The bridge is having 8.30m narrow carriage way located in
accident prone area with horizontal and vertical curve on heavy traffic intensity road. It is a history that number of frequent accidents are occurred on this bridge till date. It is declared accident prone area for which the re construction of the bridge is necessary. While carrying out first cycle inventory based on IBMS guidelines and taking the above points into consideration, the said bridge was listed under distress bridge. Meanwhile in review meeting held at New Delhi on 19-12-2018 subsequent further directions are received from IDDC regarding classification of distress bridges. Accordingly, the 3rd cycle inventory is carried out on 20-02-2019 for the above said bridge and reported minor repairing instead of distress bridge. There is provision of two new bridges parallel to this location in four laning ongoing project. presently the substructure on both the bridges are completed. It is submitted for information please.