You are on page 1of 29
£44 Exercise 1 Manufacturing Planning At the conclusion of this exercise, you will be able to: + Display the Stock/Requirements list © Create a rough cut plan © Create a production plan ‘+ Transfer requirements to demand management. + Performa planning run Production for a material is only done if there are requirements for it ‘These requirements are created based on the sales plan. Im planning, the sales plan must be covered by a production plan. After the production plan is created, a planning run is executed t0 create elements which can be converted into production orders Step 1: Sales and Operations Planning - Exercise “Material F126 is ordered at short notice by your customers. As production must bbe in advanco, you create requirements for this material First, check the current stock/tequirement list for material F126, SAPECCMem | Logistics > Production > MRP > Evaluations > Stock/Requirements List ‘Teansaction cade | NDO4 ‘Use the following data: Field mame ‘User action and values Material FI 2% Plant 1 00 Expand the header details and note the following data: Field mame ‘User actonand values MRP Cntoler Froearcment ype Satay group Lotsine MRP type Material Step 1: Sales and Operations Planning - Solution Logistics > Production > MRP > Evaluations > Stock/Requirements List (tbo) (On the initial sereen, ener tne data as described, then press Ente. Expand the header details, Field ame (Sota MRE Center | 100 Procarcmentiype | # (inhouse production) Swatgy grap | 40 Lotsine EX (lot for latonderquanity) une te PD (© daterninints) Mati PERT ( finished product) £ TeMRP Controller is responsible fora group of matrials within a plant. “The planning strateuy represents the procedure wsed for planing material and & (echnically speaking) controlled by the MRP types.

You might also like