You are on page 1of 26

Km.

7 Tigatto Road, Buhangin, Davao City

PROJECT ACCOMPLISHMENT REPORT


PROJECT STATUS:
Accomplishment to Date : 33.0245 Period :
Required as per PERT CPM : 100.00 Project ID No. :
Period Accomplishment : Project Code Name :

CUMULATIVE PROGRESS
CUMMULATIVE
SCHEDULED ACCOMPLISHMENT TARGET
ITEM NO. ACTIVITY DESCRIPTION UNIT
QUANTITY NET WT. QUANTITY NET WT. QUANTITY NET WT.
(PERT-CPM) % % %
A.1.1(3) Construction of field office for the Engineer LS 1.00 0.195
A.1.1(6) Assistance to the Engineer mo. 9.00 0.132
B-5 Project Billboard each 2.00 0.010
B-7 Construction Safety And Health mo. 9.00 0.193
B-8 Traffic Management mo. 9.00 2.638
B-9 Mobilization & Demobilization LS 1.00 0.293
B.4(1) Construction Survey & Staking Km 1.92 0.024
100(1) Clearing & Grubbing ha 0.16 0.023
101(3)a2 Removal of Existing PCCP sq.m 13,870.40 3.389
102(2) Surplus Common Excavation cu.m 20,424.00 15.019
103(1)a Structure Excavation cu.m 1,201.88 0.824
103(3) Foundation Fill cu.m 22.11 0.015
103(6)a Pipe Culvert & Drain excavation cu.m 5,798.62 1.049
104(1)a1 Embankment from Roadway Excavation cu.m 2,748.00 0.687
105(1)a Subgrade Preparation sq.m 29,655.48 0.652
200(1) Aggregate Subbase Course cu.m 7,093.00 6.279
311(1)a PCCPavement (Unreinforced), 150mm thk. sq.m 2,925.00 2.509
311(1)e1 PCCPavement (Unreinforced), 280mm thk. sq.m 26,910.59 43.106
500(1)b3 PipeCulvert, 910mm dia. Class IV ln.m 1,057.00 5.174
502(1)c Manholes, 910mm dia. CHB each 43.00 1.251
504(3)c Cleaning of Pipe Culvert,910mm dia ln.m 60.00 0.023

TOTAL 83.485

Prepared by:

Project / Resident Engineer


Page No.:

PROJECT COST:
Budget to Date :
Actual Budget :

ACCOMPLISHMENT
TO DATE
REMARKS
NET WT.
QUANTITY
%
1.00 0.195
9.00 0.132
2.00 0.01
9.00 0.193
9.00 2.638
0.50 0.1465
0.96 0.012
0.08 0.0115
7569.02 1.849363
6313.60 4.642771
103.90 0.071233
5.63 0.00382
959.83 0.173638
1639.00 0.40975
14937.96 0.328423
2280.65 2.01892
132.00 0.113227
11970.11 19.174
120.00 0.587398
10.00 0.29093
60.00 0.023

33.02447
Verified Correct by:
Project Inspector / Assistant Chief Engineer

Approved by:
Chief Engineer
PROJECT STATUS SUMMARY REPORT

Period Covered: ____________________________

SLIPPAGE %
SCHEDULE (PERT-CPM PROJECT IN-
PROJECT NAME PLANNED ACTUAL EXPIRY DATE STATUS
(PERT-CPM) SCHEDULE CHARGE
LESS ACTUAL)
Prepared By: Verified Correct By: Noted By:

Office Engineer Operation Manager General Manager

Please see Attachments:


STATEMENT OF WORK ACCOMPLISHED
PROJECT ACCOMPLISHMENT REPORT
PROJECT STATUS:
Accomplishment to Date : #REF! Period : April 3 to June 3 , 2
Required as per PERT CPM : 100.00 Project ID No. : 17LO-0063
Period Accomplishment : Project Code Name : Tigatto Bypass Ro

CUMULATIVE PROGRESS
CUMMULATIVE
SCHEDULED ACCOMPLISHMENT
ITEM NO. ACTIVITY DESCRIPTION UNIT QUANTITY NET WT. NET WT.
QUANTITY
(PERT-CPM) % %
A.1.1(3) Construction of field office for the Engineer LS 1.00 0.195 0.00 0
A.1.1(6) Assistance to the Engineer mo. 9.00 0.132 0.00 0
B-5 Project Billboard each 2.00 0.010 0.00 0
B-7 Construction Safety And Health mo. 9.00 0.193 0.00 0
B-8 Traffic Management mo. 9.00 2.638 0.00 0
B-9 Mobilization & Demobilization LS 1.00 0.293 0.00 0
B.4(1) Construction Survey & Staking Km 1.92 0.024 0.00 0
100(1) Clearing & Grubbing ha 0.16 0.023 0.00 0
101(3)a2 Removal of Existing PCCP sq.m 13,870.40 3.389 0.00 0
102(2) Surplus Common Excavation cu.m 20,424.00 15.019 0.00 0
103(1)a Structure Excavation cu.m 1,201.88 0.824 0.00 0
103(3) Foundation Fill cu.m 22.11 0.015 0.00 0
103(6)a Pipe Culvert & Drain excavation cu.m 5,798.62 1.049 0.00 0
104(1)a1 Embankment from Roadway Excavation cu.m 2,748.00 0.687 0.00 0
105(1)a Subgrade Preparation sq.m 29,655.48 0.652 0.00 0
200(1) Aggregate Subbase Course cu.m 7,093.00 6.279 0.00 0
311(1)a PCCPavement (Unreinforced), 150mm thk. sq.m 2,925.00 2.509 0.00 0
311(1)e1 PCCPavement (Unreinforced), 280mm thk. sq.m 26,910.59 43.106 0.00 0
500(1)b3 PipeCulvert, 910mm dia. Class IV ln.m 1,057.00 5.174 0.00 0
502(1)c Manholes, 910mm dia. CHB each 43.00 1.251 0.00 0
PipeCulvert, 1220mm dia. Class IV ln.m 204.00 1.996 0.00 0
Manholes, 910mm dia. CONC each 16.00 1.094 0.00 0
Manholes, 1220mm dia. CONC each 11.00 0.86 0.00 0
Sidewalk sq.m 4,236.00 2.843 0.00 0
Curb and Gutter ln.m 3,530.00 3.476 0.00 0
504(3)c Cleaning of Pipe Culvert,910mm dia ln.m 60.00 0.023 0.00 0

TOTAL 0

Prepared b
Project / Resident Engineer

PROJECT ACCOMPLISHMENT REPORT


PROJECT STATUS:
Accomplishment to Date : #REF! Period : May 3 to June 3 , 2
Required as per PERT CPM : 100.00 Project ID No. : 17LO-0063
Period Accomplishment : Project Code Name : Tigatto Bypass Ro

CUMULATIVE PROGRESS
CUMMULATIVE
SCHEDULED ACCOMPLISHMENT
ITEM NO. ACTIVITY DESCRIPTION UNIT QUANTITY NET WT. NET WT.
QUANTITY
(PERT-CPM) % %
A.1.1(3) Construction of field office for the Engineer LS 1.00 0.195 0.00 0
A.1.1(6) Assistance to the Engineer mo. 9.00 0.132 0.00 0
B-5 Project Billboard each 2.00 0.010 0.00 0
B-7 Construction Safety And Health mo. 9.00 0.193 0.00 0
B-8 Traffic Management mo. 9.00 2.638 0.00 0
B-9 Mobilization & Demobilization LS 1.00 0.293 0.00 0
B.4(1) Construction Survey & Staking Km 1.92 0.024 0.00 0
100(1) Clearing & Grubbing ha 0.16 0.023 0.00 0
101(3)a2 Removal of Existing PCCP sq.m 13,870.40 3.389 0.00 0
102(2) Surplus Common Excavation cu.m 20,424.00 15.019 0.00 0
103(1)a Structure Excavation cu.m 1,201.88 0.824 0.00 0
103(3) Foundation Fill cu.m 22.11 0.015 0.00 0
103(6)a Pipe Culvert & Drain excavation cu.m 5,798.62 1.049 0.00 0
104(1)a1 Embankment from Roadway Excavation cu.m 2,748.00 0.687 0.00 0
105(1)a Subgrade Preparation sq.m 29,655.48 0.652 0.00 0
200(1) Aggregate Subbase Course cu.m 7,093.00 6.279 0.00 0
311(1)a PCCPavement (Unreinforced), 150mm thk. sq.m 2,925.00 2.509 0.00 0
311(1)e1 PCCPavement (Unreinforced), 280mm thk. sq.m 26,910.59 43.106 0.00 0
500(1)b3 PipeCulvert, 910mm dia. Class IV ln.m 1,057.00 5.174 0.00 0
502(1)c Manholes, 910mm dia. CHB each 43.00 1.251 0.00 0
PipeCulvert, 1220mm dia. Class IV ln.m 204.00 1.996 0.00 0
Manholes, 910mm dia. CONC each 16.00 1.094 0.00 0
Manholes, 1220mm dia. CONC each 11.00 0.86 0.00 0
Sidewalk sq.m 4,236.00 2.843 0.00 0
Curb and Gutter ln.m 3,530.00 3.476 0.00 0
504(3)c Cleaning of Pipe Culvert,910mm dia ln.m 60.00 0.023 0.00 0

TOTAL 0

Prepared b
Project / Resident Engineer
HMENT REPORT

April 3 to June 3 , 2018 PROJECT COST:


17LO-0063 Budget to :
Tigatto Bypass Road Actual Bud:

UMULATIVE PROGRESS
ACCOMPLISHMENT
TARGET TO DATE
NET WT. NET WT. REMARKS
QUANTITY QUANTITY
% %

0.01 0.00
3100.00 0.76 506.85 0.12
2176.00 1.60 500.49 0.37
370.44 0.25 174.47 0.12
13.00 0.01 2.30 0.00
2520.00 0.46 593.20 0.11
2000.00 0.50 0.00 0.00
6190.00 0.14 1251.23 0.03
1238.00 1.10 250.25 0.22
1500.00 1.29 0.00 0.00
4690.00 7.51 1251.23 2.00
580.00 2.84 170.00 0.83
19.00 0.55 9.00 0.26
220.00 2.15 80.00 0.78
10.00 0.68 0.00
11.00 0.86 0.00
750.00 0.50 0.00
500.00 0.49 0.00

21.691 4.850
Verified Correct by:
Project Inspector / Assistant Chief Engineer

Approved by:
Chief Engineer

HMENT REPORT

May 3 to June 3 , 2018 PROJECT COST:


17LO-0063 Budget to :
Tigatto Bypass Road Actual Bud:

UMULATIVE PROGRESS
ACCOMPLISHMENT
TARGET TO DATE
NET WT. NET WT. REMARKS
QUANTITY QUANTITY
% %

0.01 0.00
3100.00 0.76 506.85 0.12
2176.00 1.60 500.49 0.37
370.44 0.25 174.47 0.12
13.00 0.01 2.30 0.00
2520.00 0.46 593.20 0.11
2000.00 0.50 0.00 0.00
6190.00 0.14 1251.23 0.03
1238.00 1.10 250.25 0.22
1500.00 1.29 0.00 0.00
4690.00 7.51 1251.23 2.00
580.00 2.84 170.00 0.83
19.00 0.55 9.00 0.26
220.00 2.15 80.00 0.78
10.00 0.68 0.00
11.00 0.86 0.00
750.00 0.50 0.00
500.00 0.49 0.00

21.691 4.850
Verified Correct by:
Project Inspector / Assistant Chief Engineer
Approved by:
Chief Engineer
PROJECT ACCOMPLISHMENT REPORT
PROJECT STATUS:
Accomplishment to Date 45.5131 Period : June 3 to July 3, 2018
Required as per PERT CPM 100.00 Project ID No. : 17LO-0063
Period Accomplishment Project Code Name : Tigatto Bypass Road

SCHEDULED CUMULATIVE TARG


ITEM NO. ACTIVITY DESCRIPTION Unit REL. WT. REL. WT.
QTY QTY QTY
(%) (%)

PART A: Facilities for the Engineer


A.1.1(3) Construction of Field office for the Engineer ls 1.00 0.195 1.00 0.195
A.1.1(6) Assistance to the Engineer mo 9.00 0.132 9.00 0.132
a. Operations & Maintenance of Field Office for the Engineer
PART B: Other General Requirements
B-5 Project Billoard/Signboard each 2.00 0.010 2.00 0.010
B-7 Construction Safety and Health mo 9.00 0.193 9.00 0.193
B-8 Trafic Management mo 9.00 2.638 9.00 2.638
B-9 Mobilization/Demobilization ls 1.00 0.293 0.50 0.147
B.4(1) Construction Survey & Staking km 1.92 0.024 0.96 0.012
RT C: Earthworks
100(1) Clearing and Grubbing ha 0.16 0.023 0.16 0.023
101(2) Removal of Actual Structures/obstruction (Median Island) ls 1.00 0.006 - -
101(3)a2 Removal of Existing PCCP (Reinforced), 0.20m THK sq.m 13,870.40 3.389 10,057.87 2.457 2,541.68
101(4)h Removal of Curb and Gutter ln.m 50.00 0.018 - -
101(10) Removal of Existing Road Sign each 17.00 0.020 - - 17.00
102(2) Surplus Common Excavation cu.m 20,424.00 15.019 8,123.42 5.974 6,150.29
103(1)a Structure Excavation cu.m 1,067.04 0.824 429.57 0.332 318.74
103(3) Foundation Fill cu.m 18.00 0.015 10.46 0.009 7.54
103(6)a Pipe Culvert & Drain Excavation ( Common) cu.m 5,027.00 1.049 2,298.46 0.480 1,364.27
104(1)a1 Embankment From Roadway Excavation cu.m 2,748.00 0.687 1,639.00 0.409 1,109.00
105(1)a Subgrade Preparation sq.m 29,655.48 0.652 19,635.64 0.432 6,679.89
PART D: Sub-base & Base Course
200(1) Aggregate Subbase Course cu.m 7,093.00 6.279 3,264.20 2.889 2,552.53
PART E: Surface Course
311(1)a PCCPavement ( Unreinforced) 150mm Thk. sq.m 2,925.00 2.506 132.00 0.113 1,862.00
311(1)e1 PCCPavement ( Unreinforced) 280mm Thk. sq.m 26,910.59 43.105 15,835.99 25.366 7,383.07
PART F: Drainage Construction ( Catchwall)
404(1)a Reinforcing Steel, Grade 40 ( Minor Structures kg 2,862.00 0.174 - -
405(1)a3 Structural Concrete Class A ( Minor Structure) cu.m 30.22 0.293 - -
407(8) Lean Concrete ( Catchwall) cu.m 9.58 0.046 - -
505(5) Grouted Riprap, Class "A" cu.m 72.53 0.242 - -
506(1) Stone Masonry cu.m 293.03 1.166 - -
PART G: Drainage & Slope Protection Structure
500(1)b1 Pipe Culvert , 610mm dia Class IV ln.m. 7.00 0.020 - - 7.00
500(1)b3 Pipe Culvert , 910mm dia Class IV ln.m. 818.00 5.174 252.00 1.594 377.00
500(1)b5 Pipe Culvert , 1220mm dia Class IV ln.m 204.00 1.996 153.00 1.497
502(1)c Manholes ,910mm dia CHB each 32.00 1.251 14.00 0.547
502(1)c1 Manholes , 910mm dia Concrete each 16.00 1.094 - - 10.00
502(1)e1 Manholes, 1220mm dia Concrete each 11.00 0.860 0.50 0.039 5.00
502(2)a Inlets, 610mm dia Concrete each 62.00 1.818 - -
502(7) Adjusting Manhole (100mm) each 11.00 0.043 - -
504(3)c Cleaning of Pipe Culvert, 910mm dia ln.m. 60.00 0.023 60.00 0.023
504(3)e Cleaning of Pipe Culvert, 1220mm dia ln.m. 144.00 0.099 - -
PART H: Miscellaneous Structure
600(3) Curb & Gutter ( Cast in Place ) ln.m 3,530.00 3.476 - -
601(1) Sidewalk sq.m 4,236.00 2.843 - -
603(3)a Metal Guardrail ( Metal Beam ) including Post ln.m 274.32 0.770 - -
603(3)b2 Metal Beam End Piece ( Bull Nose ) each 12.00 0.176 - -
605(1)ai3 Warning Sign (420mm x 450mm ) W6-1P each 9.00 0.046 - -
605(1)K1 Warning Sign (450mm) W2-5A each 3.00 0.015 - -
605(2)a1 Regulatory Signs (450mm x 450mm ) R1-1A each 1.00 0.004 - -
605(2)ad1 Regulatory Signs (400mm x 600mm ) R5-10 each 2.00 0.009 - -
605(2)ai2 Regulatory Signs (600mm) R6-8B each 9.00 0.053 - -
612(1) Reflectorized Thermoplastic Pavement Markings ( White) sq.m 862.78 0.584 - -
612(2) Reflectorized Thermoplastic Pavement Markings ( Yellow) sq.m 67.54 0.048 - -
620(1)a Chevron Signs ( 450mm x 600mm ) each 35.00 0.521 - -
622(1)a Coco Net, 400 sq.m 325.00 0.039 - -
622(2)c Coco-logs/Fascine ln.m 47.00 0.016 - -
622(3)b Vegetation sq.m 325.00 0.023 - -
TOTAL 100.00 45.51

Verified Correct by:

Project Ins

Prepared by: Approved by:


Engr. Richard Cañete Jr
Project / Resident Engineer
PLISHMENT REPORT

PROJECT COST:
Budget to Date
Actual Budget

TARGET ACCOMPLISHMENT
REL. WT. REMARKS
REL. WT. (%) QTY
(%)

- -
- -

- -
- -
- -
- -
- -

- -
- -
0.621 -
- -
0.020 -
4.523 -
0.246 -
0.006 -
0.285 -
0.277 -
0.147 -

2.259 -

1.595 -
11.826 -

- -
- -
- -
- -
- -

0.020 -
2.384 -
- -
- -
0.684 -
0.391 -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
25.286 -

Project Inspector / Assistant Chief Engineer

Chief Engineer
PROJECT ACCOMPLISHMENT REPORT
PROJECT STATUS:
Accomplishment to D : 45.5131 Period : May 3 to June 3, 2018
Required as per PER : Project ID No. : 17LO-0063
Period Accomplishme : Project Code Name : Tigatto Bypass Road

SCHEDULED CUMULATIVE TARGET


ITEM NO. ACTIVITY DESCRIPTION Unit REL. WT. REL. WT. REL. WT.
QTY QTY QTY
(%) (%) (%)

PART A: Facilities for the Engineer


A.1.1(3) Construction of Field office for the Engineer ls 1.00 0.195 1.00 0.195 -
A.1.1(6) Assistance to the Engineer mo 9.00 0.132 9.00 0.132 -
a. Operations & Maintenance of Field Office for the Engineer
PART B: Other General Requirements
B-5 Project Billoard/Signboard each 2.00 0.010 2.00 0.010 -
B-7 Construction Safety and Health mo 9.00 0.193 9.00 0.193 -
B-8 Trafic Management mo 9.00 2.638 9.00 2.638 -
B-9 Mobilization/Demobilization ls 1.00 0.293 0.50 0.147 -
B.4(1) Construction Survey & Staking km 1.92 0.024 0.96 0.012 -
T C: Earthworks
100(1) Clearing and Grubbing ha 0.16 0.023 0.16 0.023 -
101(2) Removal of Actual Structures/obstruction (Median Island) ls 1.00 0.006 - - -
101(3)a2 Removal of Existing PCCP (Reinforced), 0.20m THK sq.m 13,870.40 3.389 10,057.87 2.457 5,114.53 1.249
101(4)h Removal of Curb and Gutter ln.m 50.00 0.018 - - -
101(10) Removal of Existing Road Sign each 17.00 0.020 - - -
102(2) Surplus Common Excavation cu.m 20,424.00 15.019 8,123.42 5.974 2,176.00 1.600
103(1)a Structure Excavation cu.m 1,067.04 0.824 429.57 0.332 370.44 0.286
103(3) Foundation Fill cu.m 18.00 0.015 10.46 0.009 13.00 0.011
103(6)a Pipe Culvert & Drain Excavation ( Common) cu.m 5,027.00 1.049 2,298.46 0.480 2,520.00 0.526
104(1)a1 Embankment From Roadway Excavation cu.m 2,748.00 0.687 1,639.00 0.409 -
105(1)a Subgrade Preparation sq.m 29,655.48 0.652 19,635.64 0.432 7,636.10 0.168
PART D: Sub-base & Base Course
200(1) Aggregate Subbase Course cu.m 7,093.00 6.279 3,264.20 2.889 1,238.00 1.096
PART E: Surface Course
311(1)a PCCPavement ( Unreinforced) 150mm Thk. sq.m 2,925.00 2.506 132.00 0.113 1,500.00 1.285
311(1)e1 PCCPavement ( Unreinforced) 280mm Thk. sq.m 26,910.59 43.105 15,835.99 25.366 6,136.10 9.829
PART F: Drainage Construction ( Catchwall)
404(1)a Reinforcing Steel, Grade 40 ( Minor Structures kg 2,862.00 0.174 - - -
405(1)a3 Structural Concrete Class A ( Minor Structure) cu.m 30.22 0.293 - - -
407(8) Lean Concrete ( Catchwall) cu.m 9.58 0.046 - - -
505(5) Grouted Riprap, Class "A" cu.m 72.53 0.242 - - -
506(1) Stone Masonry cu.m 293.03 1.166 - - -
PART G: Drainage & Slope Protection Structure
500(1)b1 Pipe Culvert , 610mm dia Class IV ln.m. 7.00 0.020 - - -
500(1)b3 Pipe Culvert , 910mm dia Class IV ln.m. 818.00 5.174 252.00 1.594 300.00 1.897
500(1)b5 Pipe Culvert , 1220mm dia Class IV ln.m 204.00 1.996 153.00 1.497 124.00 1.213
502(1)c Manholes ,910mm dia CHB each 32.00 1.251 14.00 0.547 18.00 0.704
502(1)c1 Manholes , 910mm dia Concrete each 16.00 1.094 - - 10.00 0.684
502(1)e1 Manholes, 1220mm dia Concrete each 11.00 0.860 0.50 0.039 11.00 0.860
502(2)a Inlets, 610mm dia Concrete each 62.00 1.818 - - -
502(7) Adjusting Manhole (100mm) each 11.00 0.043 - - -
504(3)c Cleaning of Pipe Culvert, 910mm dia ln.m. 60.00 0.023 60.00 0.023 -
504(3)e Cleaning of Pipe Culvert, 1220mm dia ln.m. 144.00 0.099 - - 144.00 0.099
PART H: Miscellaneous Structure
600(3) Curb & Gutter ( Cast in Place ) ln.m 3,530.00 3.476 - - 500.00 0.492
601(1) Sidewalk sq.m 4,236.00 2.843 - - 750.00 0.503
603(3)a Metal Guardrail ( Metal Beam ) including Post ln.m 274.32 0.770 - - -
603(3)b2 Metal Beam End Piece ( Bull Nose ) each 12.00 0.176 - - -
605(1)ai3 Warning Sign (420mm x 450mm ) W6-1P each 9.00 0.046 - - -
605(1)K1 Warning Sign (450mm) W2-5A each 3.00 0.015 - - -
605(2)a1 Regulatory Signs (450mm x 450mm ) R1-1A each 1.00 0.004 - - -
605(2)ad1 Regulatory Signs (400mm x 600mm ) R5-10 each 2.00 0.009 - - -
605(2)ai2 Regulatory Signs (600mm) R6-8B each 9.00 0.053 - - -
612(1) Reflectorized Thermoplastic Pavement Markings ( White) sq.m 862.78 0.584 - - -
612(2) Reflectorized Thermoplastic Pavement Markings ( Yellow) sq.m 67.54 0.048 - - -
620(1)a Chevron Signs ( 450mm x 600mm ) each 35.00 0.521 - - -
622(1)a Coco Net, 400 sq.m 325.00 0.039 - - -
622(2)c Coco-logs/Fascine ln.m 47.00 0.016 - - -
622(3)b Vegetation sq.m 325.00 0.023 - - -
TOTAL 100.00 45.51 22.503

Verified Correct by:

Project Inspector / Ass

Prepared by: Approved by:


Chief En
Project / Resident Engineer
LISHMENT REPORT

PROJECT COST:
Budget to :
Actual Bud:

ACCOMPLISHMENT
REL. WT. REMARKS
QTY
(%)

-
-

-
-
-
-
-

-
-
1,302.00 0.318
-
-
600.23 0.441
100.80 0.078
0.29 0.000
237.25 0.050
-
1,567.40 0.034

310.12 0.275

-
1,125.60 1.803

-
-
-
-
-

-
-
73.00 0.714
4.00 0.156
-
0.50 0.039
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3.909

Project Inspector / Assistant Chief Engineer

Chief Engineer

You might also like