of existing warranties affected by selective demolition.>

0.4 EXECUTION

A. Professional engineer engaged to survey condition of building.

1. Recorded by use of [measured drawings] [preconstruction photographs]


[preconstruction videotapes] [and] [templates].

B. Utility Services and Mechanical/Electrical Systems: Maintained to occupied facilities.

1. Shut Off: By [Owner] [Building manager] [Contractor].

C. Site Access and Temporary Controls: Minimum interference with roads, streets, walks,
walkways, and other adjacent occupied and used facilities

D. Temporary Facilities:

1. Temporary barricades to prevent injury to people.


2. Temporary weather protection.
3. Protection of existing finish work to remain.
4. Protection of furnishings and equipment.

E. Temporary shoring.

SELECTIVE STRUCTURE DEMOLITION 024119 - 1


Copyright 2002 and 2005 AIA MASTERSPEC Outline 11/02 (R 05/05)

F. Reuse of Building Elements:

1. Building Structure and Shell: [75] [100] percent.


2. Nonshell Elements: 50 percent.

G. Removed and Salvaged Items: Cleaned, crated, stored, and transported to Owner's [ on] [off]-
site storage area.

H. Removed and Reinstalled Items: Cleaned, repaired, crated, stored, and reinstalled.

I. Existing Items to Remain: Existing construction protected against damage.

J. Disposal of Demolished Items:

1. Burning: [Not permitted] [Permitted at designated areas].


2. Disposal: [At designated spoil areas on] [Off] Owner's property.

0.5 SELECTIVE DEMOLITION SCHEDULE

A. <Insert list of existing items required to be removed, removed and salvaged, removed and
reinstalled, and to remain.>

END OF SECTION 024119

SELECTIVE STRUCTURE DEMOLITION 024119 - 2