You are on page 1of 138

The Wellsite Guide

An Introduction to Geological
Wellsite Operations

© Bernhard W. Seubert
Consulting Geologist
Jakarta, September 1995
The Wellsite Guide Page 2 Introduction

What this text is about

This text addresses geologists who are going out to work as wellsite geologists in an offshore
or onshore location for the first time. It gives instructions and a checklist-type overview over
those wellsite operations which need geological input or supervision. THE WELLSITE GUIDE is
not a sample description manual or geological data handbook. It is assumed that the wellsite
candidate is - first of all - a geologist and knows, owns and is capable of using the basic tool
kit of geological reference books, log charts and computer utilities, as far as they are of
relevance for the work. Therefore no formulae, graphs or similar material has been
incorporated into this text, they are better quoted from the original references.
THE WELLSITE GUIDE is rather meant as a briefing instruction to those geologists who are
new to the trade or only occasionally wellsitting or, as a checklist for geologists who are
changing from one operator or operating area to another, facing new concepts, routines and
formats. It is also tried to introduce and illustrate modern or future developments that may be
new to some "old hands" with no recent exposure to the actual work. However, owing to the
fast development of techniques and methods, even this booklet will be outdated partly in very
short time.
The Wellsite Guide Page 3 Introduction

I thank Dr. Wolfgang Monninger for his critical review of an early version of this text and many
constructive comments, most of which were incorporated. Thanks also to Mr. Richard Wells for his
editing work on several chapters.

Published On-Line by : PT. PetroPEP Nusantara


Version date: 5 September 2000
File : WGUID218.TXW
The Wellsite Guide Page 4 Introduction

Contents :
6.1.4. Contribution to the Final Well Report
6 .1 .5. Data Secu rity and
List of Figures and Illustrations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Confidentiality (50)
6.2. Working with Cuttings Samples . . . . . . . . . . . . . . . 50
1. The Job Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 6.2.1. Sample Preparation (51)
6.2.2. Sample Description (51)
2. Getting Mobilized . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 6.2.2.1. Tricks and Pitfalls (51)
2.1. Duties, Responsibilities and Authorities . . . . . . . . . . . 8 6.2.3. Hydrocarbon Show Detection and
2.2. Office Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Description (52)
2.3. Materials and Equipment for the Wellsite Work . . 11 6.2.3.1. Gas Chart Interpretation
2.4. Travelling and Arriving . . . . . . . . . . . . . . . . . . . . . . 13 and Gas Shows (53)
2.4.1. The Company Man (14) 6.2.3.2. Oil Show Detection (54)
6.2.3.2.1. Odor (55)
3. On the Rig . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 6.2.3.2.2. Stain and
3.1. Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Bleeding (55)
3.1.1. Helicopter Safety (15) 6.2.3.2.3. Acid Test (55)
3.1.2. Hydrogen Sulfide, H2S (16) 6.2.3.2.4. Hot Water
3.2. Working Space . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Test (55)
3.3. Wellsite Psycho-hygiene . . . . . . . . . . . . . . . . . . . . . 17 6.2.3.2.5. Fluorescence
(56)
4. Supervising the Mudlogging . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 6.2.3.2.6. Cut and
4.1. General Aspects . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Solvent Tests
4.2. Consumables and Spare Parts . . . . . . . . . . . . . . . . . 20 (56)
4.3. Specific Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 6.2.3.2.7. Acetone -
4.3.1. Gas Detection Equipment (23) Water Test
4.3.2. Other Checks in the Mudlogging Unit (56)
(26) 6.3. Coring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
4.3.2.1. The Mud Pit Level 6.3.1. Selecting Coring Points (58)
Monitors (26) 6.3.2. While the Core is being Cut (58)
4.3.2.2. The Pump Stroke Counters 6.3.3. Core Retrieval (58)
(27) 6.3.4. Core Shipment (59)
4.3.2.3. Hook Load Sensor (27) 6.4. Pressure Engineering . . . . . . . . . . . . . . . . . . . . . . . . 61
4.3.2.4. Kelly Height Indicator 6.4.1. Leak-Off or Formation Integrity Test (
(ROP System) (28) . . . . . . . . . . . . . . . . . . . . . . . . . . 63)
4.3.2.5. Mud Flow In/Out (29) 6.4.2. Pressure Worksheet (65)
4.3.2.6. Rotary Table Speed (RPM) 6.5. Wellsite Biostratigraphy . . . . . . . . . . . . . . . . . . . . . 66
(29) 6.5.1. Foraminifera (67)
4.3.2.7. Torque (29) 6.5.2. Nannofossils (67)
4.3.2.8. Mud Resistivity (30) 6.5.3. Palynology (67)
4.3.2.9. Mud Temperature (30) 6.5.3.1. Fine Time Resolution (68)
4.3.2.10. Mud Density (31) 6.5.3.2. Environmental and Age
4.3.2.11. Standpipe Pressure (31) Range (68)
4.3.2.12. Casing Pressure (32) 6.5.3.3. Some Typical Problems
4.3.2.13. Heave Compensator (32) when working with
4.3.2.14. H2S Detector (33) Wellsite Palynology (69)
4.3.2.15. Sample Oven (33) 6.5.3.4. Equipment and Sample
4.3.2.16. Video Display (33) Preparation (69)
4.4. Mudlogging Procedures and their Checks . . . . . . . . 34 6.6. Wellsite Geochemistry . . . . . . . . . . . . . . . . . . . . . . . 69
4.4.1. The Mudlogger's Work Sheet (34) 6.6.1. Pyrolysis Data (71)
4.4.2. Chart Recorders and Charts (34) 6.6.2.Total Organic Carbon Content (71)
4.4.4. Daily Reports (36) 6.6.3. Types of Organic Matter (72)
4.4.5. Lag Time Calculation and Cuttings 6.6.4. Amount of Free Hydrocarbon (72)
Transport (36) 6.6.5. Migration (72)
4.4.6. Hole Cleaning (39)
4.4.6. Kick (Pit Volume) Drills (40) 7. Aspects of Drilling Practice and Technology . . . . . . . . . . . . . 72
4.4.7. Sample Collection (40) 7.1. Rig Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
4.4.8. Cuttings Sampling and Sample Interval 7.2. Rig Components . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
(41) 7.2.1. Derrick and Lifting Equipment (74)
4.4.9. Calcimetry (42) 7.2.1.1. The Brakes - and How to
4.4.10. Shale Density (43) Drill (75)
7.2.1.2. Rotary Table Drive, Top
5. Sample Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 Drive (75)
5.1. Routine Samples . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 7.2.1.3. Motion Compensator (76)
5.2. Other Sample Material . . . . . . . . . . . . . . . . . . . . . . 45 7.2.1.4. Swivel and Kelly Hose (76)
5.3. Sample Shipment . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 7.2.2. Drill String (76)
7.2.2.1. Drill Pipe (77)
6. Wellsite Geologist's Routines . . . . . . . . . . . . . . . . . . . . . . . . . . 47 7.2.2.2. Heavy Weight Drill Pipe
6.1. Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48 (77)
6.1.1. The Master Log (48) 7.2.2.3. Bottom Hole Assembly
6.1.2. The Daily Report (49) (BHA) (78)
6.1.3. Ad-hoc Reports (49) 7.2.2.3.1. Collars (78)
7.2.2.3.2. Subs (78)
The Wellsite Guide Page 5 Introduction

7.2.2.3.3. Downhole 10.2. Tie to Seismic . . . . . . . . . . . . . . . . . . . . . . . . . . . 123


Motors (78)
7.2.3. Drill Bits (79) 11. Computer, Electronics and Communication . . . . . . . . . . . . 123
7.2.3.1. Tricone Bits (80) 11.1. Data Formats . . . . . . . . . . . . . . . . . . . . . . . . . . . . 124
7.2.3.3. PDC Bits (80) 11.1.1. The LIS Format (124)
7.2.3.3. Classification and Grading 11.1.2. The DLIS Format (124)
of Bits (80) 11.2. Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125
7.2.4. Mud and the Mud Circulation System 11.3. Data Media . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125
(81) 11.4. Data Transmission . . . . . . . . . . . . . . . . . . . . . . . . 126
7.2.4.3. The Mud Pumps (81)
7.2.4.4. Flow Line and Solids Literature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126
Removal (82)
7.2.4.5. Trip Tank (82) Alphabetical Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127
7.2.4.6. Mud Hydraulics (83)
7.2.5. Kick and Blow Out Control Equipment Appendix A, Mudlogging Checklist and Technical Audit . . . . 129
(84) (135)
6.2.5.1. Kick During Connection
(87)
7.2.5.2. Kick while Tripping (87)
7.2.5.3. Kick while Drilling (88)
7.3. The Art of Drilling . . . . . . . . . . . . . . . . . . . . . . . . . . 88
7.3.1. “Making Hole” (89)
7.3.2. Depth Control - How Deep Are We ? (89)
7.4. Mud Engineering . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
7.4.1. Water based Mud Systems (92)
7.4.1.1. Lignosulfonate Muds (92)
7.4.1.2. Lime and Gypsum Muds
(92)
7.4.1.3. Saltwater Muds (92)
7.4.1.4. KCl Muds (92)
7.4.1.5. Polymer Muds (93)
7.4.2. Oil based Mud Systems (93)
7.4.3. Mud properties (93)
7.4.4. Mud Filtrate Tracers (94)
7.6. Real Time Logging (MWD, LWD) . . . . . . . . . . . . 95
7.6.1. Benefits and Drawbacks of Real Time
Logging (100)

8. Decision Points in Drilling a Well . . . . . . . . . . . . . . . . . . . . . . 100


8.1. Correlations and their Problems . . . . . . . . . . . . . . 102
8.1.1. Faults (102)
8.1.2. Seismic Correlation (102)
8.2. Bit Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102
8.3. Selecting Casing Points . . . . . . . . . . . . . . . . . . . . . 103
8.4. TD'ing the Well . . . . . . . . . . . . . . . . . . . . . . . . . . . 103

9. Wireline Logging Supervision . . . . . . . . . . . . . . . . . . . . . . . . . 104


9.1. Preparations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106
9.2. Depth Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106
9.3. When the Logging Job Starts . . . . . . . . . . . . . . . . . 108
9.4. Hole Problems while Logging . . . . . . . . . . . . . . . . 109
9.5. The First Run . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110
9.6. Detailed Log Checks . . . . . . . . . . . . . . . . . . . . . . . 110
9.6.1. Gamma Ray Log (111)
9.6.2. Gamma Spectroscopy (111)
9.6.3. SP (Spontaneous Potential) (111)
9.6.4. Sonic Logging (111)
9.6.5. Full Waveform Sonic (112)
9.6.6. Resistivity Logging (113)
9.6.7. Density Log (114)
9.6.8. Neutron Log (114)
9.6.9. Dipmeter Log (115)
9.6.10. Velocity Surveys, VSP, Well Seismic
(115)
9.6.11. Wireline Formation Testing (116)
9.6.12. Sidewall Cores (117)
9.7. Log Presentation and Quality Control . . . . . . . . . . 119
9.8. Quick Look and Computer Based Log Evaluation
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120
9.8.1. The Rwa Check (121)
9.8.2. Density - Neutron Logs (121)
9.9. Money: Checking the Service Ticket . . . . . . . . . . 122

10. Data Integration and Interpretation at the Wellsite . . . . . 122


10.1. Temperature Analysis . . . . . . . . . . . . . . . . . . . . . 122
The Wellsite Guide Page 6 Introduction

List of Figures and Illustrations


Figure 35: True vertical thickness and true stratigraphic
Figure 2: Think of power cables for the computer gear. Rig thickness in relation with a uniformly dipping
plugs may not have the same voltage or connector stratigraphic unit. 98
like in the office! 12 Figure 36: A View of a skid mounted logging unit (Atlas
Figure 3: Beware of tail rotor. Always go to the side or front Wireline). 106
when boarding or leaving the helicopter. 15 Figure 37: Log presentation (main log) of the Dual Induction
Figure 4: A view of a mudlogging unit The components of the Log (SCHLUMBERGER). 114
unit may be arranged .differently, but the principle Figure 38: Four examples of the more common signal quality
remains the same. 18 problems frequently seen in VSP and checkshot
Figure 6: Sensors commonly found in modern mudlogging acquisition. 116
systems. 22 Figure 39: Wireline testing tool (RFT) in open position.
Figure 7: The principle of the gas trap for ditch line gas 117
extraction. 23 Figure 40: Parts and options of the SFT tool (Halliburton).
Figure 8: The gas trap installed at the possum belly tank. 118
24 Figure 41: Log presentation. 120
Figure 9: Acoustic pit volume sensor. The sensors measure the
time taken for each pulse to echo back from the mud
surface in the pit. 26
Figure 10: An acoustic pit level sensor system installed over a
mud pit 26
Figure 11: Pump stroke sensor. 27
Figure 12: A mechanical hook load transducer. 27
Figure 13: A hook load sensor/transducer system based on
hydraulic pressure measured at the dead end of the
drill cable. 28
Figure 14: Paddle type mud flow (out) sensor (Halliburton
/Gearhart). 29
Figure 15: Torque Sensor (Anadrill) 29
Figure 16: A simple mud conductivity probe with a graphite
electrode dip cell. 30
Figure 17: The hydraulic transducer of a heave compensation
system. 32
Figure 18: The H 2S panel in the mudlogging unit consists of
several such displays. Each one for one sensor
location. 33
Figure 19: Laminar flow; arrows indicating relative velocity of
the mud. 38
Figure 20: Core as boxed and marked for despatch to the lab.
59
Figure 21: Fluidisation of unconsolidated formation. 60
Figure 22: Core deformation by mud invasion into the core
barrel. 60
Figure 23: Proper labelling and marking of core and core box.
Black line right, red line left, arrows up. 61
Figure 24: Schematic Diagram of a leak-off pressure plot.
65
Figure 25: A semisub drilling rig (twin hull type). 74
Figure 26: View of a drill ship. 74
Figure 27:The draw-work the other main parts of the hoisting
equipment. 75
Figure 28: Slips. Used to hold drill pipe in the rotary table.
77
Figure 29: Tools used to make connections. After the tool joint
has been "broken" with the tongs, the pipe may be
unscrewed by further by turning the rotary or by
using a spinning wrench. 77
Figure 30: The drill stem and its components. Note that cross
overs and other parts are not shown. 78
Figure 31: Two types of tricone bits. The bit on the left is a bit
for soft to medium hard formations. The bit on the
right a high performance insert bit for hard to very
hard formations. 80
Figure 32: Cutting action of PDC bits. 80
Figure 33: Ram type blow out preventer.. 87
Figure 34. The basic terminology on deviated wells. 97
The Wellsite Guide Page 7 Introduction

1. The Job Description


The work of the wellsite geologist is defined in the following by one major operating oil company:

"The wellsite geologist, as the source of all operational geologic information, is the most
important link in the chain of communications between wellsite and management. The
importance of the wellsite geologist to the overall successful termination of any project whose
aim is to find hydrocarbons for exploration cannot be overstated. He is the exploration
department's man-on-the-spot upon whose shoulders rests the responsibility for obtaining (of
insuring that) every possible scrap of information which can be wrested from the earth and
insuring that the data are transmitted to the office in a concise but comprehensive, coherent
report.

It is the wellsite geologist's duty to confer regularly with the company's wellsite drilling
operations representative (company man) on location to forestall misunderstandings and to
insure that the maximum information is obtained at the most economical price. Foresight,
training and a working knowledge of drilling equipment, terminology and personnel are
necessary to bring this to fruition.

The wellsite geologist under the direction of the Company Operations Geologist1 is responsible
for all geology and geologically related administrative wellsite activity."

Depending on the company he is working for, the wellsite geologist may also be responsible for certain
work in the company office, such as compiling reports, relaying routine reports to partners and
maintaining contacts with various contractors.

1
The position of an operations geologist may not be filled in a particular organization. The wellsite geologist reports in this
case to the area geologist, the senior or chief geologist.
The Wellsite Guide Page 8 Preparation

2. Getting Mobilized
2.1. Duties, Responsibilities and Authorities

you travel to the field, find out what your duties and responsibilities on location will be. As
Before a wellsite-geologist, you should know exactly what is expected of you and how and when
your reports to be submitted:

! Who is your supervisor? Whom do you report to? Make sure that you and your supervisor
understand the relationship. It is very cumbersume to be on a rig and having different people
calling and trying to tell you what to do.

! What sort of daily reports will be used for the project? What are the reporting deadlines? Some
companies report at midnight so that the report is in the office at 6:00 AM in the morning.
Others expect their reports to be up-to-date as of 6:00 AM, and expect an abridged update in the
afternoon. Be certain that the requirements are clear before you head out to the rig. (See also
page 49, daily reporting.)
Check out the working schedule of the head office, when do thwe want to see their report.

! What is your work schedule? Will you be working a regular schedule or will your time on the
rig depend on the well progress ("...stay until TD!") ? Typical on/off schedules are two weeks
on - two weeks off or four weeks on - four weeks off. It depends mainly upon the logistical
situation and the company policy. In some cases periods are required; however work periods
which are too long will affect motivation and performance.

Experience has shown that drilling operations tend to fall behind rather than move ahead of
schedule. If your stay on the rig depends on the completion of certain steps (logging, casing, TD,
testing, etc.) you are well advised to plan for the longest stay possible. Do not forget to inform
your family (friends, or whomever) accordingly.

! Will you be picking casing points? If so, do you have to confirm with the base office in town?

! Will you be selecting coring points? If yes, do you have to contact your supervisor before you
request a core ?

! Is it your responsibility to call wireline, velocity survey or other service companies so that they
are on location on time, or will the office in town motify the contractors of the well's progress
?

! Do you have authority to sign service tickets for wireline logging, velocity surveys, mudlogging,
MWD, wellsite biostratigraphy, etc.?

! Are you responsible for reporting movement and storage of radioactive or explosive substances
used for logging, sidewall cores or perforating? Who has the formal responsibility for these
matters ? The drilling department is responmsible for the safety of the drilling operation , they
ordinarily are assigned responsibility for radioactives and explosives.

Regardless of other duties, you may assume that you will be supervising the mudlogging contractor on
location. Whatever problems arise in the mudlogging unit will be your problems.

2.2. Office Preparation

! First of all, find out what this well is about. Is it an exploration well, a delineation or
development project ? Get a copy of the well montage, the seismic line(s) through the well and
The Wellsite Guide Page 9 Preparation

a copy of the drilling program. Read it carefully. What is the expected reservoir, what is known
about it, what is the stratigraphic sequence above and below it. Collect and - if possible - copy
refernce material of the regional geology. Of particular importance are descriptions and analysis
of the rocks that will be drilled. Your job is to compare the findings in this well against data that
exist already. Does this well confirm the understanding of the regional geology or is it a surprise
? You need to be able to comment or answer these questions at the wellsite.

! Get all the details about he well to be drilled. Is the well expected to be dangerous? Is it likely,
or possible that there is shallow gas, overpressure, H2S (see page 16), CO2 ?

! Is the well to be straight or deviated ? Obtain a diagram of the well course from the drilling
department.

! Are there special requirements for confidentiality? Will you encode part or all of your report?
(See page 50)

! Will you be supervising or witnessing any wireline logging? Does your supervisor require a
quick-look interpretation of wireline data? (See page 108, logging supervision for details.)

! Is electronic data transmission of log data planned ? (If so, Section 11.1 for data formats.)

! If you are responsible for supervision log acquisition, plan a session with the petrophysicist to
get the basic information and instructions. Ask for parameters required for logging and
preliminary interpretation. Get data on Rw and typical mineral composition of the area - if
available.

! Will you be witnessing other operations which are not strictly the wellsite geologist's duty, such
as perforating, testing or rig positioning?

! Will you be supervising a velocity survey or VSP ? If so, talk to the geophysicist for briefing.
(More details on page 117, VSP.)

! Who are the contractors for mudlogging, wireline logging, well seismic, transport (helicopter,
boating or land transport) biostratigraphy, geochemistry, etc? Get their addresses and/or contact
numbers.

While you are in the office you should try to get as much information as possible about the project and
make personal contact with the other exploration personnel involved. Meet the area geologist and
geophysicist for special instructions. If you are new to the geological province try to get a familiarization
session with the project geologist. This type of introduction is more valuable than reading heaps of
literature.

! What are the sample collection requirements? Drill cuttings samples are taken routinely for
analytical purposes and to satisfy the partners. Find out what type of samples, from what
intervals and how many sets are to be taken. (See also page 44, sample types.)

! Will the operation and reporting be in metric or imperial units ?

! Assemble your collection of geological documents for the well (listed on page 12).

! As a courtesy, introduce yourself to the drilling manager. Ask his opinion of the prospect, which
may be entirely different from that of the geologist.

! Discuss the mud program and possible changes to it. This may have some bearing on the wireline
logging program. Will tracers (page 92f) be used?
The Wellsite Guide Page 10 Preparation

! Try to identify and resolve any potential disagreements before going to the rig because you are
likely to be at the center of any conflict between the various interests.

Find out from the drilling department or other sources of information what facilities are available on the
rig.

! Telecommunications system: Is a telephone available? Is there a fax (facsimile)


machine, and if so does it utilize telephone lines or shortwave radio? Is there a VHF
or phone system connecting to the shore base or town office ? 
! Computers: Will there be a computer at the wellsite, do you bring a laptop from the
office or your own ? Are there any special programs, company specific software that should or
must be used. Make sure that you have at least the same text processor and the same spreadsheet
program that is considered company standard or fashionable in the office.

! Modems: Discuss the possibility and procedures of electronic data transmission (log data, see
page 108). Find out what the modem settings are, which protocol software is in use and at which
hours of the day the modem will be on and in receiving mode. Who is your partner to talk in the
office in case something does not work (don't expect any help from the drilling department).

! Transport facilities: For personnel, samples and cores. Ships, crewboats, helicopter, fixed wing
aircraft ? How will you get to location ? If you travel by helicopter, will you need a safety or
survival certificate (page 15) ? Will you have to stay overnight somewhere, is there any support
from an agent or a service company in the field ? Note the addresses in your notebook. Who
buys and supplies airline tickets ?

! Shore base. Will you be going through a company base on shore (guest house, ware house,
agent), does the company entertain a shore base ? If so, get the contact numbers.

! Medical facilities2: Is a doctor or medic on the rig? Who is responsible for emergency medical
treatment? Where is the closest hospital?

the service companies' base offices to introduce yourself. You may need to call them from
Contact the rig during operations (possibly even in the middle of the night) and it might be helpful
if they know who you are in advance. The mudlogging and wireline logging contractors are particularly
important in this regard.

! Find out the name of the wireline logging engineer(s), their suervisors, the base manger's name,
and whether or not a second wireline engineer is available. Logging jobs may exceed 40 hours,
and the safe handling of explosives and radioactive materials is essential.

! Confirm that all the wireline tools and downhole equipment are suitable for the anticipated
temperature and pressure conditions. (See also page 107, logging supervision).

! Introduce yourself to the logistics man of your company and find out about the flows of material,
transports of samples and cores and service company crew changes.

If you will be relieving another geologist who is already on location contact him (by telephone or radio)
before you leave for the rig to ensure a smooth crew-change.

2
Contingency planning for emergencies is the responsibility of the drilling department. On the other side, the wellsite geologist
is the second company representative on the rig and should be advised about the particulars of emergency planning.
The Wellsite Guide Page 11 Preparation

2.3. Materials and Equipment for the Wellsite Work

There are many things which might be useful at the wellsite, but it is preferable to minimize the number
of things taken so as not to overload. Ordinarily there is laundry service on the rig or in camp, so that
one change of clothes should be sufficient. Pack your belongings in a soft bag rather than in a sturdy
suitcase, particularly if you will be travelling by helicopter. You may be mobilized with only a few hours
notice, so you should you decide in advance what you will take along to the rig.

personal gear:
Minimum
! Work clothes (coveralls), T-shirts and underwear. Wear one set and
take another for changing.
! Safety shoes (required).
! Hard hat. Don't rely on the rig's supply as they may have visitors and
run short.
! Safety goggles to protect your eyes against dust and aggressive mud
chemicals.
! Select clothing with regard to the climate, and allow for unseasonably
cold weather, if this is a possibility.
! Sandals, slippers or sport shoes to be worn inside the living quarters.
! Shaving kit, with the usual essential items.
! A sweat shirt or pullover may be needed inside their living quarters, which can be extremely cold
on air-conditioned rigs.
! Spare glasses.
! ID card, company ID badge and passport.
! Money. Be sure to include some local currency if going to another country. You may need some
to pay taxi fare, porters or airport fees. Do not take credit cards, checks or other valuables with
you. They are useless on a drilling rig and prone to get lost.
! Cigarettes (if you are a smoker).
! Medicine, if you are under medication or usually take certain drugs. You may be suspected of
carrying illegal drugs. Make sure your medicine is in the original package. Bring along your
doctor's prescription if there could be any doubt or question.
! Watch and alarm clock. Make sure the alarm is loud enough to be heard over the usual
background noise, and the batteries are still o.k.

Minimum working gear :

! Pencils and ballpoint pens.



! Notebook.
! Forms for sample and core descriptions, reports, routine communication, material
shipment, transportation requests, etc. Take a collection of everything that might be useful. Take
one form of each and photocopy on the rig, if possible.
! Blank master log forms3, transparent preferred, in the appropriate units (metric or imperial).
! Calculator. (Preferably a programmable calculator for quick-look log analyses).
! Ruler.
! Rapidograph (or other) drafting pens (two or three, size 0.25, 0.35 and 0.5) and drafting ink.
! Colored pencils (just a few).
! Contact telephone numbers (including home phones, pagers etc.) and addresses of the
supervisors and decision makers in the office and of the relevant service companies (mudlogging,
wireline, freight agents, transportation contractors, etc.).
! Shipping addresses for samples and cores.

3
It is very practical to use master log formats similar to wireline log displays. Transparents can be copied on fan-fold blue print
paper available in the wireline logging unit and fit into the fax machine.
The Wellsite Guide Page 12 Preparation

! Manuals and documentation (see page 12 for more details).


If there is any possibility that you may be coring, be sure to include the following:

! Hand lens (6x, 10x or combination 10x and 20x).


! Geologist's hammer to take rock chips from a core.
! Marker pens.
! Steel tape measure .

With this minimum gear you should be equipped to do your job on the wellsite. However, you may want
to add a few items from the following list to your expedition baggage.

personal gear :
Additional
! Rain coat (or rain coveralls).
! Radio, cassette or CD player.
! Pocket knife (always useful).
! Books, magazines for your leisure time. Be prepared for unexpected periods of down-time,
which can come at any time.
! Camera and flashlight (batteries !).
! Padlocks (to protect company and private valuables).
! Torch (flashlight) with spare batteries (needed to check shakers, desander, desilter, etc. during
the night.)

Let your selection be guided by the job you are going to, the expected length
of your stay and the remoteness of the rig from your supply base or office.
Depending on the these factors, you might bring anything from the bare
minimum (see above) to a complete office, drafting room and petrological lab.
A reasonable compromise might also include the following:

! Clip board.
! Laptop computer (with printer, modem, cables, etc.), loaded with text Figure 2: Think of power
processor, spreadsheet, graphics program, log interpretation software cables for the computer gear.
etc. Don't forget the latest anti-virus software. Rig plugs may not have the
same voltage or connector like
! Scaled ruler ( 1:200, 1:500, etc.). in the office!
! Rubber stamps with well name and location, company mailing
address, etc.
! Writing pads, envelopes, white (address) stickers.
! Transparent paper, graph paper, etc.
! Correction fluid, white (to make the final corrections on fax reports).
! Scotch tape, stapler, hole puncher.
! File folders, files or something suitable to organize your work.
! Magnets (for displaying maps and montages on the wall. Warning: these must be packed and
stored far from computer diskettes and magnetic tapes).
! Business cards.

! Manuals :
" Wireline logging chart book.
" Log interpretation handbooks. 
" Sample description manual4.
" Drilling data handbook.

! Geological documentation :

4
Swanson,R.G.: Sample Examination Manual .- AAPG Methods in Exploration Series, Tulsa, 1981
The Wellsite Guide Page 13 Preparation

" Well proposal, well program, prospect montage.


" Selected seismic lines.
" Logs from offset wells for correlation and reference.
" Seismic time/depth charts from control wells.
" Directional well course diagram (if any).

! Programmable calculator, computer, programs, software manuals and batteries or 110 V adaptor
with the proper adaptor plugs.

! If you will be using a computer, consider taking templates for spread sheet programs and
diskettes with customized programs and report forms. The following items may be particularly
useful:

Diskettes:
! Spread sheet with seismic velocities, interval velocities, of surface seismic and adjacent
wells, pre-set graphics.
! Spread sheet for quick-look log interpretation
! Spread sheet for extrapolation of wireline well temperatures
! Spread sheet for overpressure prediction (as questionable as the particular methods
might be; see also page 63).
! Other software (such as programs for log interpretation, report generation,
communications, data base, word processor, - just to name a few).

! Company stickers (baseball hats, T-shirts). These give-away items are ideal for making friends
and honouring people you work with for their cooperation, and as gifts for officials or visitors.
Remember that you will be representing your company at the wellsite.
If you are a consultant (free lance or self employed) it might pay to promote yourself. Have
some lighters, pencils or other gadgetry made up with your contact number or address on them.
This investment could provide valuable contacts for future work

2.4. Travelling and Arriving

The trip to the rig may be by car, supply boat or small motorboat, airplane, helicopter or any
combination thereof. Even if your destination is only a short distance, you should expect to
be delayed and have to spend the night somewhere enroute. You may be hoisted on the deck 
of the rig in a crew basket or you might be the last passenger on a fully loaded helicopter.
Therefore, travel light. If your belongings weigh more than ten or fifteen kilograms and you
are travelling by helicopter you should reduce it. It may be possible to transport part of your gear as
cargo, particularly if you are carrying company materials, spare parts, etc.

If you travel by air, you must comply with air safety regulations (see also page 15 regarding helicopter
safety). When flying over water you must wear a life vest. In cold areas, survival suits must be warn.
These are insulated garments which keep you warm enouth to survive for a time in cold water. Follow
the instructions given by the pilot or the dispatcher.

! Immediately upon arrival on the rig report to the radio operator who will add your name to the
crew list (POB list) and assign your lifeboat station.

! Make sure, radio operator knows who you are, what your name and function is, and who you
work for. He will receive the radio or telephone calls from your office and page you all over the
rig. It is therefore important that he does not mistake you for a service company hand.

On some rigs you must also report to the safety officer, the liaison officer or (in certain countries) to the
police or army representative on the rig. One of the above will direct you to the camp boss or chief
The Wellsite Guide Page 14 Preparation

steward who will show you to your room, shack or cabin and assign your bed. Find out where the galley
is and when it is open. Most rigs provide four meals a day, every six hours. Coffee, tea and some kind
of cookies are always available. Most rigs require, that you dress properly for the meals, i.e. wear clean
working clothes.

Before beginning your work you should pay a courtesy visit to the rig superintendent5 and to the captain,
on a drillship or floating rig.

2.4.1. The Company Man

The drilling supervisor, colloquially referred to as the "company man" is the operator’s representative
on the rig. He is the person ultimately responsible for nearly all aspects of the operation, in particular
the safety and operation of the rig. The wellsite geologist works in close cooperation with him but is not
under his authority, does not report to the company man. If possible, introduce yourself to him before
you start work. A good working relationship between the wellsite geologist and the company man is of
paramount importance. He may be friendly and cooperative or a card carrying arsehole, but in any case
you must work together with him.

that the company man and his counterparts on the side of the drilling contractor (the
Assume “drillers”) do have no or only a marginal understanding of the work of a geologist in
general and even less appreciation of his work. They assume that he is only on location to look at drill
cuttings and fill out a few blanks on the morning report. The position of a geologist is therefore
considered much less important than the work of any service contractor.

3. On the Rig
3.1. Safety

The major safety hazards on offshore drilling rigs are well blow-outs, poison gas and storms. The
ordinary safety hazards associated with any industrial or marine operation such as fire, falls, falling
objects and electrical hazards are also important.

Safety is top priority on the rig. For the wellsite geologist this means being aware of potential hazards,
knowing the how to prevent accidents and knowing the emergency procedures. Find your lifeboat station
as soon as it is assigned to you. Familiarize yourself with your duties in emergencies. Most rig operators
assign the geologist to “standby” in emergencies, meaning “keep out of the way”.

The most significant contribution of the geologist to rig safety is in dealing with overpressured zones,
particularly shallow gas sands. (See page 63, overpressure, for details.)

For your own personal safety:

! Wear a hard hat (helmet) and steel-toe boots whenever outside the living quarters.

! Do not smoke outside designated smoking areas.

! Watch out above you when walking outside, particularly when near the pipe deck or wherever
a crane or forklift may be operating.

5
The rig superintendent or rig manager is the representative of the drilling contractor at the location
The Wellsite Guide Page 15 Preparation

! Familiarize yourself with the communication system (telephone, pager, alarms, etc.) on the rig.
Check the location of the nearest phones relative to your different working areas and learn the
most important phone numbers (rig floor, company man, mudlogging unit, radio room, etc.).

! Learn how to sound an alarm. Usually all alarms are directed to the driller on the rig floor
because this position is always manned. The driller is familiar with the emergency procedures
on the rig and trained to take the appropriate actions in an emergency. On big semisubmersible
rigs, emergencies are managed from the control room, the place which controls engines, pumps
and boats.

! Familiarize yourself with the locations and types of fire extinguishers in your working and living
areas.

! It is good practice, even in warm countries, to wear long trousers or a coveralls rather than not
shorts.

! In tropical onshore locations, always check your boots for bugs, scorpions, etc. before putting
them on. Watch for snakes near the mud pits and mud pumps.

! When pulling cores, never allow anyone to put their hands beneath a core barrel. Core fragments
on the rig floor should be retrieved with a hammer or other tools whenever the core barrel is still
suspended.

3.1.1. Helicopter Safety

Many fatal accidents in context with oil field operations


happen while travelling with helicopters. Therefore, many oil
companies send their personnel to a helicopter survival
training and require such certificates from their service Figure 3: Beware of tail rotor. Always go to the
company personnel or consultants. Other companies take the side or front when boarding or leaving the
helicopter.
position that only regular personnel going to the rig requires
such training, thus often excluding geologists.
! Attend the safety briefing prior to boarding and listen carefully to all instructions given by the
helicopter crew.
! Wear your life jacket, and wear it correctly.
! Wear survival suits when supplied. These suits guarantee several minutes of extra (life-) time
after ditching in cold water and may save you from hypothermia.
! Study the safety leaflet. Be familiar with the operation the life jackets, the position and operation
of the emergency exits, and the location and operation of the life rafts.
! When approaching or leving the chopper, do not wear any hat, not even a hard hat. It will be
blown away by the strong winds of the rotors and might create a dangerous situation for the
bystanders.
! Do not approach or leave the helicopter from the rear. When landing on a slope, leave the
helicopter towards the down-hill side.
! If you have to walk around the nose of the chopper, be aware that the rotor blades can be as low
as 1.5 meters above the ground, in partcular when strong winds blow.
! Do not smoke when the "No Smoking" signs are lit, on the helideck or outside the terminal.
! Always keep your seat belt fastened.
! Be careful when loading and unloading material. best, leave the cargo handling to the ground
crew, they are trained for it.

3.1.2. Hydrogen Sulfide, H2S


The Wellsite Guide Page 16 Preparation

H2S or sour gas is extremely dangerous and toxic. It can cause sudden death, even in very small
concentrations. H2S is heavier than air, it is soluble in water and hydrocarbons and H2S is explosive
when mixed with air. If H2S is coming to the surface the well
should be shut in. In the event that H2S is encountered you
Effects of H2S
may need to remind the other crew members that this poison
gas is heavier than air, and that they should move higher on the ppm Effects
rig rather than lower to escape from it. H2S tends to accumulate
in low places such as in the substructure, near the shakers, the 5-10 Obvious odor of "rotten
pit room, etc. eggs".

If you are on a land drilling site, find out where the evacuation 20 Safe for about 8 hours
areas are or could be. Some open, elevated place. Check out exposure per day
if or where a wind indicator is on the rig. Would the camp
need to be evacuated ? If so, are there alarms in the camp or 100 Kills sense of smell in 3-15
minutes, may sting eyes and
any method to alert the camp properly ?
throat.

Generally, find out what the H2S alarm system consists of . Is 500 Reasoning impaired and
it a sirene, a PA-speaker announcement? Then where to go ? dizziness. Breathing ceases
Was there an H2S safety briefing, do you have evacuation after a few minutes. Prompt
procedures ? Do you have your own, personal breather pack ? a r t i fi c i a l r e s p i r a t i o n
If you feel that you have no idea what the plan might be - ask required.
the company man. he might answer himself or delegate you to
his safety officer. 700 Unconscious quickly. Brain
damage/death will result if
not rescued promptly.
! Anyone who suspects the presence of H2S must alarm
the driller on the rig floor immediately. He will then 1000 Unconscious at once. Brain
instate an H2S alarm and give the necessary damage/death after 4
instructions. minutes.

! Do not attempt to rescue a person who has been


overcome by H2S without a breathing apparatus. There are two reasons for this precaution. The
first is that the gas is probably still concentrated in the area and it can kill you, and the second
is that the victim is probably beyond help. Remember, one breath of H2S can be fatal. After you
put on your breathing apparatus, move the victim to fresh air and and keep him warm. If the
victim is not breathing, artificial respiration must be administered immediately.

Note, that steel that comes in contact with H2S becomes brittle. Drill pipe (see page 77) is particularly
exposed to any H2S. Drilling in H2S prone areas requires casing and drill pipe made of special steel.

3.2. Working Space

As geologist you have many maps, logs, book, the computer, drafting material and other working gear.
It is a classic problem to find and defend a desk in a reasonable working area. Depending on the design
of the rig and the cooperation of the company man you should be able to find adequate space. (This is
more of a problem on jack-up rigs than on semi-submersibles, which have more deck space.) In the worst
case you still can work in the mudlogging unit, but this is often inappropriate from many points of view.
It is commonly not spacious enough to put your maps and seismic sections to the wall, it is always busy,
and you cannot keep sensitive data confidential in this place. (See page 50, confidentiality.) If you have
a private cabin you might work in the living quarters, but you will need to carry your paperwork with
you. Ideally there will be a separate office for the geologist near the company man's office, with an
unobstructed view of the drilling floor. It should be equipped with a remote video display (page 33) of
the pertinent drilling data (provided by the mudlogging contractor).
The Wellsite Guide Page 17 Preparation

3.3. Wellsite Psycho-hygiene

On most rigs you will meet all sort of characters, different nationalities and people with various different
socio-cultural backgrounds. They have all one thing in common, which you share with them: Getting the
job done and earning money. You have to work together (whether it is easy or not) and you have to live
together. This does not mean that you have to be close friends with everyone, but it definitely means that
you should adhere to the basic rules of civility and courtesy.

You may be working under psychological stress, often without a sufficient rest. Remember that many
of the people working with you are in the same situation. You are literally "all in the same boat". You
cannot escape this togetherness even during your leisure time. Your personal goal should be to avoid
conflicts and handle any differences that may arise. The fact that you live very close together with no
immediate alternative makes it essential to get along well with people. The following points may help
you to develop your own personal conflict prevention and handling procedures:

! Get enough sleep. Drilling goes on round the clock but you cannot stay up around the clock and
still do your job. Build your own daily schedule around the reporting deadlines.

! Do not take pills to sleep or pills to keep you awake. Their affects can be worse than not
sleeping at all.

! Do some physical exercise every day. Some rigs have a "gymnasium" or workout room. If not,
suggest it to the company man. There are probably others on board who would also enjoy using
it. You can also go jogging around the helicopter deck. Physical exercise is an excellent method
to release stress, improve your mental attitude and increase you appetite. Otherwise your bad
moods may turn into conflicts with your colleagues.

! Be patient. Never get angry and excited. Be prepared to take more abuse than usual if
necessary. The only survival mode on the rig is the mental attitude of an old elephant.

! Take something along to enjoy during your leisure time. This can be a radio6, a book or a chess
game, or even golf clubs or musical instruments (the generator room is a great place to play the
trumpet). There is usually good fishing7 and there may even be competition to grow the biggest
sunflower or tomato on a rig (reported from the North Sea). Most offshore rigs also have a video
room and a gymnasium for work out.

! There may be things happening on the rig which do not qualify for reporting. You might also get
to know some of the details of your colleagues' personal lives. Whatever it may be, as long as
it does not directly affect your work or safety, leave it on the rig. Do not bring gossip to town
or to the office.

6
Radios do not work inside an offshore rig. The metal walls act as a Faraday Cage and inhibit radio reception. Only a few
modern rigs have antenna outlets wired in the living quarters.

7
Fishing is prohibited for safety reasons on some rigs and platforms. The fishing lines might cause trouble to the divers if left
around the well head. Check with the rig superintendent or safety officer of the drilling contractor if fishing is allows on your rig.
The Wellsite Guide Page 18 Mudlogging

4. Supervising the Mudlogging


The wellsite geologist spends typically most of his time supervising the muddlogging. Nevertheless,
supervision of wireline logging is equally important. Please refer to page 106 for aspects of wireline
logging supervision.

One of the main tasks of the wellsite geologist is the supervision of and cooperation with the mudloggers.
Their performance will make life easy or difficult for you. Be aware that you have different tasks, but
be aware also that you work on the same data, samples and problems. Cooperation also means, that you
tell the mudlogging crew what you want them to do. This requires clear, concise instructions. If possible,
give your instructions in writing, best in a log book that stays in the unit.

You cannot be physically present 24 hours in the mudlogging unit, therefore make clear to the
mudlogging crew, under which conditions you wish to be called (gas increase, drilling break etc.). Note
it down in the log book and/or on a piece of paper (“... if gas is >100 units calls geologist...”), together
with your cabin number. Stick it to a place close to the microscope so that every new logger (if there was
a crew change, for example) can read your instructions.

4.1. General Aspects

In particular if you are


new on the rig, if the
mudlogging unit has been
newly rigged up or if you
have a new mudlogging
crew, you may perform
some of the following
checks. (if you are not
familiar with the set-up
and terminology used for
the most important
components, please refer
to page 81ff). The
checklist give here is only
a first orientation, a more
detailed checklist is
included in appendix 1 of
this book.
Figure 4: A view of a mudlogging unit The components of the unit may be arranged
.differently, but the principle remains the same.
! Walk around the
unit and to the
locations where the sensors are installed (pit room, pump room, shale shakers, rig floor, etc.).
Is everything tidy, properly installed, sufficiently clean ? Is the installation safe8 ?

! Electrical safety: Check all cabling and connections visually. Does it appear safe ? Are all cables
poperly racked and do not constitute food traps on the ground ? Is the unit grounded to the rig
body or to earth with a proper ground stake ?

8
If an accident happens that involves any of the mudlogging equipment, chances are that the geologist may be blamed for it
because he is supervising the mudlogging.
The Wellsite Guide Page 19 Mudlogging

! Venting and air conditioning: The mudlogging unit must be overpressured with fresh air taken
in from a “safe” area. Check that the venting system works: open a door and observe the pressure
drop. Check the location of the air intake: It should be in a safe area (ask the rig supervisor if
in doubt). Any location near the shale shakers, the rig floor or the flare booms is not a safe area.

! Inside the logging unit: Is the place clean and tidy ? The area where samples are washed and
packed is always a bit dirty, but the rest of the unit can be clean.

! Is the mudlogging crew complete ? Get the names of all mudloggers (day and night shift), and
the name of the pressure engineer(s). Find out when the last crew change was and when the next
crew change is scheduled.

! Make clear to the mudlogging crew - in particular in onshore locations - that you wish to be
informed whenever a member of the crew leaves the location, irrespective if the man is on tour
or not.

The actual crew change is usually arranged with and through the company man. He is the one who allows
someone to leave the location. Nonetheless, a “well behaved” crew will tell their geologist who is
coming and who is going.

aspects :
Safety
! Is the unit pressurized and all doors kept shut ? This should prevent poisonous gases from
entering into the unit.
! Is at least one fire extinguisher available ? Is it of the correct type ?
! Are H2S masks available for everyone who works in the unit ? This point may not be applicable
for operations where the absence of H2S is definitely known such as basins in a mature stage of
exploration or development drilling.
! Are life jackets available (marine operations only) ? There should be life jackets for the entire
mudlogging crew in the unit, not only the jackets for the crew on duty.
! Are there flashlights ? Emergencies have a tendency to happen at night and proper lighting
contributes to the safety while abandoning the unit.
! Are personal descend lines9 available (marine operations only) ?
! Is the communication system (usually a telephone) working properly ?

The following points should be checked although they may not apply in every country
Fineprint: and on every operation:
! Has the mudlogging unit been inspected recently ? Is there a copy of the inspection certificate
?
! Excessive noise in the unit ? Does it exceed safe working conditions ?
! If dangerous or toxic fluids and substances are handled in ther unit information should be
displayed emergency procedures in case of spill or exposure.
Some cosmetics: If the unit is newly deployed to an operation in certain Middle-East countries, this may
be the moment to take off the common oil field pin-ups. These can be a cause of misunderstanding and
unnecessary trouble in such areas. At the sime time, have a look for possibly rude or otherwise
inadequate displays and grafitty that should not come to the eyes of an official inspector. Clean the
house.

9
Descend lines are special ropes made of synthetic fiber and constructed in a way that every layman can use it like a mountaineer
to lower himself into the sea or on deck a ship in case of emergency.
The Wellsite Guide Page 20 Mudlogging

related:
Geology
! Are all strip charts properly annotated with scale, time, depth and explanations of unusual
readings and events ?

! If the mudlogging services are based on an electronic database, find out when and how the
database is being backed up.

! If not already available, set up a log book for the mudlogging unit. This is a bound book with
numbered pages. It is to record any instructions given to the mudloggers, calibrations and
changes made to the equipment. The mudloggers are required to note all relevant events in the
log book. It can be used as well to note any sample material transfer from the unit to other
locations.

! Sample storage: Where are the samples of the last section drilled, the relating transmittals, how
and where is the current lot of samples stored and packaged ?

The basic concept and idea of the wellsite geologist's work is data collection (see
page 7, job description). Therefore it is important that you make sure that all data Keep data and
and samples are clearly documented, labelled, described and annotated, so that interpretation
no questions or ambiguities arise once the material is reviewed in the distant apart !
future. Good quality work is orderly work, at least in this context. As a
fundamental concept of the geological science observations and facts are to be
kept clearly apart from the interpretation. Do not accept sloppiness in any respect.

! Make sure the work is up-to-date. Even in times of very fast drilling, the mudlog must be updated
at least every twelve (12) hours before crew change. If the workload is really too heavy, you, the
wellsite geologist has to find a solution, or must step in and help. One of the ways to alleviate
the work load on the mudloggers is to use ther services of a sample catcher, unskilled help to
catch, wash and bag the sample material during times of fast drilling.

4.2. Consumables and Spare Parts

Consumables and spare part stock depends on the logistic situation of the drilling site. Stock on location
should be enough for at least one week of normal drilling operation, two or three weeks if you are in a
remote location. The list below gives only an overview of the materials that should be on location,
without exception:

The basic tool set necessary to do geological work:


! Microscope (actually a binocular type microscope with 6-20x magnification).
! UV box (sometimes combined with the microscope).
! Sieves to wash the samples. The screen of the sieves must be made of metal. Typically stainless
steel or some bronze or brass alloy is used. Reject plastic sieves ! (See page 51, for handling
instructions)
! Sample trays.
! Tweezers and pins (preparation needles).
! Magnet (stud finder) to separate ferromagnetic material (such as metal shavings from the casing)
from the cuttings.
The Wellsite Guide Page 21 Mudlogging

agents :
Test
! Clorethene for hydrocarbon solvent tests Clorethene is poisonous in high concentrations. Work
(cut). Check if the agent is contaminated only with good ventilation and use only small volumes.
with fluorescent substances (UV light). Clorethene is non-inflammable and therefore preferred
! HCl (carbonate tests and etching of over other solvents such as Acetone.
carbonate rock surfaces).
! BaCl for sulfide test.
! AgNO3 for chloride test (important if you drill evaporites).
! Alizarin S for carbonate staining (dolomite and calcite determination).
! Phenolphthalein (staining agent for cement).
! Tetrabromethane (used for the distinction between gypsum and anhydride and shale density
fluids, see page 43). Tetrabromethane is carcinogenic !

Other chemicals:
! CaCO3 as calibration for the calcimetry test (page 42.) Hydrochloric acid should be available
anyway. Check for sufficient stock if calcimetry is planned for all samples.
! Carbide for lag time check (see page 36 )
! Calibration gas for the gas detectors.
! Biocide (to prevent bacterial growth in geochem samples).
! Desiccant for the gas dryer in the gas suction line.
! Ammonia (for blueprints).

Kits and tools :


! Shale density test kit (see page 43 for procedures).
! Calcimetry test kit (Autocalcimeter). This includes glassware (best a pipette) a precise balance
which can accurately measure weight of one gram or so with at least 1/10g accuracy.
! Thermometer.
! Glassware for chemical tests (test tubes, hour-glasses, scaled glass tubes ( 1/10
cm3 sub-scale, pipette, etc.).
! Soldering and electrical tools, multitester (for resistivity, voltage, etc.), small
screwdrivers, tongues, spare cables and connectors, insulation tape, contact
cleaning spray, etc.
! Hydraulic oil (required to fill pressure transducers)
! Spare light bulbs for the microscope illumination and the UV box.
! Gas bladder, a football-like rubber bladder to collect gas from the separator or
RFT tool and transfer it to the chromatograph. To my knowledge, only one
mudlogging company offers this equipment. Nevertheless, it should be on
every location. The use of children balloons as a substitute is not satisfactory
because they burst (irrespective of what other people tell you).
! Coffee kettle, not only to make a cup of coffee during hard times but also to
provide hot water for the hot water test (see page 56) to evaluate oil shows.
! Grinding powder, glass plates, optically neutral resin, slides, heating plates, etc.
(if it is planned to make thin sections).
! Blender.
! Basic mud test kit consisting of balance and funnel.

Stationary
! Spare rolls and pens for the strip charts.
! Blueprint paper.
! Report forms.
! Computer printer and plotter paper.
! Blank diskettes.
! Latest virus detection software.
The Wellsite Guide Page 22 Mudlogging

! Copy or original of the operating system software and all relevant technical programs (database,
etc.)
! Printer ribbons, ink cartridges, plotter pens.
! Transparent and graph paper.

material :
Packaging
! Core boxes, wax, aluminum foil and cling wrap.
! Boxes or sacks to transport wet samples.
! Geochem sample containers (tins/cans).
! Boxes to transport geochem samples.
! FRANKE cells (slide type container for micropaleontological material).

4.3. Specific Checks

The following pages give a summary of


checks of mudlogging equipment.
Depending on the type of drilling
operation (e.g. development drilling)
not all the sensors may be installed, and
you may have to work with a very basic
mudlogging unit consisting only of gas
detectors, pump stroke counters and a
kelly height indicator to record the rate
of penetration (ROP); however, the
basic rules and principles of
mudlogging and wellsite geological
supervision always apply. For more
sophisticated drilling ventures, rank
wildcats or directional development
wells the mudlogging unit may or may
not accommodate the working space to
control MWD and/or directional Figure 6: Sensors commonly found in modern mudlogging systems.
operations, the latter usually supervised
by a drilling engineer or the company man.

Remember also that the company that you are representing on the rig pays for the services of the
mudlogging contractor. If certain sensors are not installed although they have been requested or do not
work properly, it can be considered to reduce the invoice of the contractor accordingly. Experience has
shown, however, that there is no point in putting pressure on the mudloggers if they apparently do not
have sufficient support from their base. It is better and more efficient to report straight to the town office
(mudlogging contractor or your supervisor). Indicate clearly what is not o.k. and what has to be done to
improve the situation.

In any case, remember, that the equipment is only as good as the people operating it and the most
sensitive geological sensors are the geologist's eyes over the microscope (while the gas detectors are in
good shape) and not the computers.
The Wellsite Guide Page 23 Mudlogging

4.3.1. Gas Detection Equipment

The most important piece of furniture in the


mudlogging unit is the gas detection equipment.
It consists of a total gas recorder and a gas
chromatograph. The correct operation of the gas
detectors is an absolute must.

Modern gas detector systems used in the


chromatograph are of the Flame Ionization
Detector type (FID). With this system a gas
sample is fed automatically into a regulated,
constant-temperature hydrogen flame. The flame
is situated in a high potential field generated by
two electrodes with 300 Volt. As combustion Figure 7: The principle of the gas trap for ditch line gas
occurs, the gas ionizes into charged hydrocarbon extraction.
residues and free electrons. A predictable
constant ratio of these charged particles induces a current between the electrodes. The current which is
proportional to the volume of hydrocarbons burnt is measured and transformed to digital values to
interface with the unit's computer.

Note also, that the total gas recordings and the chromatograph gas do not sum up, i.e. the sum of the
chromatograph gas readings in ppm is not equivalent to the percentage output of the total gas recorder.
This is due to the fact that the higher gas compounds (C2, to C5) burn with different energies per mol, -
or in plain words: the energy given off by one C-atom in a C4 -compound (C4H10) is different from the
energy released by methane (C1 or C1H4).

Older versions of logging units might still use a Catalytic Gas Detector (hot wire detector) for the total
gas recording. This instrument functions on the principle of catalytic oxidation of gases on an electrically
heated filament in the presence of air. The temperature of the filament changes with the volume of
hydrocarbons oxidized. The change of temperature causes a change of electric resistivity which is
measured with the WHEATSTONE bridge principle (Figure 5) and then translated to digital values for
display and computer processing. The operating voltage and with it the temperature can be lowered so
that only higher hydrocarbons are detected. This parameter is then referred to as petroleum vapors (PV).

The total gas recorder and the chromatograph are independent detectors, both fed from the suction line
to the gas trap. The total gas recorder works continuously registering the concentrations of all
combustible gases on a strip chart. The chromatograph is a more sophisticated device working in cycles
of three to four minutes and detecting light hydrocarbon gases only. Output on strip chart. Modern
computerized mudlogging units use on-line computer to integrate the chromatograph curve and apply
correction and calibration parameters. The computer provides then a direct output of the hydrocarbons
detected.

! If the gas detection equipment is not working while the well is approaching zones of interest,
report this shortcoming immediately to the geological supervisor in town. It may be a reason to
temporarily stop drilling.
In some occasions or situations, this may be just the right bit of information to convince the
company man to pull the bit a few hours earlier than planned or do some other work necessary.
This break should give enough time to get the gas detection equipment back into operational
condition

The gas readings recorded are concentrations of gas in air. The air is set free from the circulating mud,
passing the gas trap installed at the possum belly. By convention, total gas is displayed in units, the
chromatograph gas in ppm (part per million). The following relationship is valid:
The Wellsite Guide Page 24 Mudlogging

The gas readings as such are affected by the mud properties and the ratio of mud weight over the
formation pore pressure. Note also that the volumes of hydrocarbons seen at surface, in particular of gas,
are not the same volumes as in the subsurface. Some muds give off gas faster than others (a function of
viscosity). Some muds mimic gas as they give off small amounts of gas from organic additives (usually
negligible). More relevant for the gas readings interpretation is the formation pore pressure relative to
the hydrostatic pressure of the mud. As this margin decreases, increasing volumes of formation gas enter
the mud stream and are detected at the surface. Hence peaks like trip gas, connection gas indicate
increasing pore pressure (see also page 63) or a reduction of the mud weight.

As opposed to the absolute gas readings, which alone are little value, the compositional analysis of the
gas gives important information. As a rule of thumb, the higher the fraction of heavier gases (C2...C5) in
the total composition, the closer you are getting to the oil. Detailed gas ratio interpretation, such as the
formula developed by HAWORTH et al., 1985) makes it possible to differentiate between gas compositions
originating from coal beds, oil or gas reservoirs, migrant and residual hydrocarbons. In modern
computerized mudlogging units, the gas ratio plot should be part of the routine mudlog presentation.

! Find out how the mudlogging company treats the gas analysis and how reliable and reproducible
their findings are. This gives you a good indication of the reliability of all the other services
provided by the mudlogging contractor.

Before the gas reaches the detector system it must be sampled from the mud stream coming back from
the well bore. This is achieved with the gas trap, sometimes also called gas bell.

! Before the gas-air mixture is put through the suction line, it is dried by leading the gas-air stream
over a desiccant in order to extract the moisture.Check the continuous efficiency of the drying
process. Droplets of water in the gas line are an indication of poor drying, however, can In occur
at night time, when the ambient temperature drops significantly (such as on desert operations).

! In order to clean the gas line, it can be back-flushed.


Back-flushing should be done regularly, i.e. every
hour or so. When done, note on the gas recorder chart.

! When was the last calibration done ? If it was longer


then one week ago, do it again on the next occasion
(trip) and witness the procedure. All calibrations
should be recorded in a log book (see page 18) and on
the charts (see page 34), complete with date, name of
the operator or logger, batch number and
manufacturer of the calibration gas.

! Is the chromatograph gas reading comparable with the


total gas reading ? A common calibration and
reporting standard is to use 50 units of total gas
equivalent to 200ppm C1 (methane). Deviations from
this rule are found when drilling with diesel oil in the
mud system.
Figure 8: The gas trap installed at the possum
! If diesel oil is added to the mud, the total gas detector belly tank.
records the heavy vapors from the diesel, which do
not reach the chromatograph detector because they would arrive far behind the C5 peak. In
"diesel-situations", the total gas may read as high as 50 units, whereby the chromatograph
records only a few hundred ppm of methane (C1).
The Wellsite Guide Page 25 Mudlogging

! Are the alarms for gas set properly, i.e. close enough ? The alarm should sound if the gas level
reaches about twice the background level. This may need frequent adjustment when the
background level fluctuates. Anyway, check every time you go to the mudlogging unit.

! Check the gas trap and the suction line at least once a day. Is the gas trap installed properly in
the shaker feeder tank (possum belly)? Is the suction line straight without kinks that may obstruct
the flow of gases ?

! Notification procedures. If the gas levels exceed a certain threshold, the mudlogging crew must
report to the company man and the geologist. Some operating oil companies or rig operators
require that gas readings over 50 or 100 units are announced all over the rig through the PA
system so that hot work (welding, grinding, etc.) is paused. Note the valid procedures in the log
book of the unit. Then there will be no excuse saying, we never did this that way before...

! If the mudlogging unit is operational during a drill stem test, the low pressure side of the
separator should be connected to the chromatograph and the gas composition analyzed and
recorded at regular intervals.

! See page 54 for interpretation of gas shows.


The Wellsite Guide Page 26 Mudlogging

4.3.2. Other Checks in the Mudlogging Unit

4.3.2.1. The Mud Pit Level Monitors

The pit level sensors are installed in or at all mud pits in order
to monitor their volume and the change of volume. An
apparent increase in mud indicates that fluid is entering the
bore hole, a kick, an alarm situation. There are at least three
different principles of pit level sensors:

Some mudlogging companies use floating paddles. The


accuracy of paddle type devices decreases with lower pit fill.
This old fashioned method should be no more used.

Other companies use DELAVAL sensor posts, which have a


linear response to pit level changes. Principle: A float with a
magnet activates magnetic switches in the sensor post. The
float is sensitive to dirt such as dried mud. Typically up to 10
cm of change in fluid level are necessary to detect changes.

The most reliable principle of measuring pit levels is the


acoustic sounding. Acoustic pit level sensors do not have Figure 9: Acoustic pit volume sensor. The
moving mechanical parts and are surprisingly reliable in the sensors measure the time taken for each pulse to
noisy rig environment. Acoustic sensors can detect changes in echo back from the mud surface in the pit.
fluid level of ± 2 cm.

! Check the calibration parameters used to convert level changes in centimeters or inches to
volume changes in barrel or cubic meters.
! Make sure, that there is also a level sensor in the trip tank.

The DELAVAL pit level sensor system has a linear response to changes in fluid height. It is, however,
sensitive to dirt, in particular dried up mud which disables the movement of the float along the sensor
post.

Check the sensors at least daily. If critical intervals are drilled, where small changes may be significant
(e.g. shallow gas possible near surface or in top hole) - check sensors every few hours.

! In any case, check if the electrical wiring of


the pit level sensors looks proper. The mud
pits are rated a hazardous area. Gas may be
released from the mud and form an
explosive mixture with air.

! Acoustic sensors may give false readings if


the mud is foaming in the mud pits.
Otherwise, acoustic sensors are surprisingly
reliable.

Acoustic pit level sensor are most reliable in the


environment of drilling rigs.

Recently, advertisements have been seen in the


industry magazines, where the acoustic pit level
sensors are replaced by radar sensors. The author
Figure 10: An acoustic pit level sensor system installed over
did not yet have any experience with this system. a mud pit
The Wellsite Guide Page 27 Mudlogging

4.3.2.2. The Pump Stroke Counters

This is a mechanical switch type sensor on every mud pump (that


is one sensor per pump, typically three mud pumps on the rig). It
either works or it doesn't. If it is properly installed, it works for
months. Do not accept frequent repair of the counters. Get a
replacement or improve the installation. The pump stroke counter
is essential to calculate the lag time and lag volumes. Any
malfunction of the pump stroke counter will produce a false lag
time.

! Check the calculations which convert pump strokes to


pump output in volume (gallons, barrels, liter, or
whatever per stroke). Books and tables are available that
list the parameters of pumps produced by the different
manufacturers. If you cannot find sufficient
documentation in the mudlogging unit, see the company
man or ask the representative of the drilling company on
the rig. He should know the specifications of his
equipment.

On every major interruption of drilling operation (typically during Figure 11: Pump stroke sensor.
logging operations) the drilling people service the mud pumps.
This may include a change in liner size, a change of the piston or the valves (see also page 82).

! Check (i.e. ask the company man or driller) if the liner size has been changed thus giving a
different volume output per stroke or if the pistons have been changed, the latter gives an
increase in pump efficiency.

4.3.2.3. Hook Load Sensor

The hook load gives a value for the load on the drilling draw works. The
units are kilo-pounds (kips) or tons in a metric environment. This
reading is of eminent importance for the driller at the rig floor (it is by
far the biggest instrument at the driller's console). In the mudlogging
unit, two different types of hook load sensors may be installed: A
mechanical type or a hydraulic type.

When the drill string is tripped in the hole, just before reaching bottom,
the instrument (both on the driller's console and in the mudlogging unit)
reads the full weight of the drill string with some compensation for the
buoyancy in the mud. When drilling is resumed, the bit touches the
bottom and part of the weight is supported by the bit. This is seen in a
decrease in hook load. This difference is called weight on bit (WOB), an
important parameter to calculate drilling bit efficiency, and formation
parameters such as the Dx exponent (see also page 63). The hook load
and the weight on bit is related with the kelly height indicator (page 28)
which tells you if the drill string is on bottom or in suspension.

! Compare the readings in the logging unit with the values on the
drill floor and cross check with the calculated hook load (data Figure 12: A mechanical hook load
from driller’s work sheet). Hook load recording on a strip chart transducer.
is very useful as it virtually displays the history of a day's
drilling operation. You can see connections, trips, overpull on trips etc.
The Wellsite Guide Page 28 Mudlogging

! Make sure this chart is properly


annotated with date, time and depth.
The hook load sensor and strip chart
should never be switched off, even
during wireline logging and other non-
drilling operations.

In more critical situations during a drilling


operation, the hook load can also indicate stuck
pipe, overpull on trips, etc.

4.3.2.4. Kelly Height Indicator (ROP


System)
Figure 13: A hook load sensor/transducer system based on
hydraulic pressure measured at the dead end of the drill cable.
The kelly height indicator is a simple device
that indicates how high the kelly is above the
rotary table. Two methods are used: (1)The mechanical (steel-) line connected to a wheel and sensor and
(2)the hydrostatic method using the principle of connected U-shaped pipes. When drilling, i.e. when
making progress, the kelly is increasingly lowered to compensate for the new hole made. The drilling
progress or rate of penetration (ROP) is calculated either in feet per hour or minutes per meter.

! Check repeatability and/or nominal values. Is the kelly-down on the chart where it should be
according to the pipe tally ?

! Is the kelly height read-out automatically compensated for rig motion and tidal heave? (See also
below: Heave compensator.) Two basic mechanic principles are employed to measure the kelly
height: wire or hydrostatic.
The Wellsite Guide Page 29 Mudlogging

4.3.2.5. Mud Flow In/Out

This sensor is a kind of back-up for the mud pit sensors. An


increase in mud flow indicates a kick, a decrease in mud flow
(out) may indicate lost circulation.

! This sensor should promptly indicate any change in


pump rate and respond with only several seconds
delay when the pumps are switched off.

Figure 14: Paddle type mud flow (out) sensor


(Halliburton /Gearhart).

4.3.2.6. Rotary Table Speed (RPM)

Displays the rotary speed of the rotary table. Again, check and compare with the driller's display on the
rig floor. The RPM is of secondary importance for geological purposes. On computerized logging units
it is used to calculate the Dx exponent10, number of revolutions over the bit life and other drilling
parameters.

4.3.2.7. Torque

Principle: The torque transducer is a HALL effect device that is


fed with a constant excitation current. It is mounted in a two
piece shell that can be clamped around a single conductor cable
supplying the rotary table motor. The device produces an output
voltage proportional to the current in the conductor. This signal
is A/D converted. The current driving the rotary table motor is
directly proportional to the torque and only affected by the
efficiency of the gearing and drive system.

Torque is usually displayed in Ampere (Amps) reflecting the


electrical current necessary to turn the rotary table. Conversion
to foot-pounds (in imperial units) or Newton-meter (in metric
units) is not usual and also rarely possible.
Figure 15: Torque Sensor (Anadrill)
! Compare with the instruments on the rig floor. Do not
expect more than 10% accuracy.

10
The D-exponent (Dx) and corrected D-exponent (Dxc) are empirical formulas, which describe the "drilability" of the formations, a parameter
which describes the mechanical properties of the formation and which is corrected for weight
The Wellsite Guide Page 30 Mudlogging

4.3.2.8. Mud Resistivity

The resistivity of the drilling mud can be measured in the mud pits or -
better - at the shaker feeder tank (possum belly). It can be displayed as
resistivity (units ohm.m) or its inverse, conductivity (unit mmho/cm).

A change in mud resistivity indicates that the mud is mixed with other
matter. It may also be that a different type of shale is drilled and
incorporated into the mud system or the conductivity of the mud has
changed due to mud additives such as KCl. It may also indicate that water
is entering the bore hole and mixing with the mud.

Mud resistivity can be measured with dip electrodes or with sensors that
measure the conductivity with the induction method. Dip electrodes become
dirty in the rig environment (dry mud, etc.) and are therefore less reliable
than induction sensors. In fact, dip electrode sensors should only be used in
addition to induction sensors.

Induction sensor principle: Two torroidal coils are encapsulated in the


sensor coil. An AC signal is applied to one of the primary coils. This
induces a signal in the secondary coil that is directly proportional to the
conductivity of the mud. A thermistor bead, also encapsulated in the sensor
measures the temperature of the solution. The transmitter electronic of the
sensor produces an output signal directly proportional to the conductivity
of the mud corrected to 25°C.

! Check with a sample of seawater and freshwater. Cross-check the


water resistivity with the wireline engineer's resistivity meter.
Temperature corrections applicable are the same as for mud filtrate
(Rmf determination). Use the chartbook of the wireline logging
contractor.

! Mud resistivity (or conductivity) should be normalized for ambient


temperature or displayed in Chloride (Cl-) equivalent. Check the
method used for conversion; is it a conversion factor in the
computer system or "hard-wired"?

Figure 16: A simple mud


conductivity probe with a 4.3.2.9. Mud Temperature
graphite electrode dip cell.
The temperature of the mud flow into, and out of the hole is monitored.
The temperature increases with time of drilling or circulating as increasingly warmer mud of the active
system is recycled into the wellbore. If water is added to the mud system, for example to dilute the mud,
the differential temperature will behave erraticly tending towards lower temperatures.

Nor the temperature of the outflowing mud neither the differential temperature do have any direct
quantitative relationship with the actual, stabilized bottomhole temperature. The temperature differential
can give some indications, in some cases if an abnormally pressured formation is approached.

! Check with a thermometer if the readings recorded in the mud logging unit are correct.

! When circulation is stopped prior to logging you should note the mud temperature (out) in your
notebook. This gives the first, although very coarse, indications as to how high bottom hole
temperatures might be.
The Wellsite Guide Page 31 Mudlogging

! Note also that on offshore operations, the long riser leading through cool sea water cools down
the mud considerably. Onshore and offshore flowline temperatures are therefore not
comparable.

4.3.2.10. Mud Density

A change in mud density, in particular a decrease of mud density indicates that the mud is diluted. This
may be at surface when the drilling people reduce the mud weight for one or the other reason. A more
severe situation is given when the mud is diluted with formation waters. This means also that the
formation pressure exceeds the hydrostatic pressure of the mud column, - in other words - the well is not
in balance. This is an alarm situation that must be reported immediately to the company man.

! Compare the reading of the mud density sensors (in and out) with a mud sample taken at the
sensor point. Use the mud engineer's mud balance to verify. Accuracy should be better than 0.1
ppg.

! Of course, the mud density readings must agree with the mud weight reported by the mud
engineer. Follow up if there are any discrepancies.

There are two different types of mud density sensors. One is a simple device based on the principles of
buoyancy, the second, a nuclear density sensor. The latter works usually fine but the buoyancy sensor
is sensitive to dirt and sometimes quite unreliable.

4.3.2.11. Standpipe Pressure

Principle: The pump pressure sensor consists of a diaphragm protector head and a pressure transducer.
The head consists of a steel body with a thick rubber diaphragm inside. The inside of the rubber
diaphragm is exposed to the mud pressure in the standpipe and transmits the pressure to the hydraulic
fluid inside the body of the protector. This hydraulic pressure is then transmitted through the hose to the
transducer assembly. The pressure sensor is a piezo-resistive Wheatstone-Bridge strain gauge with a
signal conditioning circuit that produces a current output directly proportional to the pressure detected.

The standpipe pressue is of high interest to the driller but relatively unimportant for the geologist.

! A change of standpipe pressure can indicate washouts in the drill pipe, plugged bit nozzles,
condition of the downhole motor (if used), etc. The standpipe pressure is recorded continuously
on strip chart and - on modern logging units - on computer. This parameter is used to calculate
several hydraulic parameters used to optimize drilling. There is little relevance in the standpipe
pressure for the geological interpretation.

! When coring or when drilling with a downhole motor or turbine, the standpipe pressure gives
an indication if the downholle gear is performing properly.

! Compare the read-out in the mudlogging unit with the gauge on the rig floor. Accuracy should
be better than 5% and precision should allow the detection of pressure changes ±25 psi

Note also that changes in ambient temperature may introduce some variation in the apparent pressures
recorded (diurnal base line shift) as the oil in the pressure transducers expands or contracts with
temperature.
The Wellsite Guide Page 32 Mudlogging

4.3.2.12. Casing Pressure

A pressure read sensor connected to the annulus of the last casing string, the annulus of the tubing, etc.
This device is and addition to pressure readings taken by the driller on the rig floor. Compare results.
Such casing pressure monitoring is rarely done in the mudlogging unit

4.3.2.13. Heave Compensator

On floating rigs corrections have to be applied to the depth,


rate of penetration, etc. Is the heave/tide compensator
installed, working and how does it compare with the tide chart
? (This point is of course only applicable on floating rigs).
Again there are two working principles of a heave
compensator:

! The mechanical heave compensator is connected to


the guide line tensioner and the motion compensator
under the travelling block.

! The hydraulic heave compensator is much simpler. It


consists of an oil reservoir mounted on the rig
superstructure. The reservoir is connected by a
hydraulic hose to a pressure transducer mounted on
the marine riser pipe. As the rig's superstructure rises
and falls with respect to the riser (and the sea bottom),
variations in the hydrostatic head of the oil are
converted into an electric signal.

Figure 17: The hydraulic transducer of a heave


compensation system.
The Wellsite Guide Page 33 Mudlogging

4.3.2.14. H2S Detector

This device usually does not get enough attention. Make


sure it is connected to the gas suction line and is
operational. A second H2S sensor may be positioned in
the mudlogging unit. The H2S detection system in the
mudlogging unit is usually only an independent back-up
to other detectors installed on the rig floor and near the
radio room. The sensors of the H2 S detector should be
placed at the drill floor, the shaker area and near the
mud pits.

Calibration: Witness that an H2 S flask is broken at


the sensor point and gives the expected
response. Check also if the alarms - if
Figure 18: The H2S panel in the mudlogging unit
set properly - sound. consists of several such displays. Each one for one
sensor location.
On critical wells, the H2S detection and alarm system is
contracted to a service company specialized in this
field. The service company will have detctors at all critical points such as the shale shaker area, the mud
pits etc. The service company will also provide breathing apparatus and air packs for evacuation.

4.3.2.15. Sample Oven

must be dried before shipment. The washed and dried samples are dried in an oven in the
Samples mudlogging unit. The samples can also be dried with infrared light bulbs positioned just
above the sample trays. Good ventilation is imperative because some mud additives release fumes that
smell unpleasant or are even poisonous. Some companies have made attempts to dry samples with a
microwave oven. Also, this device needs proper ventilation. The fumes of a microwave oven drying
samples are extremely unpleasant.

Wet samples can be dried in the sun. Another good place for sample drying is the cooler of the power
generators in the engine room (ask permission from the drillers); see page 46, sample shipment.

4.3.2.16. Video Display

Advanced and computerized mudlogging units, such as the ones used today, provide a remote video
display of the pertinent drilling data such as ROP, gas readings, pit volumes (including loss and gain
display), etc. Remote displays are installed on the rig floor, in the company man's office and at the
geologist's working place. Make sure that the data displayed are correct which is definitely not always
the case, otherwise you will receive frequent questions and corrections from the driller on the rig floor,
and, much worse, the mudlogging and geological work loses credibility.

! During tripping in and out of the hole and when running casing a special "trip screen" should be
displayed. This screen displays the position of the bit together with the calculated and actual
hook load. Next to it actual and expected trip tank volume should be displayed.
The Wellsite Guide Page 34 Mudlogging

4.4. Mudlogging Procedures and their Checks

Despite the wide range of computer applications and automatization, the quality of the mudlogging
services depends primarily on the skills and performance of the mudlogging crew. These non-automated
routines are called procedures in the following:

4.4.1. The Mudlogger's Work Sheet

Before data are fed into the computer systems, they must be recorded on paper. The mudlogger keeps a
tally book of the singles added to the drill string and copies this information to the work sheet. The work
sheet list per depth increment (e.g. per meter) - at least - the following information:

! The pipe tally, i.e. lenght of single pipe added to the drill string and the total length of the drill
string. The work sheet must show the exact depth of the well after the current pipe has been
drilled down.
! Lag time and increment of lag time per unit of new hole, i.e. how many more pump strokes are
necessary to lift the cuttings from the bottom to surface for every meter (or foot) of new hole
drilled.
! ROP as worked out from the kelly height indicator, ("geolograph").
! Gas readings of the total gas recorder and the chromatograph.
! Lithology description of the cuttings samples.
! Oil and gas show descriptions.

This work sheet - if kept properly - is a complete documentation of the well history and the geology
encountered. It should be up-to-date, with the last entries not older than exactly one depth increment
(something in the range of five meters when drilling fast in top hole and about one meter when drilling
deep hole slowly.

! Make sure that the work sheets are handed over to the geologist or another representative of the
operating oil company. Reason: Confidentiality.

4.4.2. Chart Recorders and Charts

Even though nearly all modern mudlogging systems are based on a digital database and digital displays,
the charts, i.e. the paper prints of the data are an important media of documentation and interpretation.

Charts are graphical recordings of sensor data on paper - directly or through a digital data system, which
modifies, stores and then displays the data.
! All charts are to be marked every hour on a 24:00 hour basis including date (every 12:00 hours),
including depth and well name.
! Any calibration must be recorded on chart and annotated.
! Carbide checks and calibrations must be marked clearly on the total gas and chromatograph
chart. Mark also whenever the gas line is serviced or back-flushed.
! ROP chart: Each kelly down should be marked, as well as starting to make new hole (i.e. the
position of the kelly height when the bit is on bottom with its full weight). Drilling breaks are
to be marked (interval, top, bottom, etc.)
! Pit level charts: Any change of pit level must be explained on the chart.
! If a kick is suspected, note on the chart who was informed and when (time!). You may also
record this situation in the log book of the mudlogging unit - after calling the driller and the
company man
The Wellsite Guide Page 35 Mudlogging

Explanations for a pit gain can be:


! Kick (formation fluids are entering the well bore).
! Mud is being transferred into the active system at surface.
! Water added at surface (diluting mud).
! Kick drill (see also page 40).

Explanations for a pit volume decrease can be:


! Mud loss to the formation.
! Mud transferred out of the active system at surface.
! Mud dumped (or part of the mud system disposed of, such as dumping the sand trap).
! Mud loss over the shakers. The shale shakers may be plugged with LCM materual or fine
fraction drilling returns. Then the mud is lost over the shakes and does not flow back to the mud
pits.

Complete rolls of charts should be marked clearly indicating the sensors recorded (name trace and color),
well name, depth and time interval. they should be stored in the logging cabin until the end of the well
and then transferred to the company office in town. One box should correspond to one recorder. Note
that the charts are confidential data. Note, that the confidentiality also applies to the mudlogger's work
sheet (see page 34).

4.4.3. The Mudlog

The presentation of the mudlog should be clean and tidy. Check for consistency and edit the geological
descriptions if you feel it is necessary. The mudlog must be up-to-date, it can be expected, that the
mudlogging crew completes their work on the log before they go for rest (e.g., after a 12 hour shift) so
that the new crew starts with a clean desk (see also page 20).

! There are several ways to plot the ROP curve: feet per hour [ft/hr], minutes per foot[min/ft] and
the same in metric units minutes per meter [min/m] and meters per hour [m/hr]. In any case, the
ROP should be displayed in a way that the slow drilling intervals deflect to the right and the fast
drilling intervals to the left of the track. This mimics the character of a gamma ray log: left =
sand or limestone = fast drilling progress.

! If the mudlog is generated from a computer database, make sure that the mudlogging crew follow
good practise and back-up their computer based data regularly, - best daily.
The Wellsite Guide Page 36 Mudlogging

4.4.4. Daily Reports

The mudlogging crew has to prepare a daily report. This report consists of the mudlog and a text report
(gas, show evaluation, formation description, etc.) covering the last 24 hours. This report is distributed
to the geologist, the company man and the representative of the drilling company. If a pressure engineer
(see page 63) is on location, their reports may be combined.

Some companies request also a show evaluation report. This report describes and evaluates hydrocarbon
shows encountered within the reporting period.

! Note that the mudlogging report does not necessary cover the lithology down to the last foot or
meter drilled in the reporting interval. If drilling continues, the report will cover the last sample
at surface at the end of the reporting period11.

4.4.5. Lag Time Calculation and Cuttings Transport

Lag time means the time in minutes or number of pump strokes necessary to move a sample (cuttings,
oil or formation gas) from the bit to the surface. Other, related numbers are the down time the number
of pump strokes or the time in minutes required to pump the fluid down the drillstring to the bit, and the
round time the time required to pump the fluid down the drill string and up the annulus. The round time
is the sum of down time and lag time.
The down time is usually only very few minutes wheras the lag time ranges between twenty minutes and
more than two hours, in some cases.

arise offshore. On floating rig, the riser is the biggest diameter pipe and annular
Complications velocities can therefore be very slow. It is common that the drillers line up an
additional pump to the base of the riser to boost the velocity and improve the cuttings transport in this
section. Of course, this additional pump output must be included in the lag time calculation. In this case
calculate the riser as seperate hole section with different pump throughput and add this number to the
lag time calculated for the cased and open hole section.

The mudloggers keep a calculation sheet with all the pipe diameters in the hole (casing, open hole, drill
pipe, collars, etc) and their capacities. The lag time is updated automatically by the computer or by hand
on the occasion of a new connection for the hole take and increased lag time. With every new meter
drilled, the lag time increases and also additional volume of mud is required to keep the hole full.

Check the calculations and pipe volume parameters12 used for the lag time calculations and compare with
a carbide check.

! When a connection is made, carbide, wrapped in paper, is put into the drill pipe and pumped
downhole as the circulation resumes. Carbide reacts with water and gives off acetylene, which
can be detected by the total gas detector. Calculate the lag down (pump strokes to pump it down)
and lag up (bottom to surface) and see if the artificial gas peak comes in correct. In cased hole,
you can calculate the pump efficiency. With given pump efficiency, you can calculate the hole
diameter over open hole sections, where you may suspect washouts. If no carbide is available
on location, use rice(!) instead. Reduce the sample interval and find if the first rice grains come
up with the right number of pump strokes.

11
Example: If the well has been drilled to 5000' at 6:00 hrs in the morning and the last sample seen at surface was from 4500'
at 6:00, then the report will close with the lithological description down to 4500'.

12
such as casing volume, open hole volume, displacement of tubulars like drill pipe, collars, tubing etc. Manuals of the
cementing companies (DOWELL SCHLUMBERGER or HALLIBURTON) give answers to this questions. If such a manual is not
available in the mudlogging unit (it should be!), try the company man's office or the cementer on location.
The Wellsite Guide Page 37 Mudlogging

! If the first arrival of the carbide gas is not consistent with the lag time calculation, search for an
explanation. In any case, the calculated and actual (carbide-) lag time should be recorded in the
log book. If you have access to a small computer, make your own spreadsheet for lag time
calculations to crosscheck the work of the mudlogging crew..

! Always use constant amounts of carbide (e.g. exactly hundred or two-hundred grams, - use a
balance). The carbide peak measured should the be constant on the total gas detector, if not, this
is an indication that something has changed downhole. It could be a washout, changes in mud
properties, particular in mud weight.

! If the carbide is significantly too early and the peak small, consider also a wash out in the drill
string.

! Always run a carbide test when drilling out casing shoe. At this time the entire mud circulation
is within the casing the diameter of which is known precisely. The difference between the
calculated and actual lag time can be attributed to pump efficiency. This pump efficiency (as
factor or percentage) will then always be applied for the forthcoming open hole section. It is
unlikely to change unless the drillers change the liner of the pump and/or its pistons.

Note that this pump efficiency was calculated for one of the two pumps or both pumps running
together. The pump efficiency needs to be established again if any of the relevant parameters
(number of pumps running, speed, liner size, etc.) is changed. (See also page 82).

! In the open hole section, i.e. when drilling longer distances of new formation, the lag time (after
correction for pump efficiency) gives an indication of possible hole wash outs, calculated as an
increase in average hole size (Figure 18, Figure 18). Given the nominal lag time corrected for
pump efficiency is available (that is why you should run a carbide check in casing) the lag time
equation can be solved for the average open hole diameter.

The lag time is only the theoretical time (or number of pump strokes) hat cuttings and formation gas in
the mud would need to come to surface and be sampled or detected. In practise, cutings will always be
late realtive to the nominal lag time and gas can be early. The difference between the calculated lag time
depends on cuttings size and density, the mud density and the annular velocity and type of flow (laminar
or turbulent).

The following formulas put it into a mathematical background:


Wa Apparent Newtonian viscosity
One widespread method in determining slip velocity of cuttings d1 The outside diameter of the
during drilling operations is Moore’s correlcation. The correlation inner pipe (drillpipe, collars,
etc.) in inches
involves equating the annular frictional pressure-loss for the
d2 Inside diameter of the outer
power-law and Newtonian fluid models and then solving for the pipe, the borehole diameter in
apparent Newtonian viscosity. inches
ds The cuttings diameter in inches
The apparent Newtonian viscosity given by the first equation is FT Transport ratio (dimensionless)
K Consistency index of the fluid
then used in calculating particle reynolds number given in the n Flow behavior index of the
second equation. The assumed perticle Reynolds number is fluid
checked by the calculated perticle Reynolds number given in the NRp Particle Reynolds number
second equation. Va Mean annlar velocity in feet
per minute (fpm)
Vsl Perticle slip velocity
Moore’s correlation: as Cuttings density in g/cm3
af Fluid or mud density in g/cm3
The Wellsite Guide Page 38 Mudlogging

The cuttings transport ratio is the ratio of the cuttings transport velocity over the divided by the mean
annular velocity (Va). A positive value of transport ratio means that cuttings are transported at the
velocity of the mud stream.

To make things more difficult, we must bear in mind that the fluid velocity is not the same all across the
diameter of the borehole: The mud moves slower near the borehole wall and near the drill pipe, provided
it is in laminar flow. The situation becomes more complex and less predictabe if the flow conditions are
turbulent. Figure (7) tries to illustrate this
situation.

For practical purposes, we can assume that


there is nearly no gravity separation of
cuttings in the mud stream, but there is a
separation of gas (even solution gas) and
cuttings. Further, there is no significant delay for cuttings separated by different flow velocities in the
mud stream - unless the mud used has extremely high viscosity.

! Be aware of differential lag times between cuttings, oil, and gas, although this aspect should not
be overemphasized (see also above). These materials will travel up the annulus at different rates,
depending on mud viscosity. Cuttings may be differentiated in correspondence with size and
specific gravity. This is an application of STOKE'S LAW. Some mudlogging companies apply
correcting algorithms in their lag-time calculations. Find out how the lag time is calculated and
if corrections are applied. The differentiation of cuttings in the mud stream is also increased in
deviated and horizontal wells.

! In strongly deviated wells cuttings tend to accumulate at


the low side of the wellbore, thus leaving the mud stream
until they are stirred up by the drill pipe touching on the
bore hole wall. Expect longer "tails" of marker beds when
working on deviated wells. This effect of settling cuttings
has nothing to do with the theoretical transport velocities
as discussed above.
Figure 19: Laminar flow; arrows indicating
relative velocity of the mud.
The Wellsite Guide Page 39 Mudlogging

4.4.6. Hole Cleaning

One point, closely related to the cuttings transport is the efficiency of hole cleaning. Are you getting too
much or not enough cuttings ? Are all cuttings removed from the well and brought to surface ? And, how
could you tell ?

! Check the shale shakers every time you walk passed there. Is the volume of cuttings coming over
the shakers in relation with the hole drilled ?

holes (17½” and 12¼”) produce more cuttings per foot or meter drilled than small
Big diameter diameter holes such as 8½” or even 6" diameter hole. The amount of cuttings
coming over the shakers depends also on pump output. So, finding the right amount of cuttings that
should come over the shakers is very much subjective. Therefore, check every time you walk past the
shakers to build a feeling for what is normal and what may not be normal.

! Too much cuttings: That means that the hole is caving, there is more rock material coming from
the hole than actally drilled up by the bit. The additional volume of rock material is caved from
the side of the borehole wall. This situation is relatively easy to diagnose because the additional
material, the cavings have a different shape than the cuttings. Cavings are usually much bigger
than cuttings and can be indicative of overpressure (more on page 63). A rock type particularly
prone to caving is coal, young tertiary coals in particular.

! Another reason for too much cuttings may be that cuttings have accumulated “somewhere” and
are coming to surface. This “somewhere” may be in the possum belly itself, somewhere in the
flow line or - more typical - at the base of the marine riser. The annulus increases abruptly at
the base of the marine riser and above th cased hole section. Consequently, the ud velocity
decreases sharply at this point and cuttings can settle out there. Most offshore rigs are
constructed in way that an additional mud pump (the booster pump) can inject mud at the base
of the riser to increase the annular velocity.

! Not enough cuttings. Cuttings remain in the hole. This is a dangerous situation because the
cuttings will “choke” the circulation at one time. If cuttings remain in the wellbore, or even
worse, in the open hole section, the cloud of cuttings may settle out when the pumps are
switched off (to make a connection, for example) and can pack-off the stabilizers or the bit. A
diagnostic indication is the occurrence of overpull when making a connection or when pulling
out the first stands.

In either of the situations, consult with the company man, tell him his observation - and don’t be
surprised if he has another point of view. In any case, report !
The Wellsite Guide Page 40 Mudlogging

4.4.6. Kick (Pit Volume) Drills

and gain in mud volume can reflect loss to the formation or entrance of formation fluids into
Loss the wellbore, a kick leading in the worst case to a blow-out. Although the volume of the mud
pits is also observed by the driller on the rig floor, the correct response of the mudlogging crew to pit
level variations is essential.

! Most of the mud level changes may have other reasons. Water may be added to the mud (gain),
new mud may be transferred from another pit (gain), mud may be dumped (loss), etc. Before
such changes are made, the driller should call the mudlogger to inform him about his plans. If
the driller does not adhere to this practice, he cannot expect the optimum cooperation with the
mudloggers. In this case, tell the company man about the shortcomings.

! The pit level sensor system including the setting of alarms should be sensitive to changes in the
range of ± one barrel. However, this does not mean that the alarms should be set to ±1 barrel.

! When the mud pumps are switched on, mud is taken from the pits and the surface system fills
up, the pit volume will show an apparent loss for some minutes. On the contrary, when the
pumps are stopped, mud flows from the shakers and the flowline back to the pits and shows an
apparent pit gain. This fluctuation due to starting and stopping the pumps can be as small as 5
bbl on a very small slimhole rig or as much as 40 bbl on a big rig with a huge surface system.

! If unexplained changes in this range occur, the driller on the driller on the rig floor must be
informed immediately. Any change in mud level (gain or loss) must be annotated and explained
on the recorder chart (see page 34). No exceptions.

Check
! Go to the mud pits and lift up the sensor of the active pit, thus imitating a pit gain and see what
happens. If the mudloggers call the rig floor immediately, everything is up to standard. Inform
the driller and the company man before you make your exercise. The check is more difficult if
an acoustic pit sounding system is used. You can put your hard-hat or a plank under the
transducers to simulate a pit gain; however, the response of the indicators in the mudlogging unit
are different. An experienced mudlogger will easily spot the nature of the exercise.

As a kick or loss of mud to the formation may also occur during a trip, proper monitoring of the mud
level in the hole during a trip is extremely important. Due to the swab pressure applied while tripping
out, the hydrostatic pressure on the formation is reduced. In fact, most kicks and blow-outs occur on
when tripping out of the hole. The volume of mud gained or lost must be equivalent to the volume
displaced by the drill pipe.

4.4.7. Sample Collection

Sample collection is the duty of the mudloggers. This duty is sometimes delegated to a sample catcher,
a helper in the mudlogging shack. Most of the sample material is gathered at the shale shakers. But this
is not sufficient. Even during routine drilling, you (or the mudloggers) have to check the desander and
desilter outlet every time a sample is collected. Collect an additional sample from the desander and
desilter and put it together with the cutting samples for inspection and bagging. It is indispensable that
you check, that this practice is understood and followed by the mudloggers.

should be caught by placing a wooden board across the front of the shakers, so as to catch
Samples a representative sample of cuttings. If different screens are used on a twin shaker use two
boards and make the sample up from both piles. Normally the proportion should be approximately 50:50,
however in sand sections the ratio needs to be changed so a more representative sample is caught.
The Wellsite Guide Page 41 Mudlogging

! Make sure the roughneck who is on duty at the shakers during drilling does not change the
planks, dumps the cuttings piles. Tell him what this construction is about and, also, not to mess
with it.

! During fast drilling and in a big diameter hole, the board(s) will overload quickly, so the sample
becomes non-representative. It is best in this case to bulk the sample using two separate
collections, one at half, one at full lag time.

! During slow drilling, the same procedure may be need to be repeated several times in order to
get a representative sample and to get enough quantity.

! Always wash the boards and the shakers down after collecting a sample.

! When a sample is missed for some reason, never bulk it up using the next depth. Put the relevant
bag, empty, into the sample box or bag for shipment. Note the depth or depth interval missed on
the work sheet and log book. Leave sample description sheet and mudlog blank for that interval.
(See also page 41, bypassed shale shakers.)

! Whenever the desander or desilter is in use, always collect samples from the cyclones and
describe on the work sheet. The sample recovered from the desander or desilter should be added
to the sample collected from the shakers.

! During coring reference samples should be taken. As the sample material is not sufficient to fill
the sample bags, add empty bags (page 46) as place-holders.

! Do not accept any sample material of unknown origin. If someone brings you a piece of
something throw it away.

4.4.8. Cuttings Sampling and Sample Interval

Selecting an appropriate sample interval is the responsibility of the wellsite geologist. Select an interval
that suits geological needs and that is feasible under given drilling progress. The sample interval usually
decreases with depth or as the zones of interest are approached. At top hole the interval may be as wide
as 50 feet (or about 25 meters) or even more. When the drilling rate slows down in deeper strata the
sample spacing may be as close as 3 feet (or about 1 meter in round metric units).

! At times of fast drilling, in particular at the big-diameter tophole section, other factors influence
the sample interval. The driller will pick up the bit and wipe up and down the hole for the full
length of the kelly when making a connection. This mixes the cuttings samples in the annulus.
Make your calculations of lag time and do not try to take closer samples than warranted by the
actual resolution of the mud stream.

! As a guideline, try to adjust the sample interval so that there are not more than four to six
samples per hour to be taken. For a short interval higher sample rates may be tolerated, however,
be aware that the overall quality of the mudlogging services decreases if too many samples are
to be taken within a given time.

The shale shakers may be bypassed for one or the other reason. If lost circulation material (LCM) is in
the mud, it plugs the shaker screens. The drillers have a wide selection of materials to combat lost
circulation: Mica (muscovite), walnut or peanut shells, processed sugar cane fibre, peanut shells,
cellophane flakes, etc. When in use, the costly mud would then run over the shakers and be lost,
moreover, the LCM material, which is added to the mud to do its job downhole would be filtered out.
Therefore drilling people bypass the shale shakers on some occasions. Try to collect a sample with a
The Wellsite Guide Page 42 Mudlogging

sieve from the mud stream (flowline). If the sample volume recovered is not sufficient, take frequent
samples and lump the material together to fill the sample bags.

! For the sake of good practice intervals with no sample recovery (i.e. with empty sample bags)
should be noted in the log book, reported on the daily report and noted on the transmittals sheets
of sample shipments (see also page 41, missed sample).

4.4.9. Calcimetry

Calcimetry13 is another geological tool particularly relevant in carbonate provinces. The principle is
simple. A certain volume of cuttings substance (about one gram) is dissolved in hydrochloric acid in an
enclosed test vessel and the pressure is recorded an a small strip chart. Calcite is dissolved very fast,
dolomite slower, quartz, clay, etc. is insoluble in HCl. After calibration with clean CaCO3, the recorded
pressure curve can be translated into absolute values, whereby the first, almost immediate pressure peak
is set equivalent to the calcite content of the sample. The increment to final pressure reading after three
or four minutes is attributed to the dolomite content of the sample. Dolomite dissolves slower. The
remaining difference between a formation (cuttings) sample and the CaCO3 calibration sample is
attributed to the weight of the insoluble residue. The whole process takes five to eight minutes, so don't
expect the mudlogger in charge to produce more than one calcimetry measurement per ten minutes14.

This description of the calcimetry process appears complicated, in fact once you see the apparatus, it is
quite clear how it works - and where the weak points are:

! The calcimetry is very sensitive to any change in the environment controlling the reaction.
Needless to say that a change in acid concentration changes the calibration, but be also aware
that changes in ambient temperature may act in the same way.

! Variations within the range of 5 % (weight) are fully within the variation of the system and
acceptable.

! Check when the last calibration was made (it should be noted in the mudlogging unit's log book).
A calibration run per day or better one per shift is not asking too much. Re-calibration is due also
whenever a new bottle of acid or a new bag of calibration CaCO3 is begun.

! Have a look (with the microscope, of course) on the insoluble residue left after calcimetry. There
are interesting things to find (- from a geologist's point of view).

13
This device is also called Autocalcimeter, despite its low degree of automatization.

14
If drilling is too fast to keep up with the calcimetry you have to instruct the mudloggers to analyze only every second or third
sample.
The Wellsite Guide Page 43 Mudlogging

4.4.10. Shale Density

density can be measured in three different ways:


Shale
! Several large test tubes are filled with various density liquids Important: Tetrabromethane and
produced by mixing differing amounts of tetrabromethane calcium bromine are carcinogenic
and trichorethane. Some contractors use water solutions of fluids. Handle as little of the fluid
calcium bromine. These tubes are individually calibrated as possible. Clean and dry
with a hydrometer. Then it is a matter of finding which equipment - if any possible -
outside.
density tube allows the shale cutting to "hover", i.e. neither
float or sink.

! A development of the method above is a large graduated cylinder carefully filled with
tetrabromethane and trichlorethane so that the fluid is more dense at the base and less dense near
the surface. The tube is calibrated by placing colored beads of known density and plotting their
position on graph paper. The shale cutting is placed (with a piece of wire, shaped like a long
spoon) into the tube. Its "hovering" position indicates its density.

Note that the density of the test fluids changes with time owing to evaporation. Also, the second method
(graded test tube) is sensitive to vibration which disturbs the delicate equilibrium of fluids. The
calibration graph should therefore be checked once a day and the fluid changed with new fluid about
once a week.

! The best method is the shale bulk density, which can be measured by filling a mud balance with
cuttings until it balances at 8.33 ppg. The cup is then filled with water and the total weight (W)
measured. To convert to metric units use the following equation:

A number of problems and limitations is common to all three methods:

! Drying of the cuttings for the two density fluid methods is critical. Cuttings should be dipped in
Acetone and allowed to stand for a few seconds in air.

! Cavings must be avoided.

! Shale composition and accessories (especially carbonates and pyrite) affect the density.
The Wellsite Guide Page 44 Samples

5. Sample Material
5.1. Routine Samples

There are three different basic types of cutting samples (besides core and sidewall core samples)
collected at the wellsite:

! Wet samples. These are drill cuttings, which are bagged in cloth or plastic sample bags. The
sample material is not washed or rinsed to clean the material from mud contamination. This is
bulk sample material used mainly for paleontology.
Cloth sample bags should no longer be used. Unless the sample material is perfectly dry, the bags
will mildew or foul and disintegrate within weeks, leaving you or the poor lab technician with
a big mess of unidentifyable samples. More recently, plastic / aluminum sample bags have
become available. These bags, similar to those used for vacuum packed coffee, need to be sealed
with a special electrical tongue, much like plastic bags for the freezer.

! Washed and dried samples. Drill cuttings are washed with water over a set of sieves. The mud
contamination is washed away. If too much washing is done, soft shales will be washed away
also. The sample material is dried, packed in paper envelopes or small self-sealing plastic bags
(size about 6.5 x 12 centimeters) and shipped in cardboard boxes. The washed and dried samples
are used for quick lithological reference. They are of little use for micropaleontological purposes
because some of the clay fraction containing microfossils is at least partially washed away.

! Geochem samples are unwashed samples collected in cans. The cans are filled with tap water to
about 1 inch (1-2 cm) below their top. One drop of biocide is added to prevent bacterial growth.
Put the lid on carefully. The cans should be gas tight and not leak. Store upside down. The cans
become corroded by the drilling mud within days or weeks. Fast transport to town is indicated.
The geochemist in town will first punch a small hole in the cans to take the headspace gas for
chromatographic analysis. The cutting material is used to extract organic compounds for
chromatography and kerogen determination (done on polished mounted cuttings). The
chromatographical analysis is very sensitive to organic contaminants in the mud. Note any
possible organic contaminant (like diesel oil, organic mud additives etc.) on the transmittal note
and include a separate sample of the contaminant (see also page 45).

If no headspace gas analysis is required (some geochemists think it is "good money for old rope"
anyway), geochem samples may be collected like wet samples and dried. Another technique is
to collect wet samples and geochem samples in strong plastic sample bags (actually a bag
consisting of two plastic and one aluminum layer) which are sealed. This method is relatively
expensive but has obvious advantages.
The Wellsite Guide Page 45 Samples

5.2. Other Sample Material

! Hot shot samples are cuttings (or sidewall cores) sent to town for paleontological analysis on a
rush basis. This is done to find out if a certain horizon or marker has been penetrated. (See also
page 67, wellsite biostratigraphy.)

! Bit Samples on trips. Try to collect a sample from the drilling bit every time the drill string is
tripped to the surface. Here you get sample material from a given depth. You do not rely on lag
time calculations. Do not take your sample from the stabilizers. If you get anything, you will get
a selection of all lithologies of the open hole section with an over-representation of tight spots
and sticky clays.

Apart from rock samples other samples may be necessary or requested from time to time :

! Water samples from the formation (coming from RFT or DST) or a water sample from the drill
water used to mix the mud. Use the geochem cans or a glass jar, not plastic containers.

! Oil samples. The oil may come from a DST or RFT, or even a producing well nearby. Collect
fluid in glass or metal container. Do not use a plastic container. Be aware that this sample is not
a complete oil sample as it may be required for technical oil analysis (required for refinery
purposes) and not a reservoir sample, on which PVT analysis could be done. It may be sufficient
for geochemical purposes (source rock to oil correlation, etc.)

! Pressurized fluid sample. It is collected from DSTs at the separator or the wellhead under
pressure and stored in a pressure sample bottle, a ½ gallon steel container. The sample is needed
to study the phase behavior under reservoir conditions (i.e., under different pressure and
temperature conditions; therefore called PVT sample). The containers for pressured samples are
available on a rental basis from the well testing contractors. Shipment of pressured sample
containers has to comply with regulations for dangerous goods. Contact the freight agent or the
materials and logistics department of your company for details.

! Contaminant sample. You often need to take a sample of mud contaminants or other substances
of interest (Diesel oil, organic mud additives). Use the appropriate container. Label properly
(including date, batch number and sample point). See also page 46).

! Small gas sample, non-pressurized. If you need a small volume gas sample for compositional or
carbon isotope analysis, use pre-evacuated glass tubes for sampling. These tubes are available
from agents for medical supplies. The tubes are sealed with a rubber diaphragm. A double
pointed hypodermic needle comes with it. To take the sample, stick the needle into the sample
point (rubber hose from the separator or RFT tool), then push the other end of the needle into
the diaphragm of the glass tube. The vacuum "sucks" the gas into the tube. Shipment as
dangerous goods is not necessary because the tubes are normally pressured.

! Environmental Samples are strictly non-geological samples. Such samples are taken to
document the effect of the drilling operation on the environment or the toxity of chemicals used
in the operation. Environmental samples can be water, soil, rock, plant, mud etc.
The Wellsite Guide Page 46 Samples

5.3. Sample Shipment

Before shipment, make sure that the samples (in particular the wet sample bags) are reasonably clean,
dry and closed properly.

! Tie groups of ten sample bags together with a cardboard tag.

! If no samples were recovered over an interval (because of bypassed shakers, lost circulation,
etc.), label empty bags and put them together with the samples recovered in the shipment
container. The technician who receives the shipment and selects samples for analysis will know
then that no sample has been recovered at a certain depth an he will not have to search the whole
bag for a particular sample.

! Label every box, sack or sample container with :


Shipping address (Company address or the address of the analytical contractor).
Well name or number.
Depth interval15.

! Inform your company, supervisor or the receiver of the sample material in writing about time,
means and content of shipment. Ideally, you would fax a copy of the transmittal to town.

! Keep a record of the sample material that has left the location. Best in the log book (page 20) of
the mudlogging unit. The wellsite geologist is always made responsible for the proper
documentation of sample shipments.

! Keep one set of washed and dried samples at location until drilling is completed. This is for
reference, in case you want to review a certain interval later.

the sample shipment as closely as possible. Find out by which means and over
Follow-through which route the samples are transported. This puts you in the position to find out
where the shipment might have become stuck if it does not arrive in time at its destination.

15
Very unlike cores, which are taken at points of interest only, cutting samples are taken over the entire well section. Rules of
confidentiality are therefore not violated if the depth interval is written on the shipment containers of cuttings samples. See also page
62.
The Wellsite Guide Page 47 Geologist’s Routines and Reporting

6. Wellsite Geologist's Routines


Now, as you have convinced yourself that the sensors work properly and the mudlogging crew is up to
standards, you have to show some action yourself. There are a number of routine and non-routine duties
that the wellsite geologist has to take care of himself and cannot be delegated to the mudloggers or
anybody else.

Special reference is made to the job description of the wellsite geologist on page 7 of this book. The main
objective is to collect, document and interpret geological data. It is not the objective to help the drillng
people, the company man, or someone else. However, it is part of the job to keep them informed about
all geological aspects. In practise, this means that whenever you may be trapped between different
priorities of your work, follow this sequence:

! Safety first, then geology, finally drilling aspects.

As an example, if the driller or company man tells you to watch the pit volume during a trip, be aware
that he is delegating one of his tasks. Or, when you are asked to help counting casing, only help if there
are no other geological duties on priority - and there will always be something more important (page 122
of this book gives several examples).

One of the duties, actually the main reason for your presence on the rig, is to monitor the operation,
which means to be around and to know what is going on and represent the standpoint of the geology
department on the rig.

The geologist should know at least and constantly be aware of:


l
Awareness
! Where are you ? Your present best guess in which strata the bit is drilling at this
moment. How far away (both in depth and in operating time) are casing points,
expected reservoirs and TD?

! How is the hole condition ? Any drilling problems, indications of overpressure, sticky hole or
indications of lost circulation ?

! What type of bit is run, how long will it drill (approximately) and when is the next trip expected.
Have a look at the worn bit when it comes to surface. This gives a "feeling" as to what the
mechanical properties of the formation may be (hard, sticky, abrasive...).

! What sort of bottom hole assembly is run (slick, stiff, pendulum, directional, etc.) and why ?
The bottom hole assembly is a matter of drilling engineering. There is not much a geologist can
contribute to drilling techniques, however, he should have a clear idea why things are done the
way they are. Are we following the drilling program or is there any deviation from it ? If you
don't know - ask !

! What type of mud is in the hole, what are the basic parameters (weight, viscosity, water loss,
salinity, special additives used like diesel oil, etc.) ?

! Is your crew and equipment complete ? Are you waiting for personnel (service companies, etc.)
or equipment (logging tools, spare parts, etc.) ? If so, have you reported the situation before
and/or requested your supervisors action ? When ?

Be discerning that you should know only many things but by no means should you ever comment or in
any way, be it formal or informal, report anything about these particulars. This is solely the job and
responsibility of the drilling people and the company man.
The Wellsite Guide Page 48 Geologist’s Routines and Reporting

6.1. Reporting

The second-most important task of the wellsite geologist is to report his findings to his supervisor in town
or the base office. He is judged by the quality and punctuality of the reports he turns in. There are as
many different reporting formats and procedures as there are operating oil companies. Nevertheless, your
report should always be made up in such a way that it conveys the message as clearly, simply and
completely as possible. Just imagine that you are in the office, receiving a report from a well that you
never heard of before. Could you figure out from the report given what is going on out there?

Point out the different levels of reliability of statements in a report. There are tentative sample tops on
one side and there are firm easy to pick marker horizons, for example. So stick to the good old principle
to keep observation and interpretation apart. Make clear in you report where the interpretation begins.
Report if your interpretation is based on poor data quality. Note "poor sample quality", or "based on color
change..." or "interpreted from ROP..." or any other explanation, that may be relevant to judge the quality
and reliability of the interpretation given.

6.1.1. The Master Log

The wellsite geologist has to prepare some kind of graphical presentation (log) of the lithological
sequence drilled. On some occasions, this can be done using computer programs that draw logs and serve
as a small data base. To differentiate your product from the mudlog, that is prepared by the mudlogging
contractor, it is called the master log16 or strip log. This master log is to a certain degree a duplication17
of the work done by the mudlogging contractor, but in a way it should be more of an interpretative
summary, while the mudlog is more descriptive. Modern computer based systems may change this
situation in the near future. Database systems have become available, which enable the geologist and
the mudloggers to work with the same data. Geological data files can be merged with technical
parameters recorded in the mudlogging unit (ROP, gas etc.) and a graphical combination with wireline
log data and MWD displays is possible. The daily report would then be a computer file transmission to
the office, or, the office could directly access the actual and up-to-date data files on the rig.

There are two basic concepts as to how to produce a lithological log: The percentage log and the
interpretative lithology log. The percentage log records the lithology of the cutting samples as observed.
Only obvious alien material such as cement is disregarded and the lithology of cuttings is described,
using percentage values to describe the composition of the cuttings sample. The interpretative log, in
contrast, seeks to zone lithologies, that occur together in one sample relative to the rate of penetration
(ROP), gas occurrance and any other observation of relevance. For example, a coal streak of a few feet
thickness which caves in over the following hundreds of feet will be recorded as only one streak (if
recognized as such) in the interpretative log. On the percentage log it will show as a high percentage of
coal cuttings fading away over the interval, still, being described as "trace" near the end of the interval.

16
Some other operators call this presentation sample log.

17
You can actually judge the quality of the reporting procedures of your outfit by the degree the both logs are duplications or complementing each
other.
The Wellsite Guide Page 49 Geologist’s Routines and Reporting

6.1.2. The Daily Report

Depending upon the set-up, the routines within your company, the daily geological report is either sent
by alone or combined with the drilling report as an integral part thereof. It may be sent by telex, fax, e-
mail, file transfer or read out on the phone or radio. Any type and format of a daily geological report
should contain at least the following information:

! Well name and/or number.

! Depth at reporting deadline (usually midnight or 06:00 hrs local time in the morning).

! Date report sent, and date of reporting period.

! Footage drilled and summary of operations. Make sure you have exactly the same details on
your report like the company man. Often, the midnight depth is rounded or slightly changed by
the driller or company man and then entered into the reports. Check with the company man what
he puts on his report. In case of differences, the daily IADC report of the drilling contractor is
the ultimate authority.

! Interpreted lithology, hydrocarbon shows and stratigraphy.

! Hydrocarbon show evaluation as complete as it is available at the reporting deadline.

! Graphical presentation (the “log”). Send a copy of your log, or the mudlog, if technically
possible by fax or electronic mail.

Do not delay the report only because you want to include something, which you think is important. (If
you had a drilling break just at reporting deadline, report only what you know for certain. You still can
send an update. Beside, the people from the office will call you anyway.)

in intervals. That means group similar lithologies together, add rate of penetration,
Report hydrocarbon shows etc for the interval under consideration. A good report will always read
"from" and "to", giving an interval.

Make sure to send the geological report every day, even if there is no geological activity such as when
casing is run and cemented. Make up the standard form with a remark "no geology to report" or "no
drilling" or whatever is appropriate in the given situation. This habit keeps up the routine of paper flow
and evades the silly question from the town office, "why did you not send a report today ...?"

6.1.3. Ad-hoc Reports

Be prepared at any time, 24 hours a day, for your supervisor to call you on the rig and ask for
an update of the last report. You may just have gone to bed and have no idea what is going
on so do not answer the phone or radio unless you know the basic data: c
! What is the current operation ?
! What is the present depth ?
! Any shows or other interesting things to report?
! Markers reached, change of formation ?
! What is the present average drilling progress (ROP) ?
! Background gas reading ?

If you don’t know wht’a going on, do not commit to any statement if you do not have the correct answer.
Ask for a few minutes time and find out, even if it appears embarrassing at the moment. It is better this
way. The people in the office could base important decisions on the answers you give.
The Wellsite Guide Page 50 Geologist’s Routines and Reporting

Again, a well kept notebook can be an important help. Note down the important parameters
(depth, progress, gas, etc.) every time you leave the logging unit. When you are called to the
phone or radio you can call the mudlogging unit for a short update. l
6.1.4. Contribution to the Final Well Report

Regardless of whether you will compile the final well report later, or not, prepare and file your data in
a format that is similar to the format used for the final well report. Many data are easily collected during
operations at the wellsite but almost irretrievable from the files. (Page 109, the circulation time prior to
logging is an excellent example). Make your notes and keep your notebook. This notebook, if properly
kept and annotated can be a treasure of information.

! If you have a computer on location, it may be a good idea to merge the lithological descriptions
every day into one file. This document needs to be edited when sidewall cores and lab results
become available before it can be used as contribution to the final well report.

! Keep a file logging the daily operations (check the daily drilling report) and another document
in which you type the body of the final well report, interpretation and results of analyses if they
become available from town office.

6.1.5. Data Security and Confidentiality

Treat all data as confidential and unique. That means lock you report and log file away if possible and
make sure nobody makes copies of your work - don't forget you computerized data, original data or
interpretation without your permission. Think also of your waste paper and make sure is shreddered or
at least torn up and disposed off properly. Think also of the confidential value of your notebook, diskettes
used and data that may be filed on the hard disk of a shared computer on the rig.

The mudlogging and wireline logging contractors have always access to the most sensitive data are but
are committed to confidentiality by their work- or service contracts. Assume that they adhere to
professional standards of confidentiality. There is usuially no problem, if you share data and sensitive
information with them; however, do not divulge any information to them which is beyond the scope of
their work.

If you mail data to the office, make sure that a back-up copy, a duplicate, is kept on the rig, in case the
mail is lost during transport. This applies in particular for transparencies (mudlog, etc.) and magnetic
tapes or diskettes with mudlogging data.

For some operations such as testing, special rules of confidentiality apply. It may be requested by the
operator not to report in open language, which means you have to encode your report (see also page 9).
This may be necessary in particular if you report by short wave radio. (See also page 62 for aspects of
confidentiality for packed sample material.)

Special reference is made also to strip charts and work sheets (page 34 and page 34). This data may
appear out-dated , superseded or even useless when the well is completed. Nevertheless it can tell the
whole story of the well. It is absolutely essential that this data is transferred to the office of the operating
oil company. If the operations geologist should decide to destroy this data it's his business.
The Wellsite Guide Page 51 Samples

6.2. Working with Cuttings Samples

6.2.1. Sample Preparation

taken from the shakers (see page 40, sample collection) must be prepared, washed, sieved,
Samples prior to description and packaging. Sample preparation is the duty of the mudloggers.
Supervise and see if the following procedures are implemented:

! Both fresh water and sea water are acceptable to wash the samples.

! The raw wet sample should be put in the top tray of the sieve column, preferably 5mm screen
size, and washed with a high pressure single jet applied in an angle to the sample. the action
should be to slice the sample so that it breaks up and falls through the large sieve. The aim is not
to pulverize the individual sample chips. After the raw sample has been jetted into the lower
sieves, a spray should be used to disintegrate the remaining sample.

! You must have a complete set of sample sieves in good condition. During casing jobs or rig
moves, the sieves should be thoroughly washed and dried in the sample oven to inhibit
deterioration. Special care should be taken when there is salt in either the mud or the sample
washing water (sea water). Do not be tempted to help preserve the sieves with oil as it will
contaminate your next samples.

! Care should be taken not to wash away the clay fraction. When in doubt, reduce the amount of
washing. Use a squeezed sponge underneath the finest sieve to remove excess water, and transfer
to a stainless steel sample tray.

! During washing, look out for an oil skim on the water after it has passed over the sample.

! Note the proportion of obvious spalled cavings retained on the uppermost sieve.

6.2.2. Sample Description

The general lithologic description of rock samples is in principle the same as the description of outcrop
samples. However, owing to the nature of cuttings, the description of sedimentary structures is nearly
never possible. This guidebook is not another sample description manual ! The author recommends using
the sample description manual of the operating company, or, alternatively, the AAPG sample
examination manual, (SWANSON, 1981) which originates from SHELL, a reputable operator.

Only a few points, which apply particularly to cuttings rather than outcrop samples, are made here.

! Describe samples when they are wet ! No exception. If the sample material is dry, wet the
surface with water. Structures and colors are much clearer visible when the sample is wet.

! Claystones and shales need special attention. Usually shales arrive in the cuttings tray as soft,
or even soluble, whereas sidewall core samples from the same shales show a hard, splintery
lithology. This is due to the effect of the mud on shales, its alkalinity and its temperature.
Claystones and shales can be altered significantly being exposed to relatively high bottom hole
temperatures in conjunction with high pH.

The lithological description should follow this sequence:


! Rock type (main lithology).
! Color.
! Texture, including grain size, roundness, etc.
! Cement and/or matrix.
The Wellsite Guide Page 52 Samples

! Fossils and mineral accessories.


! Sedimentary structures (if possible to describe).
! Porosity and oil shows (visual inspection).

Using this descriptive sequence and commonly accepted abbreviations allows to describe even fairly
complicated lithologies correctly using a minimum of text.

Even within the given framework of a sample description manual or company guidelines for sample
description, it is a common fact, that two geologists will describe the very same sample with a different
wording. The same may apply for the graphical presentation of geological data, a hand-drawn mudlog
in particular. Never mind !

! If you crew change with another geologist and tie into his previous work, have a look at his last
samples and how he described them, but then make your own description. Later you will possibly
have to defend your description, but nobody will give you credit for a mistake or error in
judgement that you may have taken over from someone else just for the sake of continuity.

On the other side you may even repeat your own sample description differently under different
circumstances. A different microscope, another UV box, or just a variation of ambient lighting may
change at least your color description or, even more your characterization of stain and cut colors.

Sample description is rather a subjective matter of art and than a science. Exact and quantitative data,
like grain size, porosity etc. are made in the lab in town, not at the wellsite.

6.2.2.1. Tricks and Pitfalls

There are many things that can go wrong with a sample decription. If you have been trapped in one of
the pitfalls - don't cover up. As embarassing as it may be at the moment, use the next best situation to
rectify your report. A good opportunity is the daily report of the following day. Don't worry, mistakes
happen and can happen to everybody.

contamination:
Cement
! When drilling closely below cemented casing, or, if cement plugs have been set recently, check
every sample for cement contamination with Phenolphthalein. This agent gives a purple stain to
the cement particles and leaves the rock cuttings unstained. Cement looks similar to a gray fine
mudstone or siltsone sometimes with black grains. Even the most seasoned wellsite geologist
can be sometimes in doubt. Cement looks strikingly similar to a fine sand- or siltstone.

(in particular soluble organics like lignosulfonate) may come up undissolved and
Mud additives as pieces, thus sieved out over the shale shaker screens and lost for the further
process.

! Gelly "fish-eyes" are one typical indication of undissolved mud additives of the starch group.
They do not do any harm to samples or analysis. Gelly fish eyes are often seen in the cuttings
after a high viscosity sweep pill ("hi-vis pill") has been pumped to clean the hole.

! Lignosufonate, another mud additive, can easily be mistaken for low rank coal. Lignosulfonate
is usually in one characteristic grain size fraction whereas coal tends to cave and appear blocky,
often in very coarse pieces. Linosulfonate is also much softer than coal, except coals, lignites
which come from very shallow levels (low rank coals).
The Wellsite Guide Page 53 Samples

! Some material used to combat lost circulation (LCM) looks strikingly similar to low rank coal
or some basaltic rocks. This material ("Nutplug") is made from nut shells and black. If in doubt,
try to burn it.

! Other mud additives (such as Baranex®) are strikingly similar to amber.

! Barite can be mistaken for fine sand. If in doubt, compare with the original material from the
mud room or tank. Check the specific gravity with density fluids. Barite will sink whereas quartz
sand will float in tetrabromethane.

! Mica is used as LCM material. If you find loose mica (muscovite) in the samples, assume first
that this is LCM material added to the mud. Only if the mica is associated with an igneous
lithology you may interpret differently. Mica is very pervasive and is found in the mud system
even if no such material has been added for days or even the duration of the well you are on.

! Plastic based LCM: Another group of LCM is plugging material made from plastic flakes
(polyethylene or - less common - polyester). Some of these materials flouresce similar colors
like real oil shows.

! Pipe dope, grease used to treat the pipe connections. It flouresces. Pipe dope contains lead or
other metal particles which can be identified under the microscope if the substance is rubbed
between the fingers or over a piece of paper. Some other pipe dope may have a copper or bronze
colour.

! Other grease may look even more misleading. Sand and other rock particles may be mixed with
the grease which gives a very "authentic" impression. If in doubt, ask the mechanic on location
if he he knows what it is.

! Paint particles sometimes make their way into the sample tray. These colorful flakes cannot be
mistaken for a mineral but still may be confusing.

! Pipe scale. Rosty pieces from inside the drill pipe may occur in the samples, inparticular when
the pipe has not been used for weeks or monhts. Pipe scale is magnetic but still has a
resemblance to limonitic shales.

When describing samples, look also for material which does apparently not come from the formation.
This can be cement from the last casing point or mud additives, which are not soluble or have not been
dissolved yet, or metal chips:

! If you find significant volumes of metal chips or metals shavings, tell the company man. This
material has a fresh metal luster and is long, curly and different from pipe scale. The bit may be
drilling on metal junk in the hole or the drill pipe may be wearing the casing, with the risk of
cutting a hole into it if the situation persists. Use a magnet to fish the steel cuttings from the tray.
Some companies also put a magnet into the flow line or the possum belly and check daily, if
magnetic material has been accumulated (see also page 83).

6.2.3. Hydrocarbon Show Detection and Description

Hydrocarbon show detection and description is the key task of the wellsite geologist and of the
mudlogging crew. However, despite the importance of hydrocarbon detection, nearly all of the tests and
indications of a hydrocarbon show are weak, depend on experience or special situations and are far away
from conclusiveness. Only petrophysical analysis will give the conclusive determination of the presence
of commercial quantities of oil or gas.
The Wellsite Guide Page 54 Samples

The color and intensity of stain, fluorescence, cut, cut fluorescence and residual cut fluorescence will
vary with each hydrocarbon accumulation. The ageing of the shows owing to a volatile hydrocarbon
fraction evaporating quickly, and flushing by drilling fluids tend to mask the evidence of hydrocarbons,
sometimes beyond recognition.

! Be aware that not all indications may be present when a hydrocarbon accumulation is penetrated.

! Believe and be sure of your own observation. In many situations the geologist tends to revise his
interpretation under the pressure of questions such as "...are you really sure ?"

Some general points pertaining to hydrocarbon detection are listed below. The more specific tests are
described in the following chapters.

! Lack of fluorescence is not conclusive proof of the absence of hydrocarbons.

! Real hydrocarbon shows will usually give cut fluorescence. Light hydrocarbons (i.e. condensate)
often give fluorescence, may or may not give a residual cut but are likely to give negative results
with other detection methods.

6.2.3.1. Gas Chart Interpretation and Gas Shows

Many aspects of gas show recognition depend on the lag time. This can give a good indication from
where the gas is coming, in particular if there is some doubt, that it is really formation gas. Well kept and
annotated charts are a great help in such situations.

Definitions:

! Zero Gas: The detector reading when circulating in a clean, balanced hole section, pipe rotating
but not on bottom, no vertical movement. This reading should be above the zero of the chart
because there is always minor volumes of gas in almost any formation; there should be a
difference on the chart between zero gas and no gas at all (e.g. when circulation stops). Check
the equipment if absolutely no gas is recorded.

! Background Gas: When drilling in a consistent lithology, it is common that a consistent gas
value is recorded. This gas level may fluctuate considerably, but it is always above zero gas.

! Gas Show: Any deviation in amount or composition above established background. All gas
reporting refers to values above background. The background gas (and its fluctuation) is reported
and marked on the log.

! Trip Gas: If a trip is made, circulation stops, of course. During this time gas can migrate from
the formation into the static mud. When circulation resumes, a gas peak is observed. This gas
peak arrives at calculated lag time or earlier. Trip gas does not constitute a gas show, but should
be reported if it clearly exceeds background.

! Connection Gas: Originates like trip gas from situations when circulation has stopped for a few
minutes to add a new single of drill pipe. Connection gas is seen as constant peaks every 10 to
20 minutes (depending how long it takes to drill one single pipe length). Clear indications of
connection gas on the chart are typically a sign of increasing formation pressure. Inform the
company man !

! Recycled Gas: Not all of the gas in the mud will be removed by the surface equipment, some will
be re-circulated back into the hole. Due to the dilution in the mud tanks and turbulence in the
hole, any patch of mud containing gas will be diluted. The subsequent peak seen on the surface
The Wellsite Guide Page 55 Samples

gas detectors will be more diffuse. On the long term, background gas will show an apparent
increase. This situation must not be allowed. Constant and high gas levels are masking any
further shows. Also, the risk of fire near the mud pits increases. Drilling people have the option
to run a mud degasser or circulate and increase the mud weight until the situation is cured.
Inform the company man !

! Do not use the term gas kick for increased gas levels. A kick is - by definition - an uncontrolled
influx into the well bore.

So what is a gas show ? No clear answer ! Any gas that comes from the formation in quantities above
the background level may be as gas show. It may be indicative of a gas reservoir if the level introducing
gas as into the formation is porous. The difference between a gas reservoir and an oil reservoir can be
seen only in the composition of the chromatograph gas while drilling. Gas bearing zones are richer in
lower alkanes (C1, C2, methane, ethane). However, only wireline logging, in particular the response of
the neutron tool can give a conclusive answer.

6.2.3.2. Oil Show Detection

6.2.3.2.1. Odor

Odor is often described as one of the indications for live oil encountered. It is the author's experience that
odor is just another observation, by far not precise enough to derive any conclusion from it. The presence
of an oil odor or its absence does not have any impact on the general oil show evaluation.

Other authors go as far as instructing the company geologist to report "oil odor or condensate odor" and
to check the shale shakers and the possum belly area (probably sniffing around there?) every 15 minutes.

! The only use of an oil odor (-test) is the application on a freshly broken rock surface in the
absence of any, paint, fuel, fume smell. This situation may be reached in an outcrop but rarely
on a core surface on a drilling rig.

6.2.3.2.2. Stain and Bleeding

The amount by which cuttings and cores will be flushed on their way to the surface is largely a function
of their permeability. In very permeable rocks only very small amounts of oil are retained in the cuttings.
Often bleeding oil and gas (noticed as bubbles) may be observed in cores and drill cuttings from
relatively tight formations.

The amount of oil staining on cuttings samples and cores is primarily a function of the distribution of the
porosity and the oil distribution within the pores. The color of the stain is related to oil gravity:

! Heavy oil stains tend to be dark brown while light oil stains tend to be paler. Report the color
and distribution of the stain (is it uniform, patchy, spotty, along joints or veins, etc.)

6.2.3.2.3. Acid Test

The acid test works only in carbonate reservoir lithologies. Carbon dioxide, CO2 is formed by the
addition of HCl to any carbonate material. The surface tension of any oil present will cause lasting
iridescent bubbles to form which are large enough to lift the cutting in the acid. If there is no oil present,
the bubbles cannot become large enough to float the fragment.
The Wellsite Guide Page 56 Samples

! Note that this test is overly sensitive to the slightest trace of oil. Even carbonaceous and
calcareous shales and even more oil contaminants in the mud may cause a positive test. Use the
results of the acid test only in conjunction with a valid fluorescence test.

6.2.3.2.4. Hot Water Test

The hot water test is a very simple but efficient method to check for oil in cuttings samples. Take about
a big spoonful of cuttings from the shakers and put the unwashed sample into a any suitable container.
The pour boiling hot water over the sample and agitate before putting the container under UV light. If
oil is present in the mud or cuttings, it will come to the surface like "fat in the soup" and can be easily
detected by its fluorescence.

6.2.3.2.5. Fluorescence

Fluorescence is the light emission of material exposed to light of a shorter wave length, higher energy.
Hydrocarbon benzol rings fluoresce when hit by ultraviolet light. This effect is used in hydrocarbon
detection. Organic compounds without benzol ring compounds will not fluoresce.

Examination of mud, drill cuttings and cores for hydrocarbon fluorescence under ultraviolet light can
indicate oil in small amounts, or colorless oils which might not be detected by any other means except
chromatography. On the wellsite, all samples should be checked for fluorescence.

! Colors of fluorescence range from brown to green, gold orange blue, yellow or white. Typically
lighter oils have lighter fluorescence. The distribution of the fluorescence may be eve, spotted,
patchy or dotty. The intensity may range from bright over dull and pale to faint.

! Beware of mineral fluorescence. Calcite, for example, has a light white-blue fluorescence
whereas hydrocarbon fluorescence shades more to warmer colors.

There are a few crude oils that do not fluoresce under ultraviolet light. They are usually of heavy gravity
and are biodegraded. The biodegradation forms a double bonded molecule that for some reason does not
fluoresce. However, on the addition of a solvent the bond is broken and an instant bright cut fluorescence
is obtained.

! Biodegraded oil are usually first noticed as an ordinary oil stain without fluorescence. A solvent
cut test (see chapter below) should be made of any suspected oil stain regardless if it fluoresces
or not.

6.2.3.2.6. Cut and Solvent Tests

Cut is property of a cuttings to produce an extract soluble in an organic solvent. The most common
solvent are Trichlorethene, Petroleum Ether and Acetone. Carbon Tetrachloride is poisonous and
carcinogenic and should therefore not be used.

! Check solvent routinely for fluorescence (blind test) under UV light. Of course, it should not
fluoresce.

cuttings or core chips, a few grains or - if possible - a single cutting, that was fluorescing
To test and picked in the UV box and put into a porcelain spot tray. A few drop of solvent are added
and the result is observed under UV light. If the material contains hydrocarbons, they will dissolve and
give a fluorescence of the solvent.
The Wellsite Guide Page 57 Samples

! The result of the cut test is also observed in ordinary white light. The white-light-cut color varies
from colorless over pale straw, dark straw, light amber to very dark brown or opaque. Colors are
dhfficult to describe in a text, fluorescence in particular. If you have never seen oil fluorescence
before, try to imagine the cuttings in the UV box are charcoal pieces on a barbecue and some of
the coals glow from fire. Then, whenever you get hold of a UV box, try it out using any diesel,
industrial oil, or if possible cuttings from an oil well to get an idea. Do not hesitate to put these
descriptive terms on your report.

! The relative darkness of the cut described in white light should not be taken as an indication of
the amount of hydrocarbons in the cuttings.

! A faint residual cut (the residual ring) is sometimes seen in the spot tray as an amber ring
remaining after complete evaporation of the solvent.

! Failure of fluorescence should not be taken as decisive evidence of lack of hydrocarbons. All
samples suspected of containing hydrocarbons should be treated with a solvent.

of the cut in plain white light and under ultraviolet light is an indication for the gravity
The color of the crude. As a rule of thumb, the lighter the color, the light the crude. The cut
fluorescence shades to bluish-white or milky white color when light oils are tested. Heavier crudes will
show a more yellowish or greenish tint.

The most reliable test for hydrocarbons is the cut fluorescence or wet cut test. In this test the effect of
the solvent on the sample is observed under ultraviolet light. The sample should be thoroughly dried
before applying the solvent - although this may not always be possible in practice, in particular when
time is pressing. If hydrocarbons are present, fluorescent streamers or clouds will emanate from the
cuttings sample. If a sample fluoresces but does not give a cut, try to crush the cutting in the solvent and
observe any cut fluorescence. This situation is called crush cut.

Some shows will not give noticeable streaming effect but will leave a fluorescent ring or residue in the
dish after the solvent has evaporated. This is termed residual cut.

Heavy oils may not fluoresce but will cut a very dark brown and their cut fluorescence may range from
milky white to dark orange. An alternate method involves picking out a number of fragments and
dropping them into a clear 10 cm3 flask or bottle. Solvent is poured until the bottle is about half full. It
is then stoppered and shaken, oil present in the sample is extracted and colors the solvent. If the color
of the solvent is very light, hold the bottle against a white background. If there is only a slight cut, it may
come to rest as a colored meniscus on the solvent.

6.2.3.2.7. Acetone - Water Test

If the presence of oil or condensate is suspected, and provided no carbonaceous matter is present in the
rock sample, the acetone-water test may be used. Proceed as follows: Crush the rock and place it in a test
tube with acetone. After shaking it vigorously the liquid phase is decanted or better filtered into another
clean test tube. Add an excess of water and shake again. When hydrocarbons are present, they form a
milky white dispersion, being insoluble in water, whereas acetone and water are miscible.
The Wellsite Guide Page 58 Coring

6.3. Coring

6.3.1. Selecting Coring Points

Coring points (or conditions where coring is indicated) are defined in the well proposal and/or drilling
program or directed during drilling from the company office. When you are at the wellsite and ready to
core (as per program), call your supervisor to confirm, unless you have discussed this very core point just
recently with him.

There are two procedures to actually pick a coring point. If you are in a well known area, in particular
in limestone sections, try to establish a correlation between the ROP plot of your well and logs of the
relevant neighboring wells. Try to correlate the ROP to the GR, SP, sonic or any other log parameter.
Whatever makes a reliable correlation is valid. You may need a few hundred feet (100 meter or more)
to build confidence in the correlation. When you are confident about your correlation, you can pick the
required casing points (e.g. top of reservoir) as close as one foot, in an ideal case. This procedure works
particularly good in carbonate provinces.

If you are sitting on a wildcat well in a fairly new area, especially in a clastic sedimentary environment,
correlation by plain ROP plots is the exception and the pick will be more statistical. Good cooperation
and communication with the driller on the brake is important. He "feels" a soft formation, a drilling break
before you can see it on any monitor or strip chart. He will stop drilling (if he is instructed and authorized
properly) and ask, if you want to core, circulate for sample or drill ahead. Unless you are very confident
about you correlation, circulate bottoms-up and see how the lithology looks and if you have any show,
if the gas increases or changes in composition. In sands, unless they are well consolidated, you typically
do not see much stain or fluorescence because the oil may be washed out of the formation into the mud.
In this case, use the gas chromatograph only to make a decision.

This bottoms-up-and-see approach is expensive, when you consider circulation times of one hour or more
and relate it to rig time, rig cost respectively. The drilling people may be concerned about their daily
progress (see also page 103, economics) -but as a wellsite geologist, you have to defend your position,
that is getting the best information from the well and not to miss a core point and not to consider drilling
time. Anyway, you will catch more problems if you miss the coring point than if you do, requesting two
or three additional bottoms-up circulations.

If you have MWD (measurement while drilling, see page 100) or real time logging available, the
correlation and formation identification is facilitated. However, the MWD sensors are several feet above
the drilling bit and if you are going to core thin objectives, the drill bit may have passed the coring point
by the time the sensors have "seen" the formation change. So, if you go for thin objectives, you have to
rely on the conventional methods like ROP correlation and "feeling".

Do not worry if your core was far off with respect to the logs run afterwards or if you missed the coring
objective by a few feet. Everybody is smarter afterwards. What matters is that you have used the best
approach and judgement at a given time.

6.3.2. While the Core is being Cut

While coring, plot the progress of coring (ROP) for every foot (or half meter) in scale 1:50 on transparent
paper (or delegate this to the mudloggers). A piece of blank film, as it is used for wireline logs is
practical if you are not equipped with the proper forms. This form can be completed later with
lithological descriptions as a graphical core log. The ROP plot gives you the first clue of the lithologies
cored. Plot pump output, weight on bit and RPM with the drill rate, if this information is available from
the read-outs in the mudlogging unit.
The Wellsite Guide Page 59 Coring

Modern mudlogging systems, on-line computer based data gathering systems allow to produce a core
"mudlog" with the same routines as they are used for regular operations. All it takes is to change the
relevant parameters of the surveillance system before coring. Once the core is being cut, the new
parameter set (e.g. different sample increment, different depth scale, etc.,) is being used.

! Mudlogging continues during coring. Gas is recorded and samples are taken. The sample interval
may be increased to 1 foot (or about ½ meter) during coring.

! Plot ROP, gas, torque and pump pressure (standpipe pressure) on a 1:50 scale; or any other
adequate scale preferred by your company.

! Prior to running into the hole with a core barrel, get the exact hole depth. Check with the
company man if the drillstring has been steel line measured on the trip out (report abbreviation:
SLMO) before coring. Cores are often seen a few feet off depth relative to wireline logs. It is
therefore important to know, how exact the drilling depth was measured.

6.3.3. Core Retrieval

are to be made before the core comes to surface. Some of the tasks can be delegated
Preparations to the mudlogger on location, other tasks require your attention in person. The
mainstream of the description below refers to conventional coring. The state-of-the-art coring technique
is fiberglass18 sleeve coring. With this method, the inner core barrel is made of fiberglass. The entire
inner barrel (sleeve) is recovered and cut in 3 foot (or 1 meter) portions for shipment. The advantage is
that the core remains intact and undisturbed, a vital characteristic when coring unconsolidated
formations.

! Prepare core boxes in excess of the core length cut. Label well name, core number, company
name and shipping address on the core box. Number core boxes as "1 of ...", but do not write
depths on it yet. Label the boxes with "T" for top and "B" for bottom.

! Check for the availability of marker pens, packing material, sample bags (for rubble), cling wrap
and aluminum foil.

! If fiberglass sleeve coring is used, check the availability of end-cups, lids to fit onto the ends of
the core barrel.

! Have a steel line measure and your tally book ready.

! In particular if you work with a new


mudlogging crew, have a short briefing
with the mudloggers to make sure that
they are ready in time and know what
their task will be.

When the core comes to surface and is retrieved


from the core barrel (you can skip the first four
points if fiberglass sleeve coring procedures are
used) : Figure 20: Core as boxed and marked for despatch to the lab.

! Take the core and place it with correct orientation in the core box. The first piece goes into box
1, bottom, then proceed towards top and use the next boxes.

18
Similar methods use a rubber sleeve or aluminum inner core barrel instead of fib
The Wellsite Guide Page 60 Coring

! Check if there is core material left in the core bit or the core catcher. You may allow for some
space in the first box to accommodate this material.

! Do not break the core to make it fit into the boxes. Do not allow anybody to take any piece of
core from the boxes for inspection or any other purpose.

! When all of the core has been retrieved, carry the boxes from the floor to
a quiet working area, ideally near the mudlogging unit. Line the boxes up
in sequence.

! Fit the core together as close or as good as possible. Again, do not break
the core to make it fit into the boxes. Then mark the core with a
continuous red and black line from top to bottom. The black line is always
to your right, the red line always to your left. The arrows point upward. Do
not be confused, as other operators may use different marking on the core.

! Do not wash the core. You may wipe it clean or just let the mud dry up
before you mark the core and write on it.

! Then measure the core. Start at the bottom of the core, i.e. at the bottom
of box 1. Mark every full foot on the core and on the box. Mark the cored
depth the inside of every box.
Figure 21:
! If fiberglass sleeve coring is used, the whole fiberglass core barrel is laid Fluidisation of
unconsolidated
out on the catwalk using a rig crane. Then a roughneck will cut the barrel formation.
and the core under your direction into 3 foot (or 1 meter in round metric
units) pieces. A diamond saw blade is used. Mark the barrel with red and
black stripes and arrows before the core is cut into pieces.

! When a fiberglass core is cut into three foot or one meter sections, cut
only the fiberglass sleeve and break the core. This allows the core to be
fitted together again in the lab.

! It is also a good idea to apply marks on a side of the core which make it
possible to align the core with the fiberglass sleeve.

! Calculate the core recovery and report to the company man and call your
supervisor in town. This may be another decision point whether to
continue coring (i.e. to run in the hole with the core barrel or to resume
drilling with a conventional rock bit.

! If the core length recovered is less than the core distance cut, then the
interval which is not represented in the core sample is assigned to the
bottom of the core, because parts of the core can be lost while
disengaging after cutting or while tripping out. It is unlikely to loose part
of the core while coring without jamming the core barrel. However, soft F i g u re 2 2 : C o r e
deformation by mud
formations may wash out and may not be represented in the firm core
invasion into the core
retrieved barrel.

! Now go to the lithological description of the core. Take a chip at every


full foot and put it into a sample bag. Take additional chips at points of interest, such as change
in lithology. The selection of rock chips and their description should give a good idea what
lithologies have been recovered.
The Wellsite Guide Page 61 Coring

! If a fiberglass sleeve is used, you can take chips only from the end of every cut piece, i.e. only
every 3 feet. Put the chips into sample bags, label properly.

! Make a lithological description of the core chips, using the appropriate forms of the operating
company (page 51, for sample description). The format of the lithological description is identical
with the one used to describe drill cuttings.

! Concurrently, the core may be sealed in wax and packed for shipment now. This is mainly the
job of the mudloggers on site. Pack all porous lithologies first in cling wrap,
then in aluminum foil. Mark the wrapped core again with red and black line
and arrows. Seal the core material with wax. As the wax may cover your
previous markings, put stickers or packaging tape on the packed and waxed
core, stating up and down (red and black lines) and depth.

! Sealing of the fiberglass sleeve is much easier. Put the lids on every
end of the barrel, fasten with adhesive tape if necessary and dip the
ends into the wax bath. Another option of sealing is epoxy (such as
Bakerlock®).

! Complete labelling of the boxes, note down the content (depth


interval) of every single box and make up a shipping document.

! The core chips that you have used for description will be packed up
separately and shipped together with drill cutting samples and
should not be shipped together with the core.

! Send your description of the core to the town office. (Fax the core
log 1:50 with it, if possible.) This report may be required as soon
as possible - or latest with the next routine (morning-) report.

6.3.4. Core Shipment

Make sure the core is packed properly. This means it should not roll around Figure 23:
23 Proper
labelling and marking of core
in the boxes (use padding material). If the core is transported by truck or and core box. Black line right,
supply boat, it is a good idea to strap the core boxes on a palette. This makes red line left, arrows up.
handling by crane or fork lift more practical. The outside labelling of the
core boxes should only show :

! Shipping address (company office, warehouse, or core analysis contractor)


! Well name
! Core number
! Box .. of ..
The Wellsite Guide Page 62 Coring

the cored interval on the outside of the boxes. This practice is mainly for the sake
Do not write of confidentiality. People outside the company (this includes freight agents, service
company personnel etc.) do not need to know at which depth your company found something interesting
which they considered worth coring.

! Make up shipping documents (at least in duplicate) and report to the man in charge19 that the
core is ready for transport. Fax (or e-mail, telex) a copy of the shipping documents to your
supervisor in town and advise him of the means of transport that will be used.

! If you have time, print the address labels on a good printer and run make a number of
photocopies. Then stick or glue the labels on each core container or box.

19
This may be the company man on board, the company's materials man or the radio operator.
The Wellsite Guide Page 63 Pressure

6.4. Pressure Engineering

Pressure engineering, the science of predicting and interpreting pore pressures is often part of the
mudlogging contract and, to a certain extent, subject to the wellsite geologist's supervision. The pressure
engineer20 in the mudlogging unit usually reports to the geologist and the company man, because his
findings have direct bearing on both the drilling and the geological interpretation. Again, cooperation is
appreciated.

If no pressure engineer is on location, as it may be the case on many development wells, the geologist
takes care of reporting indications of abnormal pore pressures to the company man.

little is known about the actual formation pore pressure. Unless a RFT or DST,
During drilling yielding directly measured formation pressures, has been conducted, all
information about formation pore pressure is inferred from empirical formulas. Drill exponent
calculations (Dxc) with all their various corrections and compensations are employed to get some
information on the pore pressures. Even on development wells, that is to say in areas where much of the
geology is no more secret, even there pressure conditions may vary in an unforeseen way. The general
pressure alert with its pit drills, regular checks, etc. is an ingredient indispensable for any drilling
operation.

The general philosophy for drilling is to adjust the mud weight in such a way, that it compensates for the
formation pore pressure, allowing a safety margin for p pressures when tripping out. If the mud weight
is too high, the drilling progress is slowed down, or, in other words, the cost per foot drilled increases.

The ROP depends as well on the differential pressure across the bore hole bottom. If the mud weight is
too high relative to the pore pressure, the cuttings are held to the formation, the cleaning efficiency of
the mud stream and is reduced, hence the drilling progress slowed down. Furthermore, if the mud weight
is too high, the well is prone to lose fluids to the formation, thus inducing differential sticking of the
drillstring and damage potential reservoirs. In contrast, if the mud weight is too low, the well is prone
to kick, an unsafe drilling practice.

It is outside the responsibility of the wellsite geologist to find the correct mud weight. In fact the
geologist and the drilling people (personified by the company man) may have a substantial difference
in understanding as to what the correct mud weight should be.

From the perspective of the mudlogging shack, proper mud weight is deduced from the following
observations:

! Reasonable drilling progress (considering all the factors contributing to ROP such as formation
drillability, weight on bit, bit wear, etc.)

! Distinct trip gas (see page 54) and connection gas peaks over gas background. If you can see the
trip gas and connection gas on the strip charts the mud weight appears to be correct. If the
connection gas is higher than 50% of the background21, the mud weight may be on the low side.

! Normal shaped cuttings with minimum (shale-) cavings. In particular if the shale cavings
increase in number and size, you may be approaching a zone of overpressure or abnormal
pressure. Report to the company man !

It can be seen from the points above, how subjective and biased pressure interpretation can be.

20
Some mudlogging contractors use the word ADT engineer, meaning Advanced Drilling Techniques engineer.

21
Meaning something in this range. The actual values depend a lot on the regional setting and on other drilling parameters.
The Wellsite Guide Page 64 Pressure

The term abnormal pressures is used to describe any situation of a pressure gradient deviating from
hydrostatic pressure. However, it usually means overpressure, i.e., a pressure regime exceeding
hydrostatic pressures. Abnormal pressures may occur in young sediments, zones of rapid sedimentation,
young uplift and fast or deep burial. The advent of an overpressured zone will result in a change in a
number of physical properties of the formation, which are reflected in the change of a number of
parameters. The following observations might indicate a high pressure zone, however, almost all of them
can have other reasons.

of increasing pore pressure while drilling :


Indicators
! Gain in pit volume ("kick").
! Increase in ROP ("drilling break").
! Increased torque while drilling.
! Drag on trips and connections.
! Bottom fill after trips (or wiper trips).

From drilling returns :

! Increased background gas, connection gas (mud gas may show an increase in carbon dioxide).
! In some areas is has proven empirically true that an inversion of mud chromatograph gas, that
is C3 > C2 or C2 > C1 indicates the approach to an overpressured zone. In those areas where this
relationship has been established, this indicator is fairly reliable.
! Changes (increase) in flowline temperature. Only applicable, if the drilling is steady and the
temperatures stabilized, otherwise external effects will cover the subtle changes of flowline
temperature.
! Change of shape of cuttings, typical pressure cavings. (Figure 23f.) The shape of pressure
cavings may not be mistaken for swelling or sloughing claystones. This is the most sensitive and
still only a qualitative indication. Under overpressure conditions the shales (claystones) have
a typical elongated shape. Pressure cavings have similar shape and increase in size.
! Try to establish if the caving lithology comes from the bottom of the hole (new formation) or if
a formation drilled higher up caves in.
If you see shale slivers coming over the shaker screens, that are bigger than the teeth of the
drilling bit, the absolute alarm situation has been reached. Inform the company man a.s.a.p.

Indicators calculated or analyzed at the wellsite:

! Shale density decreases or deviates from the trend line.


! Water loss of shale cuttings increases.
! Significant increase in potassium content (mud, mud filtrate and shale water).
! Shale water (filtrate) may have amber color.
! Sharp change in cation exchange capacity ("shale factor" measured by titration with methylene
blue).
! Decreasing D-exponent.

A number of empirical techniques have been developed to calculate pore pressures from wireline logs.
The principle of most techniques is to establish a trend line of a parameter (logarithmic plot of resistivity,
sonic travel time, density, neutron porosity, etc.) versus depth. Deviations from the trend line are
interpreted to be indicative of abnormal pressures. These empirical relations work good in the areas
where they were developed. Outside their classical application areas they are less correct, though not
necessarily wrong.

A lot has been published about overpressure detection from wireline logs and empirical formulae have
been developed to estimate pore pressures from logs. In any case the drilling bit must have reached the
zone of abnormal pressure and it must have been logged. Overpressure situations need fast answers
because the drilling problems may already start after a few feet of cap rock drilled. Back to square one.
The Wellsite Guide Page 65 Pressure

The situation is, however, vastly different if you have MWD tools or real-time logging (see page 100).
Therefore, watch all drilling parameters closely (in particular the mud pit level and the background gas)
and try to come up with a sensible interpretation.

Another aspect of abnormal formation pressures are sub-normal pressures. Such situations are common
when a well is drlled through a formation that has been produced as a reservoir. initial reservoir pressure
is reduced as oil, gas or water has been removed from the reservoir. This may lead to particularly
problematical situations:

! When drilling in producing oil fields where produced and unproduced reservoir horizons are
close together. In this situation, a relatively high mud weight may be required to hold the fluids
of the unproduced reservoir back in the formation while a relatively low mud weight may be
required in order not to loose mud into the produced, sub-normally pressured formation.
Ideally, these situations are taken into account when designing a well. The well program will
then try to case-off one formation before drilling into the next formation that may have a
different pressure regime.

! When drilling in old, abandoned oil fields with an unknown or poorly documented production
history. In such situations, maximum care is needed because formation pressures may change
in an unpredictable way at any time.

6.4.1. Leak-Off or Formation Integrity Test

The leak-off test (LOT), also known as Formation Integrity


Test (FIT) is a pressure test to determine how much pressure
a given formation can take before fractures are induced by the
hydraulic pressure. This is necessary to know for kick-kill
calculations, the leak-off pressure is the maximum pressure
that can be closed-in the casing without risking an
underground blow out.

To conduct a test, the well is closed in on the BOP and mud is Figure 24:24 Schematic Diagram of a leak-off
pumped with the pumps of the cementing unit into the pressure plot.
wellbore. The pumps of the cementing unit have a better
control on pumping small volumes of fluid under higher
pressure when compared to the rig's mud pumps. Also, the pressure monitoring equipment (charts,
gauges, etc.) on the cementing unit are better suited for this purpose. Volume pumped is plotted against
pressure. At the beginning this relationship plots as a straight line. Later, after more volume has been
pumped, the pressure increases less per volume unit until it drops to a certain level where it remains
constant. This is the fracture pressure. The formation integrity pressure is read at the point where the
graph departs the first time from the linear relationship.
The Wellsite Guide Page 66 Pressure

pressure can be expressed as pressure measured at the wellhead or in equivalent mud


The leak-off weight (ppg or g/cm3), the maximum mud weight that can be supported by the tested
formation without fracturing. The fracture pressure is defined as

where Pfrac fracture pressure [psi]


S overbuden pressure [psi]
Pp pore pressure [psi]
W Poissons Ratio

In simple words, the leak-off pressure or its mud weight equivalent is the maximum pressure the
formation can take. Mud weight cannot be increased above this point. If a kick is taken, the maximum
pressure that can be closed in at the well head is equivalent to the leak-off pressure. Any higher pressure
will fracture the formation.

The leak-off pressure is also the maximum pressure that can be contained in the wellbore when the well
kicks and the BOP has to be closed. If the surface shut-in pressre exceed this mark, fluids must be
diverted, blown overborad or into the countryside in a more or less controlled fashion.

6.4.2. Pressure Worksheet

Make up your own pressure worksheet. Plot formation pressure gradients, mud weight (its gradients) and
all available data points from RFT, DST, kicks incurred (if any), leak-off tests, etc. against depth (true
vertical depth !), on a sheet of graph paper. Vertical depth, horizontal pressure gradient in psi/ft
(imperial) or g/cm3 (metric), mud weight in ppg (or metric equivalents). Note and plot zones that are
forecasted to be abnormally pressured. This diagram gives you a good indication if pressures are
changing, how high the safety margin from the mud hydrostatic head must be and how pressure regimes
change with formation changes. This type of worksheet is usually not part of your routine report,
however, your interpretation of the situation may be asked sometime. Anyway, be prepared.
The Wellsite Guide Page 67 Biostratigraphy

6.5. Wellsite Biostratigraphy

A wellsite biostratigraphic service is rather the exception than the rule on most drilling operatons. The
decision for or against wellsite biostratigraphy as opposed to biostratigraphy in town on a hot shot (see
page 45) basis is governed by the cost relationship for mobilization and day rates for the wellsite
biostratigraphical services in comparison to the transport cost by an unscheduled helicopter flight (or
similar) and also on the foreseeable need to base any decision making on the upshot of biostratigraphy.

On logistically remote exploratory wells a wellsite biostratigrapher may be on location to give a


preliminary micropaleontological interpretation.

It is the responsibility of the wellsite geologist to supervise and instruct the micropaleontologist on
location. He also has to interpret, integrate and report the findings of the stratigrapher. If no such “bug-
man” is on location, the following section may serve as an introduction to the ideas and problems of
stratigraphic analysis of drill cuttings samples.

6.5.1. Foraminifera

The study of planktonic and benthonic foraminifera is a pre-requisite for the determination of age and
paleoenvironments in sediments of marginal to deep marine origin. Planktonic foraminifera are
particularly useful chronostratigraphic indicators in open marine environments because of their wide
geographic distribution, abundance and often restricted stratigraphic age.

Larger benthonic foraminifera enable age determination of material from shallow marine environments.
When examined in thin section, these are especially useful in the analysis of thick limestone sequences.

! The study of foraminifera requires sufficient sample material. A full bag of unwashed material
(wet sample) is ideal.

6.5.2. Nannofossils

Nannofossils are fossilized remains of nannoplankton (marine algae) and constitute a varied group which
includes

! Coccoliths
! Nannoconids
! Discoasters

Nannofossils are an extremely useful group because they are morphologically diverse and key species
can be identified easily. Their planktonic lifestyle results in a widespread geographic distribution.
However, due to their nature, their study is applicable only in marine sequences. In some cases, good
results were achieved in deltaic sequences.

! Biostratigraphy based on nannofossils requires a scanning electron microscope (SEM). The


application of this device precludes any wellsite work on nannofossils.

! Nannofossil work requires less than 20 gram of sample material. The use of washed and dried
samples is possible.
The Wellsite Guide Page 68 Biostratigraphy

6.5.3. Palynology

Palynology, the study of acid insoluble microfossils, has grown from a scientific curiosity in the 1830s
and through a rudimentary time-tool in the 1960s to provide the modern explorer with precise age dating
and detailed information on depositional environments, source rock potential and organic maturity. Their
small size and resistant chemistry allows vast numbers of palynomorphs to be recovered from small rock
samples. Their rapid evolution, and occurrence in continental and marine sediments of Precambrian to
Recent age, further enhance their value as biostratigraphic markers. Rapid turn-around aids cost effective
drilling. Problems confronting the palynologist include reworking and caving (including mud
penetration), barren reservoir sections, palynofacies, inconsistent data sets, and the current incomplete
state of knowledge.

The organic residue recovered includes both recognizable microfossils (palynomorphs) and the remaining
organic debris. Apart from megaspores which are spores >200µ, most palynomorphs fall within the size
range 15...150µ.

comprise:
Palynomorphs
! Megaspores, large asexual reproductive organs from fern-type plants.
! Miospores
" Microspores, asexual reproductive organs from fern-type plants.
" Angiosperm pollen grains, male sex organs from flowering plants.
" Gymnosperm pollen, male sex organs from cone-bearing plants.
! Microplankton
" Dinoflagellate cysts, resting spores of mobile unicellular green algae.
" Acritarchs. Incertae sedis, probably sexual and asexual reproductive structures mostly
of plants.
" Algal cysts and bodies, reproductive organs and pieces of algae.
" Fungi, mostly asexual reproductive spores or young germlings.
" Scolecodonts, minute jaws of animals.
" Chitinozoans, minute structures of probable plant origin, known from the Paleozoic.
" Foraminiferal linings. Organic linings of dissolved foraminifera.

The common characteristic is their chemical composition which is insoluble in acid. this also makes the
various wall material difficult to study chemically, and they are loosely grouped under the term
sporopollenin. Chemical variations do exist and are indicated to the palynologist by various palynomorph
types responding differently to stains, and to maturation.

The small size of these resistant, variable, and plentiful fossils means they are widespread in many types
of sediment, often in vast numbers, reducing statistical problems and enhancing species definition. Five
grams of average shale will yield 500...10,000 individual fossils, and it is an adequate weight of sediment
to produce sufficient strew-mount slides to study the assemblage. Organic shales may require only 2
grams, while organically lean limestones or sands may require 200 to 500 grams. Because of the small
size palynomorphs normally "survive" drilling and can be recovered from the standard cuttings samples.
Palynomorphs are usually destroyed by the high temperatures associated with turbo-drilling. Their
abundance in cuttings often aids the recognition of missing zones in a condensed or incomplete sequence
located between sidewall cores or conventional cores.

6.5.3.1. Fine Time Resolution

are very common and evolved rapidly through Middle Jurassic and younger
Dinoflagellates times. Precise zonal resolution is thus possible in marine sections, often to the
order of one million years. this rivals schemes based on ammonites and forams, although much more
widely applicable. Study of several groups (especially nannofossils, foraminifera and dinoflagellates in
The Wellsite Guide Page 69 Biostratigraphy

the marine late Mesozoic-Tertiary) can provide zonal overlap, and extremely high precision. resolution
based on dinoflagellates alone is improving. Spores and pollen produced by land plants do not show the
same fast rate of change as dinoflagellates. Thus, time units based on spore-pollen assemblages tend to
be in the order 5...10 million years, with boundaries between them imprecise.

6.5.3.2. Environmental and Age Range

Because palynomorphs occur in both non-marine and marine sediments, useful age data can be obtained
from a wide range of environments. Palynology is not restricted to marine sections, it is the only
microfossil group available in continental section.

Land plants have been common and diverse since the Devonian and consequently palynology can be used
in most of the subsequent sedimentary record. However, acritarchs can be common in the early Paleozoic
and algal remains extend back into the Precambrian.

6.5.3.3. Some Typical Problems when working with Wellsite Palynology

Reworking: The small size, large numbers and resistant nature of palynomorphs results in frequent and
sometimes massive reworking. The problem is worst where sequences are rapidly deposited (particularly
in turbidite sequences) and above major unconformities. In the worst case, a rich reworked assemblage
will mask a lean in-situ assemblage and cause an erroneous, older age assignment. The likelihood of
confusion is highest in cuttings, or where the palynologist is pressed for time.

Caving: If there is caving in a hole, a richly fossiliferous horizon can easily mask the age of deeper, less
productive sediments, particularly in ditch cuttings studies. The caliper log run later will often indicate
the source of the younger assemblage. the caving, particularly within a sandy interval, can penetrate into
a sidewall core sample due to the pressure involved in the shooting, making careful cleaning of sidewall
cores essential before palynological processing commences. With conventional cores, the problem is
usually restricted to the top and the bottom of the core and coarse grained clastic lithologies over
intervals where the core may be discontinuous, lost. Often during the trip to position the core barrel, a
lump of material can be dislodged from the side of the uncased hole section and taken with it.

Mud contamination: A related problem to cavings is produced by mud contamination. Contaminants can
be included from the drilling mud ingredients, various additives during drilling, or even from a previous
well in the case of drilling vessels if the mud tanks are not cleaned between wells. This problem is even
more specific to wells drilled with oil based mud, which is typically re-used if the situation permits. It
is generally wise to keep mud samples for palynology in case initial results are problematic. It produces
similar problems to cavings with sidewall cores. Accordingly, wireline conveyed coring is particularly
prone to mud contamination.

! Be careful when asphaltic mud additives have been used or any other item from the mud
engineer's list of spices may introduce alien palyno-species.

6.5.3.4. Equipment and Sample Preparation

Lab equipment for micropaleontological / palynological rig work is usually supplied by the respective
service company or contractor. The wellsite geologist should check that it is complete and operational.
Micropaleontological (foraminifera, etc.) sample preparation can be done in the mudlogging unit because
only simple equipment such as ultrasonic processing, etc. are used for sample disintegration. Most of the
situations give claystone and shale lithologies as the sample material for the micropaleontological
analysis. A good conventional binocular microscope (incident light) is sufficient.
The Wellsite Guide Page 70 Biostratigraphy

Palynology requires a special lab technician to handle the hazardous fluids (hydrofluoric acid) for sample
processing. A special mobile lab unit or a specially designated working area with exhaust fan is necessary
to accommodate for the needs of palynological sample processing. For the identification of the
palynological taxa a microscope with up to 1200x magnification is necessary.
The Wellsite Guide Page 71 Geochemistry

6.6. Wellsite Geochemistry

Wellsite geochemical methods, in particular wellsite pyrolysis ("rock eval") is available since a few
years. This method is based on the rapid, inert atmosphere pyrolysis of organic matter present in small
(ca. 100 mg) rock samples. Rock-Eval pyrolysis is usually done in the town lab of the analytical
contractor. Wellsite geochemistry is used only on some exploration wells when hot-shot sampling cannot
guarantee the fast answers possibly needed or on scientific stratigraphic test holes.

For planning purposes it should be remembered that the system requires a few days of training for the
geologist or mudlogger designated to operate and maintain the device. Make sure also that there is
enough space in the mudlogging unit to install and operate the system. Mudlogging units are known to
be very cramped with space. Get the specifications from the geochem service company. For onshore
operations it may be considered to install the geochem lab in an additional trailer or shack near the
mudlogging unit. Also for planning purposes, the interfacing to computers and reporting formats should
be considered.

Three basic configurations are available:


! Volatilization of free hydrocarbons and analysis of total hydrocarbons
! Thermal cracking of the organic matter not transformed into petroleum (i.e. kerogen), with
selective detection of hydrocarbon compounds alone or hydrocarbon compounds plus CO2
released.
! Oxidation of the residual organic matter remaining after pyrolysis in order to determine the total
organic carbon content (TOC).

The applications and results of such wellsite geochemistry are as follows:


! Source rock characterization. Analysis of total organic carbon (TOC), petroleum potential,
degree of maturation, type of organic matter, detection and quantification of free hydrocarbons.
! Interpretation of oil and gas shows.
! Detection of contaminant matter in the mud (organic mud additivesx
! Aid in determining the TD of a well (see also page 104), if certain maturation levels have been
reached at a given depth.

6.6.1. Pyrolysis Data

The following information can be derived from pyrolysis:


S0 Gas present in the rock (mg HC/g of rock).
S1 Oil present in the rock (mg HC/g of rock).
S2 Residual Petroleum Potential, that is hydrocarbon compounds resulting from cracking of kerogen
(mg HC/g of rock).
S3 (Not analyzed with current wellsite pyrolysis).
Tmax Oven temperature of at peak (°C), a maturation indicator.
Tmax @ 430...435 °C

Immature zone.
Tmax @ 465 °C Oil window.
Tmax > 465 °C Gas window.
S4 Quantity of CO2 produced by oxidation of the residual organic matter. This measurement is
currently available at the wellsite.
GPI Gas Production Index: GPI = S0 (S0 + S1 + S2)
OPI Oil Production Index: OPI = S1 (S0 + S1 + S2)
TPI Total Production Index: TPI = GPI + OPI
TOC Total Organic Carbon (in % of rock) = sum of residual organic carbon and pyrolyzed organic
carbon (calculated from S0 + S1 +S2)
The Wellsite Guide Page 72 Geochemistry

6.6.2.Total Organic Carbon Content

This provides a first estimate on the quality of a potential source rock lithology, for instance: TOC < 0.5
% = source rock rated "poor"
TOC > 2.0 % = source rock rated "good" to "very good".
However, this measurement is not always sufficient to estimate the petroleum potential of a source rock
(such as evolved or highly detritic source rocks).

6.6.3. Types of Organic Matter

The plot of Tmax versus HI (Hydrocarbon Index) allows a quick estimation of the types of organic matter
and their degree of evolution. This diagram is also called van Krevelen diagram. In such a plot, the
organic matters are situated within "evolution paths" which characterize each type of kerogen.

6.6.4. Amount of Free Hydrocarbon

These quantities are given by the values of S0 and S1, which are expressed in mg HC/g of rock. Quantities
are proportional to the petroleum potential (S2) of the rocks and their degree of evolution. In the "oil
window" the S1 may be correlated with the solvent extract of the rock.

6.6.5. Migration

The production indices GPI, OPI and TPI corrdspond to the ratio nf organic matter tr`nsformed into oil
and gas during burial. The indices can thus be used to check whether the free hydrocarbons were
effectively produced by the organic matter in the rock where they were found. During maturation, these
ratios increase steadily as a function of depth because S0 and S1 are formed to the detriment of S2. If
migration phenomena have affected these free hydrocarbons, an accumulation will be revealed by values
of the oil and/or gas production indices which will be higher than they should be at the stage of
maturation being considered.
The Wellsite Guide Page 73 Drilling

7. Aspects of Drilling Practice and Technology


The wellsite geologist needs to become familiar with the basic equipment, techniques and terms
("jargon") used in drilling. Although he has no direct responsibility for the drilling or the rig, the
geologist has to be conversant with the equipment and procedures so that he can advise on certain aspects
and so that he can understand the effects of drilling methods affecting the parameters he uses for his
interpretation. It is also important for the geologist to develop good working relationship with the drilling
personnel to keep a two-way flow of information and gain the greatest benefit for the operation.

7.1. Rig Types

The different rig types can be classified as follows:

Land rigs, onshore rigs:

! Heli rigs are lightweight drilling with components consisting of small compnents that can be
transported as sling load under a helicopter. This rig type is used for remote locations, jungle and
swamp operations. A heli rig does not necessarily require a helicopter. Often heli rigs are used
because they can be broken down into small truck loads of about one ton a piece and transported
along small roads (remember the weak bridges in between !) to a location without having to
construct a heavy-duty road.

! Truck mounted rigs. Self contained units installed on a customized truck. This rig type has
usually only very limited depth capacity (reaching down some 1,000 or 1,500 meters) and is
found rarely in the mainstream of oil field operations. Truck mounted rigs may be very useful,
however, for work-over operations such as changing out downhole pumps or tubing on producing
wells.
Some rigs designed for desert operation are mounted on a wheeled substructure, self propelled
or can be towed with a truck or Caterpillar. Although these rigs reach the depth performance of
"normal" rigs but would by definition fall into this category.

Offshore rigs:

! Fixed platforms: Drilling rigs supported by a permanent steel or concrete structure. This
configuration is used for field development. The rig is then used to drill the development wells
and later, during the production phase, for work-over operations.

! Drilling barges: Used for shallow water and swamp operations. The drilling barge is towed to
location and ballasted to rest on the bottom. Depending on the location, an access channel may
have to be dredged. Drilling barges are relatively small and require therefore additional barges
to carry casing, bulk chemicals and cement and services such as the cementing (pump-) unit, the
testing surface equipment, etc. During rig move and while towed, the derrick of a drilling barge
is laid down to increase the stability of the vessel.
The Wellsite Guide Page 74 Drilling

! Jack-up rigs are barges with tubular or lattice legs. The rig is towed onto location and with its
legs raised. These are then lowered to the sea bottom and the barge lifted well above sea level.
The gap between the hull of the barge and the sea level is called air gap. Jack-up rigs are
relatively stable installation capable to cope with maximum water depths of 50 or 60 meters,
depending on design. To move off location the legs must be retracted again. As the legs may
have penetrated several meters of muddy sea bottom, it may be hard to retract. Therefore, the
mud pumps of the rig can be connected to the end of the legs to jet them free with sea water
pumped at a very high rate.

! Semi-submersible rigs are floating rigs supported on


pontoons. A common design consists of four, five or
six legs. On location, up to eight anchors maintain the
rig on station, and ballast lowers the rig in the water to
its drilling draught. Semi-submersible rigs are the
elephants of the offshore rigs, capable to continue
operation in bad weather. Semi-submersible rigs move
with the tide, the drill rate, ROP, must be corrected for
the influence of the tidal heave.

Figure 25:
25 A semisub drilling rig (twin hull
type).

Figure 26:
26 View of a drill ship.

! Drill ships are ships specially built or modified to drill in deeper water or in operations not that
suitable for semi-submersible rigs. Drill ships are either anchor moored or fitted with dynamic
positioning equipment that uses a system of thrusters to keep the ship on location. This feature
allows a drill ship to operate in waters depths beyond the reach of anchors. Drill ships are less
stable than semi-submersible rigs but are self propelled and capable of carrying sufficient
supplies of casing, mud chemicals, etc. for at least one deep well. This aspect makes them
(almost) independent of tug boats and supply vessels.

7.2. Rig Components

The following components are identical in function and different only in size and capacity. They are
found on any operational drilling rig.
The Wellsite Guide Page 75 Drilling

7.2.1. Derrick and Lifting Equipment

drilling item, and the


The basic most obvious, is the
derrick or mast. The derrick is used as a
crane, and as such is equipped with lifting
gear capable of holding the entire weight
of the drillstring. It is the lifting capacity
of the derrick and the hoist, which in
practice determine the depth rating of a
particular rig.

The lifting gear consists of a hoist known


as the draw-works, where a series of
pulley wheels (sheaves) mounted in the
crown of the derrick, and a moving block
of sheaves (the travelling block) attached
to the hook. The drilling line is a heavy
duty cable that joins all of these together,
running from the drum of the draw-works,
up to the crown sheaves and then over
several loops back and forth between the
crown and the travelling block and ending
in the dead end anchor, the point where the
other end of the rope is clamped to the rig
and not moving. This is the sensor point
for the weight on bit equipment (see page
27, hook load).

7.2.1.1. The Brakes - and How to Drill

The brake is the main lever at the driller's


console. The man on the brake is by
definition the driller. The draw-works is Figure 27:The
27 draw-work the other main parts of the hoisting
equipped with at least two powerful equipment.
braking systems:

! A switch operated electric or hydraulic brake that is capable of controlling the enormous loads
imposed by the drill string or casing string, when running casing. This brake cannot stop the
movement of the drill line entirely.

! A lever operated, mechanical friction brake that is capable of bringing the load to a stop but
cannot repeatedly control heavy loads on its own.

Both brakes are thus used in tandem. Actual drilling is accomplished by gently releasing the mechanical
brake a little at a time, allowing the drill line to unwind slowly, and so lowering the drill pipe through
the rotary table in a way that a more or less constant hook load (and with it a constant weight on the bit)
is achieved.

Geological Note: While drilling, the noise of the releasing mechanical brake is heard all over the
rig. An experienced rig hand listening to the brake can almost feel the drilling
progress made. The changing tune of the break is very often the first indication
of a drilling break, much before the increased rate of penetration is evident on
The Wellsite Guide Page 76 Drilling

strip charts or any other recording device. So, if you are waiting for a coring
point, this is your signal. Call the driller and ask what is going on.

Some rigs use a device called automatic driller. This is a mechanic device that releases the brake
automatically and maintains a constant weight on bit. Experienced drillers claim, however, that a good
man on the brake is superior and drilling more efficient than with the help of the automatic gadget.

7.2.1.2. Rotary Table Drive, Top Drive

The drive mechanism turning the pipe and with it the drill pipe can be one of the two: rotary table drive
or top drive. The top drive is a relatively new concept and installed usually only on high-tech offshore
rigs although top drive mechanisms are available also for smaller land rigs. The main advantage of a top
drive are a reduction in rig time when making connections and when tripping. A further advantage is the
ability to keep on pumping mud while pulling the pipe upwards, a practice also known as back-reaming.

The rotary table drives the drill pipe around transmitting torque to the drill bit. The rotary table is
mounted on the rig floor, and is powered by either a mechanical take-off from the draw-works, or by its
own electrical motor and gearbox. The rotary table is the measuring point for the RPM sensor and the
torque sensor (page 29). Both parameters are usually recorded in the mudlogging unit.

The kelly is the topmost part of the drill string. Typically the kelly is 45 feet long, hexagonal or square.
The interior of the kelly is hollow for the passage of the drilling mud. Around the kelly is the kelly
bushing, or drive bushing, which is equipped with four (or six) rollers that engage the flats on the face
of the kelly. Four pegs in the base of the bushing engage in the rotary table. Thus, the rotary turns the
bushing, which forces the kelly to rotate, while the rollers allow the kelly to slide through the bushings
as the hole gets deeper.

7.2.1.3. Motion Compensator

it is necessary to allow for the heave of the vessel which is caused by wave
On floating rigs action or tidal motion. The motion compensator is fitted to the travelling block.
The hook is the supported through two very large hydraulic cylinders that are driven by a system sensing
the motion relative to the seabed (a delicate arrangements of wires). The action of the hydraulic cylinders
should (so the theory) keep the distance between the kelly and the seabed constant.

Geological note: During wireline logging operations the motion compensation system is
sometimes switched off without notifying the geologist. The effect on the depth
control of the wireline logs is evident. Check the status of the motion
compensator when logging !

7.2.1.4. Swivel and Kelly Hose

At its top, the kelly is connected with the swivel, which allows the kelly and the drill pipe to rotate below
the (stationary) hook of the travelling block, from which the whole drill string is suspended. A flexible
hose, the kelly hose, connects the mud pumping system to the kelly and the drill string. The part of pipe
leading up the derrick and connecting to the kelly hose is called stand pipe.
The Wellsite Guide Page 77 Drilling

7.2.2. Drill String

The drill string is the entire arrangement of drill pipe, heavy weight drill pipe, stabilizers, downhole
motors or sensors such as MWD tools, subs and cross-overs down to the drill bit.

7.2.2.1. Drill Pipe

Drill pipe is gauged by the nominal outside diameter, the most


common in use being 5". When drilling 6" 5.5" hole or smaller 3.5"
drill pipe is used.

Drill pipe comes in lengths of about 31 feet. The exact length of


every drill pipe is measured before this particular pipe is used in the
string. The total of drill pipe lengths, the pipe tally is the first and
most correct means of depth control. Three drill pipes together, as
they are pulled for trips and put aside in the derrick are called a
Figure 28: Slips. Used to hold drill pipe
stand. The drill pipe has upsets at each end to give additional strength in the rotary table.
at the joint ends and to allow the pipe to be lifted when tripping.

As this often still a hand-written and hand-calculated pipe tally system is prone for errors (usually wrong
calculations when totalling), the drill pipe is measured again when tripping out of the hole before logging
or running casing. The procedure is called strapping pipe or SLMO (steel line measurement when
tripping out)

comes also in different grades, the grading indicated by color bands at the end of every
Drill pipe joint (visible of course only when the pipe is new or has just been inspected). The
grading summarizes the quality of the pipes, it says
if a pipe is junk iron or whether it can be used
within its design limits or within lower limits. The
pipe inspection is done every few weeks or months
and always when a new set of drill pipe is to be
used. The inspection considers if a pipe is straight
(or bent), if the threads (pin and box end
connectors) are intact or worn, if the drill pipe or its
upsets have still a sufficient diameter (drill pipe
becomes thinner owing to wear and tear) and all
other aspects, that may bear on the quality of the
drill pipe.

For a geologist it may be of interest to know that the


steel of a drill pipe becomes brittle when exposed to
Figure 29: Tools used to make connections. After the tool CO2 or H2S environment. Drill pipe that has been
joint has been "broken" with the tongs, the pipe may be
unscrewed by further by turning the rotary or by using a
used in such an environment must be re-inspected.
spinning wrench. Drilling in an H2S environment requires drill pipe
and casing made of special grade steel.
The Wellsite Guide Page 78 Drilling

7.2.2.2. Heavy Weight Drill Pipe

Heavy weight drill pipe (HWDP) is similar to standard drill pipe but
has a smaller inside diameter (ID) so that it is heavier and stiffer. It
is becoming common practice to place several lengths of heavy
weights between the BHA and normal drill pipe to give a better
transition between the rigidity of the BHA and the relative flexibility
of the normal drill pipe.

Geological note: Heavy weight drill pipe has the same OD


but a smaller ID than normal drill pipe. The
velocity of mud inside the HWDP is
therefore higher than in normal drill pipe. It
should therefore be considered when
making lag time calculations, that is when
calculating the down-time and round time.

7.2.2.3. Bottom Hole Assembly (BHA)

The BHA is made up of collars (very thick drill pipe), subs, stabilizer
and other specialized tools. The purpose of the BHA is as follows :
! To provide weight on bit for the drilling. Note that the actual
weight on bit is provided by the drill collars, the drill string
itself hangs on the kelly.
! To maintain tension of the drill string.
! To provide rigidity (or not) to provide that the new hole
drilled is aligned with the old hole (or not).

If you need detailed information about the BHA being run at the
moment, see the driller. He keeps a record, the BHA-sheet, a listing
of all parts of the bottom hole assembly and their measures.

7.2.2.3.1. Collars

Drill collars have a larger outside diameter (OD) and a smaller inside Figure 30: The drill stem and its
diameter (ID) than drill pipe. There are two basic designs of drill components. Note that cross overs and
other parts are not shown.
collars, the ones which are slick outsidd and the ones which have
spiral frooves ottside. Monel collars are made of non-magnetic
metals that allow the use of deviation and orientation measuring instruments (see page 97, deviation
surveys) inside the collar.

7.2.2.3.2. Subs

Subs are short lengths of pipe or collars for specific jobs:

! Cross over subs are used to combine thread sizes at each end to join different sections of pipe
or collars or different threads or, just to invert the pin-down to box-down. The simple
explanation for the newcomer: The bit is box-up and the drill pipe is run pin-down, therefore
there must be a cross over sub somewhere in the drill string (it is usually next to the bit).

! Junk subs are run near the bit with the aim to collect heavy particles such as metal junk which
is lifted by the mud but not carried to the surface. A junk sub works in principle like a basket
The Wellsite Guide Page 79 Drilling

with the open end pointing upwards. The actual use of it is, however, even questioned by drilling
experts.

! Stabilizers are short subs with fins that are exactly of the hole diameter. The purpose of the
stabilizers is to centralize the collars and to keep the hole straight. The faces of the stabilizer fins
are coated with hard material such as tungsten carbide to reduce wear and tear. It is not the
purpose of the stabilizer to increase the hole size after the bit or exert any kind of abrasive action
- reamers are run in the BHA if this becomes necessary.

! Bumper subs are telescopic shock absorbers, typically with a stroke of 5 feet and are used either
singly or in multiples. Bumpers are used to control vibration and also to compensate for heave
motion. The inclusion of a bumper in the drill string must be noted by the geologist. The closing
and opening of the bumper sub will cause problems with depth monitoring and can possibly be
misinterpreted as a drilling break. (When in doubt - ask the driller on the floor !)

! Jars are made to provide a heavy upward pulling shock to the drill pipe and the BHA should it
get stuck in the hole. You can hear a beating jar all over the rig - it sound like two stands of drill
pipe crashing together. If you hear that noise during a trip, you should be available in the
mudlogging unit to monitor the trip, note the amount of overpull and possibly figure out where
in the open hole section the formation is causing problems.

! Fishing tools are tools run on the drill string in order to remove unwanted material, metal, a lost
part of the drill string, from the hole. The most common types are the overshot to grasp outside
the lost pipe in the hole and the spear to engage inside the lost pipe. There are nearly as many
types of fishing tools as there are types of pipe, BHAs, cables, logging tools, bit cones, etc. that
can be lost in a hole. If the drillers don't know how the end of the thing lost in the hole looks
like, they will run a lead impression block (LIB) to get a imprint of the obstacle and to select the
proper fishing tool.

7.2.2.3.3. Downhole Motors

motors are increasingly utilized and included in the BHA. These machines are located
Downhole immediately above the bit and use the power of the flowing mud (pumped down the
drill string) to turn the bit independently of the drill string. If a downhole motor is run then the RPM of
the bit is that of the rotary table plus the RPM of the downhole motor. Unfortunately there is no direct
method to measure the actual RPM of the motor, it has to be calculated from the pump rate of the mud
(a parameter which is monitored in the mudlogging unit).

Positive displacement motors (e.g."Dynadrills") consist of a spiral cavity with an elliptical cross section
(the stator) which houses a sinusoidal rotor driving the bit.

Turbines utilize a series of turbine blades to transfer the movement of the mud inside the drill pipe into
rotational drive for the bit.

Turbines are commonly used with diamond bits. The high revolutions of the turbine complement the very
long life potential of the diamond bit. This enables long sections of harder formation to be drilled without
the need for time consuming (i.e. expensive) trips that would be necessary to keep changing less durable
conventional bits.
The Wellsite Guide Page 80 Drilling

7.2.3. Drill Bits

The bit is one of the most critical items in rotary drilling operation. Bits are available in many styles and
are more highly specialized and engineered than any other rig tool. It is that the performance of the bit,
its ability to drill fast, is the most prominent parameter determining cost. Because of the high cost of rig
time plus support services (boats, helicopters, all the contractors on day rate) the apparently high cost
of a drilling bit is balanced by its performance. Fast drilling is cheap drilling.

7.2.3.1. Tricone Bits

Tricone bits are the most common type


of bit in use today. Nearly all tricone
bits are fitted with jets. Tricone bits
come in different designs to drill soft
medium and hard formations.

To make difficult things simple: The


longer the teeth of the bit - the softer
the formation need to be - and vice
versa. The teeth can be made of the
same material as the cones (milled
teeth) or made of hard (e.g. tungsten
carbide) inserts, hence insert bits.

Tricone rock bits come with a variety


of bearings on the cones. The most
Figure 31: Two types of tricone bits. The bit on the left is a bit for soft to
simple type is fitted with friction medium hard formations. The bit on the right a high performance insert bit
bearings. More sophisticated designs for hard to very hard formations.
have sealed bearings or journal
bearings. The main difference - apart
from the cost - is the endurance of the bits. Journal bearing bits can stay longer on bottom, rotate longer
until they need to be replaced by a new bit. There is not much difference for the geologist in the
mudlogging unit, except that the number of bit trips is reduced.

! Watch the torque while drilling. Short spikes or a sharp increase in torque may indicate that one
or all of the bearings of the bit are worn out and lock up. Tell the company man.

! For the geologist it is important to know that the shape and size of the cuttings depends on the
type of bit in use. The longer the teeth of the bit, the bigger the cuttings. Bits for very hard
formations generate very fine cuttings, almost powder. In some rare cases it is then almost
impossible to describe the lithology correctly.

7.2.3.3. PDC Bits

PDC bits (PDC stands for something like polycrystalline diamond


cutters) don’t have any moving parts. The cutting faces are made
from a very hard synthetical material. This material is very resitive
to abrasive formations but sensitive to shock because it is brittle.
Such bits can stay on bottom for a long time and drill long distances.
However, on the negative side, PDC bits are extremely sensitive to
pyrite in the formation and metal junk such as debris that may come
Figure 32: Cutting action of PDC bits.
The Wellsite Guide Page 81 Drilling

from a cast iron casing shoe. Also their penetration rate in shale lithlogies is relatively poor and their cost
mcuh higher than the cost of ordinary tricone bits.

As a consequence, PDC bits are usually employed in a development situation where the lithogy is known
and the efficiency of such bits has been established. PDC bits can last for several wells but can also be
totally destroyed within a foot of drilled rock if junk is present in the hole.

For the geologist:

! If a PDC bit is to be run, tell the company man immediately if you see any metal debris or pyrite
in the samples.

! Note that the shape of cuttings from a PDC bit is different from conventionally drilled cuttings.
PDC cuttings are usually smaller and shale lithologies can be “scooped” together (see Figure
31) due to the different bit action. Limestone cuttings appear more chalky and can be powdered
to dust.
However, in most cases, PDC cuttings appear somewhat cleaner and there is no substantial
problem to identify and describe the nature of the rock.

7.2.3.3. Classification and Grading of Bits

The IADC (International Association of Drilling Contractors) has a standard classification system,
whereby each bit type, regardless of manufacturer is given a three digit code. Tables are available to
show and compare the various types of bits from the main manufacturers.

There is also a standard classification for describing the amount of wear and tear a bit has suffered during
use. The degree and type of wear can be expressed in three ways: Teeth, bearings and gauge (TBG).
Every of the three items is graded on a 1 to 8 scale, eight being the worst. B=8, for example, would mean
that all teeth are broken or worn. The geologist does not need to be conversant with the grading and all
its sub-systems. However, as the grading of a worn bit is an entry on the graphical log produced, he
should know what it means and what the rocks of the last section drilled have done to the bit.

7.2.4. Mud and the Mud Circulation System

The mud is of great importance to the drilling operation. Whilst drilling, the mud is constantly circulated
from the storage pits, down through the drill string through the bit, returning up the annulus and back
over the shale shakers before returning to the pits. This is termed normal circulation. Reverse circulation
is applied only under special circumstances, e.g. when reversing out fluids in the drill string after a test.

of the mud and its related functions are:


The properties
! Mud density: Controlling subsurface pressures
and also
help to support the weight of drill pipe or casing.
! Viscosity: Removal of cuttings from the hole
! Gel strength: Keeping cuttings in suspension when the circulation is stopped
! Oil, additives Cooling and lubrication of the bit and the drill string
! Filtrate, Water Loss:
Lining the hole with an impermeable filter cake, the mud cake

The mud engineer, in a way the chemist on location, conducts a comprehensive series of tests at least
once a day to determine the mud properties. This mud check is part of the daily drilling report, but more
The Wellsite Guide Page 82 Drilling

important, the geologist and the mudloggers must attempt to get a copy of the report (try the company
man). More about mud, it's properties, etc. on page 92.

7.2.4.3. The Mud Pumps

A drilling rig has usually two mud pump to circulate the mud. Some big rigs have three pumps. It
depends on the pump output volume required if all pumps run simultaneously or if one pump is sufficient
to support the drilling. Big diameter hole usually requires both pumps operating. Mud pumps are either
duplex double-acting or triplex single-action pumps.

are not only used to pump mud, but can also be used to pump cement slurry
Mud pumps (replacing the cement unit when big volumes have to be delivered) or any other fluid.
On jack-up rigs, the mud pumps can be connected to the ends of the legs in order to jet them free if they
penetrated deeply into the sea bottom, to jet the legs free, as the jargon says.

pumps are found now almost universally on new rigs because of their better performance.
Triplex The triplex pump has three pump cylinders operating on one crank shaft with 120 degrees
phase difference. Every cylinder pumps with the forward moving action of the piston and recharges with
the retracting action of the piston. It is obvious that this arrangement is superior to two-cylinder arrays
which are 180 degrees out of phase and therefore create a much stronger pulsation of the mud pressure
in the standpipe. In order to smooth the residual pulsation of the pump pressure, all pumps are equipped
with pulsation dampeners

The cylinder liner and the piston of the mud pumps can be changed to provide different balances between
volume and pressure. It is not uncommon to operate the pumps with 7" liners during the upper portion
of a hole, where large mud volumes are required and then change to 6"liners for the deeper portion of
the hole, where volume is less important than pressure.

Note, that the actual volume output of the mudpumps is not exactly the volume of liner length times
piston area. The actual pump output is less, depending on the pump efficiency. The effieciency of
normally operated pumps is somewhere between 85 to 95 percent. Use the efficiency discounted value
of pump output when calculating lag time, etc. (page 36).

Geological comments:
! The liner size affects the output of the pump and finally the lag time. Operating two pumps with
different size liners leads to problems monitoring the lag. The driller should keep both pumps
identical.

7.2.4.4. Flow Line and Solids Removal

The mud flow returns to the surface up the annulus. On an offshore rig, the mud continues from the
seabed to surface through the riser. Immediately below the rig floor, the mud is diverted down a large
diameter pipe, the flow line, into the possum belly, the small tank that feeds into the shale shakers.

The shale shakers consist of an inclined frame on springs with a fine mesh screen stretched over it. Note
that the screen sizes can change depending on the driller's requirements.

! The size of the cuttings fraction is therefore also dependent on the shaker screens.

An electric motor with an eccentric can causes the frame to vibrate. Double-deck shakers have tandem
screens mounted one above the other, the top one being coarser. The mud pour onto the top of the screens
and drops straight through, leaving cuttings and cavings to shake down the screen and to fall off into a
discharge trough.
The Wellsite Guide Page 83 Drilling

! Some companies place a magnet in the flow line or somewhere in the mud stream, before it
reaches the shale shakers. This magnet attracts metal coming up with the drill cuttings such as
detrital matter of the bit, the stabilizers, the casing or anywhere else downhole where metal is
eroded, worn. The mudloggers should check the magnet on a daily basis.

From the tank near the shale shakers, the sand trap22, the mud is then pumped through the desander and
desilter. These devices are arrays of funnels separating the (heavier) fines from the (lighter) mud by
centrifugal force.

! The geologist and the mudloggers when taking a sample should always check the amount and
material discharged by the desanders and desilters. The desander and desilter output should be
combined with the sample taken at the shale shakers..

! Beware of mistaking barite for fine sand (see also page 53) !

Solids removal includes also the removal from solids in the borehole. If the hole cleaning is not
sufficient, not all cuttings are brought to surface, two effects occur:

! The actual mud weight increases. The hydrostatic head of the mud in the hole increases due to
the admixture of cuttings. In cases where the fracture gradient is near the hydrostatic pressure,
fracturing of the formation and mud losses may occur, although the nominal mud weight going
into the hole appear to be light enough not to fracture the formation.

! If cuttings accumulate, they may fall sink down to the bit or the stabilizers when the pumps are
stopped, for example, when making a connection. In bad cases, the drillstring may become stuck
when pulling up by a stand, when the connection is made.

7.2.4.5. Trip Tank

Nearly all rigs have an extra mud tank, usually sited away from the rest of the mud circulation system,
called the trip tank. Its purpose is to aid the monitoring of the mud level in the hole during a trip. The trip
tank is usually tall and slender, so that any volume change causes a relatively large fluctuation in level
and is more easily and accurately monitored. The read-out on the rig floor is direct, not depending on any
electronic or mechanic device. Often a string with a mark near the driller's console connects directly to
the float in the trip tank.

Just prior to a trip, the trip tank is filled. When the main mud pumps are stopped, a small centrifugal
pump is switched on. This circulates the mud from the trip tank into the hole, which then overflows into
the flow line and is diverted back into the trip tank. Once the small pump is running, the hole remains
always full and the hydrostatic head constant. As each stand of drill pipe is pulled out of the hole, the
mud level drops by an amount equivalent to the displacement of the pipe removed. The trip tank
immediately replenishes this, so that the mud level in the trip tank should fall by a certain amount. This
change is monitored at regular intervals (e.g. every ten stands pulled). Any deviation from the calculated
volume ("hole take") should alarm the driller. The volume of the trip tank is usually monitored
independently by the driller and the mudlogging unit.

! The majority of kicks and blow-outs occurs whilst tripping. Correct monitoring of the hole fill
on trips is essential. During trips, the most critical phase is near midnight and lunchtime when
the crew on tour is waiting for the next crew to continue and when their concentration is reduced
after long hours of work.

22
The sand trap is a small settling tank for the coarser particles in the mud. It is emptied regularly. When the sand trap is
emptied (dumped), the total mud volume decreases. This decrease should trigger the alarms in the mudlogging unit. (See also
page 40.)
The Wellsite Guide Page 84 Drilling

If the rig is not equipped with a trip tank, then the hole is filled up with the mud pumps. The number of
strokes necessary to fill the hole is converted to volume and compared with the expected volume of hole
take.

7.2.4.6. Mud Hydraulics

This chapter is supposed to introduce only to hydraulics of the mud flow and the implications for the
implications on the geological side of the drilling operation. The novice wellsite geologist may be
interested to know that this optimization process is one of the most important tasks of the drilling
engineer when planning the drilling of a well.

In order to optimize drilling performance (fast, cheap, safe), the mud flow is optimized in order to have:

! maximum flow velocity at the bit's jets in order to maximize rate of penetration.
! minimum pressure losses in the drill pipe and the annulus.
! optimum cuttings lifting performance (hole cleaning).
! minimum turbulent flow in the open hole section (in order to avoid hole wash out and caving).

The limiting side conditions in this exercise are :

! the pumps available (or more precise their power and their output rate).
! the hole geometry.
! the drillstring in the hole.
! any obstacles restricting the flow inside the drill string (e.g. a downhole motor) or in the annulus.
! Mud properties (see page 94).

Some points are points of relevance for the geologist or of general interest are mentioned here:

! The most important factors controlling cuttings transport are the annular velocity (i.e. the
velocity of the mud in the annulus) and the rheologic properties of the mud. Usually annular
velocities of 50 feet per meter
provide satisfactory cuttings transport in typical drilling muds. Cuttings transport efficiency
increases with increasing viscosity of the mud.
! Cuttings size and fluid density (mud weight) have only moderate influence on the increase of the
transport efficiency. (I.e. the effect of settling after STOKE'S Law is relatively small compared
to the effect of viscosity, page 95.)
! Hole size, drill pipe rotation and drilling rate have only a slight effect on cuttings transport if the
annular velocity is constant. It makes also a difference when a big hole is drilled with limited
pump output and a big rock volume transformed to cuttings, however, this is a matter of plain
volume calculations, not of the rheology and hydraulic in the sense of this chapter.

A build-up of cuttings in the annulus (due to low pump output, for example) is detrimental for the drilling
performance:

! The mud weight increases uncontrolled and may - in the worst case - induce fracturing and losses
to the formation.
! In extreme cases, cuttings adhere to the drill string thereby restricting the annulus and create a
pressure loss.

Note that most of these formulae are made up in oilfield units. As unpractical as it
Terminology may seem for an engineer, grown up in other fields of technology, these units are
being used and most of the drilling specific software and much of the instruments on the drilling rig use
The Wellsite Guide Page 85 Drilling

these “funny” units. Some of the buzz words commonly used when describing mud hydraulics (and bit
hydraulics) are explained herebelow:

Annular Velocity is the average speed at which drilling fluid is moving back up the annular space as the
well is drilling or circulated. Although the mud pump output is constant, annular velocities vary at
different points in the wellbore due to change in pipe, collar and hole sizes.

Whereby AV: the annular velocity in ft/min


GPM: the actual pump output in gallons per minute
Dh: the hole or casing diameter in inches
od: the pipe outside diameter in inches

Jet Nozzle Area. A conventional rotary drilling bit has two to four (usually three) jet nozzles installed
to impart a jetting action on the mud to clean the bottom of the hole. In some occasions (big hole) no
nozzles at all are installed. In fact, this jet action does most of the drilling work by breaking up small
fractures and lossening the cuttings from the solid rock ahead of the bit. The nozzle size is variable and
measured in 32nds of an inch. Thus, a bit with “three 13's” has three nozzles with 13/32 inch diameter.

Whereby An: the area of all three nozzles in square inches


J1, J2, J3 the area of the individual nozzles (measured in 32nds of an inch)

Jet Nozzle Velocity is the velocity of the mud exiting the jet nozzles of the bit and is calculated as

Whereby JNV the jet nozzle velocity in feet per second


An: the area of all three nozzles in square inches
GPM: the actual pump output in gallons per minute

Total Hydraulic Horsepower The total hydraulic horsepower available for drilling hydraulics is defined
by the circulation rate and the pressure of the mud pump(s).

Whereby THhp: the total hydraulic horsepower (in horsepower !)


Pp: the pump pressure in psi
GPM: the actual pump output in gallons per minute

Hydraulic Horsepower at the Bit Similar to the total hydraulic horsepower above, the hyraulic
horsepower at the bit is calculated. Instead of the pump pressure, like for the whole system, the jet nozzle
pressure loss is plugged into this equation.
The Wellsite Guide Page 86 Drilling

Whereby BHhp: the hydraulic horsepower at the bit (in horsepower !)


JNPL: the jet nozzle pressure loss in psi
GPM: the actual pump output in gallons per minute

Jet Nozzle Pressure Loss. Pump pressure is the the total pressure expended throughout the circulatin
system’s surface equipment., but only the pressure expended through the jet nozzles accomplishes useful
work for drilling. The remaining pressure losses are referred to as parasitic pressure losses. The useful
jet nozzle pressure loss is calculated as follows

Whereby JNPL: the jet nozzle pressure loss in psi


MW: the mud weight in pounds per gallon
GPM: the actual pump output in gallons per minute
An: the area of all three nozzles in square inches

Jet Impact Force. The jet impact force is the force that the mudstream jetting out of the bit nozzles
exerts on the formation and makes the whole thing drill good, provided the jet impact force is optimal.
the formula is

Whereby JIV: the jet impact force in pounds


MW: the mud weight in pounds per gallon
GPM: the actual pump output in gallons per minute
JNV: the jet nozzle velocity in feet per second

Please note, that therse formulae are not the working kit of the geologist. They are copied here to give
the wellsite geologist some understanding of the optimization processes that are going on at the wellsite
and to give the geologist some basis of understanding the driller’s tasks and the solutions he might
choose.
The Wellsite Guide Page 87 Drilling

7.2.5. Kick and Blow Out Control Equipment

A kick - by definition - is the uncontrolled influx of formation fluids into the borehole. The fluids may
be gas, oil or water or any mixture of them.

There is never a lack of indications that a kick may


occur. Since in the majority of cases the bore hole and
the active mud pit are a closed circulating system, the
addition of any fluid from the formation will be
experienced as a change in flow rate out of the bore
hole and an increase in total mud volume.

A kick is controlled by shutting either the pipe rams or


the annular preventer in the BOP stack. Only as a last
resort will the shear rams be operated. (The shear rams Figure 33: 33 Ram type blow out preventer..
would cut off the drilling pipe and make it difficult, if
not impossible to circulate properly.) With the BOP closed, heavier mud23 is circulated down the drill
pipe while the returning mud is passed through the choke line of the manifold. The valves of the choke
manifold are used and set to control the pressure of the closed-in bore hole in the required way.

There are at least two different methods to kill a kick, referred to as the weight and wait method and the
other, the engineer's method. In any case, the driller on duty has a worksheet ready that contains all
relevant parameters (present mud weight, depth, etc.) and that allows to conduct the kill calculations as
fast and as simple as possible. Like many other problems in the oil fields, one of the major sources of
confusion or error when calculating parameters for a kick kill, is the variety of units, metric versus
imperial, etc.

The most common causes for a kick are:

! A failure to keep the hole full, i.e. filling up the hole on trips with the trip tanks and closely
monitoring the "hole take (see page 83, trip tank system).

! Swabbing. When tripping out, the drill pipe acts as a piston reducing the hydrostatic pressure on
the formation.

! Insufficient mud density, mud weight too low.

! Lost circulation. If the mud level in the annulus drops due to lost circulation, the hydrostatic
pressure will drop accordingly and may allow formation fluids to enter into the well bore.

Kicks are - of course - strongly related to formation pressures and pressure engineering. See page 63 for
more.

6.2.5.1. Kick During Connection

When drilling close to hydrostatic balance, a flow into the wellbore can occur when the pumps are shut
down for a connection. This results from a pressure reduction caused by the removal of the annular
pressure loss. When the kelly is lifted, swab pressures can further reduce the bottom hole pressure.

during connection is signalled by the following indications:


A kick

23
One of the mud pits must always contain a special, heavy kill mud.
The Wellsite Guide Page 88 Drilling

! The well is still flowing when the pumps are shut off. Monitor the flow-out sensor closely. Flow
out at the mud flow line should cease in a few seconds after the pumps ware switched off. When
monitoring the flow out at the pit tanks, the afterflow is somewhat longer, depending on the type
of mud cleaning equipment and the volumes contained in them.

! An increase in pit volume may be noticed only after the connection. When the levels have
stabilized after the pumps are restarted. An increase in pit level indicates that flow into the
wellbore has occurred.

! Loss of pump pressure when resuming drilling. If lighter fluids (oil, gas) have entered the
wellbore, less pump pressure is required to lift the mud in the annulus to surface (i.e. a reduction
of the hydrostatic pressure in the annulus has occurred).

7.2.5.2. Kick while Tripping

The majority of kicks occurs when tripping out of the hole. The reasons for this are the reduction of
pressure at the bottom caused by swabbing action of the bit (and also by stabilizers which can be packed
with shales and exert an even greater swab effect than the bit. The swab pressure increases with the speed
of the travelling drill string. Usually the trip speed out of the hole is restricted to one or two minutes (or
even much slower, depending on pressures estimated) per stand of drill pipe.

Of course, the well must be kept full with mud and the hole take compared with the calculated hole take.
(See page 83, trip tank.)

7.2.5.3. Kick while Drilling

The first indication that a kick may occur is a drilling break, an increase in ROP. A significant drilling
break is defined by an increase of ROP by the factor of two, i.e. twice the drilling progress per unit time.

! Any significant drilling break must be checked for flow. Call the rig floor and request a flow
check if you have seen a significant drilling break and the driller does not take any action. For
a flow check the pumps are switched off and the well is observed at the rig floor by peeping into
the annulus with a torch and with a second watch at the shakers or possum belly. The time to
observe the well should not be less than five minutes. (See also page 40).

! If there is any indication that the well is not static after the pumps are shut off - call the driller
on the rig floor immediately.

The second indication of a kick is an increase in the flow rate out. Once flow begins, the rate of flow
increases proportional to the depth of penetration into the reservoir. Most mudlogging units have
computerized alarm that go off when the flow rate[out] is bigger than the flow in.

! If you see any increase of flow out without a corresponding change in pump output -call the
driller on the rig floor immediately and alert him about the situation.

The third possible indication of a kick while drilling may be seen in an increase in hook load. If the
invading fluid is lighter than the mud then the buoyancy of the drill string is reduced and an increase of
hook load registered by the sensors.

The fourth possible indication of a kick while drilling may be an increase in the pump rate. The reasons
are similar to the ones explained above. The invading fluid is lighter than the mud and the force required
to lift the mud in the annulus is less. The pumps usually respond to this loss in back-pressure with an
increase in speed seen as increased strokes per minutes (SPM).
The Wellsite Guide Page 89 Drilling

7.2.5.4. Gas Cuttings

Certain relatively harmless conditions may give the false appearance of a severe kick, notably gas
cuttings. Rock chips cut by the bit may contain gas which, although suppressed in down hole conditions,
may escape as the cuttings rise to lower pressure levels. Alternatively, the background level of gas in the
mud may get too high, which will also expand as the mud nears the surface. In the top few hundred feet
of the hole this gas cutting can be severe, foaming the mud and vastly increasing its volume. At the
surface this appears very serious but the well has not taken a kick since the gas not entered the hole from
the wall under uncontrolled conditions. The mud weight does not necessarily require increasing.
However, it will be necessary to remove the accumulated gas from the mud by running the degasser. It
may be necessary to close the BOP for a short time to prevent loss of mud if the foaming is severe enough
to lift the mud over the top of the flow line. The conditions leading to over-accumulation of gas in the
mud must be remedied.

7.3. The Art of Drilling

This chapter is far outside the actual duties and resonsibilities of the wellsite geologist. However, it is
equally important that you understand the priciples of drilling practise and the impact of drilling practise
on the quality of geological data.

For example, drilling is different when using fast turning downhole motors with a PDC bit and different
for coring or conventional tricone-bit drilling. Also, there is a big difference if the driller sets the bit on
bottom with a lot of weight and then starts rotating or if he runs slowly to bottom with a rotating bit and
hits the bottom of the hole while rotating. Different bits, different drill strings and different rocks may
require different approaches.

7.3.1. “Making Hole”

of drilling is to put enough weight on the drill bit (by releasing the brake) and to keep the
The art weight steady. If the weight on bit (WOB) is too high, the bit may be damaged very fast,
if the weight is too low, no drilling progress is made. Of course, there are spec sheets and smart
computer programs that calculate how much weight on a bit would be ideal, nevertheless, it comes down
to the driller to optimize this process.

The choice of parameters, RPM, WOB and pump output is limited by a number of factors and design
criteria: For example, the ROP depends of the bit and hole size and possible resonance in the drill string.
The pump output depends on the horsepower of the pumps, the mudweight, hydraulic conditions and the
WOB depends on bit type and lithology. This interrelationship is by far more complex, but also beyond
the scope of this book.

The weight on bit (WOB) required to drill properly depends on the type of bit and the type of rocks being
drilled. Soft rocks, usually drilled with a long-tooth bit, take relatively little weight. Too much weight
would spud the teeth in the shale and mke it difficult for the bit to turn. The torque would be increase to
levels that are technically not acceptable. In contrast, hard formations, usually drilled with a short-tooth
bit can take more weight. The drilling action in hard rocks is optimized to crush and fracture the rock
ahead of the bit and break the fractures with the acton of the jets.

When drilling with PDC bits, the weight on bit is relatively less compared to tricne bits. PDC bits do not
crush and fracture the rock. PDC bits are designed to srcatch and scoope the formation. Therefore, PDC
bits are run usually with less weight and higher RPM han comparable tricone bits.

Geological note:
The Wellsite Guide Page 90 Drilling

It is far outside the scope of the geologists work to find the right drilling parameters. However,
a good understanding of the drilling paramters give a deep insight and help with the
interpretation of the ROP curve, Dx-exponents, etc. Such formulas work only within the
limitations of the methods whereas there is a number of situations in which the ROP (or Dx)
curve may indicate a change of lithology where in reality an abrupt change of drilling parameters
may have caused a break in the log curve.
For practical purposes, ROP and Dx curves shold only be compared within the same hole size,
for similar bits and comparable mud weights.

7.3.2. Depth Control - How Deep Are We ?

Depth control on a drilling well appears to be trivial. However, it can be a very complex and
controversial subject. In simple terms, depth is measured by summing the length of the drillpipe in the
hole. Every drill pipe is measured and numbered and then added to the list, the pipe tally. The exact depth
is established every time a connection is made. In the drillers’ jargon this sounds like “next kelly-down
is 7436.7 meters”, meaning when the next connection is due, the hole will be at exactly 7436.7 meters,
as an example.

! The drill pipe tally is the first and ultimate depth reference. All other depth measurements relate
to this pipe tally.

The pipe tally is relative to a datum, and there are two depth reference datums are used in drilling
operations:

! The Rotary Kelly Bushing (RKB)


! The Rotary Table (RT)

Go to the rig floor and inspect the difference ! Drilling depth is measured from RKB, that is the top of
the kelly bushing, about 1 foot above the rotary table. When drilling the kelly is marked with chalk in
meter or foot increments to see the progress and calculate the ROP while drilling a single.

When running logs, the kelly and with it the kelly bushing is removed at put aside. The depth reference
for logging is the rotary table (see page 109) which is usually level with the rig floor.

! You have to be aware of the difference in datum and the possible error introduced by the two
reference points.

In case of any doubt as to the correct depth of a well, the drill pipe will be strapped, i.e. every stand of
drill pipe is measured again, totalled and the result is compared with the pipe tally. If operationally
relevant, the geologist can request pipe strapping (SLMO, steel line measuring while tripping out).

pipe can and will stretch under its own weight and depending on the mud weight, which
Drill determines the boyancy of the drill pipe acting against its weight. This stretch is in the range of
three feet (one meter) for a medium deep well. A good drilling engineer will have have tables and charts
to estimate the exact stretch of the pipe. An additional uncertainty is the drill-off practise: While drilling,
the lower part of the drill string is in compression and the weight of the lower part of the string acts as
weight on bit (WOB). If, before tripping out of the hole, the driller keeps on drilling until the weight on
bit approaches zero, an additional one to three feet are drilled without adding drill pipe. This extra hole
is not accounted for. So, when comparing drillers depths, find out from the driller on the floor how this
final depth has been reached. With the full weight on bit or drilling off to near-zero weight on bit. The
described practise is often used prior to running casing (and logging), because it adds some “extra hole“
which does not appear on the daily report but may be of help when running casing to accomodate
possible problems and unconsistencies in the casing tally.
The Wellsite Guide Page 91 Drilling

Common Errors:

! Depth discrepancies in the range of one to two feet are common and not really substantial. Pipe
stretch and inaccurate measurements can be an explanation (see also the previous chapter).

! Wireline logging depth is shallower than the drilled depth derived from the pipe tally. It can be
assumed that cavings have accumulated on the bottom of the well and the loggig tools cannot
reach the bottom of the hole.

Uncommon Errors:

! The number of drill pipe singles is wrong or a stand of pipe that is included in the tally has not
been run into the hole. Therefore, beware of depth errors which are close to 30 feet (one single
pipe) or 100 feet (one stand).

! The rig or platform measurements are wrong. This introduces a datum error which is not obvious
because the tally measurements are consistent and only formation tops and fluid contacts are
shifted.
The Wellsite Guide Page 92 Mud Enginering

7.4. Mud Engineering

Mud engineering is the science (or art ?) and application of controlling drilling fluids in an optimum
manner. The mud engineer on location reports to the company man. The geologist cannot give much
input as to how the mud should be treated. the properties of the mud do, however, strongly affect the
geological work, the wireline logging (page 109), the pressure engineering (page 63), and many other
aspects of the routine drilling and geological operation.

The function of the mud is to remove the drill cuttings from the bottom and transport them to the surface,
to create a hydrostatic head in order to control the pore pressure (see also page 63, pressure engineering)
of the formation, and to cool and lubricate the drilling bit.

These purposes are achieved by systems and mixtures of various chemical compounds in either water
or oil as continuous phase. Other systems like drilling with foam or with air (or gas) are used
occasionally under special circumstances.

7.4.1. Water based Mud Systems

Water based mud is the most common type of mud used for exploration drilling. The water used to mix
the drilling mud can either be fresh water or sea water. Clays, such as bentonite and/or synthetic
polymers are added to water to increase viscosity and density. Additional chemicals are used to control
viscosity, pH, foaming, etc. The most common material to increase the weight of a mud fluid is barite.

7.4.1.1. Lignosulfonate Muds

lignosulfonate muds are commonly employed for drilling in areas where mud making
Freshwater formations are prevalent, i.e. where part of all of the shales in the formation drilled
are dispersed into the mud system. Such systems are sometimes referred to as native muds.
Lignosulfonate muds provide rheological control and afford a degree of inhibition to drill solids.

Lignosulfonate muds can be based on fresh water or sea water. A pH value close to 10.5 is required and
maintained by the addition of caustic soda (NaOH).

Geological comments:

! Shale cuttings are usually under-represented in the total drill cuttings. Their shape is rounded due
to solution processes. Shales may also appear softer in the sample, in particular if they have
travelled up a deep hole.

! Undissolved lignosulfonate may be mistaken for coal or lignite from the formation.

7.4.1.2. Lime and Gypsum Muds

Lime i.e. Ca(OH)2, or gypsum muds are muds treated with calcium and used in areas where shale
hydration and swelling results in significant bore hole instability (i.e. sloughing and heaving). Increased
levels of soluble calcium are maintained in these muds to provide an inhibitive environment to minimize
shale swelling. The solubility of lime or gypsum is controlled by the pH of the system and typical pH
values range pH = 9.5-10.5. Lime and to a lesser degree also gypsum muds are temperature sensitive and
are subject to solidification at 275 °F.

7.4.1.3. Saltwater Muds


The Wellsite Guide Page 93 Mud Enginering

Saltwater muds are used to drill salt (halite, NaCl) containing formations. Some application also for
sensitive shale sections. The most commonly used salt muds contain NaCl or KCl (occasionally also
CaCl2). Viscosifiers can be salt tolerant polymers, gels, or clay (attapulgite or bentonite).

7.4.1.4. KCl Muds

Potassium chloride muds are a special class of salt muds, in that potassium (K+) is utilized as the
principal inhibition ion. Potassium in concentrations from 3% to 15% is used to inhibit the swelling and
dispersion of clays contained in various formations. KCl is primarily used as a shale control agent, but
is also frequently used to prevent formation damage from clay swelling in producing zones (as a
completion fluid). KCl can be combined with a polymer base but also with clay base muds.

Geological comments:

! KCl muds will exhibit a slow increase in chlorides (Cl-) over a few days if the same
concentration of K+ is maintained.

! When calculating Rmf from chlorides, bear in mind that the resistivity of KCl solution has to be
transformed into NaCl equivalent. (See the relevant charts and chart books of the wireline
logging contractor for this.)

! The potassium content in the KCl mud does affect the gamma ray logs, both the conventional
GR and the spectral gamma log. The wireline contractors apply correction algorithms when
processing the logs, but not on the wellsite. For a quick-look interpretation it may be suffcient
to shift the GR log towards the sand base line.

7.4.1.5. Polymer Muds

The basic component of polymer base drilling fluids is a high molecular weight water soluble
viscosifying polymer. Various types of polymers are available. Polymers are required only in low
concentrations as compared to conventional viscosifiers. They are subject to temperature thinning and
tend to be more corrosive than conventional muds. Their temperature limitations are below those of most
clay base systems, however, high temperature polymers are available.

Geological comments:

! Polymer muds encapsulate shales without exposing them much to free water. Shale cuttings are
therefore firm and in original shape as drilled by the bit.

! If the mud system is changed over from conventional mud to polymer the change of cuttings
shape from soft rounded to splintery or platy shale cuttings may be misinterpreted as a formation
change.

7.4.2. Oil based Mud Systems

Oil based mud systems are emulsions of water in oil. The advantages of oil based muds are:

! Better temperature stability in high temperature environments.


! Non-reaction with shales, clays and evaporites24.

24
The choice to drill a salt section is either a NaCl saturated water based mud or oil emulsion mud.
The Wellsite Guide Page 94 Mud Enginering

! Easier maintenance of the mud weight, in particular when weighting material such as barite or
hematite are used.
! Faster drilling (therefore cheaper operating cost) owing to better hole cleaning and better
viscosities.
! Better drill string lubrication.

Disadvantages:

! Relatively high cost per volume unit (this however being offset by recycling of used muds and
faster drilling).
! Pollution problems and toxicity.

An emulsion is typically made up of 75% oil and 25% water. Increasing the amount of water leads to a
less stable, more viscous, but cheaper mud. To this mix is added: emulsifiers, viscosifiers (bentonite),
lime (gives the alkalinity necessary for emulsification), salts and weighting agents (barite, etc.).

Geological comments:

Washing : The oil base mud does not cling to the surface of the cuttings like water based mud, and
so no washing of the cuttings is usually necessary. Should the geologist require cuttings
to be washed, then clean diesel followed by ordinary detergent is be used. Minimize the
use of water in order to prevent the swelling of shales.

Fluorescence : The thin layer of oil mud on the cuttings will slightly decrease the amount of any crude
oil fluorescence seen in the cuttings. The base oil of the mud will either not fluoresce
at all or will fluoresce with a distinctive white or blue-white color, quite unlike any
crude fluorescence which usually shows shades of brown, yellow, gold, etc.

Log evaluation :
The water phase of oil based muds is highly saline and this salinity may increase to
saturation when drilling evaporites. Be aware that conventional methods determining the
Rmf of oil based muds may underestimate the actual salinity of the filtrate.

Kick detection: CO2 , CH4 and other hydrocarbon gases are soluble in oil muds. If gas enters the
wellbore, it can be in solution under the hydrostatic pressure of the mud. As the mud
moves up the the wellbore, it can break out of solution at the bubble point pressure and
rapidly evacuate the hole.

7.4.3. Mud properties

The most important parameters describing the properties of a given mud system are:

! The mud weight, the specific density of the mud expressed in g/cm3 or in pounds per gallon
(ppg) in imperial units25. The mud weight controls the hydrostatic head of the mud column in the
well bore designed to counterbalance the pore pressure of the formation or reservoir. More about
the implications of the mud weight on page 63. The mud weight is measured using a mud
balance.

25
The unit pounds per cubic foot (lb/cuft) is rarely used any more.
The Wellsite Guide Page 95 Mud Enginering

! Viscosity. The viscosity controls the ability of the mud to lift the drill cuttings from the bottom
to the surface. Equally important is its influence on the hydraulic behavior of the fluid, hence
another point to optimize drilling parameters and to drill more efficiently, cheaper.

The easiest - although not very precise - way to measure viscosity is to measure the time it takes
for a given volume of fluid to pass through an flow restriction. On the rig, a plastic funnel
containing one quart of mud is used and the time is measured it takes to empty this funnel.
Viscosity is therefore expressed in seconds.

Viscosity and density are parameters in the REYNOLDS equation which indicates whether turbulent or
laminar flow conditions prevail under given velocity of a flowing medium. Owing to the importance of
the two parameters many rig contractors announce the mud weight and viscosity regularly every half hour
or so over the rig's PA system. This is a very useful practice.

Other mud properties, not less important, are:

! Salinity. Expressed in ppm NaCl or Cl-. Both units are used parallel and are therefore prone to
create confusion. In the realm of drilling people usually chloride (Cl-) is used. Multiply by 1.64
to get the same ppm value for NaCl.
! pH
! Gel strength (PV/YP)
! Solids content. Solids content can be reported as high
Note: When barite or any other
gravity solids (HGS) such as barite or hematite, used weighting material is used in a well,
as weighting material and low gravity solids, such as the GR logs must be corrected for the
quartz. attenuation of gamma radiation by the
! Oil content. material. Charts are available for this.
! Water loss. The property of the mud to separate under
pressure on a filter into filtrate (the liquid) and filter
cake (the solid).

7.4.4. Mud Filtrate Tracers

Whilst drilling through a permeable formation, mud filtrate will invade the region close to the well bore
and mix with natural fluids in the formation. Formation water samples obtained using a wireline tool or
during a drill stem test (DST) are usually contaminated by mud filtrate. It is important to know how much
of the fluid sample is formation water and how much is mud filtrate for the following reasons:

! The true salinity of the formation water must be known to enable accurate measurement of the
hydrocarbon saturation in the reservoir from electric wireline logs.

! If wireline or DST fluid samples recover water from a zone thought to be oil bearing, then either
the zone is water bearing or the mud filtrate has swept oil away from the bore hole. To enable
the cause to be established and a decision on testing to be made, the source of the recovered
water must be known.

! Quantitative evaluation of the presence of formation water recovered on tests enables the
selection of the best water samples for further laboratory analysis. Knowledge both of the tracer
content and mud filtrate characteristics will then allow a quantitative determination of formation
water properties.

! Deeply invaded zones will flow mainly mud filtrate when sampled with an RFT. Note that the
possible presence of oil in the formation may be hidden. The relative abundance of tracer in the
recovered fluid may indicate such a possibility.
The Wellsite Guide Page 96 Mud Enginering

By adding a tracer to all the fluids that are introduced into the drilling mud at a known constant
concentration it is possible to determine the quantity of mud filtrate in a fluid sample by measuring the
tracer concentration.

The tracer can be any substance that does not affect the mud properties, that can be easily analyzed
quantitatively and is easy to handle. The following methods have been used:

! Nitrate (NO4-) in the form of Sodium- or Potassiumnitrate can be used. Analytical detection is
by titration. High concentrations of lignosulfonate can mask the detection. Recommended
concentration of Nitrate is 500 ppm, so few sacks of Nitrate tracer substance are sufficient to
hold a detectable concentration of the drilling period of a deep well. However, Nitrate
decomposes under higher temperatures and the concentration can therefore not kept stable.
Results will still bear some ambiguity.
Note that KNO3 and NaNO3 are oxidizing agents that react as explosive when mixed with a
reducing agent such as many mud additives (CMC, starch for example). Nitrate is also used as
fertilizer.

! Uranyl compounds are colorful greenish-yellow fluorescing substances that can be detected in
very low concentrations (ppm - range) by photometric methods.

! Triated water is chemically identical to untreated water but has one of two Hydrogen atoms
replaced by a Tritium26 atom. It is suitable as a tracer because it does not occur naturally and
allows rapid and accurate measurements even at low concentrations. It is chemically stable under
downhole conditions, not absorbed by mud solids or the formation. Safety standards applicable
to low radioactive materials have to be followed.

! Iodine. (Sodium- or Potassium Iodide). Available in liquid form in drums. Detected with
electrolytic methods ( halide electrode). The test kit is usually furnished by the mud contractor.
Recommended concentration is 127mg/l of Potassium Iodide giving a concentration of 0.058
ppb.
However, some regions have naturally iodine rich formation waters. The origin of such iodine
rich waters is speculated to come from thick marine shale sequences where iodine has been
accumulated in marine phyton. Needless to say, that iodine as mud filtrate tracer is not
applicable in such areas.

26
Tritium is the heavier isotope of Hydrogen. It is radioactive emitting beta-(A)-radiation.
The Wellsite Guide Page 97 Directional Drilling

7.5. Directional Drilling

Directional drilling is the technique to drill holes that are not vertical in a planned and predictable way.

Directional surveys of some sort are made in all wells, even in a vertical well, to see if the hole is really
vertical. The directional surveying is supervised from the company man as representative of the drilling
department. The verification and advice of the geologist to the company man is important, if the well is
drilled directionally towards a certain target in the subsurface. The geologist will also specify the
tolerable deviation from the planned well course.

The well course of almost any well is typically spiral, like a cork screw. The azimuth is changing
clockwise. It depends on the details of drilling practice (BHA, weight on bit, rotary speed, etc.) how
much the well course can be affected by exterior parameters such as changes in the formation drilled (see
also below).

Terminology
A dogleg is usually defined as any deviation greater than 3 degrees per 100 feet, and it occurs when a
sharp change of direction is taken in the wellbore. In a vertical hole, a dogleg is often caused by a change
in the dip of a formation or by a change in the weight applied to the bit (WOB). Severe doglegs can
result in stuck casing or stuck drill pipe, in particular when tripping out of the hole. If casing is run
through the dogleg, excessive wear on the drill pipe or production equipment can occur (watch for metal
chips in the samples, page 53). Dogleg severity is a
measure of the “straightness” of a hole. The smaller the
radius of curvature in a given hole section is the greater the
dogleg severity.

Key seats usually form as a result of dog legs. s key seat is


formed when a channel or groove is cut in the side of the
hole, parallel to the axis of the hole. The drill pipe dragging
action through the sharp bend is in a dogleg creates the
groove in the side of the wellbore. Overpull with the risk of
sticking the pipe will be experienced when tripping out
through a key seat. Overpull will occur when the first, Figure 34. The basic terminology on deviated wells.
topmost stabilizer passes through the key seat.

available for directional surveying:


Techniques
! Single-shot survey. A pendulum type device hits a graded disk or a compass and pendulum
assembly is photographed downhole.

! Multi-shot survey. Essentially the same as a photographic single-shot, but with timed repeat
capability.

! Gyro survey, an electronic recording device with gyrometric orientation. This type of survey
yields the most accurate results.

! MWD survey.

Single-shot and multi-shot surveys are run inside the drill pipe. A spear like device with a thin retrieval
wire is dropped into the drill pipe and sinks to the bottom of the drill string. After a few minutes it
reaches bottom and a time delayed camera or mechanical pendulum is activated. A measurement is taken.
The survey tool can be retrieved. If a compass type device is run, a non-magnetic ("monel") drill collar
is required.
The Wellsite Guide Page 98 Directional Drilling

On a vertical well, directional data are used to see if the well is really vertical. If the well course is
deviated more than some 3 or 4 degrees from the vertical, problems like key seating may cause trouble
when tripping or when running wireline logs.

data are also used to convert logs (mudlog and wireline logs) from measured (MD)
Directional depth to true vertical depth (TVD). When drilling (deviated) development wells, the
directional survey data are of much higher importance. They are used to construct three-dimensional
models of the subsurface for development geology and reservoir engineering. Directional data, the
precise knowledge of the well course is of importance also, if relief wells have to be drilled after a blow-
out has occurred.

There may also be some geologic information in the directional data. If the plot of the well course shows
a distinct change in direction although the drilling parameters were kept constant, the change in direction
is likely to come from the rocks. The bit is usually deviated down dip of inclined geological surfaces such
as fault planes or tops of hard formations. In a similar way, the azimuth of the well course may change
when such a surface is penetrated. In fact, the azimuth plot (map view) of the well course is much more
sensitive to geologic changes than the deviation from the vertical.

Note also, that a sudden departure from a well course may have a geological significance. Given that all
drilling parameters have been kept the same, this departure
may mean that a steeply dipping or foliated unit hat been
encountered. The tendency to depart from a more or less
straight well course increases if the newly encountered unit
is much harder (in drilling terms) than the overlying unit.

The wellsite geologist is not directly involved in the


process or supervision of the directional survey work,
however, should perform a quality control on the
directional data in the sense of a plausibility check:

! When drilling development wells, the gas/oil or


oil/water contacts are known and can be used as
reference and subsurface depth datum.
Figure 35: True vertical thickness and true
! Compare the directional results with the stratigraphic thickness in relation with a uniformly
directional data obtained with a dipmeter log (see dipping stratigraphic unit.
page 115). But note, that the different accuracies
of the two methods allow only a coarse plausibility check.

used in this situation need to consider the three dimensionality of the well course and
Formulas the penetrated geology. In a plan-view situation, the following algorithms are
applicable. The first of the three equations is the bread & butter when sitting on a deviated well.
The Wellsite Guide Page 99 Directional Drilling

Where TVD: is the true vertical depth of a deviated hole segment between the measured depth MDi and the next
measured depth point MDi+1
NSD: is the displacement in north-south direction from the well zero, the surface point.
EWD: is the displacement in east-west direction.
? is the inclination angle, in degrees from the vertical
A is the compass bearing in degrees, clockwise, zero is north.
i the n-th survey point (i=0 is the first survey point at surface)

Several algorithms are being used and are implemented in the various software available to the
technicians. The list of methods below increases from top to bottom in sophistication:

! The tangential or terminal angle method assumes a constant deviation for the entire survey
interval until the next survey point is taken into consideration.

! The angle averaging method uses the average between two survey points at either end of the
segment.

! The balanced tangential method is derived by placing the interval depths half way between the
individual survey points thus assuming that the deviation is constant in the interval around the
measured point.

! The radius of curvature method approximates the well path as a circular arc in the vertical plane,
which is then wrapped around a vertical cylinder.

Of course, different methods will give - slightly - different results, but it is beyond the scope of this book
to go into all the details of directional computations and surveying.

Another point of attention is the computer accuracy when carrying out several of such trigonometric
calculations. Computer accuracy of trigonometric functions is finite ! The consequential effect is that
the small inherent error of such calculations may become quite important when a series of calculations
is summed. This problem should not arise from professional and tested programs or handheld calculators
which usually have a 15 digit accuracy. However, the problem of low computer accuracy may well be
relevant when home spun programming or programs of unknown orgin are employed.
The Wellsite Guide Page 100 MWD, LWD

7.6. Real Time Logging (MWD, LWD)27

A technique that became available in the oil fields in the early eighties is the MWD. MWD tools are part
of the bottom hole assembly near the drilling bit. MWD tools can have sensors for resistivity, gamma
radiation, density, downhole torque etc. similar to wireline logging tools. Two concepts of MWD tools
are commonly available:

! Memory tools, that is MWD collars, that record the parameters in a solid state memory. The data
can be played back every time the collars are pulled, i.e. usually on a bit trip.

! Other tools have the capability to transmit the data to surface while drilling.

Most modern tools can operate in both modes, some selected parameters are transmitted to the surface,
other parameters are stored in the memory.

MWD tools provide the geologist with a display similar to wireline logs, which give an excellent tool
for correlation with offset wells, a great help when selecting coring points. However, the sensors are
several feet above the drilling bit. Thin layers may have been penetrated already by the time you analyze
the log-plots. Furthermore, MWD is not cheap and therefore used only on wells where conventional
mudlogging techniques appear not sufficient.

For the drilling people the MWD may introduce limitations and sometimes even unwanted but necessary
re-arrangements of the bottom hole assembly.

7.6.1. Benefits and Drawbacks of Real Time Logging

Benefits of real-time logging, whether data are telemetered through the mud or stored downhole include:

! "Insurance" logging. Guaranteed data recovery, even if the well is lost or cannot be logged by
wireline. This applies of course only for MWD tools that can transmit the data in real time to the
surface unit.

! Real-time location of casing and coring points. This “real time” logging has a drawback as the
logging sensor are a few feet above the drilling bit. In cases of fast drilling and thin coring
objectives, the bit may be already through the objective to be cored before the downhole sensors
actually see the objective.

! Early reconnaissance of potential pay, particularly gas zones.

! Rt determination while invasion is taking place - in effect, a dynamic Rt . If several passes of


resistivity measurements are recorded over the same zone, a time-invasion profile can be
constructed. For this purpose it is most desirable to re-record data over the zone of interest on
every bit trip made. The difference of the logs are affected mainly by the increasing mud filtrate
invasion over time.
! Improved statistical accuracy of nuclear measurements when ROP is 50 feet (15 meters) per hour
or less (however, see comments below).

! Improved pore pressure estimates. (Compare with page 64.)

27
MWD (Measurement While Drilling) and LWD (Logging While Drilling) have basically the same meaning: Parameters are
measured downhole while drilling. SCHLUMBERGER and ANADRILL have coined the term LWD to promote downhole methods that
parallel wireline logging as opposed to MWD which gives a surface read out of drilling related parameters such as downhole weight
on bit (DWOB) or directional information.
The Wellsite Guide Page 101 MWD, LWD

! Integration of mudlog, cuttings and real-time log data on a single database. MWD data can be
stored on diskette in the same format as wireline log data and loaded into the same software
packages for interpretation.

Drawbacks
! Cost: Real-time logging is expensive. The advantages outlined above must be carefully balanced
against the cost. Many small or shallow onshore operations will therefore not benefit from MWD
logging.

! The MWD tool in the BHA is a restriction for the mud flow and may limit some operations. The
MWD tool may plug if coarse LCM material is pumped through it. It also may pose a problem
if cement needs to be pumped through it. Drilling people often prefer not to run an MWD in the
drill string if the section to be drilled is prone for lost circulation.

! Depth control: MWD data are less accurate with respect to depth control than good wireline log
data. Assume that MWD data are affected by a non-systematic error of at least one foot - usually
more.

The data quality of MWD logs depends - amongst other parameters - on the ROP. MWD data are
transmitted or recorded in regular time intervals. Therefore, in times of fast drilling, less measurements
are taken per depth increment. If the drill rate exceds some about 100ft/hr the sample density can drop
below one sample per foot. As a consequence, the log becomes more spiky. This effect is particularly
strong on radioactive tools (neutron, density) which require a longer time to take a reading. Very often,
a smoothing filter is applied to the data to correct or compensate the overly active log trace. Depending
on the situation, this may be correct, however, in some situation some real, fine resolution data may be
lost. The author recommends to leave any kind of smoothing, filtering or data shaping up to the people
in the processing center in the town office of the MWD contractor. For the wellsite, it is sufficient to
have the apparent readings displayed properly.

! If MWD log data are very spiky or do not correlate properly, check if the log in question was
recorded over intervals with excessively fast drilling.

The MWD data transmission through the mud stream is a low frequency signal. The pulsations may
coincide with the pulsation from the mud pumps. If the two frequencies come near to each other, inform
the driller to speed up or slow down the mud pumps to avoid interference.
The Wellsite Guide Page 102 Decision Making

8. Decision Points in Drilling a Well

That's why you are there: Contribute to the process of decision making. The wellsite geologist collects
data and contributes to decisions that may be necessary. It is rarely the case that the geologist makes a
major decision by himself, he usually needs the consent of his supervisor in town or at least fo the
company man on location. However, the geologist is the skilled geological eye of the management and
his opinion will be heard when it is required. Be ready to make your contribution by saying “My
recommendation is ... because ....”.

8.1. Correlations and their Problems

The well program can be changed as new information becomes available. Is the well still drilling in the
formations forecasted for a given depth or is it deeper or higher relative to the forecast ? Did you get any
information back from the office in town if there was a change in program or if preliminary results
change the current interpretation drastically ?

! Report immediately to your supervisor in town if you find significant discrepancies between the
"forecast" and the "actual" rocks drilled.

8.1.1. Faults

A fault may be the reason that the well prognosis does not agree with the formations actually
encountered. Or, there is a fault in the well program, however there is no indication of any fault when
drilling.

! If you can establish correlation28 with nearby wells, normal faults are seen in the correlation as
a part of the section missing. The well drills from the lower fault block through the fault into the
higher fault block.
! Reverse faults manifest themselves as a part of the section drilled twice, repeated, normal faults
cut out a piece of sction - an interval is missing.

A facies change, an unexpected change in lithology may be another reason to loose correlation. More
problematical are volcanic interbeds, dikes, but also mineralized faults. Those lithologies are often
mistaken for basement because of their mineral content, although there is still a prospective sedimentary
section underneath.

8.1.2. Seismic Correlation

On rank wildcat wells, the only correlation may be provided by seismic in the form of seismic sections.
Without going into the details of seismic time depth conversion, it can be assumed for practical wellsite
purposes, that the seismic forecast is accurate to about 50 meters absolute depth only. ( I am aware that
this statement will be challenged by geophysicists.)

Many exploration wells are targeted to markers identified in the seismic. The wellsite geologist is then
supposed, sometimes even pressed to find and identify those markers in the ditch cuttings under the
microscope, often an impossible exercise.

! As a rule of thumb, never expect a seismic marker to coincide with a lithology change unless
there is reliable information as to what this lithology change may be. Too many forced

28
Good, reliable correlation is often only established by means of electrical logging. ROP plot and other methods are usually
not conclusive enough, except maybe, in carbonate areas, where beds can be correlated e
The Wellsite Guide Page 103 Decision Making

interpretations consisting more of wishful thinking than of reflections and rocks have been seen.
Describe only what you see and don't let yourself box into an interpretation which is not
warranted by the facts seen.

8.2. Bit Selection

The selection of the right drilling bit is not the job of the wellsite geologist, however on some well
managed and cooperatively spirited drilling operations, the company man might consult the geologist.
He may ask about lithology, hardness and abrasiveness of the hole section to be drilled next. Basic types
and properties of drilling bits are described on page 80ff.

Remember, that all drilling operations are optimized for cost, i.e. to drill the hole as cheap as possible.
The cost of a drilling bit is relatively small compared to the cost of rig time. A trip to change the bit is
unproductive time (no progress) and even an expensive bit can drill relatively cheap, provided in stays
long enough on bottom and makes reasonable progress.

! You should know that chert, concentrations of Pyrite, Anhydride can ruin or dull a drilling bit
very fast. Tell the company man if you expect such layers over the distance of the next bit run.
Soft, plastic clays (gumbo, in the drillers' jargon) need an other bit and different drilling
parameters.

! Restrict your comments to the prognosed lithology only, by no means try to mix with the
decision making process of the company man or any driller.

The mudlogging unit monitors some of the drilling parameters. The mudloggers and the geologist would
therefore also be in the situation to comment on bit performance. It is recommended, however, to restrict
the geologist's comment only to critical situations, such as an abrupt change in torque possibly indicating
locked cones etc. or sudden changes in standpipe pressure indicating plugged nozzles or a washout
somewhere in the drill string. In these cases report immediately to the company man or the driller on the
rig floor29.

8.3. Selecting Casing Points

Casing points are dependent on a number of aspects outside the responsibility of the wellsite geologist.
Firstly, the casing design and program is set up in the drilling program of the well. Not much can be
changed in the course of the drilling operation if someone finds out that the casing should be of a
different quality or should be set deeper if there is only a certain length of casing string available.

The geologist advises the company man about the top of a certain formation that may be defined as
casing seat or the approach of an abnormally pressured zone (see page 63 ) that could warrant that the
casing be run earlier. He may advise also that the base of a problematical interval has been reached.

casing point is a formation that can take and hold maximum pressure without fracturing,
The ideal a shale or a tight limestone. When cementing the casing, the maximum hydrostatic head
of the cement slurry is at TD, and the density (and with it the pressure gradient) of cement is much
greater than mud. If the formation might fracture under given pressures, more sophisticated cementing
techniques (like double stage cementing, light weight cement etc.) must be used. Furthermore, casing
points are selected in a way that troublesome intervals (swelling shales, salt, zones of mud loss etc.) are
"cased away" to permit normal drilling operations to continue.

29
The driller has the same or similar sensors reading torque and standpipe pressure and should have realized the situation
himself anyway.
The Wellsite Guide Page 104 Decision Making

Consider for logging operations, that the logging tools cannot reach to the very last foot drilled. Some
sensors can be as far as 90 feet (ca. 30 meter) away from bottom. (See also page 107, for aspects of
combining logging tools.) Therefore, request another hundred feet (ca. 30 meter) to be drilled, if any zone
of interest was penetrated near casing point. This "extra hole for the geologist" is sometimes called rat
hole.

8.4. TD'ing the Well

comes to an end, sometime. When the well has reached its target depth and penetrated
Everything the objectives described in the well proposal and/or drilling program drilling will stop
and the well will be plugged and abandoned or completed after running the final suite of wireline logs.
This appears to be simple,however, in many situation the process of decision making is more
complicated, because further subsequent decisions as whether to run casing, to sidetrack or to run drill
stem tests will have to made. In any case, the wellsite geologist advises his supervisor in town whether
to stop drilling or not, but the decision is made in the office, best after consulting with the drilling
department.

Go through these points:


! Have all geological objectives which were defined in the geological well prognosis been
encountered ? If yes, the well may be stopped. Unless there is some exploratory thinking in the
office and some budget money yet to be spent. Some oil fields in this world have been
discovered by drilling deeper than planned.

! Is there any reason to stop drilling before planned total depth (encountered economic basement)
? If so, are you sure and double sure that it is “basement”. Many wells have encountered
volcanic sills or volcaniclastic layers that had the appearence of basement. However, later
phases of exploration have shown that there is more section and possibly even commercial
reserves under the igneous layer. Don’t recommend to stop too early.

! Structurally shallow or deep to prognosis ?

! Target below field's oil-water contact ? If so, is there a wish to explore for a deeper pool or try
to recover a sample of the source rock that may be underneath the reservoir ?

! Technically impossible, unsafe or economically not feasible to continue drilling under given
circumstances ? Consult with the company man, safety and drilling matters are his responsibility
and - finally - his decision. In such a situation, drilling people have the last word.

! A well may be TD'ed because porosities encountered and extrapolated may be too low to expect
a commercial reservoir. But then again, such assumptions are based on the extrapolation of a
single porosity-depth relationship. Furthermore, oil reservoirs are anaomalies and can also be
porosity anomalies.

! The maturity of the expected or known source rock may be over the threshold under which oil
or gas can be expected. For example, if thermal maturation, vitrinite reflectance, bottom hole
temperature or any other parameter indicates dry gas generation, it is useless to drill deeper to
find an oil accumulation. Exceptions are, of course, complicated geological situation such as
thrust belts. Here, high grade maturity strata may have been thrusted over formations with a
lower degree of thermal maturity.

What will happen after the well’s TD ? Plans for further action:
! Plug & abandon the well, because the were no zones of interest ? Or does the office want to see
logs over critical zones first and will then make a decision ? If so, how much time is there to
The Wellsite Guide Page 105 Decision Making

make a log interpretation. Who makes the interpretation (wellsite or town ?) and what data are
considered required and sufficient to make a decision ?

! Set casing and run drill stem tests over zones of interest ? For safe practice, no drill-stem testing
is done in open, i.e. uncased hole. If the zone of interest is near TD and the open hole section
relatively short, packer may be set in casing and the hole tested barefoot.

! Sidetrack the well to a different, structurally higher subsurface target ?

! Change of the logging program ?

! Will the rig move to another location or be released ? Think of confidential data to be packed
up and sent to the office.
The Wellsite Guide Page 106 Wireline Logging

9. Wireline Logging Supervision


It is the task of the wellsite geologist to supervise the openhole wireline logging
If it moves, it works
program, unless a log analyst or petrophysicist is on location. This supervision and if it repeats,
should safeguard optimum operation and data quality. The wellsite geologist you can sell it
is usually present in the logging unit as long as the tool is in open hole. The oil
company needs a report about the progress of the logging program (time used, Slogan from a
downtime, etc.) and the kind and quality of data produced, a comprehensive wireline logging
wireline logging report. training school.

Wireline logging, in the sense of this book and in the usual rig terminology includes also drillpipe
conveyed logging and sometimes even LWD logging (see page 100). For good reason: The tools used
in drillpipe conveyed logging are the same tools as used for wireline logging. Furthermore, priciples of
tools used and, to a degree, the tools themseves are identical in wireline logging and LWD (logging while
drilling).

Certain wireline logs or tools succh as cement


quality logs (CBL) are run only for drilling
technical purposes and are therefore supervised
by the drilling personnel on location. This
would apply for cement bond logs, back-off
tools, junk basket and retainer runs.

Like with the mudlogging supervision (page 18)


you should familiarize yourself with the
equipment and its set up. Admittedly, only the
engineers will know the details of all the tools
and cartridges on location, but you as the
supervising geologist should have a good idea
what is what and why things are done the way Figure 36: A View of a skid mounted logging unit (Atlas
Wireline).
they are done. Have a first look around:

! Is the installation and use of wireline equipment safe, tidy and clean ?
! Where are the storage containers for radioactive and explosive materials ?
! Do you have to be active in the process of reporting on radioactive and/or explosive stock, use,
inventory ?

In any case, get an inventory list of all explosive and radioactive substances. If possible make sure that
the reporting requirements towards the authorities have been fulfilled.

9.1. Preparations

Several days before the anticipated logging operation, you should familiarize yourself with the logging
program, check with company base in town if there are any changes to the program. Find out what
displays and what scales are used or required by the company. The typical presentation would be in
1:200 and 1:500 scale. Other operators prefer 1:1000 scale displays30. On deviated holes one set of TVD
(true vertical depth) and one set of MD (measured depth) are usually required.

! Have a word with the representative of the logging company on the location. Are
all tools checked, calibrated and ready for the job? Ask him, if he is awaiting any
shipment from town or from his base, that may be essential for the coming job. l
30
Some small American companies still insist on non-metric displays such as 1 foot = 1 inch (1/12) or similar follies.
The Wellsite Guide Page 107 Wireline Logging

! Ask the wireline engineer specifically for the availability of rarely used equipment on location,
even if there is only a small chance that it might be used at surface or run downhole.

! Ask and check (as far as possible) if the surface logging equipment is good shape. Ask
particularly if all software to run the tools and to do the planned wellsite processing is available.
Software for the more rarely used tools such as the full-wave-sonic, VSP, dipmeter processing,
etc. might be not available.

! Ask, find out and note which version, which release of logging software is used. See page 125
for possible complications.

Some of the usually troublesome items are listed below:

! Lubricator (wireline BOP) for wireline operations under pressure.


! Cable length. Can he cut off some cable from the drum and still continue logging operation to
PTD ?
! High temperature gear. If you expect high temperatures, that is anything coming close to 320°F
to 350°F or above, check the temperature rating of every tool. Ask, if the explosives for sidewall
cores (and perforation, if necessary) are rated for given temperatures.
! Air guns and their accessories for the velocity survey (page 116).
! Find out if external logistic support is needed for certain logging operations. In particular some
VSP operations need a supply boat and precise radio navigation or differential GPS positioning.
! Tool pusher or TLC , a tool kit to run the logging tools on drill pipe (see page 110), if you are
on a deviated hole.

with the logging engineer the sequence of the individual logging runs and set up a program,
Discuss so that the most important tools, like resistivity, are run first and the least important tools
are run last. Sidewall cores are the last logging run because they may leave bullets or metal debris in the
hole, a problematical situation if other logging tools are run later.

Many tools can be combined on one string, however, there are restrictions:

! The tool string may become too long, so that the tools at the upper part of the string cannot see
zones of interest near the bottom of the hole. This distance can be as far as 100 feet (30m).

! The combined tool string is more prone to sticking and creating other downhole problems, if the
hole is in bad condition.

! Some tools such as the sonic or the induction tool must be run centralized31 whereas other ones
need to be decentralized, such a s the neutron tool in the hole. This is overcome with a knuckle
joint, joining the centralized and excentralized part of the string, and a bow spring that holds the
decentralized tools agains the borehole wall. This configuration increases the risk of sticking
but may be technically necessary for a long string. As an alternative, shorten the string and make
more logging runs.

! In any case, let the engineer prepare a sketch of every tool string to be run. This sketch also part
of the final log presentation and be printed on film.

! Prepare a time estimate as to how long the anticipated logging job may take. This is important
for the drillers who may want to get their casing ready and also may want to use the quiet
logging time to do some rig maintenance.

31
Some tools should be as close as possible to the bore hole wall. Therefore a bow spring is attached to force the center line
of the tool off the center line of the bore hole.
The Wellsite Guide Page 108 Wireline Logging

! A second wireline engineer is required for logging operations in excess of 30 to 35 hours. Even
better if there is a second man (or woman, as the case may be) to take over the job after 16 hours.
Some logging contractors do not share this point of view and allow their logging engineers to
work over 80 hours in a row. This is not safe ! This man will have to handle delicate substances
(explosives and radioactive). Sometimes the company man will decide to make a wiper trip (to
condition the hole - as it will appear on the reports) to give the logging engineer a few hours of
rest. As the case may be, a second engineer to continue logging is cheaper and safer than any
other practice.

the logging is not enough. You have to report and transmit at least part of the logging
Supervising results to the decision makers in the office. Modern technology and communication
techniques allow the transmission of digital log data straight from the wellsite to the company office.

! Make sure that the town office is aware of the timing of the next logging job. Find out if
someone is standing-by in the office or at home to receive the results and distribute them to the
decision makers.

! If data transmission is requested find out which communication path will be used, whether all
necessary modems are installed and operational, or if certain format standards for transmission
are necessary. You may even try a short test transmission before the actual logging job starts.

9.2. Depth Control

Which parameter is given free of charge by the logging contractor ? Answer: The depth (see also page
90). To find the correct depth of the hole is not as easy as it may appear. For practical purposes the
wellsite geologist should be aware of the factors controlling the depth measurement. A table on this page
summarizes the possible errors of depth control.

! The best method of depth control is to find the casing shoe when going into the hole. Run a short
log across the casing shoe and pick the depth from the resistivity. The depth of the casing on the
logs shold be maximal 5 feet off from the nominal casing depth as calculated by the driller. The,
re-set the depth counter to the nominal casing depth and run to bottom.
On the way out, check the casing depth again on the main log. It should be the same, it may be
somewhat shallower if heavy tool sticking was occuring during the logging run.

If the logging engineer reaches deeper than the depth given by the driller something is likely to be wrong.
Request the re-measurement (strapping) of the drill pipe and check if the depth control (zero setting and
correlation) is correct beyond any doubt.

If the drilled depth is deeper than the depth tagged by the logging tools, caving may be suspected. This
becomes more likely if more and more bottom fill is encountered in consecutive logging runs, not
interrupted by hole conditioning operations.

Potential Depth Error at 10,000 ft / 3050 meters (after Theys, 1991)

meters Remarks

Elastic cable stretch 2.4

Inelastic stretch 1.8 Experienced on first run only

Temperature 0.6 assuming 300°F BHT

Cable twisting 0.5...1.5 1 ft for each 50 turns

Measuring wheel 1.0...3.0


The Wellsite Guide Page 109 Wireline Logging

Sheave movements 0.6...1.0

Viscous drag 0.6...1.0

Error due to tool sticking up to 12 only if tool sticking occurs on the logging run

The table above gives some indications of depth errors that can be expected on a logging run.

9.3. When the Logging Job Starts

Before tripping out, i.e. when the mud is still circulating, catch a mud sample from the flowline. The mud
engineer should run a full mud check on this sample. Preserve the filter cake and filtrate for the logging
engineer. He will use this material to determine Rm, Rmf and Rmc at surface condition. This information
is of extreme relevance for the evaluation of the logs run.

Before the logging job starts, you should update your notebook with a number of data:

! Type of mud in the hole ? Does it contain Barite, Diesel oil, KCl, Mica ? Any of l
these materials have an effect on the logging results and may require correcting the
logs. Get the last mud check from the mud engineer (see also page 92).

! Hole size and condition. Note the hole size, depths of any tight spots, overpull, dog legs, etc. Is
it safe to run the holes to TD or wold it be better to stop at a certain depth to avoid sticking ?
Are there any porous zones that in the case of high mud weight might cause differential sticking
of the logging cable or tools ?

! Directional data, to generate a TVD playback (see also page 97).

! Casing data. Get the precise depth of the last casing shoe. On deep wells, this may need
correction for stretch (as the casing string is stretched out by its own weight) and on floating rigs
a tide correction may be applicable. Have a friendly word with the drilling engineer if the
company man does not answer to you.

! Note casing inside diameter (ID) and weight per foot, a parameter pertaining to wall thickness
of the casing.

! Get the elevation of the rig floor, kelly bushing, water depth and the actual final depth of the hole
prior to logging.

! Get the present depth of the well. Check with the driller or company man, if the drill pipe was
measured stand-by-stand on the last trip out. On floating rigs, you should ask if a tide correction
has been applied. This background information gives you a good clue as to how precise you can
expect to hit TD when logging.

! On floating rigs, the depth reference is taken from the nominal depth of the first casing string.
All subsequent logs will tie into the GR of the previous logging job. For example, the depth
reference for the first log of the 8 1/2" hole section is the first descent of the 12 1/4" hole section.

! From the mudloggers you will get the reading of the last MTO (mud temperature out) and the
total circulation time, that is the number of hours since the last trip, including wiper trips,
circulating samples up, etc. Note, that a long riser on marine operations can cool the mud
significantly. You need the MTO and the average surface or sea bottom temperature later to
correct the log temperatures for static bottom hole temperatures (BHT).
The Wellsite Guide Page 110 Wireline Logging

! Note down the time, when the rig floor was free for the logging company to rig up (check with
the company man as to what he puts down on his report) and the time, when the first tool passed
through the rotary table.

You should also have available a copy of the mudlog and/or the master log. If a MWD log was recorded,
you should have a copy. When logging, you will "read" the available logs against the wireline logs being
acquired.

9.4. Hole Problems while Logging

Logging in open hole may be affected by a number of problems. Most bothersome are sticky hole
conditions. Inform the company man as soon as you see some overpull on the logging cable.

! Do not stop the cable but keep on moving up and down ("yo-yo") until you get free or find
another solution. If you suspect bad (sticky) hole conditions or if you had overpull or sticky
experiences on the previous tool run, inform the company man and request a wiper trip to
condition the hole.

Many logging tools can be run on drill pipe32 . This is common practice on deviated and horizontal
development wells, where the logging tool string would not go to the bottom of the well by its own
weight. Depending on the hole conditions and the tools used, the maximum deviation angle that can be
logged with conventional wireline methods is between 50° and 60°.

9.5. The First Run

The first set of logging tools going into the hole is the resistivity (Laterolog or Induction type), combined
with a sonic log, a gamma ray log, a caliper and an SP. This combination gives the most valuable
information. Even if the hole is lost after this logging run, the basic data would be sufficient (but not
perfect) to calculate Sw and k, the most important parameters. Some general log checks are applicable
for this tool string (see the following chapters for specific tool checks):

! Casing shoe. When going down, check if you find the end of the casing where it should be. Note
discrepancies. Make a GR correlation with the formation logged previously (i.e. behind the
casing). Apply depth correction if necessary.
! Watch the tension indicator and note the weight of the tool plus the free cable.
! Check if the casing ID is correct (caliper).
! Check if the sonic reads a correct 57 µs/ft (for steel) inside the casing.
! Stop for at least one minute in open hole and see if the SP reading stays constant or if it is
drifting.
! Check if you reach TD where it should be. This is indicated only by a small reduction of weight
on the tension indicator. If the tools hit bottom earlier than expected, think if there is a fill
(cavings) on bottom or if your depth setting may be wrong. Tidal variations may be another
explanation (floating rigs only). Check also if the drilling crew has changed anything on the
heave compensator.
! Repeat section. Select an interval, preferably over zones of interest to record a repeat section.
Check if the repeatability of the tools is plausible (See comments for the individual tools on the
following pages).
! When the tool comes back out through the rotary table, see if the depth indicator passes zero
(tool zero is usually set to the lower end of the tool string).

32
Drill pipe conveyed logging, SCHLUMBERGER calls this technique TLC, meaning tough logging conditions,
GEARHART/HALLIBURTON'S' trademark is Toolpusher.
The Wellsite Guide Page 111 Wireline Logging

Compare the logging data on the screen immediately with logs available, such as with the mudlog or any
MWD data (if available).

9.6. Detailed Log Checks

The checks included below are intended to sort out some of the common problems encountered in
wireline logging33. They are by far not as comprehensive as those which a log analyst at the wellsite
might investigate and cover only a small selection of typical openhole logs. The world of cased hole and
production logging is outside the sphere of wellsite geology.

9.6.1. Gamma Ray Log

Principle: Scintillometric measurement of natural formation radioactivity.


Uses: Definition of bed boundaries, correlation, indicator of shale and zonation of
sand and shale.
Checks : ! Near-zero API34 counts are uncommon except in massive evaporite sequences.
(Check with sonic in questionable evaporite sections.)
! Repeat sections may not repeat perfectly due to the statistical variation in
gamma ray radiation.
! Readings are affected by the logging speed (more scatter, less repeatability).
! Readings are reduced by barite in the mud system.
! Readings are increased in KCl mud systems and in mud that contains mica (both
due to potassium content). If a KCl system is used, the log header should have
a comment entry stating concentration of KCl and correction algorithm used, if
any.
Display : Usually 0 - 100 API or 0-200 API, linear, left track.
Comment : The GR is a fairly reliable tool, not many problems are expected.

9.6.2. Gamma Spectroscopy

Principle : Measuring gamma ray energies in different parts of the gamma ray spectrum
which can be related to different radioactive decay series.
Uses : Mineral and in particular clay mineral identification, help for interpretation of
sedimentary environment.
Display : The gamma spectroscopy is can be displayed as ratio-plot on a separate film
with four tracks: Thorium [ppm], Uranium [ppm] and Potassium [%]. The left
track of the display shows total GR and Uranium-free GR. The calculated GR
can be merged into the usual GR display (see page 111).

9.6.3. SP (Spontaneous Potential)

Principle : Measurement of formation electrical potential.


Uses : Calculation of formation water salinity Rw at given Rmf and given temperature.
Correlation tool.
Checks : ! Check stability with static logging tool (see page 110).

33
This summary does not refer to the individual tool names used by the wireline logging companies. It is in any case suggested
that you go through the technical books of the logging companies or refer to independent publications.

34
The API units are arbitrary units, whereby 100 API are the GR reading generated by an "average Mid-Continent Shale"
as defined in a test well in the United States.
The Wellsite Guide Page 112 Wireline Logging

! If formation water salinity and mud filtrate salinity are close, the SP curve may
be flat, without characteristic.
! The SP is very sensitive to electric potentials created technically on the rig.
Check if the cathodic protection is switched off. Cathodic protection is an
electrical potential applied artificially to the body of marine rigs to decrease
corrosion induced by the contact of steel and seawater.
Sharp spikes indicate, that electric welding is going on.
Display : Usually 10 mV per division, linear, left track, together with the GR. Note that
the SP is no "absolute value", SP reading from different logging runs rarely line
up and need therefore to be shifted to tie.
Potential Problems: Magnetism appears as regular cyclic disturbance. The wavelength of the
disturbance is exactly the length of the cable drum circumference, about 5
meters. The disturbance disappears when the cable stops and is generated by
one or several parts of the unit or truck transmission that are magnetized. To get
rid of it, the logging cable and its drum must be demagnetized in the shop.
Sometimes it may also be necessary to demagnetize the chain linking the
logging unit engine and drum separately.
Bimetallism: In some cases, a DC potential is superimposed on the SP curve. It
is generated when two distinct metals are in contact with an electrolytic solution
(mud, sea water) and form a battery. The noise is reduced when the metallic
parts are identified and insulated.
Telluric currents: Naturally occurring earth currents are induced by solar
activity and usually subside at night, except for the Northern Lights. Telluric
currents are observed on the SP track as slow, random drift. The cure is to run
a differntial SP with a downhole return electrode.
Random electrical disturbances: are caused by an electrical anomaly around the
ground return electrode. Electric weldic, generators, etc. are often the cause.
Cable noise is causeed by the making and breaking of the bimetallic cell
constituted by the cable armour and the casing. The cure is to put the fish at
some distance from the rig and to prevent the cable from rubbing against any
metal (rotary table, etc.)
Comment : The SP is usually given free of charge by the wireline logging company.
The SP can give you some information and a lot of headache. Don't worry too
much. It is a give-away.

9.6.4. Sonic Logging

Principle : Measurement of acoustic travel time (based on the identification of the first
arrival of the acoustic signal).
Uses : Porosity indication. Overpressure / undercompaction indicator.
Needed for the correlation to seismic and to generate synthetic seismograms.
Correlation.
Checks : ! Sonic must read 57 Ws/ft in the casing (Ft of steel).
! Maximum reading 185-189 Ws/ft, that is the sonic travel time in water or mud.
If the sonic tool records a more or less straight line around this value it is
reading mud only.
! Watch for spikes (cycle skips, noise trigger, see below) on the log. Slow down
logging speed if you have more than one or two spikes per 200 feet (50 meter).
Display : Usually linear, 40 - 140 Ws/ft scale, integrated travel time marked as "pips" in
the depth track. Near surface and in unconsolidated formation a display of 90-
190 or 40-240 Ws/ft may be more convenient.
Potential Problems : Noise triggering and cycle skipping : If the sonic travel times are very slow or
the received signal is very weak, the sonic tool will accept the first break of any
random noise as the sonic signal and calculate the travel time time accordingly.
The Wellsite Guide Page 113 Wireline Logging

These "mistakes" show on the log as sharp spikes to the fast side of the sonic
track if the erroneous first break pick was earlier than the actual first arrival. If
the first break is detected late, relative to the expected arrival, the error will
show as a sharp spike to the slow side of the track.
To cure the problems described above, slow down logging speed. If this does
not help and if time allows, pull out and change the configuration of bow
springs and stand-offs that may be attached to the logging tool string.
Comment : The sonic is a very reliable tool and not very sensitive to bore hole or electrical
disturbances. It should be combined with the first tool string going into the hole
to have at least one porosity indicator.

9.6.5. Full Waveform Sonic

Principle : Recording of the full wave train of the sonic signal (as opposed to the first
arrival).
Uses : Processing, extraction of compressional, shear and Stoneley Ft can be used for
fracture detection, rock elastic properties and even indicate permeability from
STONELEY wave attenuation.
Display : Wellsite display like a conventional sonic log. Check with your supervisor or
the petrophysicist in charge if any wellsite processing is required.

Comment : The Full Waveform Sonic records large volumes of digital data. This is usually
too much (i.e. too expensive and time consuming) for digital data transmission
(see page 108).
The Wellsite Guide Page 114 Wireline Logging

9.6.6. Resistivity Logging

A huge number of different logging tools35 have been designed


to measure the specific resistivity (or conductivity) of the
formation. They differ in their depth of investigation and their
resolution, may be focussed or not, but in any case, they are
based on the two basic principles following :

Principles: OHM's law. A voltage is applied to the formation


and the resulting current measured. The specific resistivity is
derived. Best results of this tool type in situations where the
formation resistivity is high, compared to the mud resistivity.

Induction principle. An electric field is induced in the


formation. By measuring this field, formation conductivity
(and resistivity) can be derived. Tools based on this principle
are run mainly in freshwater or oil based mud and/or in
situations, where the formation resistivity is much lower than
the mud resistivity.
Figure 37
37: Log presentation (main log) of
the Dual Induction Log (SCHLUMBERGER).
Uses : The resistivity tools are run to give
an answer about the fluid content of
the pore space of the formation. They are the tools to see, if there is oil (or gas)
in your well or not. With the application of more sophisticated algorithms, the
diameter of the flushed zone around the bore hole, the permeability, etc. and
other secondary parameters can be calculated.

Checks : Run repeat section over the zones of interest, the potential pay zone. The
repeatability should be near perfect for the deep resistivity tools. because the
resistivity tools are not affected by statistical variations like the radioactive
tools. The shallow resistivity tools may show some variation as a consequence
of hole rugosity and tool rotation which makes it impossible to re-run exactly
the same inch of the bore hole wall.

Presentation : Logarithmic, usually 0.2 - 200 pm, right track or, middle track on merged
presentations, when the right track is used to display sonic or neutron/density.

Comment : Resistivity tools give direct indication of hydrocarbons. Remembering, that


most wells are drilled to find or produce hydrocarbons, every possible effort
must be made to collect proper resistivity logs.

9.6.7. Density Log

Principle : Measurement of energy loss between a radioactive-emitting source and return


of gamma rays36 the detector. The loss of energy is by collision of gamma rays
with electrons in the formation, the electron density being directly proportional
to the bulk density of the formation.

35
The reader is referred to the technical manual of the wireline companies. It is beyond the scope of this publication to go
into the details of the design specifics of the logging tools.

36
COMPTON scatter effect
The Wellsite Guide Page 115 Wireline Logging

Uses : Evaluation of formation density, porosity, shale content and lithology


identification. The density log is also required to calculate a synthetic
seismogram using the sonic log.
Checks : Repeatability should be within 0.05 g/cm3, except a in washed out hole.
The Fa (delta rho) should be mainly positive except in dense baritic muds or
over gas zones. Consistent offset or drift above zero is suspicious.
Comment : The density sonde is a "pad-tool" and therefore sensitive to rugose bore hole
wall and mud cake. Thick mud cake, in particular when it contains barite or
hematite (both dense substances), will affect the a reading.
Display : Together with neutron-porosity (see below) in units of g/cm3. Some companies
like to display the density log in porosity units relative to the selected matrix
For limestone matrix a = 2.71 g/cm3, for sandstone matrix a = 2.65 g/cm3..

9.6.8. Neutron Log

Principle : A neutron source bombards the formation and the resultant scattering and
neutron deceleration depend largely on the formation hydrogen content (that is
a straight relationship to formation water or hydrocarbon content). Epithermal
neutrons are detected.
Uses : For porosity evaluation, in fact, the neutron log is the most reliable porosity log.
Direct indication of gas in the formation. In combination with other tools it is
used for lithology identification and evaluation of shale content.
Comment : The neutron sonde contains a radio nuclide emitting neutrons. This substance
is dangerous. Safe handling practice is necessary at surface. Fishing operations
for stuck neutron and density tool string are extremely tedious. Radioactive
contamination of the whole mud system may be one of the extreme
consequences. Make sure the company man and the safety officer on the rig are
fully aware of this problem before you embark on fishing operations for
radioactive tools.
Display : Linear scale, together with the density. Porosity units or percent.

9.6.9. Dipmeter Log

Principle : Comparing the depth shift of four or more microresistivity curves recorded by
a multi-arm pad tool.
Uses : Determination of structural (tectonic) and sedimentary dip. Facies
interpretation. Fracture identification. Also as high resolution resistivity tool
(can replace MSFL type tools in log processing).
Secondary : Directional data (with limitations) and calculation of hole volume for
cementing.
Checks : Individual traces should be identical and slightly shifted. Statistical noise on all
pads usually indicates poor hole conditions and/or poor pad contact to the bore
hole wall. On deviated wells, statistical noise on one pad means that the tool's
arm does not reach the upper side of the bore hole. Centralizing rubber finns
might cure the problem, provided the pad contact force is strong enough. All
efforts must be made to overcome this "floating-arm-problem" because it cannot
be cured by any processing afterwards, even more, it renders the data acquired
close to useless.
Display : The wellsite presentation is usually only a record of the resistivity traces.
Processing is necessary to turn the log curves into meaningful tadpole displays
to reveal dips. The hole volume is calculated and printed at the log header.
Comment : Dipmeter data recorded on digital tape are voluminous. They are usually only
handcarried to town as the data transmission would take too long. Furthermore,
The Wellsite Guide Page 116 Wireline Logging

most of the "decision making" for completion etc. is based on the results of
other logs, rather than on the dipmeter, which is strictly a geological tool.

9.6.10. Velocity Surveys, VSP, Well Seismic

Principle : An acoustic noise signal is generated at the surface (usually with an air gun, rarely with
explosives) and the first arrival, the full wave train or even the full wave train in three
axes' direction is recorded with a downhole receiver. Air guns, which are easy to
handle, are also used onshore. In this case a pool of about 2 meters depth has to be
excavated and the source is submerged into the pool.
Uses : Tie-in from the well to seismic
lines, calibration of synthetic
seismograms.

Level selection :
Select the levels (depths) of
r ecor ding, unless the
geophysicist in town will do this
for you. The typical spacing is
about ½ wave length. Assume a
central frequency of 70 to 90 Hz
(decreasing with depth).
Logically spacing will be
increasingly wider with depth
(as a function of increasing
interval velocity). Figure 38: Four examples of the more common signal quality
problems frequently seen in VSP and checkshot acquisition.
You can work this out from the
IIT ticks (“pips”) of the sonic log. If time is pressing just use a fixed interval of about
75 feet. Check the caliper log at every recording level. If the hole is out of gauge and
you suspect poor acoustic coupling, then move the recording level by about 5 feet. If any
possible, locate a recording level near, but below a point of strong velocity contrast. It
is advisable to stay about 5 feet away from the acoustic impedance boundary.
Checks :
! The repeatability of the first break (first arrival) at a given depth should be ± 1 ms. The
frequency spectra of the gun should not change from shot to shot. If more than one gun
is used, tune the shot signal by changing the delay of individual guns so that the
resulting total signal comes closest to a sharp minimum-phase wavelet. Check for
repeatability.

! Plot travel time versus depth and the energy received at the tool (in dB or mV, whatever)
against depth. Watch the signal strength and the travel time over sections where the hole
is oversized, washed out. Check if there is a time warp indicating an anomaly.

! See also how the signal looks. Is it a clear first break (though maybe weak) or is it mixed
with a high frequency ringing typical casing first arrivals.

! When shooting, observe background noise. Engine noise, wind and waves can
contribute, however, are negligible if the source-receiver system is ideal. The best
instant quality criterion is a clear and repeatable signal and first arrival of signal.

! Note sea-level variations (tide diagram) on marine operations. Compare calculated


interval velocities with integrated velocities from the sonic log (see page 116).
The Wellsite Guide Page 117 Wireline Logging

! Check the gun(s) while shooting: Look outside once every few shots if the gun is still
in position or if a stupid crane operator has moved it. Some few meters shift to the side,
however, is not critical. Check also if the gun is leaking. Bubbles in between the shots
may indicate a leaking gun and consequently a changed signal (different strength and
frequency content).

Display : Wellsite display is the stacked wave train of every recording level and a time-depth
graph. Make sure that the scale and display conventions are the same as on the seismic
displays commonly used by you company in this area. Positive display polarity means
that a compressional wave gives a white trough, negative display polarity gives a black
peak (a black shaded area under the wiggle trace). Check the display polarity at lithology
breaks or sea bottom.

Comments : Check with the geophysicist in charge what he really wants. Sometimes it is required to
record in open hole, other surveys can be recorded in casing. Recording in casing may
change the frequency spectrum, surveys (different runs) in open hole and in casing may
therefore not be compatible. The number of levels to be recorded, the source (or source
array), the shooting geometry and many other recording parameters including quality
control parameters depend on the actual purpose and application of the velocity survey
and on the ideas of the geophysicist.

Logistical : Find out the set-up for the velocity survey. Sometimes a walk-away or offset VSP is
recorded, which may require logistical preparations, such as setting up geodetic survey
stations, drilling or digging a hole for the air gun(s) or having a boat with radio-
positioning equipment at location.
Note also, that the velocity survey may be contracted to another company, but the
wireline logging company. In this case only the cable of the wireline contractor is used,
downhole tool and surface equipment are provided by the geophysical contractor.

9.6.11. Wireline Formation Testing (RFT, SFT37)

Principle : A probe is pressed to the bore hole wall and a pressure gauge records the formation fluid
pressure. Formation fluid samples can be recovered.
Uses : Measurement of formation pore pressure.
Determination of permeability based on the pressure
build-up. Recovering a formation fluid sample. This
can be gas, oil or water. If water is recovered, the water
resistivity (Rw) gives a direct measurement for the log
interpretation. The RFT is the tool for the petroleum
engineer.
Checks : Calculate the hydrostatic pressure of the mud at a given
depth. Use the correct parameters, that is true vertical
depth and actual fluid level. Subtract the distance of
the rotary table to the flowline from the TVD. The
hydrostatic pressure measured at a given depth should
be correct by about ±3 psi. Allow some time for the
pressure gauge to compensate for the bore hole
temperature after running in.
Figure 39
39: Wireline testing tool
(RFT) in open position.

37
RFT, Repeat Formation Tester, a trademark of SCHLUMBERGER, SFT is a trademark of HALLIBURTON LOGGING
SERVICES
The Wellsite Guide Page 118 Wireline Logging

! Depth control: Do not expect to "shoot" thin layers. The depth control, even after the
most perfect correlation is not better than about one meter (three feet). The depth control
of subsequent pressure readings is even worse because some of the accuracy is lost
every time the cable is slacked and pulled again. Particular bad influence is experienced
when the tool is sticking and has to be pulled free. (See page 108 for more details about
depth control.)

! Temperature stabilization: All tools require time to warm up to downhole temperature.


For this reason, formation tests are usually carried out taking the topmost reading first
and then working deeper. With this method the time required for adapting to formation
temperature is minimized. If the pre- and after survey hydrostatic readings do not agree
by 1 psi, then it can be assumed that the tool is still warming up or cooling down.

! Pressure readings take time. The lower the permeability of the formation, the longer the
time. If in doubt, wait another five minutes while the pressure is stabilizing before
instructing the wireline engineer to retract the tool. Ideally, the pressure should be
stabilized to 1 psi/minute. However, if the tool is sitting in an absolutely tight
formation, interrupt the test right away. Waiting costs time, precious rig time.
Interrupting the pressure build-up too early may result in useless data and lost rig time.
Moreover, the log has your name on it, so make sure its good data.

If a gas or water sample is recovered, make the following checks immediately at the wellsite :

! Water salinity and resistivity. The mud engineer should make a chloride (Cl-) analysis.
Then take a resistivity reading with the resistivity meter used by the logging company
to determine Rmf.

! Gas composition analysis. Use a gas bladder to transfer the gas to the mudlogging unit.
Use a syringe to inject the gas into the chromatograph.

Comment : Have sample containers ready to collect gas, oil or water for detailed analysis in town.
If a tracer (page 95) was carried in the mud, get a quantitative analysis. Estimate the
ratio of formation water and mud filtrate. Try to calculate the water resistivity (Rw) of
uncontaminated formation water.

Figure 40:
40 Parts and options of the SFT tool (Halliburton).

The RFT tool is stationary and anchored in the borehole for several minutes, if not hours. This increases
the risk of sticking the tool.
The Wellsite Guide Page 119 Wireline Logging

! If in doubt about the hole condition, talk to the company man and explain in detail what the RFT
programme will be like, how many levels will be tested, etc. and get his endorsement for the
programme.

9.6.12. Sidewall Cores

The sidewall coring is usually the last run of a logging suite at a given depth. It is the responsibility of
the wellsite geologist to select the levels for sidewall cores. Sidewall cores are taken for various different
purposes:

! Shales / claystones for paleontological purposes (age dating).


! Shales / claystones and coals for geochemical purposes (source rock and maturity studies).
! Reservoir intervals to check fluid content (shows?).
! Reservoir intervals to determinate reservoir properties like porosity and permeabilit. The data
quality of reservoir parameters from sidewall cores is usually much inferior to full-bore cores,
however, in some situations, sidewall cores will be taken and analyzed.
! Anywhere for "rock-typing", that means to recover cores over intervals with obscure lithologies
or exotic mineral content to assist the petrophysicist with his interpretation.

Select the levels for the sidewall cores on a 1:200 scale log. Use the caliper log and watch for washouts
in the hole. Be aware that the logging engineer can select bullets with different penetration depths for
soft and hard formations, and that he can adjust within certain limits for over gauge hole size.

! Note the expected maximum bottom hole temperature (BHTmax) during the SWC sample log run.
The common explosives are rated to 280°F for one hour. If you go for higher temperatures,
special high temperature charges have to be used. List the requested sampling levels on paper,
note hole size and expected lithology, and give it to the wireline engineer.

! When the sidewall core gun is loaded and above the rotary table, absolute radio silence is
required for safety reasons. Radio frequencies, and even more, arc welding or thunderstorms
may in severe cases fire the explosives in the sidewall core gun. It is not your job to inform the
radio operator, safety engineer or company man, but for good practice you should check and
make sure that the logging engineer has reported properly. If not, tell the company man. Radio
communication may resume when the gun is below mud line.

! The wellsite geologist must supervise at least the depth correlation of the sidewall core gun with
previous logs. Request a film, not a paper copy of the correlation GR and do not hesitate to
request another correlation run or interval from the engineer, if you are not positive about the
correlation. The GR tool running with the sidewall core gun is less sensitive than the "normal"
GR logging tools. Look for peaks, troughs and patterns for correlation purposes.
If the correlation does not fit, do not take any "sales talk" about cable stretch, tide motion or
moon phases from the engineer. Find out what is wrong and make another correlation, best over
another section of the hole.

! When shooting, watch the tension indicator. Good recoveries show a medium tension when
pulled free. Heavy pull indicates that the bullet will be lost. Note down the maximum pull on line
or request this on a report from the wireline engineer.

! When the gun comes to surface count the bullets lost in the hole. If bullets were left in the hole,
the company man may want to clean the hole with a wiper trip, a junk mill or a magnet, before
resuming drilling. If casing will be run, a wiper trip will be made in any case to clean and
condition the hole.
The Wellsite Guide Page 120 Wireline Logging

! The wellsite geologist should witness the transfer of the core samples from the bullets to the
sample jars. Mix-up can easily happen at this point. Insist that the bottles be labelled, not the lid,
Otherwise nobody will know what is in the jar when the lid was taken off. The marking should
include well name, depth and core number.

! Some companies require that potential source rock lithologies and sidewall cores with oil shows
be packed with cling wrap and aluminum foil and maybe also sealed with wax before packaging.
This is considered good practise. It keeps the sample material physically together during
transport and minimizes evaporation of formation fluids.

The description of the sidewall core material follows the usual procedure of sample description (see page
51). This description may be a report by itself, it also can be combined and
merged with the daily geological report.

! Be aware that some samples may recover only thick mud cake,
which appears like soft, plastic clay.

If special analysis (geochem, paleo, poroperm etc.) are planned for the
sidewall cores, it is appreciated if the wellsite geologist makes a pre-
selection of samples for the various analysis. Note on your description sheet
which cores are particularly apt for certain analysis. Shales for palynology,
dark shaly lithologies for geochemical purposes and unbroken samples of
reservoir lithologies for porosity and permeability determination.

9.7. Log Presentation and Quality Control

The detailed quality log quality control is a wide field and beyond the scope
of wellsite geological operations. This is a filed for the petrophysical
specialst. However, even with the restricted time and facilities at the
wellsite, a minimum QC must be done. Although this is a tedious and rarely
fruitful job, it prevents the dissemination of low quality or faulty data.
Some QC checks have also been incorporated into the logging tool
description (page 111).

! Log header: Check every single entry for correctness and spelling.
Are the coordinates right, the depths (TD, casing shoe etc.) right ?

! Check the repeat section of every log. Is the depth matching


consistent, the repeatability reasonable ? The repeat section is an
integral part of the field log presentation.

! Check and double check the entries for mud resistivity, temperature
etc.

! Check the scales, the grid and the header of every track. Is the scale
on the header the same as on the log track ? Sometimes it isn’t.

! Cross check between the individual log traces and between


different tool runs if a depth shift is apparent. If so, investigate for
reasons.

! If TVD logs are produced on deviated wells, the directional data


deserve special attention. The TVD log should also note, which
Figure 41:
41 Log presentation.
The Wellsite Guide Page 121 Wireline Logging

directional data (MWD, gyro or multishot) have been used for the depth conversion.

Remarks Section:

! Operating engineers (and wellsite geologists) should not be afraid to add drilling circumstances
or mud characteristics into the remarks section of the log film. Drilling conditions (for instance,
BHA changes) may directly impact logging data by the bias of hole condition. Mud parameters
and circulation timing are essential in the understanding of invasion, which affects most logs.
! The presence of barite, Kcl or mica in the mud. Has the log presented already been corrected for
mica and potassium ? Which algorithm has been used for the correction ?

! Are all unusual events (e.g. tool sticking, change of logging speed) recorded in the remarks field.
If a tool was run in a different configuration than normal (e.g. centralized instead of
excentralized), it should be noted on the log.

9.8. Quick Look and Computer Based Log Evaluation

All modern logging units provide on-site data processing, quick-look methods to determine Sw, mineral
content, basic dipmeter processing, etc. It depends on the operating concepts of your company whether
these services will be used. Some operating oil companies have their own log data processing center,
other companies prefer the quick answers from the wellsite. The cost of the wellsite processing is another
aspect.

By the time this text is written, virtually all wireline service companies can copy the log data or any
selection thereof onto diskette or transfer to a desk-top computer. With the help of inexpensive PC
software it is now possible to make a fairly comprehensive log analysis at the wellsite.

9.8.1. The Rwa Check

Rwa the apparent water resisitivity of the formation water can be calculated when a porosity log is
available. Usually, the porosity is derived from the sonic log by assuming a matrix velocity. Rwa can then
be calculated in real time and displayed on the GR track, given an appropriate scale. The Rwa value has
not much to do with the actual formation water resistivity, however, any excursion in the Rwa can be
interpreted as the

! first indication for hydrocarbons


or
! change in formation water resistivity indicating a formation change or - less probable - a
significant change in pore pressure.

In simple cases, Rwa is equal to the water resistivity in a clean, water bearing zone.

whereby F, the formation factor is a function of porosity


The Wellsite Guide Page 122 Interpretation

The Rwa is also the first indication where to pick your first guess for Rw - unless you are in a development
situation, where the water resitivities are known or you have a formation water sample. The latter can
come only from a RFT sample or from water byproduction during a DST.

9.8.2. Density - Neutron Logs

Large separation of the neutron-density curve (jD < jN) is often indicative of a shaly zone. In known
areas, the changes in the known separation help to identify zones of marginal reservoir potential.

As the neutron tool is sensitive to the presence of hydrogen atoms in the formation it will also detect
hydrogen of hydrocarbons. The effect of liquid hydrocarbons is relatively small, the effect of gas,
however, is significant.

! If the neutron tool shows extremely high porosities without any similar response from the density
tool then the formation is gas bearing. This indication is usually more sensitive than the gas
effect on the resistivity logs and can be used as a very reliable indicator. Owing to the shape of
the curves, this gas effect is occasionally and for obvious reasons called "Dolly Parton Effect".

9.9. Money: Checking the Service Ticket

At the end of the logging job, you may be asked to sign a service ticket. (See page 8 for authorities.) With
your signature on this document you acknowledge that certain services have been rendered and you will
see an outlook on the expected cost. It is not an invoice and the figures may change, when this ticket is
used in town to generate the monthly or final invoice.

! Note on the service ticket any comment, that may have a bearing on the final cost (for example
"GR not working from ... to ..., should not be charged" etc.

It's even better to discuss critical issues with the wireline logging engineer at the location, before he
makes up the service ticket in order to solve the problem at the wellsite instead of bringing all problems
to town. In any case, it is suggested that you familiarize yourself with the price list of your wireline
logging contractor. If you don’t have one, get one from the office or from the logging contractor. Read
all the small comments and exceptions set out in footnotes. That is where the service company makes
the money. It takes quite a while to dig through all this legal and cotractual stuff, but it is very likely that
you can save some money for your company. Some supervisors appreciate that. Furthermore, it is a good
way to get an introduction to the economics of logging and drilling operations.

Computer spreadsheet programs are an excellent method to forecast and control the wireline logging cost.
If you have the right tools available at location, you may even be in the situation to fine tune the logging
program, maybe replacing one type of survey with another one that suits given conditions better. But in
any case, usually a change of the logging program needs authorization from your supervisor.

Wireline logging or formation evaluation is expensive. The comparison of formation evaluation cost
with other cost incurred gives you the right picture and will demonstrate that it makes no sense to save
on a some one dollar items in the mudlogging unit and then to throw out huge amounts for poorly
designed logging operations. Sometimes you will even have to educate your supervisor and give him the
right picture, i.e. cost figures when you are proposing any changes.

10. Data Integration and Interpretation at the Wellsite


The Wellsite Guide Page 123 Interpretation

The time after completion of the logging operation is usually a quiet phase from a wellsite geological
point of view. Casing is run and cemented and BOP testing and changing may take up as much as two
or three days on deep wells. Time to do the homework and integrate the log data into the general
geological framework.

! Update your pressure worksheet (page 66).

! Relate the geology of the last section to seismic time. Find out where you are on the seismic
section by updating you time/depth graph with the help of an integrated sonic log or check shots.
Or use the display from the VSP.

! Correlate logs with offset wells.

Record, document and interpret all your findings properly. This compilation may be a valuable
contribution to the final well report (see page 50).

10.1. Temperature Analysis

Based on circulation time, time elapsed since circulation stopped until the log tools reached bottom, and
with the use of chart books (a graphical solution of the HORNER Equation) the static bottom hole
temperature is calculated. Compare the results with direct temperature measurements, if available.
Integrate with temperature data from DST's, if available. Plot temperatures against depth.

The resulting geothermal gradient graph is needed for geochemical (maturity) calculations and basin
modeling. Beside, the cementing people on the rig need the temperature data to design the right blend
of retarding or accelerating additives to the cement slurry.

10.2. Tie to Seismic

Use the integration of the sonic log (counting the ITT ticks) to establish a seismic time depth graph or
use the velocity or VSP survey, if available, to tie into the seismic. Although it is not the responsibility
of the wellsite geologist to make seismic ties, you should have an idea, what section of seismic has been
drilled, how the reflectors relate to the observations of the drill cuttings (a relation, that is rarely
established with sufficient clarity on the wellsite) and which horizons are still ahead of the drilling bit.
The Wellsite Guide Page 124 Computer

11. Computer, Electronics and Communication


Like it or not: Computers are a fact of life. Computers have made their way to
the wellsite and help in any branch of a drilling operation. The main areas of
wellsite geology, where computers are used are wireline logging and log
interpretation, mudlogging, in particular the database keeping of drilling and
geological parameters, and the reporting systems. A geologist should have
access to a modern computer system at the wellsite. The future may bring
networked systems on the rig that allow the exchange of data and parameters
between all parties working on the rig (the driller, the mud engineer, the
geologist, the directional driller, the mudloggers, etc.). Networked systems (wide area networks) and e-
mail systems to correspond with the town office are common.

11.1. Data Formats

The most significant problem in tape retrieval and diskette exchange is negotiating the maze of data, in
particular tape formats. Sometimes, a data user attempts to decode data with a software incompatible with
the recording software (most of the time, recording software has many more features than the reading
software). It is therefore essential that the compatibility of recording and reading software is checked
long in advance.

The following tape formats are available :

! SCHLUMBERGER LIS format.


! AMERICAN PETROLEUM INSTITUTE (API), DLIS format.
! WESTERN ATLAS BIT format.
! WESTERN ATLAS EBIT format.
! GEARHART DDL format.

11.1.1. The LIS Format

The Log Interpretation Standard (LIS) is a standard for the exchange of well log information. Not only
well log information, but also mudlogging data are exchanged and stored on LIS format tapes. Though
it generally relates to data encoded on magnetic tape, it can also be used to represent log data on any
other storage support.

LIS distinguished three types of information associated with well logging:

! Data frame. It is a collection of sensor readings put in conjunction with an index value. The
index may be of two types:
" For tapes recorded in the field, the index is recorded only once at the beginning of data
frames.
" For tapes recorded with a computing center software, the first data channel of each
frame is dedicated to the index.
In the field tape, the sequence of data frames is preceded by the primary index set at the depth
where the log is started. The following data frames contain only data channels. With the
computing center software, the record starts directly with data frames. Each data frame contains
a primary index channel in addition to data channels.

! Transient information. It consists of the dialogue between the system and the logging engineer,
in addition to comments and messages.
The Wellsite Guide Page 125 Computer

! Static information. It consists of the information about the logical structure of the reel or disk
file. They are used to describe how data frames are formatted.

11.1.2. The DLIS Format

When more complex logging tools were introduced, people handling log data were slowed by the
limitations of the existing tape formats. One of the major problems is the wide variety of data types
(among others, wave forms and arrays) and record length (from a few bits to several thousand bits). The
existing formats have difficulty handling variable sampling rates, which can eventually be recorded
during the same logging run.

The DLIS format has the following features:

! Ability to contain both standard and auxiliary logging data.


! Possibility to merge, splice and flip log data.
! Presentation of channels regardless of sampling rate and dynamic range.
! Allowance for complex forms of data including arrays.
! Record of indefinite length.
! Textual data capabilities.
! Encryption capabilities.

11.2. Software

A coherent set of software programs on the logging unit needs to be used for a given logging job. All
calibration and logging phases should be covered with compatible software versions. For instance, if a
tool is calibrated with the June 1988 version, then logged with the January 1989 version, with an
algorithm change from September 1988, a systematic shift may appear on the data..

It is imperative that all changes in the constants during logging are reported along with the depth where
they were performed. These changes can have a disastrous effect on the value of data and only an in-
depth scrutiny of the print or field tape can detect them. As an example, all calibration parameters should
be frozen and the software should make their modifications on-the-fly during logging impossible or
obvious.

In the event of a computer crash, the status and values of the logging constants should be noted before
restarting the operations. Such system crashes should be reported on the film.

There is a vast variety of PC-based log evaluation programs38 and as big is the variety of data formats
used. Their common denominator is the ASCII-format, the most simple and basic file structure. Others
use proprietary formats without releasing any information about their structure. The message conveyed
in this chapter is very simple:

! Do not take for granted that computer stuff, hardware or software works. Test everything before
you use it in a mission critical situation. Compatibility does not mean that it really works under
real conditions. So, whenever you have to rely on data transfer - try it out first. If it has not been
tested in all detail, do not use it on the wellsite.

38
A market review made by Geobyte in 1991 showed already some 20 different log evaluation programs available commercially.
This does not yet include the public domain share-ware and some home-spun software created by weekend programmers with various
skills.
The Wellsite Guide Page 126 Computer

11.3. Data Media

The most common data media for small computers today is the 3½" diskette with 1.4Mb formatted
capacity. The older 5¼" data diskettes are rarely used anymore.. Keep sufficient stock of diskettes with
you when you go to the wellsite.

On big computers, such as the wireline logging unit, big reels of 9-track tape are increasingly replaced
by video-8 or DAT cartridges. Such cartridges are able to hold up to several gigabytes of data. One
complete logging run, often also including the "bulky" data like dipmeter or full wave sonic can fit onto
one single cartrige.

11.4. Data Transmission

Data transmission depends on people, software, modems and communication lines. That's about most of
it. You will need somebody on the other end of your communication link who can operate the receiving
computer. It is recommended that you establish personal contacts with your computer operator on the
other end before your go to the wellsite. Also, get the home phone number.

Modems come in pairs - a sending modem and a receiving modem. Although the manufactureres claim
that their particular modem can communicate with any other modem - don't rely on it unless you have
tested the system personally. Two modems of the same brand work - usually - better together.

Communication lines can be ordinary phone lines (very often), dedicated data lines, VHF point-to-point
systems, dedicated satellite lines (such as the Inmarsat on many ships or floating rigs), SSB shortwave
radios; also any combination thereof.

! If you are preparing to transmit large volumes of data, you should consider to compress the data
file. Data compression programs are readily available and can compress file to less than a half
of its original size. However, as many modems are also using some kind of compression
algorithm, transmission time is not speeded up any more because the compressed file cannot be
further reduced.

Data compression is in any case useful to reduce file size of logging data copied onto diskette to be sent
to town or to the office overseas.

! Make sure that the receiver has a copy of the decompression software. If not certain, include one
on the first diskette and explain the method of operation in a short READ.ME file.

It needs to be tested and found out if a data compression gives a time advantage while using a high-speed
modem or not.
The Wellsite Guide Page 127 Literature

Literature
West Shelf, Australia. - In: Purcell, P.G., & R.R., (Eds.):
ALLEN, D., et al. (1989): Logging While Drilling. - in: The North West Shelf, Australia: Proceedings of Petroleum
Oilfield Review 1, no.1 (April 1989), pp. 4-17. Exploration Society, Australia Symposium, Perth, 1988.

ALMON, W.R. (1979): A geologic Appreciation of Shaly HAWORTH, J.H., SELLENS, M., WHITTAKER, A., (1985):
sands. - SPWLA Twentiesth Annual Symposium, pp. Interpretation of Hydrocarbon Shows Using Light (C1 - C5)
WW1-14. Hydrocarbon Gases from Mud-Log Data. - Bull. Am. Ass.
Petr. Geol., v. 69, 8, (August 1985), pp. 1305-1310.
ALMON, W.R., DAVIES, D.K., (1981): Formation Damage
and the crystal Chemistry of Clays. - In: Clays and the KULANDER, B.R., DEAN, S.L., WARD, B.J., (1990):
Resource Geologist, Longstaffle, F.J. (Ed.), Mineral Fractured Core Analysis: Interpretation, Logging, and Use
Association of Canada, pp. 81 - 103. of Natural and Induced Fractures in Core. - AAPG Spec.
Publ., Methods in Exploration Series, No. 8, 88p.
API D9 Bulletin: Standard Format for Storing Digital Well
Log Data on Magnetic Tape. - May 1989. LASSERRE, D. (1990): Formation Evaluation in Highly-
Deviated long reach Development on the North Rankin
ATLANTIC RICHFIELD INDONESIA (1978): Geologist's Well- Gas Field, NW Shelf, Australia. - Austral. Petrol Expl.
Site Manual .- Atlantic Richfield (ARCO), Jakarta, August Assoc. Journal, Vol.30, Part 1, pp. 310-318, APEA
1978, Unpublished. Conference Darwin 17.-20. June 1990.

BAIRD, S. (1986): Overpressure. - GEARHART GEODATA, LORENZ, J.C., (1991): Subsurface Fracture Spacing:
Document 1.10, Aberdeen, UK. Comaprison of Inferences from slant/horizontal Core and
vertical Core in Mesaverde Reservoirs. - SPE Paper No.
BIZANTI, M.S., ROBINSON , S.W. (1988): Transport Ratio 21877, 16p.
can Show Mud-Carrying Capacity.- Oil & Gas Journal,
June 27, 1988, pp. 39-46. MASTIN, L. (1988): Effect of Borehole Deviation on
Breakout Orientations. - Jour. Geophys. Res., Vol. 93, No.
BLACKBOURN, G.A. (1990): Core and Core Logging for B-8, pp. 9187 - 9195.
Geologists. - Whittles Publishing Services, London 1990.
MCPHATER, D., MACTIERNAN, B., (1983): Well-Site
BOND, D., BROCK, N., CHAPMAN, G., LAY, K., WORMALD, Geologist's Handbook. - McKinlay-Smith Int.'l Ltd.,
G., (1990) : Introduction of New Technology into Timor PennWell Publishing Company, Tulsa, Oklahoma.
Sea Operations. - Burgess, T. (1990) : Horizontal Drilling
Comes of Age. - Oilfield Review, Vol. 2, No. 3, pp. 22-33, MORTON-THOMPSON, D, AND WOODS, A.M. (Editors)
Elsevier, Amsterdam - New York. (1992): Development Geology Reference Manual - AAPG
Methods in Exploration Series, No.10, Am. Ass. Petrol
CLAVIER, C.G., DUMANOIR, J., (1977): The theoretical and Geol., Tulsa, 1992.
experimental Bases of the “Dual Water” Model for the
Interpretation of shaly Sands. - SPE Paper No. 6859. REHM, B. MCCLENDON, R., (1971): Measurement of
Formation Pressure from Drilling Data. - SPE 46th Annual
ENGELDER, J.T. (1974): Cataclasis and the Generation of Fall Meeting, New Orleans, SPE paper 4643, 8p.
Fault Gouge. - Bull. Geol. Soc. Amer., Vol. 85, pp. 1515 -
1522. ROSE, R.J., TAYLOR, M.R., JANTZEN, R.E., (1989):
Information Transfer Standards for Well-Site Data. -
E XLOG (1979): Field Geologist's Training Guide.- Geobyte 1989, 9, Tulsa.
Exploration Logging Inc., Revision B August 1980,
Sacramento, USA. SCHLUMBERGER (1987): Log Interpretation Principles /
Applications.- SCHLUMBERGER Educational Services,
FAGIN, A.R. (1994): Understanding MWD data acquisition Order no. SMP-7017, Houston.
can improve Log Interpretation. - Oil & Gas Journal, Feb
14, 1994. SCHLUMBERGER (1991): Log Quality Control Reference
Manual, CSU Services. - Paris, 1991.
FONTENOT, J.E., V IKRAM RAO, M., (1988): MWD Aids
Vital Drilling Decisions. - Oil & Gas Journal, March 14, SCHOWATER, T.T., HESS, P,D., (1982): Interpretation of
1988, pp. 60-65. Subsurface Hydrocarbon Shows. - Bull. Am. Ass. Petrol.
Geol., Vol. 66, No. 9, (September 1982), pp. 1302-1327.
GRAVES, W., (1986): Bit-Generated Rock Textures and
Their Effect on Evaluation of Lithology, Porosity and SHARP, J.M. (1983): Permeability Controls on aquathermal
Shows in Drill-Cutting Samples. - Bull. Am. Ass. Petr. Pressuring. - Bull. Am. Ass. Petrol. Geol., Vol. 67, No. 11,
Geol., v. 70, 9, (September 1986), pp. 1129-1135. pp. 2057 - 2061.

GRIM, R.E.: (1968): Clay Mineralogy. - McGraw-Hill, New SWANSON, R.G., (1981): Sample Examination Manual.-
York. Methods in Exploration Series. Am. Ass Petrol. Geol.,
(Publ.), Tulsa.
INGRAM, B., MORGAN, R., (1989): The Development and
Status of the Mesozoic Palynostratigraphy of the North
The Wellsite Guide Page 128 Literature

THEYS, P.P. (1991): Log Data Acquisition and Quality


Control. - Paris 1991 (Editions Technip, 27 Rue Ginoux
75737 Paris, Cedex 15).

THOMAS, J.B. (1981): Classification and Diagenesis of Clay


Minerals in tight Gas sandstones: Case Studies in which
Clay Mineral Properties are crucial to drilling Fluid
Selection, Formation Evaluation and Completion
techniques. - In: Clays and the Resource Geologist,
Longstaffle, F.J. (Ed.), Mineral Association of Canada, pp.
104 - 110.

WAXMAN , J.B., SMITS , L.J.M., (1968): Electrical


Conductivities in oil-bearing shaly sands. - Jour. Soc.
Petrol. Eng., vol. 8, pp. 107 - 122.

WELEX/HALLIBURTON (1986): Open Hole Services. -


Technical Brochure G-6003.

WOODSIDE W., MESSMER, M.H., (1961): Thermal


Conductivity of porous Media. - Jour. Applied Geophys.,
Vol. 39, pp. 1688 - 1706.

YOUNG, R., LOW, P.F., (1965): Osmosis in Argillaceous


Rocks. - Bull. Am. Ass. Petrol. Geol., Vol. 49, No. 7, pp.
1004 - 1008.
The Wellsite Guide Page 129 Index

Alphabetical Index
Calculator 11, 13 Computer 13, 22, 34, 37, 50, 121
AAPG 51 Calibration 24 and mudlogging 59
Accidents 14 calcimetry 42 based reporting 48
Acetone 56, 57 documentation of 20 mudlog 35
Acetylene 36 gas 21, 24 shared on the rig 50
Acoustic on charts 34 Condensate 54, 57
logging 112 Caliper 110 Conductivity 30
pit volume sensor 26 Camera 12 Conductivity logging 114
Acritarchs 68 Camp boss 13 Confidentiality 9, 35, 46, 50
ADT engineer 63 Captain 14 charts 35
AgNO3 21 Carbide 21, 36, 135 core 62
Air Casing 103 worksheet 34
gap 74 point 103 Conflicts 17
gun 107, 117 Casing points Connection gas 54
Alarm 64 selecting 8 Consumables 20
gas 25, 135 Catalytic Gas Detector 23 Contaminant 45
H2S 16 Cathodic protection 112 Contamination 44
Algae 68 Caustic soda 92 radioactive 115
marine 67 Caving 39, 69 Contractor
Alizarin S 21 overpressure 63 mudlogging 10
Aluminum foil 22, 120 pressure 64 wireline logging 10
amber 53 Cement 53 Cooperation 16, 18, 40, 58, 63
Ammonia 21 in cuttings 52 Core 55
Ammonites 68 volume 115 bleeding 55
Anhydride 103 Changes box 59
Annulus 81, 82, 87 mud volume 40 chips 61
Area geologist 9 Chartbook 12 fiberglass 60
Area geophysicist 9 Chert 103 fiberglass sleeve 59
Army 13 Chip gun 119
ASCII-format 125 core 60 labelling 61
Attapulgite 93 metal 53 marking 60
Authorities 8 Chitinozoans 68 Correlation 102
Autocalcimeter 21, 42 Chloride 118 for sidewall cores 119
Back-flushing 24, 34 test 21 general 102
Background gas Chlorides 93 offset wells 13
fluctuating 25 Chromatograph 21, 23, 24, 34, 55, sidewall core 119
BaCl 21 58, 118 sonic log 112
Barite 83, 94, 109, 115 checklist 135 with MWD 58
in samples 53 Circulation with ROP 58
mud 111 for core 58 Cost
Bed 14, 49 lost 29, 41, 47 logging 122
Benthonite 92-94 prior to logging 109 optimize 103
BHA 78, 79 reverse 81 Crane 61, 117
directional 97 Claystone 119 Crew
sheet 78 Cling wrap 22, 120 basket 13
BHT 109 Clorethene 21 change 19
Binocular 20 Clothes 11 list 13
Biocide 21, 44 CO2 64, 77 mudlogging 19
Biostratigraphy 45 Coal 92, 119 Crewchange 19
Bit caving 39 daily 20
jets 80 Coccoliths 67 geologist 10
performance 103 Coffee 21 Cross over sub 78
tricone 80 Collars 78 Cut
BIT tape format 124 Communication 10, 108 crush 57
Blank log forms 11 general 7 fluorescence 57
Bleeding core 55 Company 22 general 56
Blow out 40 Company man 7, 14, 16, 22, 23, 27, in white light 57
control equipment 87 31, 33, 36, 40, residual 57
underground 65 47, 53, 55, 59, Cuttings 38, 40, 56, 81
BOP 65, 89 60, 62-64, 82, and oil based mud 94
wireline 107 92, 97, 103, 104, lifting 84
Bottom hole assembly 47 109, 110, 119 shape 39, 64, 81, 93
Bottom hole temperature 109, 119, and pressure engineer 63 size 82, 84
123 bit selection 103 transport 38, 84
Bottoms-up 58 directional supervision transport efficiency 84
Brake 75 97 Cycle skip 112
Breathing apparatus 16 drilling report 110 D-exponent 64
Briefing 9 fishing log tools 115 pressure 63
Bulk density introduction 14 Daily Report 49
shale 43 notification 25 mudlogging 36
Bullets 119 stuck logging tools 110 Dangerous goods 45
Calcimetry 21, 42 Company stickers 13 DDL tape format 124
Calculated GR 111 Compass 97 Dead end anchor 75
The Wellsite Guide Page 130 Index

Decision makers 11, 108 Fault 102 Gradient


Decision making 103, 104, 116 Fax 10, 12, 46, 49, 62 geothermal 123
Degasser 55, 89 FID 23 Grain size 51
DeLaval sensor 26 Files 12 Graph paper 12, 66
Density 64, 95 Filter cake 81, 95, 109 Gravity
logging 114 Filtrate separation of cuttings 38
Derrick 75 mud 109 Grinding powder 21
Desander 12, 40, 41, 83 Final well report 50 Gumbo 103
Description Fire 55 Gun
core 60, 61 Fire extinguisher 15, 19, 137 sidewall core 119
geological 35 First arrival 116 Gymnosperm 68
sidewall cores 120 sonic 112 Gypsum 21
subjective 52 Fishing mud 92
Desiccant 24 log tools 115 Gyro survey 97
Desilter 12, 40, 41, 83 recreation 17 H2S 16, 19, 77
Diesel 57, 94, 109 tools 79 detector 33
contaminant 44 FIT 65 Hall effect 29
Digital log data 108 Flame Ionisation Detector 23 Hand lens 12
Dinoflagellate 68 Floating rig 14 Hard hat 11
Dipmeter 115 Flow check 88 helicopter 15
Directional Flow Line 82, 83 HCl 21, 55
data for logging 109 Flowline temperature Heave
surveying 97 increase 64 compensation 32
Discoasters 67 Fluorescence 54, 56, 94 tidal 28
Diskettes 50, 101 cut 57 Helicopter 13, 15, 67, 73
with confidential data 50 mineral 56 Hematite 94, 115
DLIS tape format 124 Foraminifera 67 Hole
Doctor 10, 11 Formation volume 115
Dogleg 97 fluids 40 Hook 75
Dolly Parton Effect 122 water 118 Hook Load 27, 29, 33
Draw-works 75 Forms 11 increase 88
Drill cuttings 44 Fracture detection 113 Hospital 10
Drill pipe Freight agents 11, 45, 62 Hot shot 67
general 77 Fungi 68 Hot water 21
logging 110 Gain Hot water test 56
tally 90 pit 64 Hot wire detector 23
Drill ship 74 Gamma spectroscopy Hot work 25
Drill string 34 log 111 HWDP 78
Driller 16, 40, 88, 101 Gas 24, 34 Hydrocarbon 53
Drilling alarms 25 Index 72
break 18, 34, 49, 64, 88 background 25, 49, 54, show 53
data display 33 64 Hydrocarbon Gases
data handbook 12 chromatograph 23 Literature 127
department 9 composition 64, 118 Hydrocarbons 56, 57
development 22 connection 24 and Rwa 121
engineer 22 cuttings 89 residual 24
fast 41 detection 23 Hydrostatic pressure 117
manager 9 headspace 44 Induction
performance 84 increase 18, 58 logging 114
Practise 73 mud weight 63 Installation
rate 41 overpressure 64 safe 18
routine 40 poisoneous 19 Interpretation 24, 48
stop 23 ratio 24 Invoice 122
with torque 64 recycled 54 Iodine 96
Drilling bit shallow 9, 14 Jack-up rig 74
selection 103 show 54 Jars 79
Drilling break solution 94 Junk 53
false 79 solution gas 38 KCl 111
Drillship 14 suction line 21, 25, 33 Kelly 41, 75, 87
DST 63, 95 trap 24, 25 bushing 76, 109
Duties, 8 trip 24 cock 78
Dynadrill 79 units 23 general 76
Dynamic positioning 74 zero 54 height 22, 28, 34
E-mail 62 Gas bladder 21, 118 hose 76
EBIT tape format 124 Gas composition 24 saver-sub 78
Emergency 10 Gas Production Index 71 Kerogen 44, 71
Encryption of log data 125 Gel strength 81, 95 Key seat 97
Environment Geodetic control 117 Key seating 98
depositional 68 Geologist 2, 34, 76, 77, 81, 83, 103 Kick 26, 29, 34, 40, 63-66, 83
Equipment Geolograph 34 control 87
wellsite 11 Geophysicist 9, 117 definition 87
Explosives 106, 108 Geothermal gradient 123 gas 55
rating for SWC 119 Glass tubes Lag time 27, 34, 36, 41, 45, 54, 78
responsibility 8 pre-evacuated 45 differential 38
Facilities 10 Goose neck 75 trip gas 54
The Wellsite Guide Page 131 Index

Laundry 11 engineering 92 SWC samples 120


LCM 41, 53 filtrate 30, 64, 95, 112, Palynomorphs 68
and MWD 101 118 Perforating 8
Leak-Off Test 65 filtrate tracer 95 Permeability 119
Leisure time 17 foaming 26 and bleeding 55
Liaison officer 13 gain 35, 40 Petroleum
Life jackets 19 hydraulics 84 ether 56
Lifeboat 13, 14 KCl 93 Petroleum vapours 23
Lifeboat station 14 KCl and GR logging 111 Petrophysicist 9, 119
Lignite 92 kill 87 pH 95
Lignosufonate 52 lignosulfonate 92 Phenolphtalein 21, 52
Lignosulfonate 52, 92, 96 loss 35, 40 Phone numbers 11
Lime 92 native 92 Physical exercise 17
LIS tape format 124 oil based 93 Pipe
Lithology pits 40 dope 53
description 34 polymer 93 tally 28, 34, 77, 136
prognosed 103 pressure 31 volume 36
Living quarters 11, 14, 16 properties and gas 24 Pit
Log pump 27 drill 40
analyst 111 resistivity 30, 114 level sensors 26, 136
header 120 sample 109 volume 64
interpretative 48 temperature 30 volume change 34, 65
master 48 water based 92 Police 13
percentage 48 weight 31, 63, 66, 84, 94 Pollen 68, 69
presentation 114, 120 weight, correct 63 Pollution 94
quality control 120 weight, low 87 Polymer 93
Log book 18, 20, 24, 25, 34, 37, 42, Mud Pore pressure 24, 117
46 engineer 81 real-time logging 100
Log Interpretation Mud density 81 Porosity 119
Literature 127 Mudlog 35, 36, 52, 101, 136 description 52
Logging Multi-shot 97 neutron 64
on floating rigs 76 Muscovite 53 Possum belly 23, 25, 55, 82, 88
real-time 100 MWD 8, 22, 58, 65, 77, 100, 121 Potassium 64, 111
speed, GR 111 directional survey 97 Potassium chloride 93
Logging While Drilling Nannoconids 67 Potassiumnitrate 96
Literature 127 Nannofossils 67 Potential source rock
LOT 65 Neutron sidewall cores 120
Lubricator and gas 55 Pressure
logging 107 logging 115 abnormal 64
Magnet 12, 53, 83, 119 Nitrate 96 engineering 63
Magnetic tapes 50 Noise 116 gauge 118
Mast 75 sonic background 116 gradient plot 66
Master log 11, 48 Notebook 11, 50, 109 hydrostatic 24, 117
Matrix Nozzles pore 24
lime, sand 115 plugged 103 standpipe 31
Maturity 104, 119 Nutplug 53 sub-normal 65
Megaspores 68 Offset VSP 117 swab 87
Memory. Oil worksheet 66
MWD 100 base mud 93 Pump
Metal chips 53 biodegraded 56 booster 39
Methylene blue 64 fluorescence 94 efficiency 27, 36, 82,
Mica 41, 53, 109, 111 in mud 95 135
Micropaleontologist 67 production index 71 general 82
Micropaleontology skim 51 liner 37
samples 44 water contact 98, 104 output volume 27
Microresistivity 115 window 72 room 18
Microscope 20, 22, 42 Oil based mud 114 PV 23
micropaleo 69 Operation Pyrite 103
Microspores 68 current 49 in shale 43
Microwave oven 33 Operations Pyrolysis 71
Migration 72 summary of 49 QC
Modem 126 Operations Geologist 7, 50 logging 120
Monel 97 Operator Quality control
Monel collar 78 radio 13 logging 120
Motion compensator 76 Overpressure Quick-look 121
Mud expected 9 Radio
additives 52, 53 from sonic log 112 leisure 17
additives, organic 44 Overpull 27, 79, 109 operator 13
balance 43 in key seat 97 positioning 117
cake 81, 120 Overshot 79 report 49
cake and density log 115 Padlocks 12 room 33
check 109 Paleontology 119 shortwave 10
circulation system 81 Paleozoic 68 silence 119
density 31 Palynologist 69 Radioactive 8, 96
engineer 92, 109, 118 Palynology 68 storage 106
The Wellsite Guide Page 132 Index

Ratio-plot 111 bag, empty 46 Single-shot 97


Reamer 79 bags 44 SLMO 59
Repeat section 114, 120 bit 45 Software 13
Report 25, 36, 48, 57 catcher 20, 135 Solids
ad-hoc 49 circulate for 58 high gravity 95
core 61 contaminant 44, 45 Solvent 57
daily 49 description 51, 52 Solvent, cut test 56
geological 49 description manual 12 Sonic 112
logging 108 Examination Manual 12, Noise triggering 112
mudlogging 36 127 travel time 64
paleo 67 for nannofossils 67 Source
sidewall cores 120 interval 41 accoustic 117
update 49 interval while coring 59 rock 68, 119
Reporting jars 120 Source rock
abnormal pressures 63 log 48 characterization 71
deadline 49 mud 69 SP
gas 54 oil 45 and Magnetism 112
period 36 palynomorph 68 check 110
Reservoir pressurized 45 drift 110
gas 55 tray 20 Spare part
Residual Petroleum Potential 71 ultrasonic processing 69 stock 20
Resistivity 30, 118 unknown origin 41 Spear 79
Resistivity logging 114 washing 51 SPM
Responsibility 7, 8, 47, 67 water 45 increase 88
general 8 water from RFT 118 Spores 69
Responsibiliy wet, foraminifera 67 Sporopollenin 68
sample shipment 46 Sample preparation Spreadsheet 37
RFT 21, 63, 66, 95, 117 micropaleo 69 Stabilizer 79
Rig Samples Stain 55
floating 32, 109 fluid 95 Stand pipe 76
floor 18, 40, 82, 90, 109, geochem 44 Standpipe pressure 31, 103
110 hot shot 45 Static SP check 110
motion 28 shipment 46 Stationary 21
positioning 9 washed & dried 44 Stickers 13
superintendent 14 wet 22, 44 Sticking
Ring 57 Sand differential 63
Ringing trap 35 Strapping, drill pipe 108
casing 116 Sand trap 83 Stratigraphy 49
Riser 36, 39, 82 Scintillometric measurement 111 Strip charts 20, 23
RKB 90 Scolecodonts 68 Suction line 25
Rmf 94 Seal Sulfide test 21
Rock eval 71 core 61 Supervisor 8, 9, 11, 23, 48, 49, 58,
Rock-typing 119 Seismic 102 60, 62, 104, 122
ROP 28, 34, 48, 90, 100 displays 117 Supply boat 13
and MWD 101 Seismic tie 123 Survey
and pore pressure 63 SEM 67 directional 97
chart 34 Semi-submersible rig 74 velocity 117
checklist 135 Service companies 10 Swab pressure 40, 87
correlation 58 Service Ticket 122 Swabbing 87
increase 88 SFT 117 Swivel 75, 76, 78
increasing 64 Shale 119 Synthetic seismogram 115
interpretation 90 cavings 63 Target
mud weight 63 density 43, 64 directional 97
report 49 density, test kit 21 Target depth 104
scale 35 description 51 TD 110
system 28 factor 64 Telecommunication 10
tide correction 74 shaker 40, 52, 82 Telephone 10
units of 28 shakers 18, 39, 82 Telluric currents 112
when coring 59 swelling 103 Tension
while coring 58 Sheaves 75 while logging 110
Rotary speed 29 Shipment 46 Test
RPM 79 Shipping 59 drillstem 25
sensor point 76 core 62 Test tube 57
Ruler 12 Show 49 Tetrabromethane 21, 43, 53
Rwa 121 gas 54 Texture 51
Safety 14, 104 hydrocarbon 49 Thermometer 30
engineer 119 in SWC 119 Thin section 21, 67
mudlogging 19 Show eveluation report 36 Thorium 111
of the mudlogging unit Sidewall core Tide
18 general 119 chart 32
radioactive 96 sample 69 compensator 32
shoes 11 sidewall cores 120 Time-depth graph 117
Salinity 95 cleaning 69 Titration 64
Salt 93, 103 Sieve 51 TOC 71
Sample 40 Sieves 20, 51 Tool pusher
The Wellsite Guide Page 133 Index

logging 107 drill-off 90


Top drive 76 Work sheet 41
Torque 29, 64, 103 Working clothes 11
downhole 100
sensor (figure) 29
sensor point 76
Total gas recorder 23
Total Production Index 71
Tracer 95, 118
Transmission 108
dipmeter 115
Transmittal 46
Transport 10
Travelling block 75
Trichlorethene 56
Trichorethane 43
Trip
gas 63
gas, definition 54
tank 33, 83
Tritium 96
True vertical depth 98
Turbine 79
TVD
playback, QC 120
TVD playback 109
Ultraviolet light 56
Uranium 111
Uranium-free GR 111
Uranyl compounds 96
UV box 20, 56, 57
Valuables 12
Velocity
annular 84
seismic 123
Velocity survey 9, 117
Video display
remote 33
virus 21
Viscosity 81, 84, 95
Vitrinite reflectance 104
Volcanic 102
VSP 9, 116, 117, 123
Washout 31, 119
Water
formation 95
fresh 51
resistivity 118
salinity 111
sample 118
sea 51
Welding 112
Well
proposal 13
vertical 98
Well report
final 23
final, data collection 123
Wellsite 102
biostratigrapher 67
Wellsite geologist 2, 7, 9, 14, 20, 41,
46, 52, 53, 58,
63, 67, 69, 98,
103, 104, 106,
119, 120, 123
job description 2, 7
master log 48
reporting 48
routines 47
tasks 18
wireline logging 106
Wireline logging 106
second engineer 10
WOB 27, 89
dogleg 97
The Wellsite Guide Page 134 Index
The Wellsite Guide Page 135 Appendix A, Checklist Mudlogging

Appendix A, Mudlogging Checklist and Technical Audit


Inspection carried out by __________________
Date: __________________
Rig: __________________ Location: _____________________
Mudlogging Contractor: __________________ Logging Unit Number: _____________________

Names:

Day Shift Crew Night Shift Crew

Logger #1 Logger #3

Logger #2 Logger #4

Pressure Engineer #1 Pressure Engineer #2

Services Provided:
Yes:r No:v

Total gas detection V


Gas chromatography V
Depth / ROP analysis V
Sample catching (sample catchers only) V
Monitoring drilling parameters V
Drilling efficiency V
Pore pressure prediction V
Sample preparation and packaging V
Lithologiocal description V
Mud property data monitoring V
H2S detection and alarm V
Core retrieval and packaging V
Daily reporting functions V
Directional services V
Database services V
Communication/modem V

Chromatograph Analysis
Total Gas Detection System
Has the instrument been calibrated ? Yes V No V
Ist the detection system reliable ? Yes V No V
Last calibration made date/time ___________________
Does the gas alarm system work ? Yes V No V depth __________________rkb

Has the gas flow rate been regular ? Yes V No V Lab analysis certificates on on calibration gas bottles ?
Yes V No V
Were carbide checks run ? Yes V No V Are records of the last calibration
kept on file ? Yes V No V
Last carbide check at (date, depth) ____________________
What kind of drilling fluid was used over the last drilling
Were the carbide returns of sufficient interval or prior to the last calibration ? Air V
magnitude to allow for good control on Water V
lag time ? Yes V No V Diesel V
Mineral Oil V
After the carbide check, has the hole size
and pump efficiency been re-calculated ? Yes V No V Was the recorder rate increased over
intervals with shows ? Yes V No V
What are the alarm setting on the
total gas recorder system _________units Brand name and serial no. of the
chromatograph _____________________
The Wellsite Guide Page 136 Appendix A, Checklist Mudlogging

Gas Traps and Lines surface system after the pumps have been
switched off ? ________bbl
Is the gas trap located in optimum position ? Yes V No V
Has the gas trap been cleaned and serviced ? Yes V No V H2S sensors installed and running ? Yes V No V

How long since the last inspection: ___________ days Last check / calibration ? date____/____/____

Water Vapor Condenser Alarm level threshold __________ppm


Type of Condenser : _____________________________
Serial No.:______________ Installed at:__________________ Is a carbon dioxide detector installed ? Yes V No V
Has the gas line been inspected for cracks,
leakages and internal condensation ? Yes V No V
Type of gas line :______________________________ Sample Catching and Preparation
Diameter: _____________mm
Approximate length: _______________m Are the sample being caught at the intervals
specified by the well programme or the
Have the inspections been documented in the geologist ? Yes V No V
log book of the mudlogging unit ? Yes V No V
Is the sample board under the shakers cleaned
Does the automatic flush-back system work properly and every time a sample is taken ? Yes V No V
efficiently ? Yes V No V
Is the mud temperature measured at least every six hours with
Does the line failure alarm operate when the a thermometer and compared to the sensor measurements ?
gas line is blocked ? Yes V No V Yes V No V

Mud agitator: Is the output from the desander checked every


Agitator speed : ____________rpm time a sample is taken ? Yes V No V

Are all agitator blades in the mud ? Yes V No V Is the fine material included in the bagged
in the sample bag ? Yes V No V
Does the agitator malfunction trigger an alarm in the unit ?
Yes V No V Are samples packed into pre-labelled bags ? Yes V No V

Depth and Drill Rate Recorder Are wet samples in cloth bags dried prior to packaging and
shipment to town ? Yes V No V
Type of recorder ? Microswitch V
Hydraulic V
Crown Block V Sample Description and Documentation
Drawworks V
Other (specify): ____________________________ Are the lithological descriptions discussed and
agreed with the geologist ? Yes V No V
Is the depth system independent from the depth system of the
rig used by the driller ? Yes V No V Are all samples screened for fluorescence ? Yes V No V
Does it cover the entire kelly movement ? Yes V No V
Has the mudlog been kept up to date and
Is the recorder reliable when compared to the available for the geologist's inspection ? Yes V No V
drilling contractor's pipe tally ? Yes V No V
Is the geological description and interpretation
Has the recorder been operating continuously ? Yes V No V professional and correct ? Yes V No V

Is the selected chart range appropriate ? Yes V No V Are the work sheets filled out and
filed properly ? Yes V No V
What kind of sensor/indicator is used to operate
the ROP system ? ________________________ Data Gathering and Documentation

Are the strip charts annotated properly with


Other Sensors a time mark every hour, date, type of operation
(drilling, circulating, etc.) and are all
Are pit level sensors installed in unusual events marked, reasons given ? Yes V No V
all mud pits (including reserve and kill pit ) ? Yes V No V
What computer system is used _______________________
How many pit sensors are installed ? _____________units
Is the computer system and data format compatible with the
What is the alarm setting on the system used by the oil company ? Yes V No V
pit level totalizer ? ±________bbl
Are the data backed up regularly ? Yes V No V
What is the usual back-flow from the
The Wellsite Guide Page 137 Appendix A, Checklist Mudlogging

What back-up system is used ________________________

When was the last back-up made : ______/______/_______

Has the computer been checked with an anti-virus program ?


Yes V No V
Video Display Units (VDU)
How many units are installed ? ________screens
Where ?
#1 at __________________________working ? Yes V No V
#2 at __________________________working ? Yes V No V
#3 at __________________________working ? Yes V No V
#4 at __________________________working ? Yes V No V
#5 at __________________________working ? Yes V No V

Operational Efficiency
Was rig time lost due to mudlogging equipment
malfunction ? Yes V No V

Was rig time lost due to any problems arising from the
mudlogging ? Yes V No V

Safety standards in the units:


Fire extinguisher available ? Yes V No V
Exhaust and fresh air supply o.k. ? Yes V No V
Safety goggles worn near the shakers ? Yes V No V
Safety boots worn at all times ? Yes V No V

Is the unit manned and powered up at all times


during drilling, tripping, testing and other operations ?
Yes V No V

Do the mudloggers communicate properly with the rig floor ?


Yes V No V
Any language problems ? Yes V No V

Language used for communication : ____________________

Is the access to the unit limited to


authorized personnel only ? Yes V No V

Rating of Services :
V GOOD/EXCELLENT V FAIR/ACCEPTABLE V POOR V DANGEROUSLY POOR

If the rating of services is less than fair, indicate reasons for it:

V Poor/old equipment V Insufficient maintenance V No support from contractor's town office


V Unqualified Personnel V Attitudinal problems V No support from operator
V No support from drilling V Technical environment problems
(no electricity, no water, etc.)

Other Comments:

What measures can be taken to improve the situation ?

Signed by:

Mudlogging Unit Captain : ________________________ Date: ___/___/___

Wellsite Geologist : ______________________________


The Wellsite Guide Page 138 Appendix A, Checklist Mudlogging

You might also like