Project Title: CALATAGAN MULTI-FUNCTION WORKSHOP REHABILITION

Location: HACIENDA LINDA, CALATAGAN, BATANGAS


Owner: MR. CARLOS MAñALAC
Subject: BILL OF QUANTITY

CONSTRUCTION LABOR
DESCRIPTION OF WORKS MATERIAL COST COST TOTAL REMARKS
OWNER SUPPLIED MATERIALS
A. FOUNDATION AND PEDESTAL REBARS 527,530.00 422,024.00 949,554.00 ON GOING
B. SLABS REBARS 498,551.29 398,841.03 897,392.31
C. CONCRETING 4,884,436.40 4,884,436.40
D. A36 STEEL BEAMS AND COLUMNS 4,830,734.00 2,898,440.40 7,729,174.40
E. ANCHOR BOLTS 209,890.70 125,934.42 335,825.12
F. MS PLATES 1,413,240.00 847,944.00 2,261,184.00
G. ANGULAR BAR 247,660.00 148,596.00 396,256.00
H. WELDING ROD-ESAB(CONSUMABLES) 2,456,400.00 1,473,840.00 3,930,240.00
I. BASE PLATES 177,303.00 106,381.80 283,684.80
J. TUBULAR 747,669.00 448,601.40 1,196,270.40
K. REINFORCEMENT STEEL BAR FOR CHB 86,871.00 52,122.60 138,993.60
L. WATERPROOFING WORKS 3,200,000.00 3,200,000.00
M. STEEL DECKING 1,741,341.41 1,741,341.41
N. INSTALLATION OF STEEL DECK 3,000,000.00 3,000,000.00
O. PUMPCRETE RENTAL 455,000.00 455,000.00
P. ADDITIONAL MS PLATE,COLUMNS & C
1,141,269.00 798,888.30 1,940,157.30
CHANNEL
Q. ADJUSTED SALARY OF WELDERS 2,031,750.00 2,031,750.00
R. SUPPORT ON DECKING 1,000,000.00 1,000,000.00
S. ARCHTECTURAL WORKS 1,600,000.00 1,600,000.00
T. ELECTRICAL WORKS 2,900,000.00 2,900,000.00
U. PLUMBING WORKS 1,000,000.00 1,000,000.00
V. MECHANICAL WORKS 1,330,306.00 1,330,306.00
W. BOOM CRANE RENTAL 562,000.00 562,000.00
X. SUN BLASTING 3,000,000.00 3,000,000.00
Y. TESTING (THIRD PARTY) 300,000.00 300,000.00
VSS SUPPLIED MATERIALS
A. EARTH WORKS 551,040.00 385,728.00 936,768.00
B. AGGREGATES FOR GRAVEL BEDDING 80,000.00 64,000.00 144,000.00
C. WALL 235,280.00 188,224.00 423,504.00
D. TEMPORARY FACILITIES 237,100.00 142,260.00 379,360.00
E. OTHERS (CONSUMABLES) 474,200.00 426,780.00 900,980.00

TOTAL ₱ 38,887,821.80 ₱ 10,960,355.95 ₱ 49,848,177.74

Per Square Meter ₱ 22,658.26