APPENDIX D

Request for inspection Form APPENDIX D


Project Title: Main Contractor:
AB Condominium 123 Contractor Pte Ltd

Work Trade: Dry Wall Applicator:


Dry Partition Wall Installation XYZ Strongwall Pte Ltd

Location of Inspection: Inspection Request No:


Block: 82 Unit No: 55-43 123/ABC/DW/5543/01

Signature, Date & Time of Inspection form Signature, Date & Time of Inspection form ITP Reference No:
submitted: received: 4 (Installation)

Drawing No:
....................................................... ................................................
Arch/ABC/DWSD/01A
By Builder Rep. By RE/RTO

1st Inspection 2nd Inspection 3rd Inspection

By Builder Rep. Comments by RE/RTO By RE/RTO


Description of Activities
Signature Date Signature Date
PRE-ERECTION CHECK
• Drawing Used
• Materials Used
• Accessories Used

SETTING OUT CHECK


• Gridline/Ref. Line
• Setting out line
• Check Level
• Opening position

INSTALLATION CHECK
• Framing
• Studs & Studs’ Verticality
• Lateral Bracing

Close 1st side of Board


• M&E Services installation
• Additional M&E Services
Support

FINAL CLOSING OF BOARD


• Infill / Insulation
TREATMENT
Joint, Corner and Interfacing

PERFORMANCE TESTS

FINAL CHECK
Before Painting commence

Endorsement by RE/RTO: Acknowledgement By Builder:


You may proceed with the
next stage of work

Date & Time of Endorsement Date & Time of Acknowledgement


You are not to proceed
with next stage of work

Others (Please Specified):


Inspector Signature Builder Rep Signature

The graphic shown here serves as a guide only. Page 1