QUALITY WORK PROCEDURE

PROCEDURE NO. APPLICATION OF DATE ISSUED REVISION PAGES


AKS-12 BITUMINOUS PAINT 26 JAN. 2008 0 1 of 6

PROCEDURE NO.: AKS-12

PROCEDURE TITLE:

APPLICATION OF BITUMINOUS PAINT

0 26 JAN. 2008 For review and approval MJS RT

REVISION DATE DESCRIPTION REVIEWED APPROVED

Contract No. 6600018226/27/45/85


QUALITY WORK PROCEDURE
PROCEDURE NO. APPLICATION OF DATE ISSUED REVISION PAGES
AKS-12 BITUMINOUS PAINT 26 JAN. 2008 0 2 of 6

1. PURPOSE

1.1 This procedure shall serve as a guideline for implementation to meet the quality attributes
in the application of sandfix everlast-HB as bituminous painting materials on
foundation surfaces.

2. SCOPE

2.1 This procedure specifically covers the inspection and instructions for sandfix everlast-
HB as bituminous painting materials on foundation surfaces to suit the project
requirements.

3. RESPONSIBILITY

3.1 Project Superintendent or Supervisor shall be responsible for performing the activity.

3.2 Project QC Manager or QC Supervisor or QC Civil Inspector shall be responsible for


all test, inspection and coordinate inspection point with PID.

4. REFERENCE

4.1 Saudi Aramco Standards (SAES) & Procedures (SAEP)

4.1.1 Sandfix Everlast-HB - Manufacture's Catalog.


4.1.2 SAES-Q-001 - Criteria for the Design and Construction of
Concrete Structures.
4.1.3 SAES Q-005 - Concrete Foundation.
4.1.4 PP-516021 - Project Specifications.
4.1.5 SAES-H-003 - Coating Requirements for Concrete Structures
4.1.6 SAES-H-101 - Approved Protective Coating System
4.1.7 SAES-H-101V - Approved Saudi ARAMCO Date Sheets
Painting & Coating
4.1.8 SAEP-316 - Performance Qualification of Coating Personnel
4.1.9 SAEP-1150 - Project Inspection on Projects

5. METHOD

5.1 Materials
5.1.1 Sandfix Everlast-HB
Contract No. 6600018226/27/45/85
QUALITY WORK PROCEDURE
PROCEDURE NO. APPLICATION OF DATE ISSUED REVISION PAGES
AKS-12 BITUMINOUS PAINT 26 JAN. 2008 0 3 of 6

5.2 Preparation
5.2.1 Upon stripping the forms, proceed immediately in curing the concrete.
5.2.2 Do the cosmetic repair of the concrete surface with the use of Fosam Fosroc
Renderoc.
5.2.3 Conduct the moisture test.
5.2.4 Use compressed air to blow-out dust and debris from the concrete surface.

5.3 Mixing
5.3.1 Sandfix Everlast-HB is cold applied and direct use.

5.4 Application
5.4.1 Apply the paint according to APCS-10 by brush or roller.

5.5 Painting Works


Painting Works Procedure shall be done base on Manufacture's Catalog Sandfix
Everlast-HB. All pertinent documents/attachments for Painting Works shall be
monitored and recorded.

6 RECORDS

6.1 A copy of the pouring permit duly approved by the Saudi ARAMCO designated
representative shall be kept as a file document.

6.2 A pouring log history should be made for AL-KHODARI AND SONS ready reference; such
as curing time, moisture checks.

6.3 A painting log history shall be made for records and documentation.

7 DOCUMENTATION
Contract No. 6600018226/27/45/85
QUALITY WORK PROCEDURE
PROCEDURE NO. APPLICATION OF DATE ISSUED REVISION PAGES
AKS-12 BITUMINOUS PAINT 26 JAN. 2008 0 4 of 6

The records documenting the compliance to Project Quality Plan and other project
requirements are to be filed and kept and to be submitted to Saudi Aramco at the close of the
project construction. The quality records will be available for S. Aramco review at any time.

7.1 Non-Conformance Report (NCR) Form

Contract No. 6600018226/27/45/85